{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,4,5]],"date-time":"2022-04-05T14:02:59Z","timestamp":1649167379104},"reference-count":58,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2016,3,3]],"date-time":"2016-03-03T00:00:00Z","timestamp":1456963200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["4OR-Q J Oper Res"],"published-print":{"date-parts":[[2016,6]]},"DOI":"10.1007\/s10288-016-0307-1","type":"journal-article","created":{"date-parts":[[2016,3,3]],"date-time":"2016-03-03T14:01:30Z","timestamp":1457013690000},"page":"173-200","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Pooling heterogeneous products for manufacturing environments"],"prefix":"10.1007","volume":"14","author":[{"given":"Tanja","family":"Mlinar","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Philippe","family":"Chevalier","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,3,3]]},"reference":[{"key":"307_CR1","doi-asserted-by":"crossref","first-page":"478","DOI":"10.1016\/j.ijpe.2015.07.030","volume":"170","author":"K Altendorfer","year":"2015","unstructured":"Altendorfer K (2015) Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times. Int J Prod Econ 170:478\u2013488","journal-title":"Int J Prod Econ"},{"issue":"7","key":"307_CR2","doi-asserted-by":"crossref","first-page":"1827","DOI":"10.1080\/00207541003660176","volume":"49","author":"K Altendorfer","year":"2011","unstructured":"Altendorfer K, Jodlbauer H (2011) An analytical model for service level and tardiness in a single machine MTO production system. Int J Prod Res 49(7):1827\u20131850","journal-title":"Int J Prod Res"},{"issue":"2","key":"307_CR3","doi-asserted-by":"crossref","first-page":"555","DOI":"10.1016\/j.ejor.2014.12.003","volume":"243","author":"K Altendorfer","year":"2015","unstructured":"Altendorfer K, Minner S (2015) Influence of order acceptance policies on optimal capacity investment with stochastic customer required lead times. Eur J Oper Res 243(2):555\u2013565","journal-title":"Eur J Oper Res"},{"issue":"1","key":"307_CR4","doi-asserted-by":"crossref","first-page":"79","DOI":"10.1016\/j.ijpe.2010.09.004","volume":"129","author":"A Azaron","year":"2011","unstructured":"Azaron A, Fynes B, Modarres M (2011) Due date assignment in repetitive projects. Int J Prod Econ 129(1):79\u201385","journal-title":"Int J Prod Econ"},{"issue":"1","key":"307_CR5","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/0272-6963(82)90020-1","volume":"3","author":"KR Baker","year":"1982","unstructured":"Baker KR, Bertrand JWM (1982) A dynamic priority rule for scheduling against due-dates. J Oper Manag 3(1):37\u201342","journal-title":"J Oper Manag"},{"key":"307_CR6","doi-asserted-by":"crossref","DOI":"10.1002\/9780470451793","volume-title":"Principles of sequencing and scheduling","author":"KR Baker","year":"2009","unstructured":"Baker KR, Trietsch D (2009) Principles of sequencing and scheduling. Wiley, Hoboken (chap Appendix A: Practical Processing Time Distributions)"},{"issue":"5","key":"307_CR7","doi-asserted-by":"crossref","first-page":"495","DOI":"10.1080\/07408179808966489","volume":"30","author":"S Barman","year":"1998","unstructured":"Barman S (1998) The impact of priority rule combinations on lateness and tardiness. IIE Trans 30(5):495\u2013504","journal-title":"IIE Trans"},{"key":"307_CR8","unstructured":"Bassamboo A, Randhawa RS, Van Mieghem JA (2010a) A little flexibility is all you need: asymptotic optimality of tailored chaining and pairing in queuing systems. Working paper, Northwestern University, Evanston, IL"},{"issue":"8","key":"307_CR9","doi-asserted-by":"crossref","first-page":"1285","DOI":"10.1287\/mnsc.1100.1184","volume":"56","author":"A Bassamboo","year":"2010","unstructured":"Bassamboo A, Randhawa RS, Van Mieghem JA (2010b) Optimal flexibility configurations in newsvendor networks: Going beyond chaining and pairing. Manag Sci 56(8):1285\u20131303","journal-title":"Manag Sci"},{"issue":"1","key":"307_CR10","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1016\/j.ejor.2007.02.020","volume":"187","author":"A Baykaso\u011flu","year":"2008","unstructured":"Baykaso\u011flu A, G\u00f6\u00e7ken M, Unutmaz ZD (2008) New approaches to due date assignment in job shops. Eur J Oper Res 187(1):31\u201345","journal-title":"Eur J Oper Res"},{"issue":"2","key":"307_CR11","doi-asserted-by":"crossref","first-page":"375","DOI":"10.1016\/0377-2217(94)00155-6","volume":"87","author":"S Benjaafar","year":"1995","unstructured":"Benjaafar S (1995) Performance bounds for the effectiveness of pooling in multi-processing systems. Eur J Oper Res 87(2):375\u2013388","journal-title":"Eur J Oper Res"},{"issue":"4","key":"307_CR12","doi-asserted-by":"crossref","first-page":"548","DOI":"10.1287\/mnsc.1040.0303","volume":"51","author":"S Benjaafar","year":"2005","unstructured":"Benjaafar S, Cooper WL, Kim JS (2005) On the benefits of pooling in production-inventory systems. Manag Sci 51(4):548\u2013565","journal-title":"Manag Sci"},{"key":"307_CR13","unstructured":"Board of Governors of the Federal Reserve System (2015) Industrial production and capacity utilization-G 17. [statistical release]. http:\/\/www.federalreserve.gov\/releases\/g17\/Current\/ . Accessed 28 Sept 2015"},{"issue":"11","key":"307_CR14","doi-asserted-by":"crossref","first-page":"1017","DOI":"10.1057\/jors.1985.181","volume":"36","author":"JH Bookbinder","year":"1985","unstructured":"Bookbinder JH, Noor AI (1985) Setting job-shop due-dates with service-level constraints. J Oper Res Soc 36(11):1017\u20131026","journal-title":"J Oper Res Soc"},{"issue":"5","key":"307_CR15","doi-asserted-by":"crossref","first-page":"768","DOI":"10.1287\/mnsc.42.5.768","volume":"42","author":"JA Buzacott","year":"1996","unstructured":"Buzacott JA (1996) Commonalities in reengineered business processes: models and issues. Manag Sci 42(5):768\u2013782","journal-title":"Manag Sci"},{"issue":"1","key":"307_CR16","doi-asserted-by":"crossref","first-page":"360","DOI":"10.1016\/j.ijpe.2012.08.019","volume":"141","author":"B Chen","year":"2013","unstructured":"Chen B, Matis TI (2013) A flexible dispatching rule for minimizing tardiness in job shop scheduling. Int J Prod Econ 141(1):360\u2013365","journal-title":"Int J Prod Econ"},{"issue":"2","key":"307_CR17","doi-asserted-by":"crossref","first-page":"156","DOI":"10.1016\/0377-2217(89)90100-8","volume":"38","author":"TCE Cheng","year":"1989","unstructured":"Cheng TCE, Gupta MC (1989) Survey of scheduling research involving due date determination decisions. Eur J Oper Res 38(2):156\u2013166","journal-title":"Eur J Oper Res"},{"issue":"2","key":"307_CR18","doi-asserted-by":"crossref","first-page":"476","DOI":"10.1016\/j.ejor.2014.07.015","volume":"240","author":"P Chevalier","year":"2015","unstructured":"Chevalier P, Lamas A, Lu L, Mlinar T (2015) Revenue management for operations with urgent orders. Eur J Oper Res 240(2):476\u2013487","journal-title":"Eur J Oper Res"},{"key":"307_CR19","volume-title":"Queues","author":"DR Cox","year":"1961","unstructured":"Cox DR, Smith WL (1961) Queues. Methuen Co. Ltd, London"},{"issue":"4","key":"307_CR20","doi-asserted-by":"crossref","first-page":"608","DOI":"10.1287\/mnsc.41.4.608","volume":"41","author":"I Duenyas","year":"1995","unstructured":"Duenyas I (1995) Single facility due date setting with multiple customer classes. Manag Sci 41(4):608\u2013619","journal-title":"Manag Sci"},{"issue":"1","key":"307_CR21","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1287\/mnsc.41.1.43","volume":"41","author":"I Duenyas","year":"1995","unstructured":"Duenyas I, Hopp WJ (1995) Quoting customer lead times. Manag Sci 41(1):43\u201357","journal-title":"Manag Sci"},{"issue":"2","key":"307_CR22","doi-asserted-by":"crossref","first-page":"305","DOI":"10.1016\/S0377-2217(98)00101-5","volume":"116","author":"FF Easton","year":"1999","unstructured":"Easton FF, Moodie DR (1999) Pricing and lead time decisions for make-to-order firms with contingent orders. Eur J Oper Res 116(2):305\u2013318","journal-title":"Eur J Oper Res"},{"issue":"20","key":"307_CR23","doi-asserted-by":"crossref","first-page":"6085","DOI":"10.1080\/00207540903252274","volume":"48","author":"ST Enns","year":"2010","unstructured":"Enns ST, Grewal CS (2010) Lot size optimisation under pooled and unpooled scenarios in batch production system. Int J Prod Res 48(20):6085\u20136101","journal-title":"Int J Prod Res"},{"issue":"5","key":"307_CR24","doi-asserted-by":"crossref","first-page":"755","DOI":"10.1002\/nav.20020","volume":"51","author":"S Gurumurth","year":"2004","unstructured":"Gurumurth S, Benjaafar S (2004) Modeling and analysis of flexible queueing systems. Nav Res Logist 51(5):755\u2013782","journal-title":"Nav Res Logist"},{"key":"307_CR25","unstructured":"Hella Australia Pty Ltd (2007) Behr Hella service-bringing the world\u2019s best thermal management products to the Australian automotive aftermarket. [press release]. http:\/\/www.hella.com\/produktion\/HellaAU\/WebSite\/Channels\/Company\/Press\/National_Press\/Company_News\/BehrHellaPR.jsp . Accessed 15 Nov 2012"},{"key":"307_CR26","volume-title":"Factory physiscs","author":"WJ Hopp","year":"2008","unstructured":"Hopp WJ, Spearman M (2008) Factory physiscs. McGraw-Hill, New-York"},{"issue":"9","key":"307_CR27","first-page":"771","volume":"32","author":"WJ Hopp","year":"2000","unstructured":"Hopp WJ, Sturgis MLR (2000) Quoting manufacturing due dates subject to a service level constraint. IIE Trans 32(9):771\u2013784","journal-title":"IIE Trans"},{"issue":"2","key":"307_CR28","doi-asserted-by":"crossref","first-page":"479","DOI":"10.1016\/j.ijpe.2013.03.020","volume":"144","author":"A H\u00fcbl","year":"2013","unstructured":"H\u00fcbl A, Jodlbauer H, Altendorfer K (2013) Influence of dispatching rules on average production lead time for multi-stage production systems. Int J Prod Econ 144(2):479\u2013484","journal-title":"Int J Prod Econ"},{"issue":"4","key":"307_CR29","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1007\/s00291-002-0108-0","volume":"24","author":"CV Ivanescu","year":"2002","unstructured":"Ivanescu CV, Fransoo JC, Bertrand JWM (2002) Makespan estimation and order acceptance in batch process industries when processing times are uncertain. OR Spectr 24(4):467\u2013495","journal-title":"OR Spectr"},{"issue":"2","key":"307_CR30","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1007\/s00291-005-0015-2","volume":"28","author":"VC Iv\u0103nescu","year":"2006","unstructured":"Iv\u0103nescu VC, Fransoo JC, Bertrand JWM (2006) A hybrid policy for order acceptance in batch process industries. OR Spectr 28(2):199\u2013222","journal-title":"OR Spectr"},{"issue":"8","key":"307_CR31","doi-asserted-by":"crossref","first-page":"1082","DOI":"10.1287\/mnsc.1040.0245","volume":"50","author":"AV Iyer","year":"2004","unstructured":"Iyer AV, Jain A (2004) Modeling the impact of merging capacity in production-inventory systems. Manag Sci 50(8):1082\u20131094","journal-title":"Manag Sci"},{"issue":"4","key":"307_CR32","doi-asserted-by":"crossref","first-page":"577","DOI":"10.1287\/mnsc.41.4.577","volume":"41","author":"WC Jordan","year":"1995","unstructured":"Jordan WC, Graves SC (1995) Principles on the benefits of manufacturing process flexibility. Manag Sci 41(4):577\u2013594","journal-title":"Manag Sci"},{"issue":"2","key":"307_CR33","doi-asserted-by":"crossref","first-page":"422","DOI":"10.1016\/j.ijpe.2013.03.010","volume":"144","author":"C Kaman","year":"2013","unstructured":"Kaman C, Savasaneril S, Serin Y (2013) Production and lead time quotation under imperfect shop floor information. Int J Prod Econ 144(2):422\u2013431","journal-title":"Int J Prod Econ"},{"issue":"3","key":"307_CR34","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1007\/s10951-008-0053-0","volume":"11","author":"P Kaminsky","year":"2008","unstructured":"Kaminsky P, Lee ZH (2008) Effective on-line algorithms for reliable due date quotation and large-scale scheduling. J Sched 11(3):187\u2013204","journal-title":"J Sched"},{"issue":"1","key":"307_CR35","doi-asserted-by":"crossref","first-page":"56","DOI":"10.1287\/opre.1060.0339","volume":"5","author":"R Kapuscinski","year":"2007","unstructured":"Kapuscinski R, Tayur S (2007) Reliable due-date setting in a capacitated MTO system with two customer classes. Oper Res 5(1):56\u201374","journal-title":"Oper Res"},{"key":"307_CR36","doi-asserted-by":"crossref","unstructured":"Kelly FP, Massouli\u00e9 L, Walton NS (2009) Resource pooling in congested networks: proportional fairness and product form. Queue Syst Theory Appl 63(1\u20134):165\u2013194","DOI":"10.1007\/s11134-009-9143-8"},{"key":"307_CR37","doi-asserted-by":"crossref","unstructured":"Keskinocak P, Tayur S (2004) Due-date management policies. In: Simchi-Levi D, Wu SD, Shen ZJM (eds) Handbook of quantitative supply chain analysis: modeling in the e-business era. International series in operations research and management science. Kluwer Academic Publishers, Norwell, pp 485\u2013553","DOI":"10.1007\/978-1-4020-7953-5_12"},{"issue":"2","key":"307_CR38","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1287\/mnsc.47.2.264.9836","volume":"47","author":"P Keskinocak","year":"2001","unstructured":"Keskinocak P, Ravi R, Tayur S (2001) Scheduling and reliable lead-time quotation for orders with availability intervals and leadtime sensitive revenues. Manag Sci 47(2):264\u2013279","journal-title":"Manag Sci"},{"key":"307_CR39","volume-title":"Simulation modeling and analysis","author":"AM Law","year":"2007","unstructured":"Law AM (2007) Simulation modeling and analysis. McGraw Hill, Boston"},{"issue":"5","key":"307_CR40","doi-asserted-by":"crossref","first-page":"633","DOI":"10.1287\/mnsc.40.5.633","volume":"40","author":"L Li","year":"1994","unstructured":"Li L, Lee YS (1994) Pricing and delivery-time performance in a competitive environment. Manag Sci 40(5):633\u2013646","journal-title":"Manag Sci"},{"key":"307_CR41","doi-asserted-by":"crossref","first-page":"362","DOI":"10.1016\/j.jmsy.2014.07.012","volume":"37","author":"M Li","year":"2015","unstructured":"Li M, Yang F, Wan H, Fowler JW (2015) Simulation-based experimental design and statistical modeling for lead time quotation. J Manuf Syst 37:362\u2013374","journal-title":"J Manuf Syst"},{"issue":"1","key":"307_CR42","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/j.ejor.2012.03.020","volume":"221","author":"X Li","year":"2012","unstructured":"Li X, Wang J, Sawhney R (2012) Reinforcement learning for joint pricing, lead-time and scheduling decisions in make-to-order systems. Eur J Oper Res 221(1):99\u2013109","journal-title":"Eur J Oper Res"},{"issue":"7","key":"307_CR43","doi-asserted-by":"crossref","first-page":"971","DOI":"10.1287\/mnsc.44.7.971","volume":"44","author":"A Mandelbaum","year":"1998","unstructured":"Mandelbaum A, Reiman MI (1998) On pooling in queueing networks. Manag Sci 44(7):971\u2013981","journal-title":"Manag Sci"},{"issue":"6","key":"307_CR44","doi-asserted-by":"crossref","first-page":"906","DOI":"10.1287\/opre.35.6.906","volume":"35","author":"MH Rothkopf","year":"1987","unstructured":"Rothkopf MH, Rech P (1987) Perspectives on queues: combining queues is not always beneficial. Oper Res 35(6):906\u2013909","journal-title":"Oper Res"},{"issue":"3","key":"307_CR45","doi-asserted-by":"crossref","first-page":"713","DOI":"10.1080\/00207543.2013.828176","volume":"52","author":"SA Slotnik","year":"2014","unstructured":"Slotnik SA (2014) Lead-time quotation when customers are sensitive to reputation. Int J Prod Res 52(3):713\u2013726","journal-title":"Int J Prod Res"},{"issue":"1","key":"307_CR46","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1002\/j.1538-7305.1981.tb00221.x","volume":"60","author":"DR Smith","year":"1981","unstructured":"Smith DR, Whitt W (1981) Resource sharing for efficiency in traffic systems. Bell Syst Tech J 60(1):39\u201355","journal-title":"Bell Syst Tech J"},{"issue":"3","key":"307_CR47","doi-asserted-by":"crossref","first-page":"1201","DOI":"10.1016\/j.ejor.2007.03.037","volume":"186","author":"V Sridharan","year":"2008","unstructured":"Sridharan V, Li X (2008) Improving delivery reliability by a new due-date setting rule. Eur J Oper Res 186(3):1201\u20131211","journal-title":"Eur J Oper Res"},{"issue":"4","key":"307_CR48","doi-asserted-by":"crossref","first-page":"708","DOI":"10.1287\/opre.18.4.708","volume":"18","author":"S Stidham Jr","year":"1970","unstructured":"Stidham S Jr (1970) On the optimality of single-server queueing systems. Oper Res 18(4):708\u2013732","journal-title":"Oper Res"},{"key":"307_CR49","unstructured":"Swinnen J, Van Herck K (2011) Poland, Bulgaria and Romania: social impact of discount and organized food retail formats on remote regions. Report series 16, FAO Investment Centre\/EBRD Cooperation Programme, Licos"},{"issue":"6","key":"307_CR50","doi-asserted-by":"crossref","first-page":"546","DOI":"10.1080\/07408170802512586","volume":"41","author":"E Tekin","year":"2009","unstructured":"Tekin E, Hopp WJ, Van Oyen MP (2009) Pooling strategies for call center agent cross-training. IIE Trans 41(6):546\u2013561","journal-title":"IIE Trans"},{"issue":"3","key":"307_CR51","doi-asserted-by":"crossref","first-page":"296","DOI":"10.3401\/poms.1080.0029","volume":"17","author":"NM Dijk van","year":"2008","unstructured":"van Dijk NM, van der Sluis E (2008) To pool or not to pool in call centers. Prod Oper Manag 17(3):296\u2013305","journal-title":"Prod Oper Manag"},{"issue":"1","key":"307_CR52","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1016\/S0360-8352(01)00043-2","volume":"41","author":"EA Veral","year":"2001","unstructured":"Veral EA (2001) Computer simulation of due-date setting in multi-machine job shops. Comput Ind Eng 41(1):77\u201394","journal-title":"Comput Ind Eng"},{"issue":"1","key":"307_CR53","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1016\/j.ijpe.2010.08.017","volume":"129","author":"V Vinod","year":"2011","unstructured":"Vinod V, Sridharan R (2011) Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system. Int J Prod Econ 129(1):127\u2013146","journal-title":"Int J Prod Econ"},{"issue":"2","key":"307_CR54","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1016\/j.ejor.2004.02.011","volume":"166","author":"B Watanapa","year":"1999","unstructured":"Watanapa B, Techanitisawad A (1999) Simultaneous price and due date settings for multiple customer classes. Eur J Oper Res 166(2):351\u2013368","journal-title":"Eur J Oper Res"},{"issue":"7","key":"307_CR55","doi-asserted-by":"crossref","first-page":"834","DOI":"10.1287\/mnsc.37.7.834","volume":"37","author":"LM Wein","year":"1991","unstructured":"Wein LM (1991) Due-date setting and priority sequencing in a multiclass M\/G\/1 queue. Manag Sci 37(7):834\u2013850","journal-title":"Manag Sci"},{"issue":"7","key":"307_CR56","doi-asserted-by":"crossref","first-page":"1018","DOI":"10.1287\/mnsc.38.7.1018","volume":"38","author":"LM Wein","year":"1992","unstructured":"Wein LM, Chevalier PB (1992) A broader view of the job-shop scheduling problem. Manag Sci 38(7):1018\u20131033","journal-title":"Manag Sci"},{"issue":"1","key":"307_CR57","doi-asserted-by":"crossref","first-page":"124","DOI":"10.1109\/TEM.2012.2194288","volume":"60","author":"DZ Yu","year":"2013","unstructured":"Yu DZ, Zhao X, Sun D (2013) Optimal pricing and capacity investment for delay-sensitive demand. IEEE Trans Eng Manag 60(1):124\u2013136","journal-title":"IEEE Trans Eng Manag"},{"issue":"1","key":"307_CR58","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1016\/j.ijpe.2013.01.012","volume":"144","author":"ZG Zhang","year":"2013","unstructured":"Zhang ZG, Kim I, Springer M, Cai GG, Yu Y (2013) Dynamic pooling of make-to-stock and make-to-order operations. Int J Prod Econ 144(1):44\u201356","journal-title":"Int J Prod Econ"}],"container-title":["4OR"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10288-016-0307-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10288-016-0307-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10288-016-0307-1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T12:13:00Z","timestamp":1559131980000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10288-016-0307-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,3,3]]},"references-count":58,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2016,6]]}},"alternative-id":["307"],"URL":"https:\/\/doi.org\/10.1007\/s10288-016-0307-1","relation":{},"ISSN":["1619-4500","1614-2411"],"issn-type":[{"value":"1619-4500","type":"print"},{"value":"1614-2411","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,3,3]]}}}