{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,3]],"date-time":"2026-06-03T16:52:44Z","timestamp":1780505564727,"version":"3.54.1"},"reference-count":538,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2018,11,19]],"date-time":"2018-11-19T00:00:00Z","timestamp":1542585600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Artif Intell Rev"],"published-print":{"date-parts":[[2020,1]]},"DOI":"10.1007\/s10462-018-9667-6","type":"journal-article","created":{"date-parts":[[2018,11,18]],"date-time":"2018-11-18T23:46:57Z","timestamp":1542584817000},"page":"501-593","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":99,"title":["A state of the art review of intelligent scheduling"],"prefix":"10.1007","volume":"53","author":[{"given":"Mohammad Hossein","family":"Fazel Zarandi","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ali Akbar","family":"Sadat Asl","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Shahabeddin","family":"Sotudian","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Oscar","family":"Castillo","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2018,11,19]]},"reference":[{"key":"9667_CR1","volume-title":"Intelligent scheduling of robotic flexible assembly cells","author":"KK Abd","year":"2015","unstructured":"Abd KK (2015) Intelligent scheduling of robotic flexible assembly cells. Springer, Berlin"},{"key":"9667_CR2","unstructured":"Abdennadher S, Schlenker H (1999) Nurse scheduling using constraint logic programming. In: AAAI\/IAAI"},{"key":"9667_CR3","doi-asserted-by":"publisher","first-page":"380","DOI":"10.1016\/j.ins.2014.03.060","volume":"278","author":"S Abdullah","year":"2014","unstructured":"Abdullah S, Abdolrazzagh-Nezhad M (2014) Fuzzy job shop scheduling problems: a review. Inf Sci 278:380\u2013407","journal-title":"Inf Sci"},{"issue":"6","key":"9667_CR4","doi-asserted-by":"publisher","first-page":"872","DOI":"10.3844\/ajassp.2014.872.877","volume":"11","author":"M Abdullah","year":"2014","unstructured":"Abdullah M, Othman M (2014) Simulated annealing approach to cost-based multi-quality of service job scheduling in cloud computing enviroment. Am J Appl Sci 11(6):872","journal-title":"Am J Appl Sci"},{"issue":"3","key":"9667_CR5","doi-asserted-by":"publisher","first-page":"628","DOI":"10.1016\/0377-2217(95)00091-7","volume":"92","author":"GI Adamopoulos","year":"1996","unstructured":"Adamopoulos GI, Pappis CP (1996) A fuzzy-linguistic approach to a multi-criteria sequencing problem. Eur J Oper Res 92(3):628\u2013636","journal-title":"Eur J Oper Res"},{"issue":"1","key":"9667_CR6","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1287\/ijoc.1040.0108","volume":"18","author":"A Agarwal","year":"2006","unstructured":"Agarwal A, Jacob VS, Pirkul H (2006) An improved augmented neural-network approach for scheduling problems. INFORMS J Comput 18(1):119\u2013128","journal-title":"INFORMS J Comput"},{"key":"9667_CR7","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1007\/978-3-540-24734-0_15","volume-title":"Economics, Management and Optimization in Sports","author":"Abderrahmane Aggoun","year":"2004","unstructured":"Aggoun A, Vazacopoulos A (2004) Solving sports scheduling and timetabling problems with constraint programming. In: Economics, management and optimization in sports. Springer, Berlin, pp 243\u2013264"},{"issue":"2","key":"9667_CR8","doi-asserted-by":"publisher","first-page":"246","DOI":"10.1504\/IJOR.2014.058954","volume":"19","author":"G Ahani","year":"2014","unstructured":"Ahani G, Asyabani M (2014) A tabu search algorithm for no-wait job shop scheduling problem. Int J Oper Res 19(2):246\u2013258","journal-title":"Int J Oper Res"},{"issue":"5\u20138","key":"9667_CR9","doi-asserted-by":"publisher","first-page":"693","DOI":"10.1007\/s00170-011-3190-0","volume":"56","author":"F Ahmadizar","year":"2011","unstructured":"Ahmadizar F, Hosseini L (2011) Single-machine scheduling with a position-based learning effect and fuzzy processing times. Int J Adv Manuf Technol 56(5\u20138):693\u2013698","journal-title":"Int J Adv Manuf Technol"},{"issue":"1\u20134","key":"9667_CR10","doi-asserted-by":"publisher","first-page":"581","DOI":"10.1007\/s00170-012-4198-9","volume":"65","author":"F Ahmadizar","year":"2013","unstructured":"Ahmadizar F, Hosseini L (2013) Minimizing makespan in a single-machine scheduling problem with a learning effect and fuzzy processing times. Int J Adv Manuf Technol 65(1\u20134):581\u2013587","journal-title":"Int J Adv Manuf Technol"},{"issue":"3","key":"9667_CR11","doi-asserted-by":"publisher","first-page":"679","DOI":"10.1007\/s10845-014-0906-7","volume":"27","author":"A AitZai","year":"2016","unstructured":"AitZai A, Benmedjdoub B, Boudhar M (2016) Branch-and-bound and PSO algorithms for no-wait job shop scheduling. J Intell Manuf 27(3):679\u2013688","journal-title":"J Intell Manuf"},{"issue":"1","key":"9667_CR12","doi-asserted-by":"publisher","first-page":"95","DOI":"10.1016\/j.cie.2007.04.006","volume":"53","author":"DE Akyol","year":"2007","unstructured":"Akyol DE, Bayhan GM (2007) A review on evolution of production scheduling with neural networks. Comput Ind Eng 53(1):95\u2013122","journal-title":"Comput Ind Eng"},{"issue":"5-6","key":"9667_CR13","doi-asserted-by":"publisher","first-page":"576","DOI":"10.1007\/s00170-007-0993-0","volume":"37","author":"DE Akyol","year":"2008","unstructured":"Akyol DE, Mirac Bayhan G (2008) Multi-machine earliness and tardiness scheduling problem: an interconnected neural network approach. Int J Adv Manuf Technol 37(5-6):576\u2013588","journal-title":"Int J Adv Manuf Technol"},{"issue":"1","key":"9667_CR14","doi-asserted-by":"publisher","first-page":"272","DOI":"10.1016\/j.advengsoft.2011.10.004","volume":"45","author":"P Alcan","year":"2012","unstructured":"Alcan P, Ba\u015fL\u0131Gil H (2012) A genetic algorithm application using fuzzy processing times in non-identical parallel machine scheduling problem. Adv Eng Softw 45(1):272\u2013280","journal-title":"Adv Eng Softw"},{"issue":"12","key":"9667_CR15","doi-asserted-by":"publisher","first-page":"1223","DOI":"10.1016\/S0305-0548(00)00036-8","volume":"28","author":"U Al-Turki","year":"2001","unstructured":"Al-Turki U, Fedjki C, Andijani A (2001) Tabu search for a class of single-machine scheduling problems. Comput Oper Res 28(12):1223\u20131230","journal-title":"Comput Oper Res"},{"issue":"3","key":"9667_CR16","doi-asserted-by":"publisher","first-page":"512","DOI":"10.1016\/S0377-2217(01)00091-1","volume":"137","author":"R Alvarez-Valdes","year":"2002","unstructured":"Alvarez-Valdes R, Crespo E, Tamarit JM (2002) Design and implementation of a course scheduling system using Tabu search. Eur J Oper Res 137(3):512\u2013523","journal-title":"Eur J Oper Res"},{"key":"9667_CR17","first-page":"37","volume":"8","author":"G Ambika","year":"2014","unstructured":"Ambika G, Uthra G (2014) Branch and bound technique in flow shop scheduling using fuzzy processing times. Ann Pure Appl Math 8:37\u201342","journal-title":"Ann Pure Appl Math"},{"key":"9667_CR18","doi-asserted-by":"publisher","DOI":"10.7551\/mitpress\/3905.001.0001","volume-title":"An introduction to neural networks","author":"JA Anderson","year":"1995","unstructured":"Anderson JA (1995) An introduction to neural networks. MIT press, Cambridge"},{"issue":"1","key":"9667_CR19","doi-asserted-by":"publisher","first-page":"73","DOI":"10.1016\/j.ejor.2007.10.044","volume":"193","author":"D Anghinolfi","year":"2009","unstructured":"Anghinolfi D, Paolucci M (2009) A new discrete particle swarm optimization approach for the single-machine total weighted tardiness scheduling problem with sequence-dependent setup times. Eur J Oper Res 193(1):73\u201385","journal-title":"Eur J Oper Res"},{"issue":"3","key":"9667_CR20","doi-asserted-by":"publisher","first-page":"704","DOI":"10.1016\/j.ejor.2003.08.059","volume":"161","author":"A Anglani","year":"2005","unstructured":"Anglani A, Grieco A, Guerriero E, Musmanno R (2005) Robust scheduling of parallel machines with sequence-dependent set-up costs. Eur J Oper Res 161(3):704\u2013720","journal-title":"Eur J Oper Res"},{"issue":"3","key":"9667_CR21","doi-asserted-by":"publisher","first-page":"503","DOI":"10.1080\/00207549208942908","volume":"30","author":"I Arizono","year":"1992","unstructured":"Arizono I, Yamamoto A, Ohta H (1992) Scheduling for minimizing total actual flow time by neural networks. Int J Prod Res 30(3):503\u2013511","journal-title":"Int J Prod Res"},{"issue":"3","key":"9667_CR22","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1016\/S0305-0548(98)00060-4","volume":"26","author":"VA Armentano","year":"1999","unstructured":"Armentano VA, Ronconi DP (1999) Tabu search for total tardiness minimization in flow shop scheduling problems. Comput Oper Res 26(3):219\u2013235","journal-title":"Comput Oper Res"},{"issue":"4","key":"9667_CR23","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1504\/IJMR.2008.020901","volume":"3","author":"P Asokan","year":"2008","unstructured":"Asokan P, Jerald J, Arunachalam S, Page T (2008) Application of adaptive genetic algorithm and particle swarm optimisation in scheduling of jobs and AS\/RS in FMS. Int J Manuf Res 3(4):393\u2013405","journal-title":"Int J Manuf Res"},{"issue":"6","key":"9667_CR24","doi-asserted-by":"publisher","first-page":"805","DOI":"10.1023\/B:JIMS.0000042665.10086.cf","volume":"15","author":"ME Aydin","year":"2004","unstructured":"Aydin ME, Fogarty TC (2004) A simulated annealing algorithm for multi-agent systems: a job shop scheduling application. J Intell Manuf 15(6):805\u2013814","journal-title":"J Intell Manuf"},{"issue":"5\u20138","key":"9667_CR25","doi-asserted-by":"publisher","first-page":"699","DOI":"10.1007\/s00170-010-2533-6","volume":"50","author":"A Azadeh","year":"2010","unstructured":"Azadeh A et al (2010) A flexible artificial neural network\u2013fuzzy simulation algorithm for scheduling a flow shop with multiple processors. Int J Adv Manuf Technol 50(5\u20138):699\u2013715","journal-title":"Int J Adv Manuf Technol"},{"issue":"2","key":"9667_CR26","doi-asserted-by":"publisher","first-page":"551","DOI":"10.1080\/00207543.2010.539281","volume":"50","author":"A Azadeh","year":"2012","unstructured":"Azadeh A, Negahban A, Moghaddam M (2012a) A hybrid computer simulation-artificial neural network algorithm for optimisation of dispatching rule selection in stochastic job shop scheduling problems. Int J Prod Res 50(2):551\u2013566","journal-title":"Int J Prod Res"},{"issue":"24","key":"9667_CR27","doi-asserted-by":"publisher","first-page":"7271","DOI":"10.1080\/00207543.2011.645511","volume":"50","author":"A Azadeh","year":"2012","unstructured":"Azadeh A et al (2012b) An integrated neural network\u2013simulation algorithm for performance optimisation of the bi-criteria two-stage assembly flow shop scheduling problem with stochastic activities. Int J Prod Res 50(24):7271\u20137284","journal-title":"Int J Prod Res"},{"issue":"1\u20134","key":"9667_CR28","doi-asserted-by":"publisher","first-page":"135","DOI":"10.1007\/s00170-015-6795-x","volume":"79","author":"A Azadeh","year":"2015","unstructured":"Azadeh A et al (2015) A hybrid computer simulation-adaptive neuro-fuzzy inference system algorithm for optimization of dispatching rule selection in job shop scheduling problems under uncertainty. Int J Adv Manuf Technol 79(1\u20134):135\u2013145","journal-title":"Int J Adv Manuf Technol"},{"key":"9667_CR29","first-page":"111","volume":"7","author":"M Bagherpour","year":"2007","unstructured":"Bagherpour M, Noghondarian K, Noori S (2007) Applying fuzzy logic to estimate setup times in sequence dependent single machine scheduling problems. Int J Comput Sci Netw Secur 7:111\u2013118","journal-title":"Int J Comput Sci Netw Secur"},{"issue":"3","key":"9667_CR30","first-page":"411","volume":"14","author":"HH Balci","year":"2004","unstructured":"Balci HH, Valenzuela JF (2004) Scheduling electric power generators using particle swarm optimization combined with the Lagrangian relaxation method. Int J Appl Math Comput Sci 14(3):411\u2013422","journal-title":"Int J Appl Math Comput Sci"},{"issue":"17","key":"9667_CR31","doi-asserted-by":"publisher","first-page":"3551","DOI":"10.1016\/j.ins.2011.04.010","volume":"181","author":"S Balin","year":"2011","unstructured":"Balin S (2011) Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation. Inf Sci 181(17):3551\u20133569","journal-title":"Inf Sci"},{"issue":"1","key":"9667_CR32","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.advengsoft.2011.12.001","volume":"47","author":"M Bank","year":"2012","unstructured":"Bank M, Ghomi SF, Jolai F, Behnamian J (2012) Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration. Adv Eng Softw 47(1):1\u20136","journal-title":"Adv Eng Softw"},{"key":"9667_CR33","volume-title":"Constraint-based scheduling: applying constraint programming to scheduling problems","author":"P Baptiste","year":"2012","unstructured":"Baptiste P, Le Pape C, Nuijten W (2012) Constraint-based scheduling: applying constraint programming to scheduling problems, vol 39. Springer, Berlin"},{"issue":"1","key":"9667_CR34","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1016\/j.advengsoft.2004.03.012","volume":"36","author":"B Bar\u00e1n","year":"2005","unstructured":"Bar\u00e1n B, von L\u00fccken C, Sotelo A (2005) Multi-objective pump scheduling optimisation using evolutionary strategies. Adv Eng Softw 36(1):39\u201347","journal-title":"Adv Eng Softw"},{"issue":"6","key":"9667_CR35","doi-asserted-by":"publisher","first-page":"777","DOI":"10.1023\/B:JIMS.0000042663.16199.84","volume":"15","author":"A Baykaso\u011flu","year":"2004","unstructured":"Baykaso\u011flu A, S\u00f6nmez AI (2004) Using multiple objective tabu search and grammars to model and solve multi-objective flexible job shop scheduling problems. J Intell Manuf 15(6):777\u2013785","journal-title":"J Intell Manuf"},{"key":"9667_CR36","first-page":"389","volume-title":"Communications in Computer and Information Science","author":"Adil Baykaso\u011flu","year":"2008","unstructured":"Baykaso\u011flu A, G\u00f6\u00e7ken M, \u00d6zbak\u0131r L, Kulluk S (2008) Composite dispatching rule generation through data mining in a simulated job shop. In: Modelling, computation and optimization in information systems and management sciences, Springer, Berlin, pp 389\u2013398"},{"issue":"1","key":"9667_CR37","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1287\/ijoc.1100.0388","volume":"23","author":"Jc Beck","year":"2011","unstructured":"Beck Jc, Feng TK, Watson jp (2011) Combining constraint programming and local search for job-shop scheduling. INFORMS J Comput 23(1):1\u201314","journal-title":"INFORMS J Comput"},{"key":"9667_CR38","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1016\/j.asoc.2014.03.031","volume":"21","author":"J Behnamian","year":"2014","unstructured":"Behnamian J, Ghomi SMTF (2014) Multi-objective fuzzy multiprocessor flow shop scheduling. Appl Soft Comput 21:139\u2013148","journal-title":"Appl Soft Comput"},{"key":"9667_CR39","doi-asserted-by":"publisher","DOI":"10.1002\/9781119183464","volume-title":"Machine learning: hands-on for developers and technical professionals","author":"J Bell","year":"2014","unstructured":"Bell J (2014) Machine learning: hands-on for developers and technical professionals. Wiley, New York"},{"key":"9667_CR40","doi-asserted-by":"crossref","unstructured":"Benini L et al (2008) A constraint programming approach for allocation and scheduling on the cell broadband engine. In: International conference on principles and practice of constraint programming, Springer, Berlin","DOI":"10.1007\/978-3-540-85958-1_2"},{"key":"9667_CR41","doi-asserted-by":"crossref","unstructured":"Berral JL, Goiri \u00cd, Nou R, Juli\u00e0 F, Guitart J, Gavald\u00e0 R, Torres J (2010) Towards energy-aware scheduling in data centers using machine learning. In:\u00a0Proceedings of the 1st international conference on energy-efficient computing and networking, ACM, pp 215\u2013224","DOI":"10.1145\/1791314.1791349"},{"issue":"9","key":"9667_CR42","doi-asserted-by":"publisher","first-page":"1584","DOI":"10.1016\/j.cor.2009.11.017","volume":"37","author":"A Berrichi","year":"2010","unstructured":"Berrichi A et al (2010) Bi-objective ant colony optimization approach to optimize production and maintenance scheduling. Comput Oper Res 37(9):1584\u20131596","journal-title":"Comput Oper Res"},{"key":"9667_CR43","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1007\/978-3-642-13520-0_34","volume-title":"Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems","author":"Timo Berthold","year":"2010","unstructured":"Berthold T et al (2010) A constraint integer programming approach for resource-constrained project scheduling. In: International conference on integration of artificial intelligence (AI) and operations research (OR) techniques in constraint programming, Springer, Berlin"},{"key":"9667_CR44","unstructured":"Bezirgan A (1992) A case-based reasoning approach to dynamic job shop scheduling. In: Ai\u201992-proceedings of the 5th Australian joint conference on artificial intelligence, World Scientific, p 233"},{"issue":"1\u20134","key":"9667_CR45","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1016\/0360-8352(90)90082-W","volume":"19","author":"JE Biegel","year":"1990","unstructured":"Biegel JE, Davern JJ (1990) Genetic algorithms and job shop scheduling. Comput Ind Eng 19(1\u20134):81\u201391","journal-title":"Comput Ind Eng"},{"issue":"7\u20138","key":"9667_CR46","doi-asserted-by":"publisher","first-page":"606","DOI":"10.1007\/s00170-003-1771-2","volume":"23","author":"O Bilkay","year":"2004","unstructured":"Bilkay O, Anlagan O, Kilic SE (2004) Job shop scheduling using fuzzy logic. Int J Adv Manuf Technol 23(7\u20138):606\u2013619","journal-title":"Int J Adv Manuf Technol"},{"issue":"1","key":"9667_CR47","doi-asserted-by":"publisher","first-page":"28","DOI":"10.1504\/IJOR.2016.073250","volume":"25","author":"VS Bilolikar","year":"2016","unstructured":"Bilolikar VS, Jain K, Sharma M (2016) An adaptive crossover genetic algorithm with simulated annealing for multi mode resource constrained project scheduling with discounted cash flows. Int J Oper Res 25(1):28\u201346","journal-title":"Int J Oper Res"},{"issue":"6","key":"9667_CR48","doi-asserted-by":"publisher","first-page":"1565","DOI":"10.1016\/j.cor.2003.11.018","volume":"32","author":"C Blum","year":"2005","unstructured":"Blum C (2005) Beam-ACO\u2014hybridizing ant colony optimization with beam search: an application to open shop scheduling. Comput Oper Res 32(6):1565\u20131591","journal-title":"Comput Oper Res"},{"issue":"3","key":"9667_CR49","doi-asserted-by":"publisher","first-page":"285","DOI":"10.1023\/B:JMMA.0000038614.39977.6f","volume":"3","author":"C Blum","year":"2004","unstructured":"Blum C, Sampels M (2004) An ant colony optimization algorithm for shop scheduling problems. J Math Model Algorithms 3(3):285\u2013308","journal-title":"J Math Model Algorithms"},{"issue":"2","key":"9667_CR50","first-page":"55","volume":"12","author":"DD Bochtis","year":"2010","unstructured":"Bochtis DD (2010) Machinery management in bio-production systems: planning and scheduling aspects. Agric Eng Int CIGR J 12(2):55\u201363","journal-title":"Agric Eng Int CIGR J"},{"key":"9667_CR51","first-page":"539","volume-title":"Lecture Notes in Computer Science","author":"Kyle E. C. Booth","year":"2016","unstructured":"Booth KEC, Nejat G, Christopher Beck J (2016) A constraint programming approach to multi-robot task allocation and scheduling in retirement homes. In: International conference on principles and practice of constraint programming, Springer, Cham"},{"key":"9667_CR52","doi-asserted-by":"publisher","first-page":"153","DOI":"10.1007\/978-3-540-45193-8_11","volume-title":"Principles and Practice of Constraint Programming \u2013 CP 2003","author":"St\u00e9phane Bourdais","year":"2003","unstructured":"Bourdais S, Galinier P, Pesant G (2003) \u201cHIBISCUS: a constraint programming application to staff scheduling in health care. In: International conference on principles and practice of constraint programming, Springer, Berlin"},{"key":"9667_CR53","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1002\/9781119042976.ch5","volume":"2","author":"M Bourenane","year":"2014","unstructured":"Bourenane M, Mellouk A (2014) Inductive approaches for packet scheduling in communication networks. Real Time Syst Sched 2:151\u2013193","journal-title":"Real Time Syst Sched"},{"key":"9667_CR54","doi-asserted-by":"crossref","unstructured":"Bo\u017cejko W, Pempera J, Wodecki M (2015) Parallel simulated annealing algorithm for cyclic flexible job shop scheduling problem. In: International conference on artificial intelligence and soft computing, Springer International Publishing, pp 603\u2013612","DOI":"10.1007\/978-3-319-19369-4_53"},{"issue":"1","key":"9667_CR55","doi-asserted-by":"publisher","first-page":"180","DOI":"10.1016\/S0377-2217(97)00010-6","volume":"100","author":"J Brandao","year":"1997","unstructured":"Brandao J, Mercer A (1997) A tabu search algorithm for the multi-trip vehicle routing and scheduling problem. Eur J Oper Res 100(1):180\u2013191","journal-title":"Eur J Oper Res"},{"key":"9667_CR56","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/978-1-4615-2263-8","volume-title":"Intelligent Scheduling Systems","author":"Donald E. Brown","year":"1995","unstructured":"Brown DE, Marin JA, Scherer WT (1995a) A survey of intelligent scheduling systems. In: Intelligent scheduling systems, Springer, New York, pp 1\u201340"},{"key":"9667_CR57","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/978-1-4615-2263-8","volume-title":"Intelligent Scheduling Systems","author":"Donald E. Brown","year":"1995","unstructured":"Brown DE, John AM, William TS (1995b) A survey of intelligent scheduling systems. In: Intelligent scheduling systems, Springer, Boston, pp 1\u201340"},{"issue":"1","key":"9667_CR58","doi-asserted-by":"publisher","first-page":"69","DOI":"10.1002\/1520-6750(199302)40:1<69::AID-NAV3220400105>3.0.CO;2-H","volume":"40","author":"MJ Brusco","year":"1993","unstructured":"Brusco MJ, Jacobs LW (1993) A simulated annealing approach to the cyclic staff-scheduling problem. Naval Res Log (NRL) 40(1):69\u201384","journal-title":"Naval Res Log (NRL)"},{"issue":"2","key":"9667_CR59","doi-asserted-by":"publisher","first-page":"359","DOI":"10.1016\/S0377-2217(99)00391-4","volume":"125","author":"X Cai","year":"2000","unstructured":"Cai X, Li KN (2000) A genetic algorithm for scheduling staff of mixed skills under multi-criteria. Eur J Oper Res 125(2):359\u2013369","journal-title":"Eur J Oper Res"},{"issue":"3","key":"9667_CR60","doi-asserted-by":"publisher","first-page":"1180","DOI":"10.1016\/j.ejor.2016.11.033","volume":"259","author":"M Carlsson","year":"2017","unstructured":"Carlsson M, Johansson M, Larson J (2017) Scheduling double round-robin tournaments with divisional play using constraint programming. Eur J Oper Res 259(3):1180\u20131190","journal-title":"Eur J Oper Res"},{"issue":"6","key":"9667_CR61","doi-asserted-by":"publisher","first-page":"513","DOI":"10.1061\/(ASCE)0733-9364(2002)128:6(513)","volume":"128","author":"WT Chan","year":"2002","unstructured":"Chan WT, Hao H (2002) Constraint programming approach to precast production scheduling. J Constr Eng Manag 128(6):513\u2013521","journal-title":"J Constr Eng Manag"},{"issue":"2","key":"9667_CR62","doi-asserted-by":"publisher","first-page":"364","DOI":"10.1016\/j.eswa.2005.04.009","volume":"29","author":"FT Chan","year":"2005","unstructured":"Chan FT, Chung SH, Chan PLY (2005) An adaptive genetic algorithm with dominated genes for distributed scheduling problems. Expert Syst Appl 29(2):364\u2013371","journal-title":"Expert Syst Appl"},{"issue":"9","key":"9667_CR63","doi-asserted-by":"publisher","first-page":"2602","DOI":"10.1080\/00207543.2012.737948","volume":"51","author":"FT Chan","year":"2013","unstructured":"Chan FT, Prakash A, Ma HL, Wong CS (2013) A hybrid Tabu sample-sort simulated annealing approach for solving distributed scheduling problem. Int J Prod Res 51(9):2602\u20132619","journal-title":"Int J Prod Res"},{"issue":"3","key":"9667_CR64","doi-asserted-by":"publisher","first-page":"377","DOI":"10.1016\/S0952-1976(01)00011-2","volume":"14","author":"S Chanas","year":"2001","unstructured":"Chanas S, Kasperski A (2001) Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates. Eng Appl Artif Intell 14(3):377\u2013386","journal-title":"Eng Appl Artif Intell"},{"issue":"3","key":"9667_CR65","doi-asserted-by":"publisher","first-page":"359","DOI":"10.1016\/S0165-0114(03)00178-7","volume":"142","author":"S Chanas","year":"2004","unstructured":"Chanas S, Kasperski A (2004) Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters. Fuzzy Sets Syst 142(3):359\u2013371","journal-title":"Fuzzy Sets Syst"},{"key":"9667_CR66","doi-asserted-by":"publisher","first-page":"215","DOI":"10.1007\/978-3-540-44511-1_11","volume-title":"Knowledge Incorporation in Evolutionary Computation","author":"Pei-Chann Chang","year":"2005","unstructured":"Chang P-C, Hsieh J-C, Wang Y-W (2005) Genetic algorithm and case-based reasoning applied in production scheduling. In: Knowledge incorporation in evolutionary computation, Springer, Berlin, pp. 215\u2013236"},{"issue":"1","key":"9667_CR67","doi-asserted-by":"publisher","first-page":"45","DOI":"10.1016\/j.ijpe.2012.06.007","volume":"141","author":"PC Chang","year":"2013","unstructured":"Chang PC, Huang WH, Wu JL, Cheng TCE (2013) A block mining and re-combination enhanced genetic algorithm for the permutation flow shop scheduling problem. Int J Prod Econ 141(1):45\u201355","journal-title":"Int J Prod Econ"},{"issue":"6","key":"9667_CR68","doi-asserted-by":"publisher","first-page":"2947","DOI":"10.1016\/j.eswa.2013.10.026","volume":"41","author":"FS Chang","year":"2014","unstructured":"Chang FS, Wu JS, Lee CN, Shen HC (2014) Greedy-search-based multi-objective genetic algorithm for emergency logistics scheduling. Expert Syst Appl 41(6):2947\u20132956","journal-title":"Expert Syst Appl"},{"issue":"13","key":"9667_CR69","doi-asserted-by":"crossref","first-page":"6379","DOI":"10.1016\/j.amc.2011.01.014","volume":"217","author":"R-M Chen","year":"2011","unstructured":"Chen R-M (2011a) Reducing network and computation complexities in neural based real-time scheduling scheme. Appl Math Comput 217(13):6379\u20136389","journal-title":"Appl Math Comput"},{"issue":"6","key":"9667_CR70","doi-asserted-by":"publisher","first-page":"7102","DOI":"10.1016\/j.eswa.2010.12.059","volume":"38","author":"R-M Chen","year":"2011","unstructured":"Chen R-M (2011b) Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem. Expert Syst Appl 38(6):7102\u20137111","journal-title":"Expert Syst Appl"},{"key":"9667_CR71","unstructured":"Chen RM, Huang YM (1998) Multiconstraint task scheduling in multi-processor system by neural network. In: Proceedings of tenth IEEE international conference on tools with artificial intelligence, IEEE, pp 288\u2013294"},{"issue":"5","key":"9667_CR72","doi-asserted-by":"publisher","first-page":"569","DOI":"10.1080\/09511920701381255","volume":"21","author":"LS Chen","year":"2008","unstructured":"Chen LS, Su CT (2008) Using granular computing model to induce scheduling knowledge in dynamic manufacturing environments. Int J Comput Integr Manuf 21(5):569\u2013583","journal-title":"Int J Comput Integr Manuf"},{"issue":"1","key":"9667_CR73","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1109\/TSE.2012.17","volume":"39","author":"W-N Chen","year":"2013","unstructured":"Chen W-N, Zhang J (2013) Ant colony optimization for software project scheduling and staffing with an event-based scheduler. IEEE Trans Softw Eng 39(1):1\u201317","journal-title":"IEEE Trans Softw Eng"},{"issue":"5","key":"9667_CR74","doi-asserted-by":"publisher","first-page":"669","DOI":"10.1016\/S0952-1976(98)00032-3","volume":"11","author":"N Chen","year":"1998","unstructured":"Chen N, Li C, Qin P (1998) KDPAG expert system applied to materials design and manufacture. Eng Appl Artif Intell 11(5):669\u2013674","journal-title":"Eng Appl Artif Intell"},{"issue":"9","key":"9667_CR75","doi-asserted-by":"publisher","first-page":"1987","DOI":"10.1080\/002075499190879","volume":"37","author":"CC Chen","year":"1999","unstructured":"Chen CC, Yih Y, Wu YC (1999) Auto-bias selection for developing learning-based scheduling systems. Int J Prod Res 37(9):1987\u20132002","journal-title":"Int J Prod Res"},{"issue":"1","key":"9667_CR76","doi-asserted-by":"publisher","first-page":"40","DOI":"10.1016\/j.ejor.2006.06.033","volume":"181","author":"L Chen","year":"2007","unstructured":"Chen L et al (2007) A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal. Eur J Oper Res 181(1):40\u201358","journal-title":"Eur J Oper Res"},{"key":"9667_CR77","first-page":"011","volume":"2","author":"J-p Chen","year":"2008","unstructured":"Chen J-p et al (2008) Study on application of CBR in steelmaking and continuous casting dynamic scheduling system. Metall Ind Autom 2:011","journal-title":"Metall Ind Autom"},{"issue":"11","key":"9667_CR78","doi-asserted-by":"publisher","first-page":"10016","DOI":"10.1016\/j.eswa.2012.01.211","volume":"39","author":"JC Chen","year":"2012","unstructured":"Chen JC, Wu CC, Chen CW, Chen KH (2012) Flexible job shop scheduling with parallel machines using genetic algorithm and grouping genetic algorithm. Expert Syst Appl 39(11):10016\u201310021","journal-title":"Expert Syst Appl"},{"key":"9667_CR79","doi-asserted-by":"crossref","unstructured":"Chen B et al (2014a) Adaptive immune-genetic algorithm for fuzzy job shop scheduling problems. In: International conference in swarm intelligence, Springer International Publishing","DOI":"10.1007\/978-3-319-11857-4_28"},{"issue":"11","key":"9667_CR80","doi-asserted-by":"publisher","first-page":"2271","DOI":"10.1007\/s00500-013-1199-z","volume":"18","author":"C-L Chen","year":"2014","unstructured":"Chen C-L et al (2014b) A revised discrete particle swarm optimization algorithm for permutation flow shop scheduling problem. Soft Comput 18(11):2271\u20132282","journal-title":"Soft Comput"},{"key":"9667_CR81","first-page":"1","volume":"30","author":"JC Chen","year":"2016","unstructured":"Chen JC, Chen YY, Chen TL, Lin JZ (2016) Comparison of simulated annealing and tabu-search algorithms in advanced planning and scheduling systems for TFT-LCD colour filter fabs. Int J Comput Integr Manuf 30:1\u201319","journal-title":"Int J Comput Integr Manuf"},{"issue":"3","key":"9667_CR82","doi-asserted-by":"publisher","first-page":"761","DOI":"10.1016\/S0360-8352(97)00247-7","volume":"33","author":"R Cheng","year":"1997","unstructured":"Cheng R, Gen M (1997) Parallel machine scheduling problems using memetic algorithms. Comput Ind Eng 33(3):761\u2013764","journal-title":"Comput Ind Eng"},{"key":"9667_CR83","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1016\/j.cie.2015.02.017","volume":"83","author":"B-Y Cheng","year":"2015","unstructured":"Cheng B-Y, Leung Joseph Y-T, Li K (2015) Integrated scheduling of production and distribution to minimize total cost using an improved ant colony optimization method. Comput Ind Eng 83:217\u2013225","journal-title":"Comput Ind Eng"},{"key":"9667_CR84","doi-asserted-by":"publisher","first-page":"49","DOI":"10.1007\/978-3-642-25944-9_7","volume-title":"Advanced Intelligent Computing Theories and Applications. With Aspects of Artificial Intelligence","author":"Tsung-Che Chiang","year":"2012","unstructured":"Chiang TC, Lin HJ (2011) Flexible job shop scheduling using a multiobjective memetic algorithm. In: International conference on intelligent computing, Springer, Berlin, pp 49\u201356"},{"issue":"1","key":"9667_CR85","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1016\/j.ijpe.2012.03.034","volume":"141","author":"TC Chiang","year":"2013","unstructured":"Chiang TC, Lin HJ (2013) A simple and effective evolutionary algorithm for multiobjective flexible job shop scheduling. Int J Prod Econ 141(1):87\u201398","journal-title":"Int J Prod Econ"},{"issue":"7","key":"9667_CR86","doi-asserted-by":"publisher","first-page":"736","DOI":"10.1057\/palgrave.jors.2600416","volume":"48","author":"JH Cho","year":"1997","unstructured":"Cho JH, Kim YD (1997) A simulated annealing algorithm for resource constrained project scheduling problems. J Oper Res Soc 48(7):736\u2013744","journal-title":"J Oper Res Soc"},{"issue":"1","key":"9667_CR87","doi-asserted-by":"publisher","first-page":"318","DOI":"10.1016\/j.ejor.2005.04.038","volume":"175","author":"F Fred Choobineh","year":"2006","unstructured":"Choobineh F Fred, Mohebbi E, Khoo H (2006) A multi-objective tabu search for a single-machine scheduling problem with sequence-dependent setup times. Eur J Oper Res 175(1):318\u2013337","journal-title":"Eur J Oper Res"},{"issue":"4","key":"9667_CR88","doi-asserted-by":"publisher","first-page":"4213","DOI":"10.1016\/j.eswa.2011.09.113","volume":"39","author":"SH Chung","year":"2012","unstructured":"Chung SH, Choy KL (2012) A modified genetic algorithm for quay crane scheduling operations. Expert Syst Appl 39(4):4213\u20134221","journal-title":"Expert Syst Appl"},{"issue":"3","key":"9667_CR89","doi-asserted-by":"publisher","first-page":"715","DOI":"10.1016\/j.ifacol.2015.06.167","volume":"48","author":"GC Ciro","year":"2015","unstructured":"Ciro GC et al (2015) A fuzzy ant colony optimization to solve an open shop scheduling problem with multi-skills resource constraints. IFAC-PapersOnLine 48(3):715\u2013720","journal-title":"IFAC-PapersOnLine"},{"key":"9667_CR90","volume-title":"Particle swarm optimization","author":"M Clerc","year":"2010","unstructured":"Clerc M (2010) Particle swarm optimization, vol 93. Wiley, New York"},{"issue":"7","key":"9667_CR91","doi-asserted-by":"publisher","first-page":"1087","DOI":"10.1016\/S0305-0548(02)00059-X","volume":"30","author":"JK Cochran","year":"2003","unstructured":"Cochran JK, Horng SM, Fowler JW (2003) A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Comput Oper Res 30(7):1087\u20131102","journal-title":"Comput Oper Res"},{"key":"9667_CR505","unstructured":"Coello JMA, Camilo dos Santos R (1998) Integrating CBR and heuristic search to solve complex real-time scheduling problems. AAAI Technical Report WS"},{"key":"9667_CR92","volume-title":"Evolutionary algorithms for solving multi-objective problems","author":"CA Coello","year":"2007","unstructured":"Coello CA, Lamont GB, Van Veldhuizen DA (2007) Evolutionary algorithms for solving multi-objective problems, vol 5. Springer, New York"},{"issue":"3","key":"9667_CR93","first-page":"161","volume":"33","author":"D Costa","year":"1995","unstructured":"Costa D (1995) An evolutionary tabu search algorithm and the NHL scheduling problem. INFOR Inf Syst Oper Res 33(3):161\u2013178","journal-title":"INFOR Inf Syst Oper Res"},{"key":"9667_CR94","first-page":"1","volume-title":"Evolutionary Scheduling","author":"Carlos Cotta","year":"2007","unstructured":"Cotta C, Fern\u00e1ndez AJ (2007) Memetic algorithms in planning, scheduling, and timetabling. In: Evolutionary scheduling, Springer, Berlin, pp 1\u201330"},{"key":"9667_CR95","doi-asserted-by":"publisher","first-page":"150","DOI":"10.1007\/11890584_12","volume-title":"Hybrid Metaheuristics","author":"Carlos Cotta","year":"2006","unstructured":"Cotta C, Dot\u00fa I, Fern\u00e1ndez AJ, Van Hentenryck P (2006) Scheduling social golfers with memetic evolutionary programming. In: International workshop on hybrid metaheuristics, Springer, Berlin, pp 150\u2013161"},{"issue":"2","key":"9667_CR96","doi-asserted-by":"publisher","first-page":"160","DOI":"10.1109\/70.282541","volume":"10","author":"LM Custodio","year":"1994","unstructured":"Custodio LM, Sentieiro JJ, Bispo CF (1994) Production planning and scheduling using a fuzzy decision system. IEEE Trans Robot Autom 10(2):160\u2013168","journal-title":"IEEE Trans Robot Autom"},{"issue":"1","key":"9667_CR97","doi-asserted-by":"publisher","first-page":"34","DOI":"10.1002\/(SICI)1099-1360(199801)7:1<34::AID-MCDA161>3.0.CO;2-6","volume":"7","author":"P Czyz\u017cak","year":"1998","unstructured":"Czyz\u017cak P, Jaszkiewicz A (1998) Pareto simulated annealing\u2014a metaheuristic technique for multiple-objective combinatorial optimization. J Multicrit Decis Anal 7(1):34\u201347","journal-title":"J Multicrit Decis Anal"},{"key":"9667_CR98","doi-asserted-by":"publisher","first-page":"49","DOI":"10.1016\/j.cor.2016.05.003","volume":"75","author":"RB Damm","year":"2016","unstructured":"Damm RB, Resende MG, Ronconi DP (2016) A biased random key genetic algorithm for the field technician scheduling problem. Comput Oper Res 75:49\u201363","journal-title":"Comput Oper Res"},{"issue":"1","key":"9667_CR99","doi-asserted-by":"publisher","first-page":"1451","DOI":"10.1016\/j.eswa.2011.08.029","volume":"39","author":"P Damodaran","year":"2012","unstructured":"Damodaran P, V\u00e9lez-Gallego MC (2012) A simulated annealing algorithm to minimize makespan of parallel batch processing machines with unequal job ready times. Expert Syst Appl 39(1):1451\u20131458","journal-title":"Expert Syst Appl"},{"key":"9667_CR100","volume-title":"On the origin of species","author":"C Darwin","year":"1859","unstructured":"Darwin C (1859) On the origin of species, 1st edn. Harvard University Press, Cambridge","edition":"1"},{"key":"9667_CR101","unstructured":"Davidrajuh R (2001) Automating supplier selection procedures. PhD Dissertation, Norwegian University of Science and Technology (NTNU), Narvik Institute of Technology Narvik, Norway"},{"key":"9667_CR102","volume-title":"The blind watchmaker","author":"R Dawkins","year":"1986","unstructured":"Dawkins R (1986) The blind watchmaker. Penguin, London"},{"issue":"6","key":"9667_CR103","doi-asserted-by":"publisher","first-page":"571","DOI":"10.1016\/0305-0548(90)90063-D","volume":"17","author":"DE Deal","year":"1990","unstructured":"Deal DE, Chen JG, Ignizio JP, Jeyakumar V (1990) An expert system scheduler: some reflections on expert systems development. Comput Oper Res 17(6):571\u2013580","journal-title":"Comput Oper Res"},{"issue":"3","key":"9667_CR446","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1108\/09576069610116896","volume":"7","author":"A De Toni","year":"1996","unstructured":"De Toni A, Nassimbeni G, Tonchia S (1996) An artificial, intelligence-based production scheduler. Integr Manuf Syst 7(3):17\u201325","journal-title":"Integr Manuf Syst"},{"key":"9667_CR104","doi-asserted-by":"crossref","unstructured":"Del Valle C et al (2003) On selecting and scheduling assembly plans using constraint programming. In: International conference on knowledge-based and intelligent information and engineering systems, Springer, Berlin","DOI":"10.1007\/978-3-540-45226-3_180"},{"issue":"1","key":"9667_CR105","doi-asserted-by":"publisher","first-page":"15","DOI":"10.1016\/0305-0548(93)E0015-L","volume":"22","author":"F Della Croce","year":"1995","unstructured":"Della Croce F, Tadei R, Volta G (1995) A genetic algorithm for the job shop problem. Comput Oper Res 22(1):15\u201324","journal-title":"Comput Oper Res"},{"issue":"5","key":"9667_CR106","doi-asserted-by":"publisher","first-page":"5787","DOI":"10.1016\/j.eswa.2010.10.053","volume":"38","author":"G-F Deng","year":"2011","unstructured":"Deng G-F, Lin W-T (2011) Ant colony optimization-based algorithm for airline crew scheduling problem. Expert Syst Appl 38(5):5787\u20135793","journal-title":"Expert Syst Appl"},{"key":"9667_CR107","doi-asserted-by":"crossref","unstructured":"Deng J, Wang L, Wu C, Wang J, Zheng X (2016) A competitive memetic algorithm for carbon-efficient scheduling of distributed flow shop. In: International conference on intelligent computing, Springer International Publishing, pp 476\u2013488","DOI":"10.1007\/978-3-319-42291-6_48"},{"key":"9667_CR108","doi-asserted-by":"publisher","first-page":"244","DOI":"10.1016\/j.knosys.2015.07.028","volume":"88","author":"B Dong","year":"2015","unstructured":"Dong B, Jiao L, Jianshe W (2015) A two-phase knowledge based hyper-heuristic scheduling algorithm in cellular system. Knowl Based Syst 88:244\u2013252","journal-title":"Knowl Based Syst"},{"issue":"2-3","key":"9667_CR109","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1016\/j.tcs.2005.05.020","volume":"344","author":"M Dorigo","year":"2005","unstructured":"Dorigo M, Blum C (2005) Ant colony optimization theory: a survey. Theor Comput Sci 344(2-3):243\u2013278","journal-title":"Theor Comput Sci"},{"issue":"3","key":"9667_CR110","doi-asserted-by":"publisher","first-page":"432","DOI":"10.1287\/ijoc.2015.0686","volume":"28","author":"H Doulabi","year":"2016","unstructured":"Doulabi H, Hossein S, Rousseau L-M, Pesant G (2016) A constraint-programming-based branch-and-price-and-cut approach for operating room planning and scheduling. INFORMS J Comput 28(3):432\u2013448","journal-title":"INFORMS J Comput"},{"issue":"2","key":"9667_CR111","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1016\/S0377-2217(97)00281-6","volume":"106","author":"KA Dowsland","year":"1998","unstructured":"Dowsland KA (1998) Nurse scheduling with tabu search and strategic oscillation. Eur J Oper Res 106(2):393\u2013407","journal-title":"Eur J Oper Res"},{"issue":"4","key":"9667_CR112","doi-asserted-by":"publisher","first-page":"426","DOI":"10.1057\/palgrave.jors.2601830","volume":"56","author":"KA Dowsland","year":"2005","unstructured":"Dowsland KA, Thompson JM (2005) Ant colony optimization for the examination scheduling problem. J Oper Res Soc 56(4):426\u2013438","journal-title":"J Oper Res Soc"},{"issue":"4","key":"9667_CR113","doi-asserted-by":"publisher","first-page":"215","DOI":"10.1007\/BF00128646","volume":"6","author":"D Dubois","year":"1995","unstructured":"Dubois D, Fargier H, Prade H (1995) Fuzzy constraints in job shop scheduling. J Intell Manuf 6(4):215\u2013234","journal-title":"J Intell Manuf"},{"issue":"1","key":"9667_CR114","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1007\/s10700-007-9026-6","volume":"7","author":"A Duenas","year":"2008","unstructured":"Duenas A, Petrovic D (2008) Multi-objective genetic algorithm for single machine scheduling problem under fuzziness. Fuzzy Optim Decis Mak 7(1):87\u2013104","journal-title":"Fuzzy Optim Decis Mak"},{"key":"9667_CR115","doi-asserted-by":"crossref","unstructured":"Dugardin F, Amodeo L, Yalaoui F (2011) Fuzzy Lorenz Ant Colony System to solve multiobjective reentrant hybride flow shop scheduling problem. In: 2011 International conference on communications, computing and control applications (CCCA), IEEE","DOI":"10.1109\/CCCA.2011.6031495"},{"key":"9667_CR116","doi-asserted-by":"crossref","unstructured":"Dumais S et al (1998) Inductive learning algorithms and representations for text categorization. In: Proceedings of the seventh international conference on information and knowledge management, ACM","DOI":"10.1145\/288627.288651"},{"issue":"5","key":"9667_CR117","doi-asserted-by":"publisher","first-page":"665","DOI":"10.1016\/j.autcon.2004.03.004","volume":"13","author":"RJ Dzeng","year":"2004","unstructured":"Dzeng RJ, Lee HY (2004) Critiquing contractors\u2019 scheduling by integrating rule-based and case-based reasoning. Autom Constr 13(5):665\u2013678","journal-title":"Autom Constr"},{"key":"9667_CR118","doi-asserted-by":"publisher","first-page":"92","DOI":"10.1007\/978-3-642-21311-3_10","volume-title":"Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems","author":"Emrah B. Edis","year":"2011","unstructured":"Edis EB, Oguz C (2011) Parallel machine scheduling with additional resources: a lagrangian-based constraint programming approach. In: International conference on AI and OR techniques in constriant programming for combinatorial optimization problems, Springer, Berlin"},{"issue":"2","key":"9667_CR119","doi-asserted-by":"publisher","first-page":"135","DOI":"10.1080\/03052151003759117","volume":"43","author":"EB Edis","year":"2011","unstructured":"Edis EB, Ozkarahan I (2011) A combined integer\/constraint programming approach to a resource-constrained parallel machine scheduling problem with machine eligibility restrictions. Eng Optim 43(2):135\u2013157","journal-title":"Eng Optim"},{"key":"9667_CR120","first-page":"84","volume":"04","author":"A Elkhyari","year":"2004","unstructured":"Elkhyari A, Gu\u00e9ret C, Jussien N (2004) Constraint programming for dynamic scheduling problems. Hiroshi Kise, editor 04:84\u201389","journal-title":"Hiroshi Kise, editor"},{"issue":"1","key":"9667_CR121","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1016\/j.ejor.2009.12.014","volume":"205","author":"S Elloumi","year":"2010","unstructured":"Elloumi S, Fortemps P (2010) A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem. Eur J Oper Res 205(1):31\u201341","journal-title":"Eur J Oper Res"},{"key":"9667_CR122","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1016\/j.cor.2016.03.007","volume":"73","author":"A Elmi","year":"2016","unstructured":"Elmi A, Topaloglu S (2016) Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization. Comput Oper Res 73:67\u201383","journal-title":"Comput Oper Res"},{"issue":"5","key":"9667_CR123","doi-asserted-by":"publisher","first-page":"216","DOI":"10.1108\/09685220310500126","volume":"11","author":"K Ergazakis","year":"2003","unstructured":"Ergazakis K, Metaxiotis K, Samouilidis E, Psarras J (2003) Decision support through knowledge management: the role of the artificial intelligence. Inf Manag Comput Sec 11(5):216\u2013221","journal-title":"Inf Manag Comput Sec"},{"issue":"1","key":"9667_CR124","doi-asserted-by":"publisher","first-page":"13","DOI":"10.1016\/S0950-7051(01)00117-4","volume":"15","author":"S Esquivel","year":"2002","unstructured":"Esquivel S, Ferrero S, Gallard R, Salto C, Alfonso H, Sch\u00fctz M (2002) Enhanced evolutionary algorithms for single and multiobjective optimization in the job shop scheduling problem. Knowl Based Syst 15(1):13\u201325","journal-title":"Knowl Based Syst"},{"issue":"9-10","key":"9667_CR125","doi-asserted-by":"publisher","first-page":"1004","DOI":"10.1007\/s00170-008-1404-x","volume":"40","author":"VP Eswaramurthy","year":"2009","unstructured":"Eswaramurthy VP, Tamilarasi A (2009) Hybridizing tabu search with ant colony optimization for solving job shop scheduling problems. Int J Adv Manuf Technol 40(9-10):1004\u20131015","journal-title":"Int J Adv Manuf Technol"},{"key":"9667_CR126","first-page":"574","volume-title":"Lecture Notes in Computer Science","author":"Caroline Even","year":"2015","unstructured":"Even C, Schutt A, Van Hentenryck P (2015) A constraint programming approach for non-preemptive evacuation scheduling. In: International conference on principles and practice of constraint programming, Springer, Cham"},{"key":"9667_CR127","doi-asserted-by":"publisher","first-page":"3887","DOI":"10.1002\/cpe.3887","volume":"29","author":"AE Ezugwu","year":"2016","unstructured":"Ezugwu AE et al (2016) Neural network-based multi-agent approach for scheduling in distributed systems. Concurr Comput Pract Exp 29:3887","journal-title":"Concurr Comput Pract Exp"},{"key":"9667_CR128","doi-asserted-by":"crossref","unstructured":"Fangming G, Qiong L (2009) A hybrid PSO algorithm for job shop scheduling problems with fuzzy processing time and fuzzy due date. In: 2009 Fifth international conference on natural computation, vol 3, IEEE","DOI":"10.1109\/ICNC.2009.216"},{"key":"9667_CR129","doi-asserted-by":"publisher","first-page":"524","DOI":"10.1007\/11504894_71","volume-title":"Innovations in Applied Artificial Intelligence","author":"Carole Fayad","year":"2005","unstructured":"Fayad C, Petrovic S (2005) A fuzzy genetic algorithm for real-world job shop scheduling. In: International conference on industrial, engineering and other applications of applied intelligent systems, Springer, Berlin"},{"key":"9667_CR130","first-page":"017","volume":"5","author":"L Feng","year":"2006","unstructured":"Feng L, Chen B, Gu H, Chunsheng G (2006) The research of fuzzy flexible job shop scheduling problem based on interval-valued fuzzy set. Comput Eng Appl 5:017","journal-title":"Comput Eng Appl"},{"key":"9667_CR131","doi-asserted-by":"crossref","unstructured":"Fortemps P (1995) Job shop scheduling problems with fuzzy or flexible durations. In: 1995 INRIA\/IEEE symposium on emerging technologies and factory automation, 1995. ETFA\u201995, Proceedings, vol. 2, IEEE","DOI":"10.1109\/ETFA.1995.496656"},{"issue":"4","key":"9667_CR132","doi-asserted-by":"publisher","first-page":"557","DOI":"10.1109\/91.649907","volume":"5","author":"P Fortemps","year":"1997","unstructured":"Fortemps P (1997) Job shop scheduling with imprecise durations: a fuzzy approach. IEEE Trans Fuzzy Syst 5(4):557\u2013569","journal-title":"IEEE Trans Fuzzy Syst"},{"issue":"1","key":"9667_CR133","doi-asserted-by":"publisher","first-page":"25","DOI":"10.1111\/j.1468-0394.1984.tb00424.x","volume":"1","author":"MS Fox","year":"1984","unstructured":"Fox MS, Smith SF (1984) ISIS\u2014a knowledge-based system for factory scheduling. Expert Syst 1(1):25\u201349","journal-title":"Expert Syst"},{"issue":"2","key":"9667_CR134","doi-asserted-by":"publisher","first-page":"79","DOI":"10.1016\/0925-5273(96)00031-X","volume":"43","author":"PM Fran\u00e7a","year":"1996","unstructured":"Fran\u00e7a PM et al (1996) A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times. Int J Prod Econ 43(2):79\u201389","journal-title":"Int J Prod Econ"},{"issue":"1","key":"9667_CR135","doi-asserted-by":"publisher","first-page":"224","DOI":"10.1016\/S0377-2217(00)00140-5","volume":"132","author":"PM Fran\u00e7a","year":"2001","unstructured":"Fran\u00e7a PM, Mendes A, Moscato P (2001) A memetic algorithm for the total tardiness single machine scheduling problem. Eur J Oper Res 132(1):224\u2013242","journal-title":"Eur J Oper Res"},{"issue":"1","key":"9667_CR136","doi-asserted-by":"publisher","first-page":"745","DOI":"10.1007\/s10479-010-0751-9","volume":"181","author":"M Frutos","year":"2010","unstructured":"Frutos M, Olivera AC, Tohm\u00e9 F (2010) A memetic algorithm based on a NSGAII scheme for the flexible job shop scheduling problem. Ann Oper Res 181(1):745\u2013765","journal-title":"Ann Oper Res"},{"issue":"1","key":"9667_CR137","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1016\/j.cie.2007.04.010","volume":"53","author":"J Gao","year":"2007","unstructured":"Gao J, Gen M, Sun L, Zhao X (2007) A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems. Comput Ind Eng 53(1):149\u2013162","journal-title":"Comput Ind Eng"},{"issue":"3","key":"9667_CR138","doi-asserted-by":"publisher","first-page":"641","DOI":"10.1080\/00207543.2011.644819","volume":"51","author":"J Gao","year":"2013","unstructured":"Gao J, Chen R, Deng W (2013) An efficient tabu search algorithm for the distributed permutation flow shop scheduling problem. Int J Prod Res 51(3):641\u2013651","journal-title":"Int J Prod Res"},{"key":"9667_CR139","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.knosys.2016.06.014","volume":"109","author":"KZ Gao","year":"2016","unstructured":"Gao KZ et al (2016) Artificial bee colony algorithm for scheduling and rescheduling fuzzy flexible job shop problem with new job insertion. Knowl Based Syst 109:1\u201316","journal-title":"Knowl Based Syst"},{"issue":"5","key":"9667_CR140","doi-asserted-by":"publisher","first-page":"733","DOI":"10.1016\/j.engappai.2008.03.009","volume":"21","author":"A Garrido","year":"2008","unstructured":"Garrido A, Onaindia E, Sapena O (2008) Planning and scheduling in an e-learning environment. A constraint-programming-based approach. Eng Appl Artif Intell 21(5):733\u2013743","journal-title":"Eng Appl Artif Intell"},{"issue":"3","key":"9667_CR141","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1007\/s10951-008-0083-7","volume":"12","author":"A Garrido","year":"2009","unstructured":"Garrido A, Arangu M, Onaindia E (2009) A constraint programming formulation for planning: from plan scheduling to plan generation. J Sched 12(3):227\u2013256","journal-title":"J Sched"},{"issue":"03","key":"9667_CR142","doi-asserted-by":"publisher","first-page":"419","DOI":"10.1142\/S0219876205000569","volume":"2","author":"HW Ge","year":"2005","unstructured":"Ge HW et al (2005) A particle swarm optimization-based algorithm for job shop scheduling problems. Int J Comput Methods 2(03):419\u2013430","journal-title":"Int J Comput Methods"},{"key":"9667_CR143","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1016\/j.cie.2018.05.014","volume":"121","author":"R Gedik","year":"2018","unstructured":"Gedik R et al (2018) A constraint programming approach for solving unrelated parallel machine scheduling problem. Comput Ind Eng 121:139\u2013149","journal-title":"Comput Ind Eng"},{"key":"9667_CR144","doi-asserted-by":"crossref","unstructured":"Gersmann K, Hammer B (2004) A reinforcement learning algorithm to improve scheduling search heuristics with the svm. In: Proceedings of 2004 IEEE international joint conference on neural networks, vol 3, IEEE, pp 1811\u20131816","DOI":"10.1109\/IJCNN.2004.1380883"},{"key":"9667_CR145","doi-asserted-by":"crossref","unstructured":"Geske U (2005) Railway scheduling with declarative constraint programming. In: International conference on applications of declarative programming and knowledge management, Springer, Berlin","DOI":"10.1007\/11963578_10"},{"issue":"4","key":"9667_CR146","doi-asserted-by":"publisher","first-page":"853","DOI":"10.1016\/j.rcim.2008.12.005","volume":"25","author":"AH Gharehgozli","year":"2009","unstructured":"Gharehgozli AH, Tavakkoli-Moghaddam R, Zaerpour N (2009) A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates. Robot Comput Integr Manuf 25(4):853\u2013859","journal-title":"Robot Comput Integr Manuf"},{"key":"9667_CR147","volume-title":"Handbook of metaheuristics","year":"2006","unstructured":"Glover FW, Kochenberger GA (eds) (2006) Handbook of metaheuristics, vol 57. Springer, Berlin"},{"key":"9667_CR148","unstructured":"Glover F, Laguna M (1989) Target analysis to improve a tabu search method for machine scheduling. Working papers on artificial intelligence in management science, vol 1, pp 56\u201374"},{"issue":"3","key":"9667_CR149","doi-asserted-by":"publisher","first-page":"662","DOI":"10.1016\/j.ejor.2014.09.048","volume":"241","author":"V Goel","year":"2015","unstructured":"Goel V et al (2015) Constraint programming for LNG ship scheduling and inventory management. Eur J Oper Res 241(3):662\u2013673","journal-title":"Eur J Oper Res"},{"issue":"4","key":"9667_CR150","doi-asserted-by":"publisher","first-page":"503","DOI":"10.1080\/0952813X.2013.782347","volume":"25","author":"A Gogna","year":"2013","unstructured":"Gogna A, Tayal A (2013) Metaheuristics: review and application. J Exp Theor Artif Intell 25(4):503\u2013526","journal-title":"J Exp Theor Artif Intell"},{"key":"9667_CR151","first-page":"1","volume":"30","author":"B G\u00f6kg\u00fcr","year":"2018","unstructured":"G\u00f6kg\u00fcr B, Hnich B, \u00d6zpeynirci S (2018) Parallel machine scheduling with tool loading: a constraint programming approach. Int J Prod Res 30:1\u201317","journal-title":"Int J Prod Res"},{"key":"9667_CR152","unstructured":"Gomes CP, van Hoeve VJ, Selman B (2006) Constraint programming for distributed planning and scheduling. In: AAAI spring symposium: distributed plan and schedule management, vol 1"},{"issue":"2","key":"9667_CR153","doi-asserted-by":"publisher","first-page":"215","DOI":"10.1111\/itor.12044","volume":"21","author":"JF Gon\u00e7alves","year":"2014","unstructured":"Gon\u00e7alves JF, Resende MG (2014) An extended Akers graphical method with a biased random-key genetic algorithm for job-shop scheduling. Int Trans Oper Res 21(2):215\u2013246","journal-title":"Int Trans Oper Res"},{"issue":"3","key":"9667_CR154","doi-asserted-by":"publisher","first-page":"1171","DOI":"10.1016\/j.ejor.2006.06.074","volume":"189","author":"JF Gon\u00e7alves","year":"2008","unstructured":"Gon\u00e7alves JF, Mendes JDM, Resende MG (2008) A genetic algorithm for the resource constrained multi-project scheduling problem. Eur J Oper Res 189(3):1171\u20131190","journal-title":"Eur J Oper Res"},{"key":"9667_CR155","doi-asserted-by":"crossref","unstructured":"Gonz\u00e1lez-Rodr\u00edguez I et al (2010) Heuristic local search for fuzzy open shop scheduling. In: 2010 IEEE International conference on fuzzy systems (FUZZ), IEEE","DOI":"10.1109\/FUZZY.2010.5584235"},{"key":"9667_CR156","first-page":"345","volume-title":"Lecture Notes in Computer Science","author":"Vittorio Gorrini","year":"1996","unstructured":"Gorrini V, Dorigo M (1995) An application of evolutionary algorithms to the scheduling of robotic operations. In: European conference on artificial evolution, Springer, Berlin, pp 345\u2013354"},{"key":"9667_CR157","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"RL Graham","year":"1979","unstructured":"Graham RL et al (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann Discrete Math 5:287\u2013326","journal-title":"Ann Discrete Math"},{"key":"9667_CR158","doi-asserted-by":"crossref","unstructured":"Greenwood GW, Gupta AK, McSweeney K (1994) Scheduling tasks in multiprocessor systems using evolutionary strategies. In: International conference on evolutionary computation, pp 345\u2013349","DOI":"10.1109\/ICEC.1994.349927"},{"issue":"4","key":"9667_CR159","doi-asserted-by":"publisher","first-page":"369","DOI":"10.1007\/s10951-011-0256-7","volume":"16","author":"C Grimme","year":"2013","unstructured":"Grimme C, Lepping J, Schwiegelshohn U (2013) Multi-criteria scheduling: an agent-based approach for expert knowledge integration. J Sched 16(4):369\u2013383","journal-title":"J Sched"},{"key":"9667_CR160","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1016\/j.future.2014.10.031","volume":"51","author":"D Grzonka","year":"2015","unstructured":"Grzonka D et al (2015) Artificial neural network support to monitoring of the evolutionary driven security aware scheduling in computational distributed environments. Future Gener Comput Syst 51:72\u201386","journal-title":"Future Gener Comput Syst"},{"issue":"7","key":"9667_CR161","first-page":"1017","volume":"28","author":"F Gu","year":"2006","unstructured":"Gu F, Chen HP, Lu BY (2006) Optimization for fuzzy flexible job shop scheduling based on genetic algorithm. Syst Eng Electron 28(7):1017\u20131019","journal-title":"Syst Eng Electron"},{"issue":"1","key":"9667_CR162","doi-asserted-by":"publisher","first-page":"63","DOI":"10.1016\/j.jmaa.2008.12.065","volume":"355","author":"J Gu","year":"2009","unstructured":"Gu J, Gu X, Gu M (2009) A novel parallel quantum genetic algorithm for stochastic job shop scheduling. J Math Anal Appl 355(1):63\u201381","journal-title":"J Math Anal Appl"},{"key":"9667_CR163","doi-asserted-by":"publisher","first-page":"481","DOI":"10.1007\/3-540-60299-2_29","volume-title":"Principles and Practice of Constraint Programming \u2014 CP '95","author":"Nabil Guerinik","year":"1995","unstructured":"Guerinik N, Van Caneghem M (1995) Solving crew scheduling problems by constraint programming. In: International conference on principles and practice of constraint programming, Springer, Berlin"},{"key":"9667_CR164","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1023\/A:1008847308326","volume":"9","author":"AL Guiffrida","year":"1998","unstructured":"Guiffrida AL, Nagi R (1998) Fuzzy set theory applications in production management research: a literature survey. J Intell Manuf 9:39\u201356","journal-title":"J Intell Manuf"},{"issue":"1","key":"9667_CR165","doi-asserted-by":"publisher","first-page":"141","DOI":"10.1016\/j.cie.2011.09.002","volume":"62","author":"C Guo","year":"2012","unstructured":"Guo C et al (2012) Decomposition-based classified ant colony optimization algorithm for scheduling semiconductor wafer fabrication system. Comput Ind Eng 62(1):141\u2013151","journal-title":"Comput Ind Eng"},{"issue":"1","key":"9667_CR166","first-page":"15","volume":"8","author":"D Gupta","year":"2016","unstructured":"Gupta D (2016) A study of three stage open shop scheduling by branch and bound technique under fuzzy environment. Arya Bhatta J Math Inf 8(1):15\u201322","journal-title":"Arya Bhatta J Math Inf"},{"issue":"04","key":"9667_CR167","doi-asserted-by":"publisher","first-page":"551","DOI":"10.1142\/S0129626496000492","volume":"6","author":"AK Gupta","year":"1996","unstructured":"Gupta AK, Greenwood GW (1996) Applications of evolutionary strategies to fine-grained task scheduling. Parallel Process Lett 6(04):551\u2013561","journal-title":"Parallel Process Lett"},{"issue":"3","key":"9667_CR168","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1016\/0377-2217(93)90240-N","volume":"70","author":"MC Gupta","year":"1993","unstructured":"Gupta MC, Gupta YP, Kumar A (1993) Minimizing flow time variance in a single machine system using genetic algorithms. Eur J Oper Res 70(3):289\u2013303","journal-title":"Eur J Oper Res"},{"issue":"9","key":"9667_CR169","first-page":"2229","volume":"3","author":"D Gupta","year":"2012","unstructured":"Gupta D, Sharma S, Aggarwal S (2012) Specially structured flow shop production scheduling to minimize the rental cost in fuzzy environment. Int J Math Arch (IJMA) EISSN 3(9):2229\u20135046","journal-title":"Int J Math Arch (IJMA) EISSN"},{"issue":"3","key":"9667_CR170","doi-asserted-by":"publisher","first-page":"642","DOI":"10.1016\/j.cor.2005.03.018","volume":"34","author":"WJ Gutjahr","year":"2007","unstructured":"Gutjahr WJ, Rauner MS (2007) An ACO algorithm for a dynamic regional nurse-scheduling problem in Austria. Comput Oper Res 34(3):642\u2013666","journal-title":"Comput Oper Res"},{"key":"9667_CR171","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.trc.2018.03.025","volume":"91","author":"AM Ham","year":"2018","unstructured":"Ham AM (2018) Integrated scheduling of m-truck, m-drone, and m-depot constrained by time-window, drop-pickup, and m-visit using constraint programming. Transp Res Part C Emerg Technol 91:1\u201314","journal-title":"Transp Res Part C Emerg Technol"},{"issue":"7","key":"9667_CR172","doi-asserted-by":"publisher","first-page":"845","DOI":"10.1080\/0020716031000103358","volume":"80","author":"A Hamad","year":"2003","unstructured":"Hamad A, Sanugi B, Salleh S (2003) A neural network model for the common due date job scheduling on unrelated parallel machines. Int J Comput Math 80(7):845\u2013851","journal-title":"Int J Comput Math"},{"issue":"1","key":"9667_CR173","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0377-2217(94)90391-3","volume":"79","author":"S Han","year":"1994","unstructured":"Han S, Ishii H, Fujii S (1994) One machine scheduling problem with fuzzy due dates. Eur J Oper Res 79(1):1\u201312","journal-title":"Eur J Oper Res"},{"issue":"1-4","key":"9667_CR174","doi-asserted-by":"publisher","first-page":"65","DOI":"10.1023\/B:ANOR.0000019099.29005.17","volume":"128","author":"G Hao","year":"2004","unstructured":"Hao G, Lai KK, Tan M (2004) A neural network application in personnel scheduling. Ann Oper Res 128(1-4):65\u201390","journal-title":"Ann Oper Res"},{"key":"9667_CR175","doi-asserted-by":"publisher","first-page":"302","DOI":"10.1016\/j.ins.2013.12.005","volume":"264","author":"K Haridass","year":"2014","unstructured":"Haridass K, Valenzuela J, Yucekaya AD, McDonald T (2014) Scheduling a log transport system using simulated annealing. Inf Sci 264:302\u2013316","journal-title":"Inf Sci"},{"key":"9667_CR176","doi-asserted-by":"crossref","unstructured":"Harjunkoski I, Grossmann IE (2001) Combined MILP-constraint programming approach for the optimal scheduling of multistage batch processes. In: Computer aided chemical engineering, vol 9, Elsevier, pp 877\u2013882","DOI":"10.1016\/S1570-7946(01)80140-1"},{"issue":"11","key":"9667_CR177","doi-asserted-by":"publisher","first-page":"1533","DOI":"10.1016\/S0098-1354(02)00100-X","volume":"26","author":"I Harjunkoski","year":"2002","unstructured":"Harjunkoski I, Grossmann IE (2002) Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods. Comput Chem Eng 26(11):1533\u20131552","journal-title":"Comput Chem Eng"},{"issue":"2-7","key":"9667_CR178","doi-asserted-by":"publisher","first-page":"337","DOI":"10.1016\/S0098-1354(00)00470-1","volume":"24","author":"I Harjunkoski","year":"2000","unstructured":"Harjunkoski I, Jain V, Grossman IE (2000) Hybrid mixed-integer\/constraint logic programming strategies for solving scheduling and combinatorial optimization problems. Comput Chem Eng 24(2-7):337\u2013343","journal-title":"Comput Chem Eng"},{"key":"9667_CR179","unstructured":"Harmanani HM, Ghosn SB (2016) An efficient method for the open shop scheduling problem using simulated annealing. In: Information technology: new generations, Springer International Publishing, pp 1183\u20131193"},{"issue":"7","key":"9667_CR180","doi-asserted-by":"publisher","first-page":"733","DOI":"10.1002\/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0.CO;2-C","volume":"45","author":"S Hartmann","year":"1998","unstructured":"Hartmann S (1998) A competitive genetic algorithm for resource-constrained project scheduling. Naval Res Log (NRL) 45(7):733\u2013750","journal-title":"Naval Res Log (NRL)"},{"issue":"1\u20134","key":"9667_CR181","doi-asserted-by":"publisher","first-page":"111","DOI":"10.1023\/A:1010902015091","volume":"102","author":"S Hartmann","year":"2001","unstructured":"Hartmann S (2001) Project scheduling with multiple modes: a genetic algorithm. Ann Oper Res 102(1\u20134):111\u2013135","journal-title":"Ann Oper Res"},{"issue":"4","key":"9667_CR182","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1142\/S0129065794000372","volume":"5","author":"S Haykin","year":"1994","unstructured":"Haykin S, Lippmann R (1994) Neural networks, a comprehensive foundation. Int J Neural Syst 5(4):363\u2013364","journal-title":"Int J Neural Syst"},{"key":"9667_CR183","unstructured":"He R-J (2005) Parallel machine scheduling problem with time windows: a constraint programming and tabu search hybrid approach. In: Proceedings of 2005 international conference on machine learning and cybernetics, vol 5, IEEE"},{"issue":"3","key":"9667_CR184","doi-asserted-by":"publisher","first-page":"688","DOI":"10.1016\/j.ejor.2008.10.005","volume":"198","author":"Z He","year":"2009","unstructured":"He Z et al (2009) Simulated annealing and tabu search for multi-mode project payment scheduling. Eur J Oper Res 198(3):688\u2013696","journal-title":"Eur J Oper Res"},{"key":"9667_CR185","doi-asserted-by":"publisher","first-page":"12","DOI":"10.1007\/978-3-642-38171-3_2","volume-title":"Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems","author":"Stefan Heinz","year":"2013","unstructured":"Heinz S, Ku W-Y, Christopher Beck J (2013) Recent improvements using constraint integer programming for resource allocation and scheduling. In: International conference on AI and OR techniques in constriant programming for combinatorial optimization problems, Springer, Berlin"},{"key":"9667_CR186","unstructured":"Heist SM (2003) A comparison of constraint programming and integer programming for an industrial planning problem. PhD thesis, Lehigh University"},{"key":"9667_CR187","volume-title":"Adaptation in natural and artificial systems","author":"JH Holland","year":"1975","unstructured":"Holland JH (1975) Adaptation in natural and artificial systems. University of Michigan Press, Ann Arbor"},{"issue":"1","key":"9667_CR188","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1016\/S0020-0255(00)00066-9","volume":"129","author":"TP Hong","year":"2000","unstructured":"Hong TP, Wang TT (2000) Fuzzy flexible flow shops at two machine centers for continuous fuzzy domains. Inf Sci 129(1):227\u2013237","journal-title":"Inf Sci"},{"issue":"7","key":"9667_CR189","doi-asserted-by":"publisher","first-page":"1047","DOI":"10.1016\/j.epsr.2009.01.001","volume":"79","author":"PK Hota","year":"2009","unstructured":"Hota PK, Barisal AK, Chakrabarti R (2009) An improved PSO technique for short-term optimal hydrothermal scheduling. Electric Power Syst Res 79(7):1047\u20131053","journal-title":"Electric Power Syst Res"},{"key":"9667_CR190","doi-asserted-by":"publisher","first-page":"159","DOI":"10.1016\/j.cie.2015.02.009","volume":"83","author":"CY Hsu","year":"2015","unstructured":"Hsu CY, Chang PC, Chen MH (2015) A linkage mining in block-based evolutionary algorithm for permutation flow shop scheduling problem. Comput Ind Eng 83:159\u2013171","journal-title":"Comput Ind Eng"},{"key":"9667_CR191","doi-asserted-by":"publisher","first-page":"140","DOI":"10.1016\/j.engappai.2016.04.005","volume":"53","author":"C-Y Hsu","year":"2016","unstructured":"Hsu C-Y, Kao B-R, RobertLai K (2016) Agent-based fuzzy constraint-directed negotiation mechanism for distributed job shop scheduling. Eng Appl Artif Intell 53:140\u2013154","journal-title":"Eng Appl Artif Intell"},{"issue":"9\u201312","key":"9667_CR192","doi-asserted-by":"publisher","first-page":"1125","DOI":"10.1007\/s00170-011-3244-3","volume":"56","author":"Y Hu","year":"2011","unstructured":"Hu Y, Yin M, Li X (2011) A novel objective function for job shop scheduling problem with fuzzy processing time and fuzzy due date using differential evolution algorithm. Int J Adv Manuf Technol 56(9\u201312):1125\u20131138","journal-title":"Int J Adv Manuf Technol"},{"issue":"3","key":"9667_CR193","doi-asserted-by":"publisher","first-page":"296","DOI":"10.1109\/60.937211","volume":"16","author":"S-J Huang","year":"2001","unstructured":"Huang S-J (2001) Enhancement of hydroelectric generation scheduling using ant colony system based optimization approaches. IEEE Trans Energy Convers 16(3):296\u2013301","journal-title":"IEEE Trans Energy Convers"},{"issue":"4","key":"9667_CR194","doi-asserted-by":"publisher","first-page":"1030","DOI":"10.1016\/j.cor.2006.07.003","volume":"35","author":"K-L Huang","year":"2008","unstructured":"Huang K-L, Liao C-J (2008) Ant colony optimization combined with taboo search for the job shop scheduling problem. Comput Oper Res 35(4):1030\u20131046","journal-title":"Comput Oper Res"},{"key":"9667_CR195","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1016\/j.cie.2014.12.001","volume":"86","author":"J Huang","year":"2015","unstructured":"Huang J, S\u00fcer GA (2015) A dispatching rule-based genetic algorithm for multi-objective job shop scheduling using fuzzy satisfaction levels. Comput Ind Eng 86:29\u201342","journal-title":"Comput Ind Eng"},{"issue":"5","key":"9667_CR196","doi-asserted-by":"publisher","first-page":"4999","DOI":"10.1016\/j.eswa.2011.10.013","volume":"39","author":"C-S Huang","year":"2012","unstructured":"Huang C-S, Huang Y-C, Lai P-J (2012) Modified genetic algorithms for solving fuzzy flow shop scheduling problems and their implementation with CUDA. Expert Syst Appl 39(5):4999\u20135005","journal-title":"Expert Syst Appl"},{"issue":"8","key":"9667_CR197","doi-asserted-by":"publisher","first-page":"877","DOI":"10.1016\/0305-0548(94)90017-5","volume":"21","author":"R H\u00fcbscher","year":"1994","unstructured":"H\u00fcbscher R, Glover F (1994) Applying tabu search with influential diversification to multiprocessor scheduling. Comput Oper Res 21(8):877\u2013884","journal-title":"Comput Oper Res"},{"issue":"1\u20133","key":"9667_CR198","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1016\/0925-5273(94)90118-X","volume":"33","author":"H Ishibuchi","year":"1994","unstructured":"Ishibuchi H, Yamamoto N, Misaki S, Tanaka H (1994) Local search algorithms for flow shop scheduling with fuzzy due dates. Int J Prod Econ 33(1\u20133):53\u201366","journal-title":"Int J Prod Econ"},{"issue":"2","key":"9667_CR199","doi-asserted-by":"publisher","first-page":"388","DOI":"10.1016\/0377-2217(93)E0235-P","volume":"81","author":"H Ishibuchi","year":"1995","unstructured":"Ishibuchi H, Misaki S, Tanaka H (1995) Modified simulated annealing algorithms for the flow shop sequencing problem. Eur J Oper Res 81(2):388\u2013398","journal-title":"Eur J Oper Res"},{"issue":"2","key":"9667_CR200","doi-asserted-by":"publisher","first-page":"204","DOI":"10.1109\/TEVC.2003.810752","volume":"7","author":"H Ishibuchi","year":"2003","unstructured":"Ishibuchi H, Yoshida T, Murata T (2003) Balance between genetic search and local search in memetic algorithms for multiobjective permutation flow shop scheduling. IEEE Trans Evolut Comput 7(2):204\u2013223","journal-title":"IEEE Trans Evolut Comput"},{"issue":"3","key":"9667_CR201","doi-asserted-by":"publisher","first-page":"339","DOI":"10.1016\/0165-0114(92)90372-B","volume":"46","author":"H Ishii","year":"1992","unstructured":"Ishii H, Tada M, Masuda T (1992) Two scheduling problems with fuzzy due dates. Fuzzy Sets Syst 46(3):339\u2013347","journal-title":"Fuzzy Sets Syst"},{"issue":"1","key":"9667_CR202","doi-asserted-by":"publisher","first-page":"71","DOI":"10.1007\/s10700-004-5571-4","volume":"4","author":"T Itoh","year":"2005","unstructured":"Itoh T, Ishii H (2005) One machine scheduling problem with fuzzy random due dates. Fuzzy Optim Decis Mak 4(1):71\u201378","journal-title":"Fuzzy Optim Decis Mak"},{"issue":"4","key":"9667_CR203","doi-asserted-by":"publisher","first-page":"593","DOI":"10.1016\/S0305-0548(03)00016-9","volume":"31","author":"SK Iyer","year":"2004","unstructured":"Iyer SK, Saxena B (2004) Improved genetic algorithm for the permutation flow shop scheduling problem. Comput Oper Res 31(4):593\u2013606","journal-title":"Comput Oper Res"},{"issue":"3","key":"9667_CR204","first-page":"1","volume":"1","author":"A Jafari","year":"2012","unstructured":"Jafari A et al (2012) A novel discrete electromagnetism-like for fuzzy open shop scheduling problem with parallel machines to minimize makespan. Int J 1(3):1\u201325","journal-title":"Int J"},{"key":"9667_CR504","unstructured":"Jain LC, Martin NM (1999) Introduction to neural networks, fuzzy systems, genetic algorithms, and their fusion. In: Fusion of neural networks, fuzzy sets, and genetic algorithms: industrial Applications. CRC Press, Boca Raton, pp 3\u201312"},{"issue":"8","key":"9667_CR205","doi-asserted-by":"publisher","first-page":"1901","DOI":"10.1016\/S0098-1354(00)00592-5","volume":"24","author":"VK Jayaraman","year":"2000","unstructured":"Jayaraman VK et al (2000) Ant colony framework for optimal design and scheduling of batch plants. Comput Chem Eng 24(8):1901\u20131912","journal-title":"Comput Chem Eng"},{"key":"9667_CR206","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1016\/j.cor.2014.01.010","volume":"47","author":"S Jia","year":"2014","unstructured":"Jia S, Zhi-Hua H (2014) Path-relinking Tabu search for the multi-objective flexible job shop scheduling problem. Comput Oper Res 47:11\u201326","journal-title":"Comput Oper Res"},{"issue":"2","key":"9667_CR207","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1016\/j.cie.2007.06.024","volume":"53","author":"HZ Jia","year":"2007","unstructured":"Jia HZ, Fuh JY, Nee AY, Zhang YF (2007) Integration of genetic algorithm and Gantt chart for job shop scheduling in distributed manufacturing systems. Comput Ind Eng 53(2):313\u2013320","journal-title":"Comput Ind Eng"},{"key":"9667_CR208","doi-asserted-by":"crossref","unstructured":"Jia Y, Qu J, Wang L (2016) A novel particle swarm optimization algorithm for permutation flow shop scheduling problem. In: International conference on human centered computing, Springer International Publishing","DOI":"10.1007\/978-3-319-31854-7_62"},{"issue":"7","key":"9667_CR209","doi-asserted-by":"publisher","first-page":"2133","DOI":"10.1016\/j.cor.2008.08.001","volume":"36","author":"F Jin","year":"2009","unstructured":"Jin F, Song S, Wu C (2009) A simulated annealing algorithm for single machine scheduling problems with family setups. Comput Oper Res 36(7):2133\u20132138","journal-title":"Comput Oper Res"},{"key":"9667_CR210","doi-asserted-by":"crossref","unstructured":"Jin L, Zhang C, Shao X, Tian G (2016) Mathematical modeling and a memetic algorithm for the integration of process planning and scheduling considering uncertain processing times. In: Proceedings of the institution of mechanical engineers, part b: journal of engineering manufacture, 0954405415625916","DOI":"10.1177\/0954405415625916"},{"issue":"3","key":"9667_CR211","first-page":"861","volume":"20","author":"F Jolai","year":"2013","unstructured":"Jolai F, Asefi H, Rabiee M, Ramezani P (2013) Bi-objective simulated annealing approaches for no-wait two-stage flexible flow shop scheduling problem. Sci Iran 20(3):861\u2013872","journal-title":"Sci Iran"},{"issue":"05","key":"9667_CR212","doi-asserted-by":"publisher","first-page":"208","DOI":"10.4236\/jsea.2016.95017","volume":"9","author":"VS Jorapur","year":"2016","unstructured":"Jorapur VS, Puranik VS, Deshpande AS, Sharma M (2016) A promising initial population based genetic algorithm for job shop scheduling problem. J Softw Eng Appl 9(05):208","journal-title":"J Softw Eng Appl"},{"issue":"1\u20134","key":"9667_CR213","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1023\/A:1010954031930","volume":"102","author":"J J\u00f3zefowska","year":"2001","unstructured":"J\u00f3zefowska J, Mika M, R\u00f3\u017cycki R, Walig\u00f3ra G, W\u0119glarz J (2001) Simulated annealing for multi-mode resource-constrained project scheduling. Ann Oper Res 102(1\u20134):137\u2013155","journal-title":"Ann Oper Res"},{"issue":"16","key":"9667_CR214","doi-asserted-by":"publisher","first-page":"7621","DOI":"10.1016\/j.eswa.2014.05.048","volume":"41","author":"KS Kahlon","year":"2014","unstructured":"Kahlon KS (2014) An embedded fuzzy expert system for adaptive WFQ scheduling of IEEE 802.16 networks. Expert Syst Appl 41(16):7621\u20137629","journal-title":"Expert Syst Appl"},{"issue":"3","key":"9667_CR215","doi-asserted-by":"publisher","first-page":"455","DOI":"10.1134\/S1064230708030155","volume":"47","author":"AV Kalashnikov","year":"2008","unstructured":"Kalashnikov AV, Kostenko VA (2008) A parallel algorithm of simulated annealing for multiprocessor scheduling. J Comput Syst Sci Int 47(3):455\u2013463","journal-title":"J Comput Syst Sci Int"},{"key":"9667_CR216","unstructured":"Kanet JJ, Ahire SL, Gorman MF (2004) Constraint programming for scheduling. In: Handbook of scheduling: algorithms, models, and performance analysis, vol 47. Chapman and Hall\/CRC Press, Boca Raton, pp 1\u201321"},{"issue":"1","key":"9667_CR217","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1080\/0305215X.2012.658783","volume":"45","author":"S Kaplan","year":"2013","unstructured":"Kaplan S, Rabadi G (2013) Simulated annealing and metaheuristic for randomized priority search algorithms for the aerial refuelling parallel machine scheduling problem with due date-to-deadline windows and release times. Eng Optim 45(1):67\u201387","journal-title":"Eng Optim"},{"key":"9667_CR218","doi-asserted-by":"publisher","first-page":"236","DOI":"10.1016\/j.knosys.2012.04.001","volume":"36","author":"H Karimi","year":"2012","unstructured":"Karimi H, Rahmati SHA, Zandieh M (2012) An efficient knowledge-based algorithm for the flexible job shop scheduling problem. Knowl Based Syst 36:236\u2013244","journal-title":"Knowl Based Syst"},{"key":"9667_CR219","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1016\/j.asoc.2014.10.015","volume":"27","author":"M Karimi-Nasab","year":"2015","unstructured":"Karimi-Nasab M, Modarres M, Seyedhoseini SM (2015) A self-adaptive PSO for joint lot sizing and job shop scheduling with compressible process times. Appl Soft Comput 27:137\u2013147","journal-title":"Appl Soft Comput"},{"issue":"4","key":"9667_CR220","doi-asserted-by":"publisher","first-page":"689","DOI":"10.1016\/j.jmsy.2013.02.001","volume":"32","author":"M-T Kechadi","year":"2013","unstructured":"Kechadi M-T, Low KS, Goncalves G (2013) Recurrent neural network approach for cyclic job shop scheduling problem. J Manuf Syst 32(4):689\u2013699","journal-title":"J Manuf Syst"},{"issue":"3","key":"9667_CR221","doi-asserted-by":"publisher","first-page":"1818","DOI":"10.1016\/j.ejor.2005.02.077","volume":"175","author":"E Khayat","year":"2006","unstructured":"Khayat E, Ghada AL, Riopel D (2006) Integrated production and material handling scheduling using mathematical programming and constraint programming. Eur J Oper Res 175(3):1818\u20131832","journal-title":"Eur J Oper Res"},{"issue":"3","key":"9667_CR222","doi-asserted-by":"publisher","first-page":"223","DOI":"10.1016\/S0736-5845(02)00013-3","volume":"18","author":"DW Kim","year":"2002","unstructured":"Kim DW, Kim KH, Jang W, Chen FF (2002) Unrelated parallel machine scheduling with setup times using simulated annealing. Robot Comput Integr Manuf 18(3):223\u2013231","journal-title":"Robot Comput Integr Manuf"},{"key":"9667_CR223","doi-asserted-by":"publisher","first-page":"95","DOI":"10.1016\/j.cie.2015.12.012","volume":"92","author":"S K\u0131r","year":"2016","unstructured":"K\u0131r S, Yazgan HR (2016) A sequence dependent single machine scheduling problem with fuzzy axiomatic design for the penalty costs. Comput Ind Eng 92:95\u2013104","journal-title":"Comput Ind Eng"},{"issue":"8","key":"9667_CR224","doi-asserted-by":"publisher","first-page":"890","DOI":"10.1016\/j.knosys.2010.06.005","volume":"23","author":"\u015e K\u0131r\u0131\u015f","year":"2010","unstructured":"K\u0131r\u0131\u015f \u015e, Y\u00fcz\u00fcg\u00fcll\u00fc N, Erg\u00fcn N, \u00c7evik AA (2010) A knowledge-based scheduling system for emergency departments. Knowl Based Syst 23(8):890\u2013900","journal-title":"Knowl Based Syst"},{"key":"9667_CR225","unstructured":"Koay CA, Srinivasan D (2003) Particle swarm optimization-based approach for generator maintenance scheduling. In: Proceedings of the swarm intelligence symposium, SIS\u201903, IEEE"},{"key":"9667_CR226","doi-asserted-by":"publisher","first-page":"46","DOI":"10.1016\/j.cie.2014.09.012","volume":"77","author":"T Kocsis","year":"2014","unstructured":"Kocsis T et al (2014) Case-reasoning system for mathematical modelling options and resolution methods for production scheduling problems: case representation, acquisition and retrieval. Comput Ind Eng 77:46\u201364","journal-title":"Comput Ind Eng"},{"key":"9667_CR227","volume-title":"Case-based reasoning","author":"J Kolodner","year":"2014","unstructured":"Kolodner J (2014) Case-based reasoning. Morgan Kaufmann, Burlington"},{"key":"9667_CR228","volume-title":"Case-based reasoning: an overview","author":"JL Kolodner","year":"1991","unstructured":"Kolodner JL, Jona MY (1991) Case-based reasoning: an overview. Northwestern University, Evanston"},{"issue":"1","key":"9667_CR229","doi-asserted-by":"publisher","first-page":"141","DOI":"10.1016\/S0165-0114(97)00380-1","volume":"109","author":"T Konno","year":"2000","unstructured":"Konno T, Ishii H (2000) An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint. Fuzzy Sets Syst 109(1):141\u2013147","journal-title":"Fuzzy Sets Syst"},{"key":"9667_CR230","doi-asserted-by":"publisher","first-page":"680","DOI":"10.1016\/j.ins.2014.02.155","volume":"277","author":"G Koulinas","year":"2014","unstructured":"Koulinas G, Kotsikas L, Anagnostopoulos K (2014) A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem. Inf Sci 277:680\u2013693","journal-title":"Inf Sci"},{"key":"9667_CR231","doi-asserted-by":"publisher","first-page":"332","DOI":"10.1007\/978-3-540-30201-8_26","volume-title":"Principles and Practice of Constraint Programming \u2013 CP 2004","author":"Andr\u00e1s Kov\u00e1cs","year":"2004","unstructured":"Kov\u00e1cs A, V\u00e1ncza J (2004) Completable partial solutions in constraint programming and constraint-based scheduling. In: International conference on principles and practice of constraint programming, Springer, Berlin"},{"issue":"5","key":"9667_CR232","doi-asserted-by":"publisher","first-page":"283","DOI":"10.1016\/0098-1354(91)80001-C","volume":"15","author":"HM Ku","year":"1991","unstructured":"Ku HM, Karimi IA (1991) Scheduling algorithms for serial multiproduct batch processes with tardiness penalties. Comput Chem Eng 15(5):283\u2013286","journal-title":"Comput Chem Eng"},{"issue":"12-15","key":"9667_CR233","doi-asserted-by":"publisher","first-page":"489","DOI":"10.1016\/S1383-7621(03)00075-4","volume":"49","author":"K Kuchcinski","year":"2003","unstructured":"Kuchcinski K, Wolinski C (2003) Global approach to assignment and scheduling of complex behaviors based on HCDG and constraint programming. J Syst Architect 49(12-15):489\u2013503","journal-title":"J Syst Architect"},{"key":"9667_CR234","unstructured":"Kumar K et al (2007) Optimization of flow shop scheduling with fuzzy due dates using a hybrid evolutionary algorithm. In: Proceedings of the international conference"},{"issue":"3","key":"9667_CR235","doi-asserted-by":"publisher","first-page":"7027","DOI":"10.1016\/j.eswa.2008.08.054","volume":"36","author":"IH Kuo","year":"2009","unstructured":"Kuo IH et al (2009) An efficient flow shop scheduling algorithm based on a hybrid particle swarm optimization model. Expert Syst Appl 36(3):7027\u20137032","journal-title":"Expert Syst Appl"},{"key":"9667_CR236","doi-asserted-by":"crossref","unstructured":"K\u03b9l\u03b9\u00e7 S, Kahraman C (2006) Metaheuristic techniques for job shop scheduling problem and a fuzzy ant colony optimization algorithm. In: Fuzzy applications in industrial engineering, Springer, Berlin, pp 401\u2013425","DOI":"10.1007\/3-540-33517-X_17"},{"key":"9667_CR237","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1007\/978-94-015-7744-1","volume-title":"Simulated annealing. Simulated annealing: theory and applications","author":"V Laarhoven","year":"1987","unstructured":"Laarhoven V, Peter JM, Aarts EHL (1987) Simulated annealing. Simulated annealing: theory and applications. Springer, Dordrecht, pp 7\u201315"},{"issue":"3","key":"9667_CR238","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/0957-4174(93)90056-C","volume":"6","author":"M Laguna","year":"1993","unstructured":"Laguna M, Glover F (1993) Integrating target analysis and tabu search for improved scheduling systems. Expert Syst Appl 6(3):287\u2013297","journal-title":"Expert Syst Appl"},{"issue":"03","key":"9667_CR239","doi-asserted-by":"publisher","first-page":"409","DOI":"10.1142\/S0218488508005340","volume":"16","author":"P-J Lai","year":"2008","unstructured":"Lai P-J, Wu H-C (2008) Using genetic algorithms to solve fuzzy flow shop scheduling problems based on possibility and necessity measures. Int J Uncertain Fuzziness Knowl Based Syst 16(03):409\u2013433","journal-title":"Int J Uncertain Fuzziness Knowl Based Syst"},{"issue":"5","key":"9667_CR240","doi-asserted-by":"publisher","first-page":"305","DOI":"10.1016\/S0142-0615(98)00009-X","volume":"20","author":"LL Lai","year":"1998","unstructured":"Lai LL, Ma JT, Lee JB (1998) Multitime-interval scheduling for daily operation of a two-cogeneration system with evolutionary programming. Int J Electr Power Energy Syst 20(5):305\u2013311","journal-title":"Int J Electr Power Energy Syst"},{"key":"9667_CR241","unstructured":"Lap\u00e8gue T, Prot D, Bellenguez-Morineau O (2012) A tour scheduling problem with fixed jobs: use of constraint programming. In: Practice and theory of automated timetabling"},{"issue":"4","key":"9667_CR242","doi-asserted-by":"publisher","first-page":"455","DOI":"10.1057\/palgrave.jors.2602423","volume":"59","author":"A \u0141awrynowicz","year":"2008","unstructured":"\u0141awrynowicz A (2008) Integration of production planning and scheduling using an expert system and a genetic algorithm. J Oper Res Soc 59(4):455\u2013463","journal-title":"J Oper Res Soc"},{"key":"9667_CR243","unstructured":"Le Pape C, Baptiste P (1997) A constraint programming library for preemptive and non-preemptive scheduling. In: Proceedings of PACT97"},{"issue":"2","key":"9667_CR244","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1016\/j.omega.2003.10.001","volume":"32","author":"SM Lee","year":"2004","unstructured":"Lee SM, Asllani AA (2004) Job scheduling with dual criteria and sequence-dependent setups: mathematical versus genetic programming. Omega 32(2):145\u2013153","journal-title":"Omega"},{"key":"9667_CR245","doi-asserted-by":"publisher","first-page":"15","DOI":"10.1177\/0361198105190700103","volume":"1907","author":"E-B Lee","year":"2005","unstructured":"Lee E-B, Harvey J, Samadian M (2005) Knowledge-based scheduling analysis software for highway rehabilitation and reconstruction projects. Transp Res Rec J Transp Res Board 1907:15\u201324","journal-title":"Transp Res Rec J Transp Res Board"},{"issue":"3","key":"9667_CR246","doi-asserted-by":"publisher","first-page":"141","DOI":"10.1016\/0167-6377(88)90080-6","volume":"7","author":"CY Lee","year":"1988","unstructured":"Lee CY, Hwang JJ, Chow YC, Anger FD (1988) Multiprocessor scheduling with interprocessor communication delays. Oper Res Lett 7(3):141\u2013147","journal-title":"Oper Res Lett"},{"issue":"1","key":"9667_CR247","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1016\/j.ijpe.2006.08.003","volume":"107","author":"DH Lee","year":"2007","unstructured":"Lee DH, Cao Z, Meng Q (2007) Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithm. Int J Prod Econ 107(1):115\u2013124","journal-title":"Int J Prod Econ"},{"issue":"1\u20132","key":"9667_CR248","doi-asserted-by":"publisher","first-page":"157","DOI":"10.1007\/s00170-007-0945-8","volume":"37","author":"D Lei","year":"2008","unstructured":"Lei D (2008) Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems. Int J Adv Manuf Technol 37(1\u20132):157\u2013165","journal-title":"Int J Adv Manuf Technol"},{"issue":"4","key":"9667_CR249","doi-asserted-by":"publisher","first-page":"610","DOI":"10.1016\/j.cie.2010.01.002","volume":"58","author":"D Lei","year":"2010","unstructured":"Lei D (2010a) Fuzzy job shop scheduling problem with availability constraints. Comput Ind Eng 58(4):610\u2013617","journal-title":"Comput Ind Eng"},{"issue":"10","key":"9667_CR250","doi-asserted-by":"publisher","first-page":"2995","DOI":"10.1080\/00207540902814348","volume":"48","author":"D Lei","year":"2010","unstructured":"Lei D (2010b) A genetic algorithm for flexible job shop scheduling with fuzzy processing time. Int J Prod Res 48(10):2995\u20133013","journal-title":"Int J Prod Res"},{"issue":"1\u20134","key":"9667_CR251","doi-asserted-by":"publisher","first-page":"253","DOI":"10.1007\/s00170-009-2379-y","volume":"49","author":"D Lei","year":"2010","unstructured":"Lei D (2010c) Solving fuzzy job shop scheduling problems using random key genetic algorithm. Int J Adv Manuf Technol 49(1\u20134):253\u2013262","journal-title":"Int J Adv Manuf Technol"},{"issue":"6","key":"9667_CR252","doi-asserted-by":"publisher","first-page":"1639","DOI":"10.1080\/00207543.2011.575412","volume":"50","author":"D Lei","year":"2012","unstructured":"Lei D, Guo X (2012) Swarm-based neighbourhood search algorithm for fuzzy flexible job shop scheduling. Int J Prod Res 50(6):1639\u20131649","journal-title":"Int J Prod Res"},{"issue":"1\u20132","key":"9667_CR253","doi-asserted-by":"publisher","first-page":"112","DOI":"10.1007\/s00170-005-0029-6","volume":"30","author":"D Lei","year":"2006","unstructured":"Lei D, Wu Z (2006) Crowding-measure-based multiobjective evolutionary algorithm for job shop scheduling. Int J Adv Manuf Technol 30(1\u20132):112\u2013117","journal-title":"Int J Adv Manuf Technol"},{"key":"9667_CR254","doi-asserted-by":"publisher","first-page":"275","DOI":"10.1007\/978-3-642-29353-5_32","volume-title":"Swarm and Evolutionary Computation","author":"Junqing Li","year":"2012","unstructured":"Li J et al (2012) Solving fuzzy job shop scheduling problem by a hybrid PSO algorithm. In: Swarm and evolutionary computation, Springer, Berlin, pp 275\u2013282"},{"key":"9667_CR255","doi-asserted-by":"crossref","unstructured":"Li X et al (2015) Study on resource scheduling method of predictive maintenance for equipment based on knowledge. In: 2015 10th international conference on intelligent systems and knowledge engineering (ISKE), IEEE","DOI":"10.1109\/ISKE.2015.13"},{"issue":"3","key":"9667_CR256","first-page":"26","volume":"34","author":"Y Li","year":"2007","unstructured":"Li Y, Li TK (2007) Research on no-wait hybrid flowshop scheduling problem based on constraint programming. Control Instrum Chem Ind 34(3):26","journal-title":"Control Instrum Chem Ind"},{"issue":"1\u20134","key":"9667_CR257","doi-asserted-by":"publisher","first-page":"583","DOI":"10.1007\/s00170-012-4337-3","volume":"66","author":"JQ Li","year":"2013","unstructured":"Li JQ, Pan YX (2013) A hybrid discrete particle swarm optimization algorithm for solving fuzzy job shop scheduling problem. Int J Adv Manuf Technol 66(1\u20134):583\u2013596","journal-title":"Int J Adv Manuf Technol"},{"key":"9667_CR258","unstructured":"Li Y, Luh PB, Guan X (1994) Fuzzy optimization-based scheduling of identical machines with possible breakdown. In: Proceedings of 1994 IEEE international conference on robotics and automation, IEEE, pp 3447\u20133452"},{"issue":"10","key":"9667_CR259","doi-asserted-by":"publisher","first-page":"977","DOI":"10.1080\/00207729708929461","volume":"28","author":"DC Li","year":"1997","unstructured":"Li DC, Wu C, Torng KY (1997) Using an unsupervized neural network and decision tree as knowledge acquisition tools for FMS scheduling. Int J Syst Sci 28(10):977\u2013985","journal-title":"Int J Syst Sci"},{"issue":"2","key":"9667_CR260","doi-asserted-by":"publisher","first-page":"283","DOI":"10.1016\/S0377-2217(99)00381-1","volume":"124","author":"H Li","year":"2000","unstructured":"Li H et al (2000) A production rescheduling expert simulation system. Eur J Oper Res 124(2):283\u2013293","journal-title":"Eur J Oper Res"},{"issue":"3","key":"9667_CR261","first-page":"2","volume":"5","author":"T Li","year":"2005","unstructured":"Li T et al (2005) Constraint programming approach to steelmaking-making process scheduling. Commun IIMA 5(3):2","journal-title":"Commun IIMA"},{"issue":"5-8","key":"9667_CR262","doi-asserted-by":"publisher","first-page":"683","DOI":"10.1007\/s00170-010-2743-y","volume":"52","author":"J-Q Li","year":"2011","unstructured":"Li J-Q et al (2011) A hybrid tabu search algorithm with an efficient neighborhood structure for the flexible job shop scheduling problem. Int J Adv Manuf Technol 52(5-8):683\u2013697","journal-title":"Int J Adv Manuf Technol"},{"issue":"3","key":"9667_CR263","doi-asserted-by":"publisher","first-page":"688","DOI":"10.1016\/j.cie.2011.12.021","volume":"62","author":"X Li","year":"2012","unstructured":"Li X, Ishii H, Masuda T (2012) Single machine batch scheduling problem with fuzzy batch size. Comput Ind Eng 62(3):688\u2013692","journal-title":"Comput Ind Eng"},{"issue":"9","key":"9667_CR264","doi-asserted-by":"publisher","first-page":"2707","DOI":"10.1080\/00207543.2014.975866","volume":"53","author":"X Li","year":"2015","unstructured":"Li X, Ishii H, Chen M (2015a) Single machine parallel-batching scheduling problem with fuzzy due date and fuzzy precedence relation. Int J Prod Res 53(9):2707\u20132717","journal-title":"Int J Prod Res"},{"issue":"5","key":"9667_CR265","doi-asserted-by":"publisher","first-page":"873","DOI":"10.1007\/s10845-014-0874-y","volume":"26","author":"D Li","year":"2015","unstructured":"Li D, Meng X, Liang Q, Zhao J (2015b) A heuristic-search genetic algorithm for multi-stage hybrid flow shop scheduling with single processing machines and batch processing machines. J Intell Manuf 26(5):873\u2013890","journal-title":"J Intell Manuf"},{"issue":"2","key":"9667_CR266","doi-asserted-by":"publisher","first-page":"77","DOI":"10.1016\/0378-7796(95)00929-C","volume":"33","author":"RH Liang","year":"1995","unstructured":"Liang RH, Hsu YY (1995) A hybrid artificial neural network\u2014differential dynamic programming approach for short-term hydro scheduling. Electric Power Syst Res 33(2):77\u201386","journal-title":"Electric Power Syst Res"},{"issue":"3","key":"9667_CR267","doi-asserted-by":"publisher","first-page":"1021","DOI":"10.1016\/j.cie.2008.09.024","volume":"56","author":"C Liang","year":"2009","unstructured":"Liang C, Huang Y, Yang Y (2009) A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning. Comput Ind Eng 56(3):1021\u20131028","journal-title":"Comput Ind Eng"},{"issue":"1","key":"9667_CR268","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1016\/j.eswa.2004.08.003","volume":"28","author":"SH Liao","year":"2005","unstructured":"Liao SH (2005) Expert system methodologies and applications, a decade review from 1995 to 2004. Expert Syst Appl 28(1):93\u2013104","journal-title":"Expert Syst Appl"},{"issue":"7","key":"9667_CR269","doi-asserted-by":"publisher","first-page":"1899","DOI":"10.1016\/j.cor.2005.07.020","volume":"34","author":"C-J Liao","year":"2007","unstructured":"Liao C-J, Juan H-C (2007) An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups. Comput Oper Res 34(7):1899\u20131909","journal-title":"Comput Oper Res"},{"issue":"2","key":"9667_CR270","doi-asserted-by":"publisher","first-page":"189","DOI":"10.1080\/02533839.1998.9670384","volume":"21","author":"LM Liao","year":"1998","unstructured":"Liao LM, Liao CJ (1998) Single machine scheduling problem with fuzzy due date and processing time. J Chin Inst Eng 21(2):189\u2013196","journal-title":"J Chin Inst Eng"},{"issue":"10","key":"9667_CR271","doi-asserted-by":"publisher","first-page":"3099","DOI":"10.1016\/j.cor.2005.11.017","volume":"34","author":"C-J Liao","year":"2007","unstructured":"Liao C-J, Tseng C-T, Luarn P (2007) A discrete version of particle swarm optimization for flow shop scheduling problems. Comput Oper Res 34(10):3099\u20133111","journal-title":"Comput Oper Res"},{"issue":"6","key":"9667_CR272","doi-asserted-by":"publisher","first-page":"1755","DOI":"10.1016\/j.asoc.2012.01.011","volume":"12","author":"C-J Liao","year":"2012","unstructured":"Liao C-J, Tjandradjaja E, Chung T-P (2012) An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem. Appl Soft Comput 12(6):1755\u20131764","journal-title":"Appl Soft Comput"},{"issue":"1","key":"9667_CR273","doi-asserted-by":"publisher","first-page":"28","DOI":"10.1016\/S0377-2217(99)00168-X","volume":"124","author":"CF Liaw","year":"2000","unstructured":"Liaw CF (2000) A hybrid genetic algorithm for the open shop scheduling problem. Eur J Oper Res 124(1):28\u201342","journal-title":"Eur J Oper Res"},{"issue":"14","key":"9667_CR274","doi-asserted-by":"publisher","first-page":"2081","DOI":"10.1016\/S0305-0548(02)00124-7","volume":"30","author":"CF Liaw","year":"2003","unstructured":"Liaw CF (2003) An efficient tabu search approach for the two-machine preemptive open shop scheduling problem. Comput Oper Res 30(14):2081\u20132095","journal-title":"Comput Oper Res"},{"issue":"1","key":"9667_CR275","doi-asserted-by":"publisher","first-page":"25","DOI":"10.1007\/s10479-007-0188-y","volume":"157","author":"O Liess","year":"2008","unstructured":"Liess O, Michelon P (2008) A constraint programming approach for the resource-constrained project scheduling problem. Ann Oper Res 157(1):25\u201336","journal-title":"Ann Oper Res"},{"issue":"1","key":"9667_CR276","doi-asserted-by":"publisher","first-page":"22","DOI":"10.1109\/TSM.2015.2511798","volume":"29","author":"J Lim","year":"2016","unstructured":"Lim J et al (2016) Fast scheduling of semiconductor manufacturing facilities using case-based reasoning. IEEE Trans Semicond Manuf 29(1):22\u201332","journal-title":"IEEE Trans Semicond Manuf"},{"key":"9667_CR277","unstructured":"Limtanyakul K, Schwiegelshohn U (2007) Scheduling tests on vehicle prototypes using constraint programming. In: Proceedings of the 3rd multidisciplinary international scheduling conference: theory and applications"},{"issue":"2","key":"9667_CR278","doi-asserted-by":"publisher","first-page":"172","DOI":"10.1007\/s10601-012-9118-y","volume":"17","author":"K Limtanyakul","year":"2012","unstructured":"Limtanyakul K, Schwiegelshohn U (2012) Improvements of constraint programming and hybrid methods for scheduling of tests on vehicle prototypes. Constraints 17(2):172\u2013203","journal-title":"Constraints"},{"issue":"4","key":"9667_CR279","doi-asserted-by":"publisher","first-page":"510","DOI":"10.1109\/TFUZZ.2002.800659","volume":"10","author":"F-T Lin","year":"2002","unstructured":"Lin F-T (2002) Fuzzy job shop scheduling based on ranking level (\/spl lambda\/, 1) interval-valued fuzzy numbers. IEEE Trans Fuzzy Syst 10(4):510\u2013522","journal-title":"IEEE Trans Fuzzy Syst"},{"key":"9667_CR280","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1007\/978-3-7908-1770-6_5","volume-title":"Recent Advances in Intelligent Paradigms and Applications","author":"Feng-Tse Lin","year":"2003","unstructured":"Lin F-T (2003) A fuzzy approach to job shop scheduling problem based on imprecise processing times. In: Recent advances in intelligent paradigms and applications, Physica-Verlag, HD, pp 91\u2013106"},{"key":"9667_CR281","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/j.knosys.2015.01.017","volume":"78","author":"J Lin","year":"2015","unstructured":"Lin J (2015) A hybrid biogeography-based optimization for the fuzzy flexible job shop scheduling problem. Knowl Based Syst 78:59\u201374","journal-title":"Knowl Based Syst"},{"issue":"4","key":"9667_CR282","doi-asserted-by":"publisher","first-page":"1065","DOI":"10.1080\/00207543.2014.942011","volume":"53","author":"SW Lin","year":"2015","unstructured":"Lin SW, Ying KC (2015) A multi-point simulated annealing heuristic for solving multiple objective unrelated parallel machine scheduling problems. Int J Prod Res 53(4):1065\u20131076","journal-title":"Int J Prod Res"},{"issue":"3","key":"9667_CR283","doi-asserted-by":"publisher","first-page":"2629","DOI":"10.1016\/j.eswa.2009.08.015","volume":"37","author":"T-L Lin","year":"2010","unstructured":"Lin T-L et al (2010) An efficient job shop scheduling algorithm based on particle swarm optimization. Expert Syst Appl 37(3):2629\u20132636","journal-title":"Expert Syst Appl"},{"issue":"2","key":"9667_CR284","first-page":"83","volume":"32","author":"CC Lin","year":"2015","unstructured":"Lin CC, Kang JR, Hsu TH (2015) A memetic algorithm with recovery scheme for nurse preference scheduling. J Ind Prod Eng 32(2):83\u201395","journal-title":"J Ind Prod Eng"},{"issue":"03","key":"9667_CR285","doi-asserted-by":"publisher","first-page":"335","DOI":"10.1142\/S1469026811003136","volume":"10","author":"SH Ling","year":"2011","unstructured":"Ling SH et al (2011) Hybrid fuzzy logic-based particle swarm optimization for flow shop scheduling problem. Int J Comput Intell Appl 10(03):335\u2013356","journal-title":"Int J Comput Intell Appl"},{"issue":"3","key":"9667_CR287","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1007\/BF00118083","volume":"7","author":"H Liu","year":"1996","unstructured":"Liu H, Dong JJ (1996) Dispatching rule selection using artificial neural networks for dynamic planning and scheduling. J Intell Manuf 7(3):243\u2013250","journal-title":"J Intell Manuf"},{"issue":"8","key":"9667_CR288","first-page":"1113","volume":"28","author":"S-X Liu","year":"2011","unstructured":"Liu S-X, Song J-H (2011) Combination of constraint programming and mathematical programming for solving resources-constrained project-scheduling problems. Control Theory Appl 28(8):1113\u20131120","journal-title":"Control Theory Appl"},{"issue":"4","key":"9667_CR289","doi-asserted-by":"publisher","first-page":"765","DOI":"10.1080\/18756891.2016.1204123","volume":"9","author":"C Liu","year":"2016","unstructured":"Liu C, Wang J (2016) Cell formation and task scheduling considering multi-functional resource and part movement using hybrid simulated annealing. Int J Comput Intell Syst 9(4):765\u2013777","journal-title":"Int J Comput Intell Syst"},{"key":"9667_CR290","doi-asserted-by":"publisher","first-page":"630","DOI":"10.1007\/11596448_93","volume-title":"Computational Intelligence and Security","author":"Bo Liu","year":"2005","unstructured":"Liu B, Wang L, Jin Y-h (2005) Hybrid particle swarm optimization for flow shop scheduling with stochastic processing time. In: International conference on computational and information science, Springer, Berlin"},{"issue":"9-10","key":"9667_CR291","doi-asserted-by":"publisher","first-page":"1001","DOI":"10.1007\/s00170-005-0277-5","volume":"31","author":"B Liu","year":"2007","unstructured":"Liu B, Wang L, Jin Y-H (2007) An effective hybrid particle swarm optimization for no-wait flow shop scheduling. Int J Adv Manuf Technol 31(9-10):1001\u20131011","journal-title":"Int J Adv Manuf Technol"},{"issue":"9","key":"9667_CR292","doi-asserted-by":"publisher","first-page":"2791","DOI":"10.1016\/j.cor.2006.12.013","volume":"35","author":"B Liu","year":"2008","unstructured":"Liu B, Wang L, Jin Y-H (2008) An effective hybrid PSO-based algorithm for flow shop scheduling with limited buffers. Comput Oper Res 35(9):2791\u20132806","journal-title":"Comput Oper Res"},{"key":"9667_CR286","doi-asserted-by":"crossref","unstructured":"Liu T et al (2012) Design and implementation of bus crew scheduling system using integrated case-based and rule-based reasoning. In: 2012 Fifth international joint conference on computational sciences and optimization (CSO), IEEE","DOI":"10.1109\/CSO.2012.110"},{"issue":"1-4","key":"9667_CR293","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1007\/s00170-015-8145-4","volume":"84","author":"X Liu","year":"2016","unstructured":"Liu X, Ni Z, Qiu X (2016) Application of ant colony optimization algorithm in integrated process planning and scheduling. Int J Adv Manuf Technol 84(1-4):393\u2013404","journal-title":"Int J Adv Manuf Technol"},{"key":"9667_CR294","unstructured":"L\u00f3pez B (2002) Combining CBR and CSP: a case study on holiday scheduling. Technical report, University of Girona, Spain"},{"issue":"2","key":"9667_CR295","doi-asserted-by":"publisher","first-page":"317","DOI":"10.1016\/S0377-2217(97)00277-4","volume":"106","author":"L Lopez","year":"1998","unstructured":"Lopez L, Carter MW, Gendreau M (1998) The hot strip mill production scheduling problem: a tabu search approach. Eur J Oper Res 106(2):317\u2013335","journal-title":"Eur J Oper Res"},{"key":"9667_CR296","first-page":"010","volume":"6","author":"B-y Lu","year":"2004","unstructured":"Lu B-y et al (2004) The model for partial flexible job shop scheduling problem based on fuzzy logic. Chin J Manag Sci 6:010","journal-title":"Chin J Manag Sci"},{"key":"9667_CR297","first-page":"013","volume":"6","author":"B-y Lu","year":"2006","unstructured":"Lu B-y et al (2006) Research of earliness\/tardiness problem in fuzzy job shop scheduling. J Syst Eng 6:013","journal-title":"J Syst Eng"},{"issue":"1","key":"9667_CR298","doi-asserted-by":"publisher","first-page":"373","DOI":"10.1016\/S0007-8506(07)63205-3","volume":"48","author":"PB Luh","year":"1999","unstructured":"Luh PB, Zhao X, Thakur LS, Chen KH, Chiueh TD, Chang SC, Shyu JM (1999) Architectural design of neural network hardware for job shop scheduling. CIRP Ann Manuf Technol 48(1):373\u2013376","journal-title":"CIRP Ann Manuf Technol"},{"issue":"6","key":"9667_CR299","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1287\/inte.31.6.29.9647","volume":"31","author":"IL Lustig","year":"2001","unstructured":"Lustig IL, Puget IF (2001) Program does not equal program: constraint programming and its relationship to mathematical programming. Interfaces 31(6):29\u201353","journal-title":"Interfaces"},{"issue":"6","key":"9667_CR300","doi-asserted-by":"publisher","first-page":"549","DOI":"10.1007\/s10732-007-9051-1","volume":"14","author":"AM Malik","year":"2008","unstructured":"Malik AM, Russell T, Chase M, Van Beek P (2008a) Learning heuristics for basic block instruction scheduling. J Heuristics 14(6):549\u2013569","journal-title":"J Heuristics"},{"issue":"01","key":"9667_CR301","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1142\/S0218213008003765","volume":"17","author":"AM Malik","year":"2008","unstructured":"Malik AM, McInnes J, Van Beek P (2008b) Optimal basic block instruction scheduling for multiple-issue processors using constraint programming. Int J Artif Intell Tools 17(01):37\u201354","journal-title":"Int J Artif Intell Tools"},{"issue":"3","key":"9667_CR302","doi-asserted-by":"publisher","first-page":"3438","DOI":"10.1016\/j.eswa.2011.09.032","volume":"39","author":"KK Mandal","year":"2012","unstructured":"Mandal KK, Chakraborty N (2012) Daily combined economic emission scheduling of hydrothermal systems with cascaded reservoirs using self organizing hierarchical particle swarm optimization technique. Expert Syst Appl 39(3):3438\u20133445","journal-title":"Expert Syst Appl"},{"issue":"4","key":"9667_CR303","doi-asserted-by":"publisher","first-page":"1392","DOI":"10.1016\/j.asoc.2007.10.006","volume":"8","author":"KK Mandal","year":"2008","unstructured":"Mandal KK, Basu M, Chakraborty N (2008) Particle swarm optimization technique based short-term hydrothermal scheduling. Appl Soft Comput 8(4):1392\u20131399","journal-title":"Appl Soft Comput"},{"key":"9667_CR304","doi-asserted-by":"publisher","first-page":"370","DOI":"10.1007\/3-540-45561-2_36","volume-title":"Real-World Applications of Evolutionary Computing","author":"Elena Marchiori","year":"2000","unstructured":"Marchiori E, Steenbeek A (2000).An evolutionary algorithm for large scale set covering problems with application to airline crew scheduling. In: Workshops on real-world applications of evolutionary computation, Springer, Berlin, pp 370\u2013384"},{"issue":"5","key":"9667_CR305","doi-asserted-by":"publisher","first-page":"465","DOI":"10.1016\/0305-0548(95)00029-1","volume":"23","author":"R Marett","year":"1996","unstructured":"Marett R, Wright M (1996) A comparison of neighborhood search techniques for multi-objective combinatorial problems. Comput Oper Res 23(5):465\u2013483","journal-title":"Comput Oper Res"},{"issue":"1","key":"9667_CR306","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1007\/s10845-011-0552-2","volume":"24","author":"S Marimuthu","year":"2013","unstructured":"Marimuthu S, Naveen Sait A (2013) Performance evaluation of proposed differential evolution and particle swarm optimization algorithms for scheduling m-machine flow shops with lot streaming. J Intell Manuf 24(1):175\u2013191","journal-title":"J Intell Manuf"},{"issue":"1","key":"9667_CR307","doi-asserted-by":"publisher","first-page":"125","DOI":"10.1016\/j.rcim.2006.06.007","volume":"24","author":"S Marimuthu","year":"2008","unstructured":"Marimuthu S, Ponnambalam SG, Jawahar N (2008) Evolutionary algorithms for scheduling m-machine flow shop with lot streaming. Robot Comput Integr Manuf 24(1):125\u2013139","journal-title":"Robot Comput Integr Manuf"},{"issue":"2","key":"9667_CR308","doi-asserted-by":"publisher","first-page":"1026","DOI":"10.1016\/j.jmatprotec.2008.03.013","volume":"209","author":"S Marimuthu","year":"2009","unstructured":"Marimuthu S, Ponnambalam SG, Jawahar N (2009) Threshold accepting and ant-colony optimization algorithms for scheduling m-machine flow shops with lot streaming. J Mater Process Technol 209(2):1026\u20131041","journal-title":"J Mater Process Technol"},{"issue":"7","key":"9667_CR309","doi-asserted-by":"publisher","first-page":"1159","DOI":"10.1007\/s00500-013-0992-z","volume":"17","author":"Y Marinakis","year":"2013","unstructured":"Marinakis Y, Marinaki M (2013) Particle swarm optimization with expanding neighborhood topology for the permutation flow shop scheduling problem. Soft Comput 17(7):1159\u20131173","journal-title":"Soft Comput"},{"key":"9667_CR310","unstructured":"Marsh CA (1985) MARS\u2013an expert system using the automated reasoning tool to schedule resources. In: Robotics and expert systems\u2013proceedings of Robex 85, Instrument Society of America, pp 123\u2013125"},{"issue":"1","key":"9667_CR311","doi-asserted-by":"publisher","first-page":"126","DOI":"10.1016\/j.omega.2006.11.002","volume":"37","author":"CH Martin","year":"2009","unstructured":"Martin CH (2009) A hybrid genetic algorithm\/mathematical programming approach to the multi-family flow shop scheduling problem with lot streaming. Omega 37(1):126\u2013137","journal-title":"Omega"},{"issue":"2","key":"9667_CR312","first-page":"140","volume":"2","author":"P Mathiyalagan","year":"2010","unstructured":"Mathiyalagan P, Dhepthie UR, Sivanandam SN (2010) Grid scheduling using enhanced PSO algorithm. Int J Comput Sci Eng 2(2):140\u2013145","journal-title":"Int J Comput Sci Eng"},{"issue":"11","key":"9667_CR313","first-page":"4125","volume":"5","author":"S Matsumoto","year":"2009","unstructured":"Matsumoto S et al (2009) Design of knowledge-based scheduling solution based on expert\u2019s technical knowledge in printing process and proposal of its improvement. Int J Innov Comput Inf Control 5(11):4125\u20134143","journal-title":"Int J Innov Comput Inf Control"},{"issue":"3","key":"9667_CR314","doi-asserted-by":"publisher","first-page":"294","DOI":"10.1016\/0377-2217(92)90119-T","volume":"62","author":"CS McCahon","year":"1992","unstructured":"McCahon CS, Lee ES (1992) Fuzzy job sequencing for a flow shop. Eur J Oper Res 62(3):294\u2013301","journal-title":"Eur J Oper Res"},{"issue":"4","key":"9667_CR315","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1007\/BF02478259","volume":"5","author":"WS McCulloch","year":"1943","unstructured":"McCulloch WS, Pitts W (1943) A logical calculus of the ideas immanent in nervous activity. Bull Math Biophys 5(4):115\u2013133","journal-title":"Bull Math Biophys"},{"issue":"4","key":"9667_CR316","doi-asserted-by":"publisher","first-page":"1063","DOI":"10.1007\/s10845-011-0520-x","volume":"23","author":"S Meeran","year":"2012","unstructured":"Meeran S, Morshed MS (2012) A hybrid genetic tabu search algorithm for solving job shop scheduling problems: a case study. J Intell Manuf 23(4):1063\u20131078","journal-title":"J Intell Manuf"},{"issue":"1\u20132","key":"9667_CR317","doi-asserted-by":"publisher","first-page":"122","DOI":"10.1007\/s00170-009-1947-5","volume":"45","author":"MS Mehrabad","year":"2009","unstructured":"Mehrabad MS, Pahlavani A (2009) A fuzzy multi-objective programming for scheduling of weighted jobs on a single machine. Int J Adv Manuf Technol 45(1\u20132):122\u2013139","journal-title":"Int J Adv Manuf Technol"},{"issue":"1","key":"9667_CR318","doi-asserted-by":"publisher","first-page":"92","DOI":"10.1016\/j.cor.2007.07.001","volume":"36","author":"JJDM Mendes","year":"2009","unstructured":"Mendes JJDM, Gon\u00e7alves JF, Resende MG (2009) A random key based genetic algorithm for the resource constrained project scheduling problem. Comput Oper Res 36(1):92\u2013109","journal-title":"Comput Oper Res"},{"key":"9667_CR319","unstructured":"Mesbah M (2014) Value management for construction projects via an expert system framework. Diss. Eastern Mediterranean University (EMU)-Do\u011fu Akdeniz \u00dcniversitesi (DA\u00dc)"},{"issue":"6","key":"9667_CR320","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1108\/02635570210432000","volume":"102","author":"KS Metaxiotis","year":"2002","unstructured":"Metaxiotis KS, Psarras JE, Askounis DT (2002) GENESYS: an expert system for production scheduling. Ind Manag Data Syst 102(6):309\u2013317","journal-title":"Ind Manag Data Syst"},{"key":"9667_CR321","doi-asserted-by":"publisher","first-page":"83","DOI":"10.1007\/978-3-662-12405-5","volume-title":"Machine Learning","author":"Ryszard S. Michalski","year":"1983","unstructured":"Michalski RS (1983) A theory and methodology of inductive learning. In: Machine learning, Springer, Berlin, pp 83\u2013134"},{"issue":"3","key":"9667_CR322","doi-asserted-by":"publisher","first-page":"639","DOI":"10.1016\/j.ejor.2003.10.053","volume":"164","author":"M Mika","year":"2005","unstructured":"Mika M, Waligora G, W\u0119glarz J (2005) Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models. Eur J Oper Res 164(3):639\u2013668","journal-title":"Eur J Oper Res"},{"issue":"3","key":"9667_CR323","doi-asserted-by":"publisher","first-page":"1238","DOI":"10.1016\/j.ejor.2006.06.069","volume":"187","author":"M Mika","year":"2008","unstructured":"Mika M, Waligora G, W\u0119glarz J (2008) Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times. Eur J Oper Res 187(3):1238\u20131250","journal-title":"Eur J Oper Res"},{"issue":"1","key":"9667_CR324","doi-asserted-by":"publisher","first-page":"66","DOI":"10.1109\/MSP.2006.1593338","volume":"23","author":"S Miranda","year":"2006","unstructured":"Miranda S, Baker C, Woodbridge K, Griffiths H (2006) Knowledge-based resource management for multifunction radar: a look at scheduling and task prioritization. IEEE Signal Process Mag 23(1):66\u201376","journal-title":"IEEE Signal Process Mag"},{"key":"9667_CR325","volume-title":"Machine learning. WCB","author":"TM Mitchell","year":"1997","unstructured":"Mitchell TM (1997) Machine learning. WCB. McGraw-Hill, New York"},{"key":"9667_CR326","volume-title":"An artificial intelligence approach","author":"RS Mitchell","year":"2013","unstructured":"Mitchell RS, Michalski JG, Carbonell TM (2013) An artificial intelligence approach. Springer, Berlin"},{"issue":"1","key":"9667_CR327","first-page":"97","volume":"8","author":"M Mittal","year":"2016","unstructured":"Mittal M, Singh TP, Gupta D (2016) Linkage of priority queue system to flow shop scheduling in fuzzy environment. Arya Bhatta J Math Inf 8(1):97\u2013108","journal-title":"Arya Bhatta J Math Inf"},{"key":"9667_CR328","unstructured":"Miyashita K (2000) Job shop scheduling with genetic programming. In: Proceedings of the 2nd annual conference on genetic and evolutionary computation, Morgan Kaufmann Publishers Inc., pp 505\u2013512"},{"key":"9667_CR329","unstructured":"Mladenovic S, Markovic M, Cangalovic M (2004) Constraint programming approach to train scheduling on railway network supported by heuristics. In: 10th World conference on transport researchworld conference on transport research society Istanbul Technical University"},{"issue":"3","key":"9667_CR330","doi-asserted-by":"publisher","first-page":"1876","DOI":"10.1016\/j.ejor.2005.12.021","volume":"177","author":"PY Mok","year":"2007","unstructured":"Mok PY, Kwong CK, Wong WK (2007) Optimisation of fault-tolerant fabric-cutting schedules using genetic algorithms and fuzzy set theory. Eur J Oper Res 177(3):1876\u20131893","journal-title":"Eur J Oper Res"},{"key":"9667_CR331","doi-asserted-by":"crossref","unstructured":"Monette J-N, Deville Y, Van Hentenryck P (2009) Just-in-time scheduling with constraint programming. In: ICAPS","DOI":"10.1609\/icaps.v19i1.13356"},{"key":"9667_CR332","unstructured":"Morton TE, Ramnath P (1992) Guided forward tabu\/beam search for scheduling very large dynamic job shops. No. 1992-47. Carnegie Mellon University, Tepper School of Business"},{"key":"9667_CR333","unstructured":"Morton TE, Fox M, Sathi A (1984) PATRIARCH; a multilevel system for cost accounting, planning, scheduling. In: Partial working document Graduate School of Industrial Administration, Carnegie Mellon University"},{"key":"9667_CR334","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.jss.2014.11.014","volume":"101","author":"IA Moschakis","year":"2015","unstructured":"Moschakis IA, Karatza HD (2015) Multi-criteria scheduling of Bag-of-Tasks applications on heterogeneous interlinked clouds with simulated annealing. J Syst Softw 101:1\u201314","journal-title":"J Syst Softw"},{"issue":"4","key":"9667_CR335","doi-asserted-by":"publisher","first-page":"1061","DOI":"10.1016\/0360-8352(96)00053-8","volume":"30","author":"T Murata","year":"1996","unstructured":"Murata T, Ishibuchi H, Tanaka H (1996) Genetic algorithms for flow shop scheduling problems. Comput Ind Eng 30(4):1061\u20131071","journal-title":"Comput Ind Eng"},{"issue":"3","key":"9667_CR336","doi-asserted-by":"publisher","first-page":"387","DOI":"10.1016\/S0165-0114(02)00138-0","volume":"134","author":"K Muthusamy","year":"2003","unstructured":"Muthusamy K, Sung SC, Vlach M, Ishii H (2003) Scheduling with fuzzy delays and fuzzy precedences. Fuzzy Sets Syst 134(3):387\u2013395","journal-title":"Fuzzy Sets Syst"},{"issue":"1","key":"9667_CR337","doi-asserted-by":"publisher","first-page":"88","DOI":"10.1016\/0377-2217(93)E0140-S","volume":"81","author":"A Nagar","year":"1995","unstructured":"Nagar A, Haddock J, Heragu S (1995) Multiple and bicriteria scheduling: a literature survey. Eur J Oper Res 81(1):88\u2013104","journal-title":"Eur J Oper Res"},{"key":"9667_CR338","doi-asserted-by":"publisher","first-page":"16","DOI":"10.17485\/ijst\/2015\/v8i16\/55529","volume":"8","author":"KK Nailwal","year":"2015","unstructured":"Nailwal KK, Gupta D, Sharma S (2015) Two stage flow shop scheduling under fuzzy environment. Indian J Sci Technol 8:16","journal-title":"Indian J Sci Technol"},{"issue":"9","key":"9667_CR339","doi-asserted-by":"publisher","first-page":"1286","DOI":"10.1016\/j.cor.2010.11.010","volume":"38","author":"RT Neto","year":"2011","unstructured":"Neto RT, Godinho Filho M (2011) An ant colony optimization approach to a permutational flow shop scheduling problem with outsourcing allowed. Comput Oper Res 38(9):1286\u20131293","journal-title":"Comput Oper Res"},{"issue":"3","key":"9667_CR340","doi-asserted-by":"publisher","first-page":"527","DOI":"10.1007\/s10845-013-0811-5","volume":"26","author":"RFT Neto","year":"2015","unstructured":"Neto RFT, Godinho Fabio M, Da Silva FM (2015) An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed. J Intell Manuf 26(3):527\u2013538","journal-title":"J Intell Manuf"},{"key":"9667_CR341","first-page":"121","volume-title":"Lecture Notes in Computer Science","author":"Su Nguyen","year":"2012","unstructured":"Nguyen S, Zhang M, Johnston M, Tan KC (2012) Evolving reusable operation-based due date assignment models for job shop scheduling with genetic programming. In: European conference on genetic programming, Springer, Berlin, pp 121\u2013133"},{"key":"9667_CR342","first-page":"251","volume-title":"Studies in Computational Intelligence","author":"Su Nguyen","year":"2013","unstructured":"Nguyen S, Zhang M, Johnston M, Tan KC (2013) Dynamic multi-objective job shop scheduling: a genetic programming approach. In: Automated scheduling and planning, Springer, Berlin, pp 251\u2013282"},{"issue":"1","key":"9667_CR343","doi-asserted-by":"crossref","first-page":"148","DOI":"10.1016\/j.amc.2008.05.086","volume":"205","author":"Q Niu","year":"2008","unstructured":"Niu Q, Jiao B, Gu X (2008) Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time. Appl Math Comput 205(1):148\u2013158","journal-title":"Appl Math Comput"},{"issue":"2","key":"9667_CR344","first-page":"59","volume":"3","author":"S Noori-Darvish","year":"2011","unstructured":"Noori-Darvish S, Tavakkoli-Moghaddam R (2011) Solving a bi-objective open shop scheduling problem with fuzzy parameters. J Appl Oper Res 3(2):59\u201374","journal-title":"J Appl Oper Res"},{"key":"9667_CR345","first-page":"1","volume":"29","author":"M Nouiri","year":"2015","unstructured":"Nouiri M et al (2015) An effective and distributed particle swarm optimization algorithm for flexible job shop scheduling problem. J Intell Manuf 29:1\u201313","journal-title":"J Intell Manuf"},{"key":"9667_CR346","unstructured":"Novara FM, Henning GP (2017) Scheduling of multiproduct multistage batch plants with uncertain processing times: an innovative constraint programming approach. In: Proceedings fundations of computer-aided process operations, Tucson, AZ, EE. UU"},{"key":"9667_CR347","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1016\/j.compchemeng.2016.04.030","volume":"93","author":"FM Novara","year":"2016","unstructured":"Novara FM, Novas JM, Henning GP (2016) A novel constraint programming model for large-scale scheduling problems in multiproduct multistage batch plants: limited resources and campaign-based operation. Comput Chem Eng 93:101\u2013117","journal-title":"Comput Chem Eng"},{"issue":"12","key":"9667_CR348","doi-asserted-by":"publisher","first-page":"2129","DOI":"10.1016\/j.compchemeng.2010.07.011","volume":"34","author":"JM Novas","year":"2010","unstructured":"Novas JM, Henning GP (2010) Reactive scheduling framework based on domain knowledge and constraint programming. Comput Chem Eng 34(12):2129\u20132148","journal-title":"Comput Chem Eng"},{"key":"9667_CR349","doi-asserted-by":"publisher","first-page":"189","DOI":"10.1016\/j.compchemeng.2012.01.005","volume":"42","author":"JM Novas","year":"2012","unstructured":"Novas JM, Henning GP (2012) A comprehensive constraint programming approach for the rolling horizon-based scheduling of automated wet-etch stations. Comput Chem Eng 42:189\u2013205","journal-title":"Comput Chem Eng"},{"issue":"5","key":"9667_CR350","doi-asserted-by":"publisher","first-page":"2286","DOI":"10.1016\/j.eswa.2013.09.026","volume":"41","author":"JM Novas","year":"2014","unstructured":"Novas JM, Henning GP (2014) Integrated scheduling of resource-constrained flexible manufacturing systems using constraint programming. Expert Syst Appl 41(5):2286\u20132299","journal-title":"Expert Syst Appl"},{"issue":"3","key":"9667_CR351","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1016\/0305-0548(90)90001-N","volume":"17","author":"FA Ogbu","year":"1990","unstructured":"Ogbu FA, Smith DK (1990) The application of the simulated annealing algorithm to the solution of the n\/m\/C max flow shop problem. Comput Oper Res 17(3):243\u2013253","journal-title":"Comput Oper Res"},{"issue":"6","key":"9667_CR352","doi-asserted-by":"publisher","first-page":"551","DOI":"10.1016\/0305-0483(89)90059-5","volume":"17","author":"IH Osman","year":"1989","unstructured":"Osman IH, Potts CN (1989) Simulated annealing for permutation flow shop scheduling. Omega 17(6):551\u2013557","journal-title":"Omega"},{"issue":"4","key":"9667_CR353","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1007\/s10951-008-0090-8","volume":"12","author":"D Ouelhadj","year":"2009","unstructured":"Ouelhadj D, Petrovic S (2009) A survey of dynamic scheduling in manufacturing systems. J Sched 12(4):417\u2013431","journal-title":"J Sched"},{"issue":"6","key":"9667_CR354","doi-asserted-by":"publisher","first-page":"420","DOI":"10.3182\/20120523-3-RO-2023.00160","volume":"45","author":"C \u00d6zt\u00fcrk","year":"2012","unstructured":"\u00d6zt\u00fcrk C et al (2012) A constraint programming model for balancing and scheduling of flexible mixed model assembly lines with parallel stations. IFAC Proc Vol 45(6):420\u2013425","journal-title":"IFAC Proc Vol"},{"key":"9667_CR355","doi-asserted-by":"crossref","unstructured":"Palacios JJ et al (2014a) \u03b2-Robust solutions for the fuzzy open shop scheduling. In: International conference on information processing and management of uncertainty in knowledge-based systems, Springer International Publishing","DOI":"10.1007\/978-3-319-08795-5_46"},{"issue":"2","key":"9667_CR356","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1007\/s11047-014-9413-1","volume":"13","author":"JJ Palacios","year":"2014","unstructured":"Palacios JJ et al (2014b) Robust swarm optimisation for fuzzy open shop scheduling. Nat Comput 13(2):145\u2013156","journal-title":"Nat Comput"},{"issue":"6","key":"9667_CR357","doi-asserted-by":"publisher","first-page":"1201","DOI":"10.1007\/s10845-013-0850-y","volume":"26","author":"JJ Palacios","year":"2015","unstructured":"Palacios JJ et al (2015) Swarm lexicographic goal programming for fuzzy open shop scheduling. J Intell Manuf 26(6):1201\u20131215","journal-title":"J Intell Manuf"},{"key":"9667_CR358","doi-asserted-by":"publisher","first-page":"152","DOI":"10.1007\/3-540-53104-1_39","volume-title":"Expert Systems in Engineering Principles and Applications","author":"Sang-Chan Park","year":"1990","unstructured":"Park SC, Piramuthu S, Raman N, Shaw MJ (1990) Integrating inductive learning and simulation in rule-based scheduling. In: Expert systems in engineering principles and applications, Springer, Berlin, pp 152\u2013167"},{"key":"9667_CR359","doi-asserted-by":"crossref","unstructured":"Park J, Nguyen S, Zhang M, Johnston M (2015) Evolving ensembles of dispatching rules using genetic programming for job shop scheduling. In:\u00a0European conference on genetic programming, Springer International Publishing, pp 92\u2013104","DOI":"10.1007\/978-3-319-16501-1_8"},{"key":"9667_CR360","doi-asserted-by":"crossref","unstructured":"Park J, Mei Y, Nguyen S, Chen G, Johnston M, Zhang M (2016) Genetic programming based hyper-heuristics for dynamic job shop scheduling: cooperative coevolutionary approaches. In: European conference on genetic programming, Springer International Publishing, pp 115\u2013132","DOI":"10.1007\/978-3-319-30668-1_8"},{"issue":"4","key":"9667_CR361","doi-asserted-by":"publisher","first-page":"419","DOI":"10.1016\/0925-2312(94)90020-5","volume":"6","author":"D Pellerin","year":"1994","unstructured":"Pellerin D, H\u00e9rault J (1994) Scheduling with neural networks: application to timetable construction. Neurocomputing 6(4):419\u2013442","journal-title":"Neurocomputing"},{"key":"9667_CR362","unstructured":"Peng J, Song K (2001) Expected value goal programming model for fuzzy scheduling problem. In: The 10th IEEE international conference on fuzzy systems, 2001, vol 1, IEEE, pp 292\u2013295"},{"key":"9667_CR363","unstructured":"Peng J, Song K (2003) Fuzzy flow shop scheduling models based on credibility measure. In: The 12th IEEE international conference on fuzzy systems, FUZZ\u201903, vol 2, IEEE, pp 1423\u20131427"},{"key":"9667_CR364","doi-asserted-by":"publisher","first-page":"154","DOI":"10.1016\/j.cor.2014.08.006","volume":"53","author":"B Peng","year":"2015","unstructured":"Peng B, L\u00fc Z, Cheng TCE (2015) A tabu search\/path relinking algorithm to solve the job shop scheduling problem. Comput Oper Res 53:154\u2013164","journal-title":"Comput Oper Res"},{"key":"9667_CR365","doi-asserted-by":"crossref","unstructured":"Pereira I, Madureira A (2010) Meta-heuristics tunning using CBR for dynamic scheduling. IN: 2010 IEEE 9th international conference on cybernetic intelligent systems (CIS), IEEE","DOI":"10.1109\/UKRICIS.2010.5898093"},{"issue":"3","key":"9667_CR366","doi-asserted-by":"publisher","first-page":"1419","DOI":"10.1016\/j.asoc.2012.02.009","volume":"13","author":"I Pereira","year":"2013","unstructured":"Pereira I, Madureira A (2013) Self-optimization module for scheduling using case-based reasoning. Appl Soft Comput 13(3):1419\u20131432","journal-title":"Appl Soft Comput"},{"issue":"7","key":"9667_CR367","doi-asserted-by":"publisher","first-page":"192","DOI":"10.3182\/20130522-3-BR-4036.00069","volume":"46","author":"Marcosiris A.O. Pessoa","year":"2013","unstructured":"Pessoa MAO et al (2013) Advanced planning and scheduling systems based on time windows and constraint programming. In: IFAC proceedings, vol 46.7, pp 192\u2013197","journal-title":"IFAC Proceedings Volumes"},{"issue":"3","key":"9667_CR368","doi-asserted-by":"publisher","first-page":"329","DOI":"10.1007\/s11081-006-9975-6","volume":"7","author":"S Petrovic","year":"2006","unstructured":"Petrovic S, Xueyan S (2006) A new approach to two-machine flow shop problem with uncertain processing times. Optim Eng 7(3):329\u2013342","journal-title":"Optim Eng"},{"issue":"2","key":"9667_CR369","doi-asserted-by":"publisher","first-page":"297","DOI":"10.1016\/S0377-2217(99)00158-7","volume":"120","author":"F Pezzella","year":"2000","unstructured":"Pezzella F, Merelli E (2000) A tabu search method guided by shifting bottleneck for the job shop scheduling problem. Eur J Oper Res 120(2):297\u2013310","journal-title":"Eur J Oper Res"},{"key":"9667_CR370","first-page":"1","volume":"2016","author":"H Piroozfard","year":"2016","unstructured":"Piroozfard H, Wong KY, Hassan A (2016) A hybrid genetic algorithm with a knowledge-based operator for solving the job shop scheduling problems. J Optim 2016:1\u201313","journal-title":"J Optim"},{"issue":"3","key":"9667_CR371","doi-asserted-by":"publisher","first-page":"311","DOI":"10.1016\/S0925-5273(02)00104-4","volume":"78","author":"P Pongcharoen","year":"2002","unstructured":"Pongcharoen P, Hicks C, Braiden PM, Stewardson DJ (2002) Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products. Int J Prod Econ 78(3):311\u2013322","journal-title":"Int J Prod Econ"},{"issue":"1","key":"9667_CR372","doi-asserted-by":"publisher","first-page":"462","DOI":"10.1016\/j.asoc.2012.07.034","volume":"13","author":"A Ponsich","year":"2013","unstructured":"Ponsich A, Coello CA (2013) A hybrid differential evolution\u2014Tabu search algorithm for the solution of job shop scheduling problems. Appl Soft Comput 13(1):462\u2013474","journal-title":"Appl Soft Comput"},{"issue":"1","key":"9667_CR373","doi-asserted-by":"publisher","first-page":"341","DOI":"10.1016\/j.ejor.2017.08.033","volume":"269","author":"SM Pour","year":"2018","unstructured":"Pour SM et al (2018) A hybrid constraint programming\/mixed integer programming framework for the preventive signaling maintenance crew scheduling problem. Eur J Oper Res 269(1):341\u2013352","journal-title":"Eur J Oper Res"},{"issue":"4","key":"9667_CR374","doi-asserted-by":"publisher","first-page":"3161","DOI":"10.1016\/j.eswa.2010.09.002","volume":"38","author":"A Prakash","year":"2011","unstructured":"Prakash A, Chan FT, Deshmukh SG (2011) FMS scheduling with knowledge based genetic algorithm approach. Expert Syst Appl 38(4):3161\u20133171","journal-title":"Expert Syst Appl"},{"issue":"10","key":"9667_CR375","doi-asserted-by":"publisher","first-page":"949","DOI":"10.1080\/088395101753242697","volume":"15","author":"P Priore","year":"2001","unstructured":"Priore P, De La Fuente D, Pino R (2001) Learning-based scheduling of flexible manufacturing systems using case-based reasoning. Appl Artif Intell 15(10):949\u2013963","journal-title":"Appl Artif Intell"},{"issue":"2","key":"9667_CR376","doi-asserted-by":"publisher","first-page":"160","DOI":"10.1108\/09576060310459456","volume":"14","author":"P Priore","year":"2003","unstructured":"Priore P, de la Fuente D, Pino R, Puente J (2003) Dynamic scheduling of flexible manufacturing systems using neural networks and inductive learning. Integr Manuf Syst 14(2):160\u2013168","journal-title":"Integr Manuf Syst"},{"issue":"9\u201310","key":"9667_CR377","doi-asserted-by":"publisher","first-page":"1014","DOI":"10.1007\/s00170-006-0787-9","volume":"35","author":"B Qian","year":"2008","unstructured":"Qian B, Wang L, Huang DX, Wang X (2008) Scheduling multi-objective job shops using a memetic algorithm based on differential evolution. Int J Adv Manuf Technol 35(9\u201310):1014\u20131027","journal-title":"Int J Adv Manuf Technol"},{"key":"9667_CR378","volume-title":"C4. 5: programs for machine learning","author":"JR Quinlan","year":"2014","unstructured":"Quinlan JR (2014) C4. 5: programs for machine learning. Elsevier, Amsterdam"},{"key":"9667_CR379","unstructured":"Quiroga O, Zeballos L, Henning G (2005) A constraint programming approach to tool allocation and resource scheduling in FMS. In: Proceedings of the 2005 IEEE international conference on robotics and automation. ICRA 2005, IEEE"},{"key":"9667_CR380","doi-asserted-by":"crossref","unstructured":"Rabelo LC, Alptekin S, Kiran AS (1990) Synergy of artificial neural networks and knowledge-based expert systems for intelligent FMS scheduling. In: 1990 IJCNN international joint conference on neural networks, IEEE, pp 359\u2013366","DOI":"10.1109\/IJCNN.1990.137594"},{"key":"9667_CR381","doi-asserted-by":"crossref","unstructured":"Raghavan NRS, Venkataramana M (2006) Scheduling parallel batch processors with incompatible job families using ant colony optimization. In: 2006 IEEE international conference on automation science and engineering, IEEE","DOI":"10.1109\/COASE.2006.326933"},{"issue":"1","key":"9667_CR382","first-page":"72","volume":"4","author":"K Raja","year":"2008","unstructured":"Raja K, Arumugam C, Selladurai V (2008) Non-identical parallel-machine scheduling using genetic algorithm and fuzzy logic approach. Int J Serv Oper Manag 4(1):72\u2013101","journal-title":"Int J Serv Oper Manag"},{"issue":"2","key":"9667_CR383","doi-asserted-by":"publisher","first-page":"426","DOI":"10.1016\/S0377-2217(02)00908-6","volume":"155","author":"C Rajendran","year":"2004","unstructured":"Rajendran C, Ziegler H (2004) Ant-colony algorithms for permutation flow shop scheduling to minimize makespan\/total flowtime of jobs. Eur J Oper Res 155(2):426\u2013438","journal-title":"Eur J Oper Res"},{"key":"9667_CR384","unstructured":"Rajpathak DG (2001) Intelligent scheduling\u2014a literature review. Technical report KMI-TR-119, Knowledge Media Institute, The Open University, Walton Hall, Milton Keynes, MK7 6AA, UK"},{"issue":"4","key":"9667_CR385","doi-asserted-by":"publisher","first-page":"798","DOI":"10.3182\/20090603-3-RU-2001.0239","volume":"42","author":"N Rezaie","year":"2009","unstructured":"Rezaie N, Tavakkoli-Moghaddam R, Torabi SA (2009) A new mathematical model for fuzzy flexible flow shop scheduling of unrelated parallel machines maximizing the weighted satisfaction level. IFAC Proc 42(4):798\u2013803","journal-title":"IFAC Proc"},{"key":"9667_CR386","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1007\/978-3-540-48584-1_7","volume-title":"Evolutionary Scheduling","author":"Kazi Shah Nawaz Ripon","year":"2007","unstructured":"Ripon KSN, Tsang CH, Kwong S (2007) An evolutionary approach for solving the multi-objective job shop scheduling problem. In: Evolutionary scheduling, Springer, Berlin, pp 165\u2013195"},{"issue":"2","key":"9667_CR387","doi-asserted-by":"publisher","first-page":"231","DOI":"10.1016\/j.trb.2006.02.006","volume":"41","author":"J Rodriguez","year":"2007","unstructured":"Rodriguez J (2007) A constraint programming model for real-time train scheduling at junctions. Transp Res Part B Methodol 41(2):231\u2013245","journal-title":"Transp Res Part B Methodol"},{"key":"9667_CR388","doi-asserted-by":"publisher","first-page":"206","DOI":"10.1016\/j.cie.2015.03.022","volume":"85","author":"M Rostami","year":"2015","unstructured":"Rostami M, Pilerood AE, Mazdeh MM (2015) Multi-objective parallel machine scheduling problem with job deterioration and learning effect under fuzzy environment. Comput Ind Eng 85:206\u2013215","journal-title":"Comput Ind Eng"},{"issue":"7","key":"9667_CR389","doi-asserted-by":"publisher","first-page":"1895","DOI":"10.1016\/j.cor.2004.09.029","volume":"33","author":"RA Russell","year":"2006","unstructured":"Russell RA, Urban TL (2006) A constraint programming approach to the multiple-venue, sport-scheduling problem. Comput Oper Res 33(7):1895\u20131906","journal-title":"Comput Oper Res"},{"issue":"10","key":"9667_CR390","doi-asserted-by":"publisher","first-page":"1489","DOI":"10.1109\/TKDE.2009.17","volume":"21","author":"T Russell","year":"2009","unstructured":"Russell T, Malik AM, Chase M, Van Beek P (2009) Learning heuristics for the superblock instruction scheduling problem. IEEE Trans Knowl Data Eng 21(10):1489\u20131502","journal-title":"IEEE Trans Knowl Data Eng"},{"issue":"4","key":"9667_CR391","doi-asserted-by":"publisher","first-page":"60","DOI":"10.1002\/1520-6440(200104)84:4<60::AID-ECJC7>3.0.CO;2-V","volume":"84","author":"M Sakawa","year":"2001","unstructured":"Sakawa M, Kubota R (2001) Two-objective fuzzy job shop scheduling through genetic algorithm. Electron Commun Jpn (Part III Fundam Electron Sci 84(4):60\u201368","journal-title":"Electron Commun Jpn (Part III Fundam Electron Sci"},{"issue":"2","key":"9667_CR392","doi-asserted-by":"publisher","first-page":"325","DOI":"10.1016\/S0360-8352(99)00135-7","volume":"36","author":"M Sakawa","year":"1999","unstructured":"Sakawa M, Mori T (1999) An efficient genetic algorithm for job shop scheduling problems with fuzzy processing time and fuzzy due date. Comput Ind Eng 36(2):325\u2013341","journal-title":"Comput Ind Eng"},{"key":"9667_CR393","doi-asserted-by":"crossref","unstructured":"Sathish S, Ganesan K (2016) Scheduling of flow shop problems on 3 machines in fuzzy environment with double transport facility. In: Innovations through mathematical and statistical research: proceedings of the 2nd international conference on mathematical sciences and statistics (ICMSS2016), vol 1739, no 1, AIP Publishing","DOI":"10.1063\/1.4952530"},{"issue":"1","key":"9667_CR394","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1023\/A:1009845710839","volume":"4","author":"A Schaerf","year":"1999","unstructured":"Schaerf A (1999) Scheduling sport tournaments using constraint logic programming. Constraints 4(1):43\u201365","journal-title":"Constraints"},{"key":"9667_CR395","volume-title":"Artificial intelligence engine","author":"RJ Schalkoff","year":"1990","unstructured":"Schalkoff RJ (1990) Artificial intelligence engine. McGraw-Hill Inc, New York"},{"issue":"3","key":"9667_CR396","doi-asserted-by":"publisher","first-page":"201","DOI":"10.1002\/(SICI)1520-6750(200004)47:3<201::AID-NAV2>3.0.CO;2-L","volume":"47","author":"A Schirmer","year":"2000","unstructured":"Schirmer A (2000) Case-based reasoning and improved adaptive search for project scheduling. Naval Res Log (NRL) 47(3):201\u2013222","journal-title":"Naval Res Log (NRL)"},{"key":"9667_CR397","doi-asserted-by":"publisher","first-page":"537","DOI":"10.1016\/S0925-5273(97)00141-2","volume":"56","author":"G Schmidt","year":"1998","unstructured":"Schmidt G (1998) Case-based reasoning for production scheduling. Int J Prod Econ 56:537\u2013546","journal-title":"Int J Prod Econ"},{"issue":"1","key":"9667_CR398","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1016\/j.amc.2007.12.006","volume":"201","author":"SU Se\u00e7kiner","year":"2008","unstructured":"Se\u00e7kiner SU, Kurt M (2008) Ant colony optimization for the job rotation scheduling problem. App Math Comput 201(1):149\u2013160","journal-title":"App Math Comput"},{"key":"9667_CR399","doi-asserted-by":"publisher","first-page":"107","DOI":"10.1016\/j.cor.2014.08.002","volume":"53","author":"V Sels","year":"2015","unstructured":"Sels V et al (2015) Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem. Comput Oper Res 53:107\u2013117","journal-title":"Comput Oper Res"},{"key":"9667_CR400","doi-asserted-by":"crossref","unstructured":"Seraj O, Tavakkoli-Moghaddam R, Jolai F (2009) A fuzzy multi-objective tabu-search method for a new bi-objective open shop scheduling problem. In: International conference on computers and industrial engineering, 2009. CIE 2009, IEEE","DOI":"10.1109\/ICCIE.2009.5223549"},{"key":"9667_CR401","first-page":"192","volume-title":"Lecture Notes in Computer Science","author":"Franciszek Seredy\u0144ski","year":"1999","unstructured":"Seredy\u0144ski F, Koronacki J, Janikow CZ (1999) Distributed scheduling with decomposed optimization criterion: genetic programming approach. In: International parallel processing symposium, Springer, Berlin, pp 192\u2013200"},{"key":"9667_CR402","unstructured":"Sevaux M, Jouglet A, Oguz C (2005) Combining constraint programming and memetic algorithm for the hybrid flowshop scheduling problem. In: ORBEL 19th annual conference of the SOGESCI-BVWB, Louvain-la-Neuve, Belgium, vol 25"},{"issue":"10","key":"9667_CR403","doi-asserted-by":"publisher","first-page":"3243","DOI":"10.1016\/j.cor.2007.02.019","volume":"35","author":"DY Sha","year":"2008","unstructured":"Sha DY, Hsu Cheng-Yu (2008) A new particle swarm optimization for the open shop scheduling problem. Comput Oper Res 35(10):3243\u20133261","journal-title":"Comput Oper Res"},{"issue":"2","key":"9667_CR404","doi-asserted-by":"publisher","first-page":"1065","DOI":"10.1016\/j.eswa.2009.06.041","volume":"37","author":"DY Sha","year":"2010","unstructured":"Sha DY, Lin H-H (2010) A multi-objective PSO for job shop scheduling problems. Expert Syst Appl 37(2):1065\u20131070","journal-title":"Expert Syst Appl"},{"issue":"1","key":"9667_CR405","doi-asserted-by":"publisher","first-page":"3","DOI":"10.3390\/computers5010003","volume":"5","author":"A Shahzad","year":"2016","unstructured":"Shahzad A, Mebarki N (2016) Learning dispatching rules for scheduling: a synergistic view comprising decision trees, tabu search and simulation. Computers 5(1):3","journal-title":"Computers"},{"issue":"2","key":"9667_CR406","doi-asserted-by":"publisher","first-page":"121","DOI":"10.1007\/BF00222707","volume":"2","author":"MJ Shaw","year":"1989","unstructured":"Shaw MJ (1989) A pattern-directed approach to flexible manufacturing: a framework for intelligent scheduling, learning, and control. Int J Flex Manuf Syst 2(2):121\u2013144","journal-title":"Int J Flex Manuf Syst"},{"issue":"2","key":"9667_CR407","doi-asserted-by":"publisher","first-page":"156","DOI":"10.1080\/07408179208964213","volume":"24","author":"MJ Shaw","year":"1992","unstructured":"Shaw MJ, Park S, Raman N (1992) Intelligent scheduling with machine learning capabilities: the induction of scheduling knowledge. IIE Trans 24(2):156\u2013168","journal-title":"IIE Trans"},{"issue":"5","key":"9667_CR408","doi-asserted-by":"publisher","first-page":"813","DOI":"10.1057\/jors.2008.194","volume":"61","author":"K Sheibani","year":"2010","unstructured":"Sheibani K (2010) A fuzzy greedy heuristic for permutation flow shop scheduling. J Oper Res Soc 61(5):813\u2013818","journal-title":"J Oper Res Soc"},{"issue":"2","key":"9667_CR409","doi-asserted-by":"publisher","first-page":"900","DOI":"10.1016\/j.eswa.2006.10.024","volume":"34","author":"Y-J Shen","year":"2008","unstructured":"Shen Y-J, Wang M-S (2008) Broadcast scheduling in wireless sensor networks using fuzzy Hopfield neural network. Expert Syst Appl 34(2):900\u2013907","journal-title":"Expert Syst Appl"},{"issue":"1","key":"9667_CR410","doi-asserted-by":"publisher","first-page":"235","DOI":"10.1016\/j.eswa.2010.06.051","volume":"38","author":"D-F Shiau","year":"2011","unstructured":"Shiau D-F (2011) A hybrid particle swarm optimization for a university course scheduling problem with flexible preferences. Expert Syst Appl 38(1):235\u2013248","journal-title":"Expert Syst Appl"},{"key":"9667_CR411","doi-asserted-by":"crossref","unstructured":"Shih W-C et al (2007) Parallel loop scheduling using knowledge-based workload estimation on grid environments. In: 2007 International symposium on applications and the internet, IEEE","DOI":"10.1109\/SAINT.2007.20"},{"issue":"7","key":"9667_CR412","doi-asserted-by":"publisher","first-page":"532","DOI":"10.1007\/s001700200187","volume":"20","author":"YR Shine","year":"2002","unstructured":"Shine YR, Su CT (2002) Attribute selection for neural network-based adaptive scheduling systems in flexible manufacturing systems. Int J Adv Manuf Technol 20(7):532\u2013544","journal-title":"Int J Adv Manuf Technol"},{"key":"9667_CR413","doi-asserted-by":"crossref","unstructured":"Shivasankaran N, Senthilkumar P, Raja KV (2014) Hybrid non-dominated sorting simulated annealing algorithm for flexible job shop scheduling problems. In: ICT and critical infrastructure: proceedings of the 48th annual convention of computer society of India, vol I, Springer International Publishing, pp 101\u2013107","DOI":"10.1007\/978-3-319-03107-1_12"},{"issue":"3","key":"9667_CR414","doi-asserted-by":"publisher","first-page":"455","DOI":"10.1080\/18756891.2015.1017383","volume":"8","author":"N Shivasankaran","year":"2015","unstructured":"Shivasankaran N, Kumar PS, Raja KV (2015) Hybrid sorting immune simulated annealing algorithm for flexible job shop scheduling. Int J Comput Intell Syst 8(3):455\u2013466","journal-title":"Int J Comput Intell Syst"},{"key":"9667_CR415","volume-title":"Fuzzy expert systems and fuzzy reasoning","author":"W Siler","year":"2005","unstructured":"Siler W, Buckley JJ (2005) Fuzzy expert systems and fuzzy reasoning. Wiley, New York"},{"key":"9667_CR416","doi-asserted-by":"crossref","unstructured":"Simankina T, Popova O (2014) Neural network application for scheduling of building constraction repair. In: Applied mechanics and materials, vol 584, Trans Tech Publications","DOI":"10.4028\/www.scientific.net\/AMM.584-586.1944"},{"key":"9667_CR417","unstructured":"Simon FYP, Takefuji T (1988) Integer linear programming neural networks for job shop scheduling. In: IEEE international conference on neural networks, IEEE, pp 341\u2013348IEEE"},{"key":"9667_CR418","doi-asserted-by":"publisher","first-page":"36","DOI":"10.1016\/j.cie.2015.12.004","volume":"93","author":"MR Singh","year":"2016","unstructured":"Singh MR, Mahapatra SS (2016) A quantum behaved particle swarm optimization for flexible job shop scheduling. Comput Ind Eng 93:36\u201344","journal-title":"Comput Ind Eng"},{"issue":"2","key":"9667_CR419","doi-asserted-by":"publisher","first-page":"97","DOI":"10.1016\/S0378-7796(03)00016-6","volume":"66","author":"N Sinha","year":"2003","unstructured":"Sinha N, Chakrabarti R, Chattopadhyay PK (2003) Fast evolutionary programming techniques for short-term hydrothermal scheduling. Electric Power Syst Res 66(2):97\u2013103","journal-title":"Electric Power Syst Res"},{"key":"9667_CR420","doi-asserted-by":"publisher","first-page":"15","DOI":"10.1007\/978-3-540-73190-0_2","volume-title":"Genetic algorithms. Introduction to genetic algorithms","author":"SN Sivanandam","year":"2008","unstructured":"Sivanandam SN, Deepa SN (2008) Genetic algorithms. Introduction to genetic algorithms. Springer, Berlin, pp 15\u201337"},{"key":"9667_CR421","doi-asserted-by":"crossref","unstructured":"Smith SF, Muscettola N, Matthys DC, Ow PS, Potvin JY (1990) OPIS: an opportunistic factory scheduling system. In: Proceedings of the 3rd international conference on industrial and engineering applications of artificial intelligence and expert systems, vol 1, ACM, pp 268\u2013274","DOI":"10.1145\/98784.98830"},{"key":"9667_CR422","doi-asserted-by":"crossref","unstructured":"Song X et al (2006) Study on the combination of genetic algorithms and ant colony algorithms for solving fuzzy job shop scheduling problems. In: IMACS multiconference on computational engineering in systems applications, vol 2, IEEE","DOI":"10.1109\/CESA.2006.313624"},{"issue":"18","key":"9667_CR423","doi-asserted-by":"publisher","first-page":"7504","DOI":"10.1016\/j.eswa.2013.06.073","volume":"40","author":"AA Soukour","year":"2013","unstructured":"Soukour AA, Devendeville L, Lucet C, Moukrim A (2013) A memetic algorithm for staff scheduling problem in airport security service. Expert Syst Appl 40(18):7504\u20137512","journal-title":"Expert Syst Appl"},{"key":"9667_CR424","doi-asserted-by":"crossref","unstructured":"Soykan B, Rabadi G (2016) A Tabu search algorithm for the multiple runway aircraft scheduling problem. In: Heuristics, metaheuristics and approximate methods in planning and scheduling, Springer International Publishing, pp 165\u2013186","DOI":"10.1007\/978-3-319-26024-2_9"},{"issue":"8","key":"9667_CR425","doi-asserted-by":"publisher","first-page":"1314","DOI":"10.3844\/jcssp.2012.1314.1320","volume":"8","author":"UG Srikanth","year":"2012","unstructured":"Srikanth UG et al (2012) Tasks scheduling using ant colony optimization. J Comput Sci 8(8):1314","journal-title":"J Comput Sci"},{"key":"9667_CR426","doi-asserted-by":"publisher","first-page":"129","DOI":"10.1007\/978-3-642-77537-6_8","volume-title":"New Directions for Operations Research in Manufacturing","author":"T. Starkweather","year":"1992","unstructured":"Starkweather T, Whitley D, Mathias K, McDaniel S (1992) Sequence scheduling with genetic algorithms. In: New directions for operations research in manufacturing, Springer, Berlin, pp 129\u2013148"},{"issue":"3","key":"9667_CR427","doi-asserted-by":"publisher","first-page":"524","DOI":"10.1016\/S0377-2217(98)00326-9","volume":"118","author":"K Steinh\u00f6fel","year":"1999","unstructured":"Steinh\u00f6fel K, Albrecht A, Wong CK (1999) Two simulated annealing-based heuristics for the job shop scheduling problem. Eur J Oper Res 118(3):524\u2013548","journal-title":"Eur J Oper Res"},{"issue":"10","key":"9667_CR428","doi-asserted-by":"publisher","first-page":"759","DOI":"10.1007\/s001700070029","volume":"16","author":"V Subramaniam","year":"2000","unstructured":"Subramaniam V et al (2000) Job shop scheduling with dynamic fuzzy selection of dispatching rules. Int J Adv Manuf Technol 16(10):759\u2013764","journal-title":"Int J Adv Manuf Technol"},{"issue":"1\u20132","key":"9667_CR429","doi-asserted-by":"publisher","first-page":"184","DOI":"10.1007\/s00170-004-2492-x","volume":"29","author":"RK Suresh","year":"2006","unstructured":"Suresh RK, Mohanasundaram KM (2006) Pareto archived simulated annealing for job shop scheduling with multiple objectives. Int J Adv Manuf Technol 29(1\u20132):184\u2013196","journal-title":"Int J Adv Manuf Technol"},{"key":"9667_CR430","first-page":"52","volume-title":"Lecture Notes in Computer Science","author":"Andrew M. Sutton","year":"2012","unstructured":"Sutton AM, Neumann F (2012) A parameterized runtime analysis of simple evolutionary algorithms for makespan scheduling. In: International conference on parallel problem solving from nature, Springer, Berlin, pp 52\u201361"},{"issue":"1","key":"9667_CR431","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1016\/S0169-7439(97)00061-0","volume":"39","author":"D Svozil","year":"1997","unstructured":"Svozil D, Kvasnicka V, Pospichal J (1997) Introduction to multi-layer feed-forward neural networks. Chemom Intell Lab Syst 39(1):43\u201362","journal-title":"Chemom Intell Lab Syst"},{"key":"9667_CR432","first-page":"347","volume-title":"Lecture Notes in Computer Science","author":"Piotr Switalski","year":"2011","unstructured":"Switalski P, Seredynski F (2011) An efficient evolutionary scheduling algorithm for parallel job model in grid environment. In: International conference on parallel computing technologies, Springer, Berlin, pp 347\u2013357"},{"key":"9667_CR433","unstructured":"Sycara K, Zeng D, Miyashita K (1995) Using case-based reasoning to acquire user scheduling preferences that change over time. In: Proceedings of 11th conference on artificial intelligence for applications, IEEE"},{"key":"9667_CR434","doi-asserted-by":"publisher","first-page":"49","DOI":"10.1016\/j.ijepes.2016.03.046","volume":"83","author":"MF Tahir","year":"2016","unstructured":"Tahir MF, Asghar Saqib M (2016) Optimal scheduling of electrical power in energy-deficient scenarios using artificial neural network and Bootstrap aggregating. Int J Electr Power Energy Syst 83:49\u201357","journal-title":"Int J Electr Power Energy Syst"},{"issue":"3","key":"9667_CR435","doi-asserted-by":"publisher","first-page":"361","DOI":"10.1007\/s10845-005-7029-0","volume":"16","author":"L Tang","year":"2005","unstructured":"Tang L, Liu W, Liu J (2005) A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment. J Intell Manuf 16(3):361\u2013370","journal-title":"J Intell Manuf"},{"key":"9667_CR436","doi-asserted-by":"publisher","first-page":"22","DOI":"10.1016\/j.autcon.2013.09.008","volume":"37","author":"Y Tang","year":"2014","unstructured":"Tang Y, Liu R, Sun Q (2014) Schedule control model for linear projects based on linear scheduling method and constraint programming. Autom Constr 37:22\u201337","journal-title":"Autom Constr"},{"issue":"2","key":"9667_CR437","doi-asserted-by":"publisher","first-page":"124","DOI":"10.1111\/mice.12277","volume":"33","author":"Y Tang","year":"2018","unstructured":"Tang Y et al (2018) Scheduling optimization of linear schedule with constraint programming. Comput Aided Civ Infrastruct Eng 33(2):124\u2013151","journal-title":"Comput Aided Civ Infrastruct Eng"},{"issue":"3","key":"9667_CR438","doi-asserted-by":"publisher","first-page":"919","DOI":"10.1016\/j.asoc.2009.10.010","volume":"10","author":"R Tavakkoli-Moghaddam","year":"2010","unstructured":"Tavakkoli-Moghaddam R, Javadi B, Jolai F, Ghodratnama A (2010) The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem. Appl Soft Comput 10(3):919\u2013925","journal-title":"Appl Soft Comput"},{"key":"9667_CR439","unstructured":"Teich T et al (2001) A new ant colony algorithm for the job shop scheduling problem. In: Proceedings of the 3rd annual conference on genetic and evolutionary computation, Morgan Kaufmann Publishers Inc"},{"issue":"1","key":"9667_CR440","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s10462-013-9399-6","volume":"44","author":"CK Teoh","year":"2015","unstructured":"Teoh CK, Wibowo A, Ngadiman MS (2015) Review of state of the art for metaheuristic techniques in academic scheduling problems. Artif Intell Rev 44(1):1\u201321","journal-title":"Artif Intell Rev"},{"issue":"4","key":"9667_CR441","doi-asserted-by":"publisher","first-page":"499","DOI":"10.1080\/03081079.2014.969252","volume":"44","author":"A Thammano","year":"2015","unstructured":"Thammano A, Teekeng W (2015) A modified genetic algorithm with fuzzy roulette wheel selection for job shop scheduling problems. Int J Gen Syst 44(4):499\u2013518","journal-title":"Int J Gen Syst"},{"key":"9667_CR442","doi-asserted-by":"publisher","first-page":"30","DOI":"10.1007\/978-3-642-04918-7_3","volume-title":"Hybrid Metaheuristics","author":"Dhananjay Thiruvady","year":"2009","unstructured":"Thiruvady D et al (2009) Hybridizing beam-aco with constraint programming for single machine job scheduling. In: International workshop on hybrid metaheuristics, Springer, Berlin"},{"issue":"4","key":"9667_CR443","doi-asserted-by":"publisher","first-page":"431","DOI":"10.1007\/s00291-002-0107-1","volume":"24","author":"C Timpe","year":"2002","unstructured":"Timpe C (2002) Solving planning and scheduling problems with combined integer and constraint programming. OR Spectr 24(4):431\u2013448","journal-title":"OR Spectr"},{"issue":"1","key":"9667_CR444","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1002\/cpe.2977","volume":"26","author":"PK Tiwari","year":"2014","unstructured":"Tiwari PK, Vidyarthi DP (2014) Observing the effect of interprocess communication in auto controlled ant colony optimization-based scheduling on computational grid. Concurr Comput Pract Exp 26(1):241\u2013270","journal-title":"Concurr Comput Pract Exp"},{"issue":"2","key":"9667_CR445","doi-asserted-by":"publisher","first-page":"250","DOI":"10.1016\/S0377-2217(02)00265-5","volume":"142","author":"V T\u2019kindt","year":"2002","unstructured":"T\u2019kindt V et al (2002) An ant colony optimization algorithm to solve a 2-machine bicriteria flow shop scheduling problem. Eur J Oper Res 142(2):250\u2013257","journal-title":"Eur J Oper Res"},{"issue":"1","key":"9667_CR447","doi-asserted-by":"publisher","first-page":"246","DOI":"10.1016\/j.cor.2010.04.018","volume":"38","author":"S Topaloglu","year":"2011","unstructured":"Topaloglu S, Ozkarahan I (2011) A constraint programming-based solution approach for medical resident scheduling problems. Comput Oper Res 38(1):246\u2013255","journal-title":"Comput Oper Res"},{"issue":"12","key":"9667_CR448","doi-asserted-by":"publisher","first-page":"4750","DOI":"10.1016\/j.asoc.2013.07.029","volume":"13","author":"SA Torabi","year":"2013","unstructured":"Torabi SA, Sahebjamnia N, Mansouri SA, Bajestani MA (2013) A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem. Appl Soft Comput 13(12):4750\u20134762","journal-title":"Appl Soft Comput"},{"issue":"1\u20134","key":"9667_CR449","doi-asserted-by":"publisher","first-page":"385","DOI":"10.1016\/0360-8352(93)90302-E","volume":"25","author":"S Toure","year":"1993","unstructured":"Toure S, Rabelo L, Velasco T (1993) Artificial neural networks for flexible manufacturing systems scheduling. Comput Ind Eng 25(1\u20134):385\u2013388","journal-title":"Comput Ind Eng"},{"key":"9667_CR450","unstructured":"Tran T-D et al (2014) Solving fuzzy job shop scheduling problems with a multiobjective optimizer. In: Knowledge and systems engineering, Springer International Publishing, pp 197\u2013209"},{"issue":"3","key":"9667_CR451","doi-asserted-by":"publisher","first-page":"671","DOI":"10.3182\/20060517-3-FR-2903.00340","volume":"39","author":"Lorraine Trilling","year":"2006","unstructured":"Trilling L, Guinet A, Le Magny D (2006) Nurse scheduling using integer linear programming and constraint programming. In: IFAC proceedings, vol 39.3, pp 671\u2013676","journal-title":"IFAC Proceedings Volumes"},{"key":"9667_CR452","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1016\/j.jpdc.2014.09.015","volume":"75","author":"B Tripathy","year":"2015","unstructured":"Tripathy B, Dash S, Padhy SK (2015a) Dynamic task scheduling using a directed neural network. J Parallel Distrib Comput 75:101\u2013106","journal-title":"J Parallel Distrib Comput"},{"key":"9667_CR453","doi-asserted-by":"publisher","first-page":"154","DOI":"10.1016\/j.cie.2014.12.013","volume":"80","author":"B Tripathy","year":"2015","unstructured":"Tripathy B, Dash S, Padhy SK (2015b) Multiprocessor scheduling and neural network training methods using shuffled frog-leaping algorithm. Comput Ind Eng 80:154\u2013158","journal-title":"Comput Ind Eng"},{"key":"9667_CR454","doi-asserted-by":"publisher","first-page":"50","DOI":"10.1016\/j.swevo.2015.04.001","volume":"23","author":"A Trivedi","year":"2015","unstructured":"Trivedi A, Srinivasan D, Biswas S, Reindl T (2015) Hybridizing genetic algorithm with differential evolution for solving the unit commitment scheduling problem. Swarm Evolut Comput 23:50\u201364","journal-title":"Swarm Evolut Comput"},{"key":"9667_CR455","doi-asserted-by":"crossref","unstructured":"Tsai CJ, Tseng SS, Wang CH, Yang CT, Jiang MF (1997) A fuzzy inductive learning algorithm for parallel loop scheduling. In: 1997 IEEE International conference on systems, man, and cybernetics, computational cybernetics and simulation, vol 1, IEEE, pp 178\u2013183","DOI":"10.1109\/ICSMC.1997.625745"},{"key":"9667_CR456","doi-asserted-by":"publisher","first-page":"177","DOI":"10.1016\/j.asoc.2013.11.003","volume":"15","author":"J-T Tsai","year":"2014","unstructured":"Tsai J-T, Yang CI, Chou JH (2014) Hybrid sliding level Taguchi-based particle swarm optimization for flow shop scheduling problems. Appl Soft Comput 15:177\u2013192","journal-title":"Appl Soft Comput"},{"issue":"2","key":"9667_CR457","doi-asserted-by":"publisher","first-page":"360","DOI":"10.1016\/j.ejor.2007.08.030","volume":"191","author":"C-T Tseng","year":"2008","unstructured":"Tseng C-T, Liao C-J (2008) A discrete particle swarm optimization for lot-streaming flow shop scheduling problem. Eur J Oper Res 191(2):360\u2013373","journal-title":"Eur J Oper Res"},{"key":"9667_CR458","doi-asserted-by":"crossref","unstructured":"Turksen IB, Yurtsever T, Demirli K (1993) Fuzzy expert system shell for scheduling. In: Optical tools for manufacturing and advanced automation, International Society for Optics and Photonics","DOI":"10.1117\/12.165037"},{"key":"9667_CR459","doi-asserted-by":"publisher","first-page":"108","DOI":"10.1016\/j.tre.2013.08.006","volume":"59","author":"O Unsal","year":"2013","unstructured":"Unsal O, Oguz C (2013) Constraint programming approach to quay crane scheduling problem. Transp Res Part E Log Transp Rev 59:108\u2013122","journal-title":"Transp Res Part E Log Transp Rev"},{"issue":"3","key":"9667_CR460","doi-asserted-by":"publisher","first-page":"612","DOI":"10.1016\/j.ejor.2011.01.011","volume":"211","author":"E Vallada","year":"2011","unstructured":"Vallada E, Ruiz R (2011) A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times. Eur J Oper Res 211(3):612\u2013622","journal-title":"Eur J Oper Res"},{"issue":"4","key":"9667_CR461","doi-asserted-by":"publisher","first-page":"1350","DOI":"10.1016\/j.cor.2006.08.016","volume":"35","author":"E Vallada","year":"2008","unstructured":"Vallada E, Ruiz R, Minella G (2008) Minimising total tardiness in the m-machine flow shop problem: a review and evaluation of heuristics and metaheuristics. Comput Oper Res 35(4):1350\u20131373","journal-title":"Comput Oper Res"},{"key":"9667_CR462","unstructured":"Van Der Zwaan S, Marques C (1999) Ant colony optimisation for job shop scheduling. In: Proceedings of the\u201999 workshop on genetic algorithms and artficial life GAAL\u201999"},{"key":"9667_CR463","volume-title":"The OPL optimization programming language","author":"P Hentenryck Van","year":"1999","unstructured":"Van Hentenryck P (1999) The OPL optimization programming language. MIT Press, Cambridge"},{"issue":"2","key":"9667_CR464","doi-asserted-by":"publisher","first-page":"409","DOI":"10.1016\/j.ejor.2009.03.034","volume":"201","author":"V Peteghem Van","year":"2010","unstructured":"Van Peteghem V, Vanhoucke M (2010) A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem. Eur J Oper Res 201(2):409\u2013418","journal-title":"Eur J Oper Res"},{"key":"9667_CR465","first-page":"532","volume":"19","author":"W-J vanHoeve","year":"2005","unstructured":"vanHoeve W-J (2005) Operations research techniques in constraint programming. Tepper Sch Bus 19:532","journal-title":"Tepper Sch Bus"},{"issue":"1","key":"9667_CR466","doi-asserted-by":"publisher","first-page":"57","DOI":"10.1016\/S0377-2217(02)00205-9","volume":"145","author":"R Varela","year":"2003","unstructured":"Varela R et al (2003) A knowledge-based evolutionary strategy for scheduling problems with bottlenecks. Eur J Oper Res 145(1):57\u201371","journal-title":"Eur J Oper Res"},{"issue":"6","key":"9667_CR467","doi-asserted-by":"publisher","first-page":"1185","DOI":"10.1007\/s10845-012-0650-9","volume":"24","author":"JA Ventura","year":"2013","unstructured":"Ventura JA, Yoon SH (2013) A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers. J Intell Manuf 24(6):1185\u20131196","journal-title":"J Intell Manuf"},{"issue":"23","key":"9667_CR468","doi-asserted-by":"publisher","first-page":"6963","DOI":"10.1080\/00207543.2010.526016","volume":"49","author":"G Vilcot","year":"2011","unstructured":"Vilcot G, Billaut J-C (2011) A tabu search algorithm for solving a multicriteria flexible job shop scheduling problem. Int J Prod Res 49(23):6963\u20136980","journal-title":"Int J Prod Res"},{"key":"9667_CR469","unstructured":"Wan G, Wan F (2003) Job shop scheduling by taboo search with fuzzy reasoning. In: IEEE international conference on systems, man and cybernetics, vol 2, IEEE"},{"issue":"6","key":"9667_CR470","doi-asserted-by":"publisher","first-page":"7243","DOI":"10.1016\/j.eswa.2010.12.027","volume":"38","author":"L Wang","year":"2011","unstructured":"Wang L, Tang DB (2011) An improved adaptive genetic algorithm based on hormone modulation mechanism for job shop scheduling problem. Expert Syst Appl 38(6):7243\u20137250","journal-title":"Expert Syst Appl"},{"key":"9667_CR471","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.knosys.2015.03.024","volume":"84","author":"S Wang","year":"2015","unstructured":"Wang S, Wang L (2015) A knowledge-based multi-agent evolutionary algorithm for semiconductor final testing scheduling problem. Knowl Based Syst 84:1\u20139","journal-title":"Knowl Based Syst"},{"issue":"1","key":"9667_CR472","doi-asserted-by":"publisher","first-page":"8","DOI":"10.1006\/jpdc.1997.1392","volume":"47","author":"L Wang","year":"1997","unstructured":"Wang L, Siegel HJ, Roychowdhury VP, Maciejewski AA (1997) Task matching and scheduling in heterogeneous computing environments using a genetic-algorithm-based approach. J Parallel Distrib Comput 47(1):8\u201322","journal-title":"J Parallel Distrib Comput"},{"issue":"2","key":"9667_CR473","doi-asserted-by":"publisher","first-page":"117","DOI":"10.1016\/S0165-0114(01)00084-7","volume":"127","author":"C Wang","year":"2002","unstructured":"Wang C, Wang D, Ip WH, Yuen DW (2002) The single machine ready time scheduling problem with fuzzy processing times. Fuzzy Sets Syst 127(2):117\u2013129","journal-title":"Fuzzy Sets Syst"},{"issue":"4","key":"9667_CR474","doi-asserted-by":"publisher","first-page":"208","DOI":"10.1111\/1468-0394.00245","volume":"20","author":"H Wang","year":"2003","unstructured":"Wang H, Jacob V, Rolland E (2003) Design of efficient hybrid neural networks for flexible flow shop scheduling. Expert Syst 20(4):208\u2013231","journal-title":"Expert Syst"},{"issue":"10","key":"9667_CR475","doi-asserted-by":"publisher","first-page":"2960","DOI":"10.1016\/j.cor.2005.02.028","volume":"33","author":"L Wang","year":"2006","unstructured":"Wang L, Zhang L, Zheng DZ (2006) An effective hybrid genetic algorithm for flow shop scheduling with limited buffers. Comput Oper Res 33(10):2960\u20132971","journal-title":"Comput Oper Res"},{"issue":"5\u20138","key":"9667_CR476","doi-asserted-by":"publisher","first-page":"761","DOI":"10.1007\/s00170-010-2868-z","volume":"53","author":"HM Wang","year":"2011","unstructured":"Wang HM, Chou FD, Wu FC (2011) A simulated annealing for hybrid flow shop scheduling with multiprocessor tasks to minimize makespan. Int J Adv Manuf Technol 53(5\u20138):761\u2013776","journal-title":"Int J Adv Manuf Technol"},{"issue":"3","key":"9667_CR477","doi-asserted-by":"publisher","first-page":"2288","DOI":"10.1016\/j.eswa.2011.08.007","volume":"39","author":"Y Wang","year":"2012","unstructured":"Wang Y et al (2012) An improved self-adaptive PSO technique for short-term hydrothermal scheduling. Expert Syst Appl 39(3):2288\u20132295","journal-title":"Expert Syst Appl"},{"issue":"12","key":"9667_CR478","doi-asserted-by":"publisher","first-page":"3778","DOI":"10.1080\/00207543.2013.765077","volume":"51","author":"S Wang","year":"2013","unstructured":"Wang S et al (2013) An effective estimation of distribution algorithm for the flexible job shop scheduling problem with fuzzy processing time. Int J Prod Res 51(12):3778\u20133793","journal-title":"Int J Prod Res"},{"issue":"10","key":"9667_CR479","doi-asserted-by":"publisher","first-page":"2913","DOI":"10.1007\/s00500-014-1453-z","volume":"19","author":"Yu Wang","year":"2015","unstructured":"Wang Yu et al (2015a) Particle swarm optimization-based planning and scheduling for a laminar-flow operating room with downstream resources. Soft Comput 19(10):2913\u20132926","journal-title":"Soft Comput"},{"issue":"2","key":"9667_CR480","doi-asserted-by":"publisher","first-page":"401","DOI":"10.1016\/j.ejor.2015.06.008","volume":"247","author":"T Wang","year":"2015","unstructured":"Wang T, Meskens N, Duvivier D (2015b) Scheduling operating theatres: mixed integer programming versus constraint programming. Eur J Oper Res 247(2):401\u2013413","journal-title":"Eur J Oper Res"},{"issue":"1","key":"9667_CR481","doi-asserted-by":"publisher","first-page":"68","DOI":"10.1057\/jors.2015.50","volume":"67","author":"K Wang","year":"2016","unstructured":"Wang K, Huang Y, Qin H (2016a) A fuzzy logic-based hybrid estimation of distribution algorithm for distributed permutation flow shop scheduling problems under machine breakdown. J Oper Res Soc 67(1):68\u201382","journal-title":"J Oper Res Soc"},{"issue":"6","key":"9667_CR482","doi-asserted-by":"publisher","first-page":"780","DOI":"10.3846\/13923730.2014.914100","volume":"22","author":"C Wang","year":"2016","unstructured":"Wang C, Abdul-Rahman H, See W, Chng WS (2016b) Ant colony optimization (ACO) in scheduling overlapping architectural design activities. J Civ Eng Manag 22(6):780\u2013791","journal-title":"J Civ Eng Manag"},{"key":"9667_CR483","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1016\/j.cor.2016.04.024","volume":"79","author":"DJ Wang","year":"2017","unstructured":"Wang DJ, Liu F, Jin Y (2017) A multi-objective evolutionary algorithm guided by directed search for dynamic scheduling. Comput Oper Res 79:279\u2013290","journal-title":"Comput Oper Res"},{"key":"9667_CR484","unstructured":"Watson J-P, Christopher Beck J (2008) A hybrid constraint programming\/local search approach to the job-shop scheduling problem. In: International conference on integration of artificial intelligence (AI) and operations research (OR) techniques in constraint programming, Springer, Berlin"},{"issue":"4","key":"9667_CR485","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1109\/51.395324","volume":"14","author":"G Weil","year":"1995","unstructured":"Weil G et al (1995) Constraint programming for nurse scheduling. IEEE Eng Med Biol Mag 14(4):417\u2013422","journal-title":"IEEE Eng Med Biol Mag"},{"issue":"6","key":"9667_CR486","doi-asserted-by":"publisher","first-page":"377","DOI":"10.1007\/BF00124064","volume":"6","author":"TM Willems","year":"1995","unstructured":"Willems TM, Brandts LEMW (1995) Implementing heuristics as an optimization criterion in neural networks for job shop scheduling. J Intell Manuf 6(6):377\u2013387","journal-title":"J Intell Manuf"},{"key":"9667_CR487","unstructured":"Wu C, Gu X (2004) A genetic algorithm for flow shop scheduling with fuzzy processing time and due date. In: Fifth world congress on intelligent control and automation, 2004. WCICA 2004, vol 4, IEEE"},{"key":"9667_CR488","doi-asserted-by":"crossref","unstructured":"Wu X-Q, Carothers JD, Gassen D (1994) A neural network for scheduling and allocation in VLSI design. In: 1994 IEEE international conference on neural networks. IEEE world congress on computational intelligence, vol 3, IEEE","DOI":"10.1109\/ICNN.1994.374457"},{"issue":"1","key":"9667_CR489","doi-asserted-by":"publisher","first-page":"54","DOI":"10.1016\/j.jmsy.2011.03.004","volume":"30","author":"CC Wu","year":"2011","unstructured":"Wu CC, Hsu PH, Lai K (2011) Simulated-annealing heuristics for the single-machine scheduling problem with learning and unequal job release times. J Manuf Syst 30(1):54\u201362","journal-title":"J Manuf Syst"},{"key":"9667_CR490","doi-asserted-by":"crossref","unstructured":"Wu Z, Zhang C, Zhu X (2012) An ant colony algorithm for Master production scheduling optimization. In: 2012 IEEE 16th international conference on computer supported cooperative work in design (CSCWD), IEEE","DOI":"10.1109\/CSCWD.2012.6221908"},{"issue":"3-4","key":"9667_CR491","doi-asserted-by":"publisher","first-page":"360","DOI":"10.1007\/s00170-005-2513-4","volume":"29","author":"W-j Xia","year":"2006","unstructured":"Xia W-j, Wu Z-m (2006) A hybrid particle swarm optimization approach for the job shop scheduling problem. Int J Adv Manuf Technol 29(3-4):360\u2013366","journal-title":"Int J Adv Manuf Technol"},{"key":"9667_CR492","doi-asserted-by":"publisher","first-page":"335","DOI":"10.1016\/j.cie.2015.04.010","volume":"85","author":"W Xiang","year":"2015","unstructured":"Xiang W, Yin J, Lim G (2015) An ant colony optimization approach for solving an operating room surgery scheduling problem. Comput Ind Eng 85:335\u2013345","journal-title":"Comput Ind Eng"},{"issue":"1","key":"9667_CR493","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1016\/j.cor.2012.05.007","volume":"40","author":"J Xiao","year":"2013","unstructured":"Xiao J, Ao X-T, Tang Y (2013) Solving software project scheduling problems with ant colony optimization. Comput Oper Res 40(1):33\u201346","journal-title":"Comput Oper Res"},{"key":"9667_CR494","doi-asserted-by":"crossref","unstructured":"Xing L-N, Chen Y-W, Yang K-W (2007) Interactive fuzzy multi-objective ant colony optimization with linguistically quantified decision functions for flexible job shop scheduling problems. In: Frontiers in the convergence of bioscience and information technologies, 2007 (FBIT 2007), IEEE","DOI":"10.1109\/FBIT.2007.18"},{"issue":"3","key":"9667_CR495","doi-asserted-by":"publisher","first-page":"888","DOI":"10.1016\/j.asoc.2009.10.006","volume":"10","author":"LN Xing","year":"2010","unstructured":"Xing LN, Chen YW, Wang P, Zhao QS, Xiong J (2010) A knowledge-based ant colony optimization for flexible job shop scheduling problems. Appl Soft Comput 10(3):888\u2013896","journal-title":"Appl Soft Comput"},{"issue":"1","key":"9667_CR496","first-page":"185","volume":"20","author":"Z Xizheng","year":"2009","unstructured":"Xizheng Z, Yaonan W (2009) New mixed broadcast scheduling approach using neural networks and graph coloring in wireless sensor network. J Syst Eng Electron 20(1):185\u2013191","journal-title":"J Syst Eng Electron"},{"key":"9667_CR497","first-page":"019","volume":"5","author":"X Xu","year":"2010","unstructured":"Xu X et al (2010a) An improved shuffled frog leaping algorithm for fuzzy flow shop scheduling problem. J East China Univ Sci Technol 5:019","journal-title":"J East China Univ Sci Technol"},{"issue":"11","key":"9667_CR498","doi-asserted-by":"publisher","first-page":"1924","DOI":"10.1016\/j.cor.2009.11.012","volume":"37","author":"K Xu","year":"2010","unstructured":"Xu K, Feng Z, Jun K (2010b) A tabu-search algorithm for scheduling jobs with controllable processing times on a single machine to meet due dates. Comput Oper Res 37(11):1924\u20131938","journal-title":"Comput Oper Res"},{"key":"9667_CR499","doi-asserted-by":"publisher","first-page":"255","DOI":"10.1016\/j.ins.2014.02.122","volume":"270","author":"Y Xu","year":"2014","unstructured":"Xu Y, Li K, Hu J, Li K (2014a) A genetic algorithm for task scheduling on heterogeneous computing systems using multiple priority queues. Inf Sci 270:255\u2013287","journal-title":"Inf Sci"},{"key":"9667_CR500","doi-asserted-by":"publisher","first-page":"47","DOI":"10.1016\/j.cor.2014.04.009","volume":"50","author":"H Xu","year":"2014","unstructured":"Xu H, L\u00fc Z, Yin A, Shen L, Buscher U (2014b) A study of hybrid evolutionary algorithms for single machine scheduling problem with sequence-dependent setup times. Comput Oper Res 50:47\u201360","journal-title":"Comput Oper Res"},{"key":"9667_CR501","doi-asserted-by":"publisher","first-page":"277","DOI":"10.1016\/j.asoc.2014.07.002","volume":"24","author":"J Xu","year":"2014","unstructured":"Xu J, Yin Y, Cheng TCE, Wu CC, Gu S (2014c) A memetic algorithm for the re-entrant permutation flow shop scheduling problem to minimize the makespan. Appl Soft Comput 24:277\u2013283","journal-title":"Appl Soft Comput"},{"key":"9667_CR502","doi-asserted-by":"publisher","first-page":"260","DOI":"10.1016\/j.neucom.2013.10.042","volume":"148","author":"Y Xu","year":"2015","unstructured":"Xu Y et al (2015) An effective teaching\u2013learning-based optimization algorithm for the flexible job shop scheduling problem with fuzzy processing time. Neurocomputing 148:260\u2013268","journal-title":"Neurocomputing"},{"key":"9667_CR503","doi-asserted-by":"crossref","unstructured":"Xujun Z, Zhimin L (2009) Model and solution for steelmaking-continuous casting scheduling problem based on constraint programming method. In: International conference on information technology and computer science, ITCS 2009, vol 1, IEEE","DOI":"10.1109\/ITCS.2009.12"},{"issue":"1","key":"9667_CR506","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1007\/s10951-009-0106-z","volume":"13","author":"S Yang","year":"2010","unstructured":"Yang S et al (2010) An improved constraint satisfaction adaptive neural network for job shop scheduling. J Sched 13(1):17\u201338","journal-title":"J Sched"},{"issue":"6","key":"9667_CR507","doi-asserted-by":"publisher","first-page":"464","DOI":"10.1007\/s001700200179","volume":"20","author":"WC Yeh","year":"2002","unstructured":"Yeh WC (2002) A memetic algorithm for the n\/2\/flow shop\/\u03b1F\u2009+\u2009\u03b2C max scheduling problem. Int J Adv Manuf Technol 20(6):464\u2013473","journal-title":"Int J Adv Manuf Technol"},{"key":"9667_CR508","doi-asserted-by":"publisher","first-page":"142","DOI":"10.1016\/j.ins.2013.10.023","volume":"269","author":"WC Yeh","year":"2014","unstructured":"Yeh WC, Lai PJ, Lee WC, Chuang MC (2014) Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects. Inf Sci 269:142\u2013158","journal-title":"Inf Sci"},{"key":"9667_CR509","doi-asserted-by":"crossref","unstructured":"Yin J, Chen BJ (2011) Design and implementation of the supervisory control expert system for dynamic scheduling. In: Advanced materials research, vol 211, Trans Tech Publications","DOI":"10.4028\/www.scientific.net\/AMR.211-212.700"},{"issue":"1","key":"9667_CR510","doi-asserted-by":"publisher","first-page":"68","DOI":"10.1080\/0953728031000089988","volume":"14","author":"K-C Ying","year":"2003","unstructured":"Ying K-C, Liao C-J (2003) An ant colony system approach for scheduling problems. Prod Plann Control 14(1):68\u201375","journal-title":"Prod Plann Control"},{"issue":"16","key":"9667_CR511","doi-asserted-by":"publisher","first-page":"3161","DOI":"10.1080\/00207540500536939","volume":"44","author":"K-C Ying","year":"2006","unstructured":"Ying K-C, Lin S-W (2006) Multiprocessor task scheduling in multistage hybrid flow shops: an ant colony system approach. Int J Prod Res 44(16):3161\u20133177","journal-title":"Int J Prod Res"},{"key":"9667_CR512","unstructured":"Yoon H-suk (2006) Optimization approaches to protein folding. Diss. Georgia Institute of Technology"},{"key":"9667_CR513","doi-asserted-by":"crossref","unstructured":"Young JS, Lin YP, Shih PW (2013) Neural network approach to gain scheduling for traction control of electrical vehicles. In: Applied mechanics and materials, vol 392, Trans Tech Publications","DOI":"10.4028\/www.scientific.net\/AMM.392.272"},{"issue":"3","key":"9667_CR514","doi-asserted-by":"publisher","first-page":"337","DOI":"10.1016\/S0360-8352(01)00010-9","volume":"39","author":"H Yu","year":"2001","unstructured":"Yu H, Liang W (2001) Neural network and genetic algorithm-based hybrid approach to expanded job shop scheduling. Comput Ind Eng 39(3):337\u2013356","journal-title":"Comput Ind Eng"},{"key":"9667_CR515","unstructured":"Yu I-K, Chou CS, Song Y-H (1998) Application of the ant colony search algorithm to short-term generation scheduling problem of thermal units. In: Proceedings of POWERCON\u201998. International conference on power system technology, vol 1, IEEE"},{"issue":"3","key":"9667_CR516","doi-asserted-by":"publisher","first-page":"623","DOI":"10.1016\/S0360-8352(02)00130-4","volume":"43","author":"YS Yun","year":"2002","unstructured":"Yun YS (2002) Genetic algorithm with fuzzy logic controller for preemptive and non-preemptive job shop scheduling problems. Comput Ind Eng 43(3):623\u2013644","journal-title":"Comput Ind Eng"},{"issue":"1-2","key":"9667_CR517","doi-asserted-by":"publisher","first-page":"213","DOI":"10.1016\/S0360-8352(02)00065-7","volume":"43","author":"Y-S Yun","year":"2002","unstructured":"Yun Y-S, Gen M (2002) Advanced scheduling problem using constraint programming techniques in SCM environment. Comput Ind Eng 43(1-2):213\u2013229","journal-title":"Comput Ind Eng"},{"issue":"2","key":"9667_CR518","doi-asserted-by":"publisher","first-page":"552","DOI":"10.1016\/j.ejor.2013.03.005","volume":"229","author":"R Zamani","year":"2013","unstructured":"Zamani R (2013) A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem. Eur J Oper Res 229(2):552\u2013559","journal-title":"Eur J Oper Res"},{"issue":"8","key":"9667_CR520","doi-asserted-by":"publisher","first-page":"1287","DOI":"10.1007\/s00500-012-0812-x","volume":"16","author":"MF Zarandi","year":"2012","unstructured":"Zarandi MF, Gamasaee R (2012) Type-2 fuzzy hybrid expert system for prediction of tardiness in scheduling of steel continuous casting process. Soft Comput 16(8):1287\u20131302","journal-title":"Soft Comput"},{"key":"9667_CR519","unstructured":"Zarandi MF, Azad FK (2013) A type 2 fuzzy multi agent based system for scheduling of steel production. In: 2013 Joint\u00a0IFSA world congress and NAFIPS annual meeting (IFSA\/NAFIPS), IEEE, pp 992\u2013996"},{"issue":"4","key":"9667_CR521","first-page":"297","volume":"2","author":"MHF Zarandi","year":"2007","unstructured":"Zarandi MHF, Esmaeilian M, Zarandi MMF (2007a) A systematic fuzzy system modeling for scheduling of textile manufacturing system. Int J Manag Sci Eng Manag 2(4):297\u2013309","journal-title":"Int J Manag Sci Eng Manag"},{"issue":"4","key":"9667_CR522","first-page":"243","volume":"2","author":"MHF Zarandi","year":"2007","unstructured":"Zarandi MHF, Zarandi MMF, Maknoon MY, Masoumi J (2007b) Scheduling of two and three machine robotic cells with fuzzy methodology. Int J Manag Sci Eng Manag 2(4):243\u2013256","journal-title":"Int J Manag Sci Eng Manag"},{"issue":"2","key":"9667_CR523","doi-asserted-by":"publisher","first-page":"297","DOI":"10.1007\/s10845-013-0860-9","volume":"27","author":"MF Zarandi","year":"2016","unstructured":"Zarandi MF, Khorshidian H, Akbarpour Shirazi M (2016) A constraint programming model for the scheduling of JIT cross-docking systems with preemption. J Intell Manuf 27(2):297\u2013313","journal-title":"J Intell Manuf"},{"issue":"6","key":"9667_CR524","doi-asserted-by":"publisher","first-page":"725","DOI":"10.1016\/j.rcim.2010.04.005","volume":"26","author":"LJ Zeballos","year":"2010","unstructured":"Zeballos LJ (2010) A constraint programming approach to tool allocation and production scheduling in flexible manufacturing systems. Robot Comput Integr Manuf 26(6):725\u2013743","journal-title":"Robot Comput Integr Manuf"},{"issue":"3","key":"9667_CR525","doi-asserted-by":"publisher","first-page":"1705","DOI":"10.1021\/ie1016199","volume":"50","author":"LJ Zeballos","year":"2010","unstructured":"Zeballos LJ, Castro PM, M\u00e9ndez CA (2010a) Integrated constraint programming scheduling approach for automated wet-etch stations in semiconductor manufacturing. Ind Eng Chem Res 50(3):1705\u20131715","journal-title":"Ind Eng Chem Res"},{"issue":"2","key":"9667_CR526","doi-asserted-by":"publisher","first-page":"229","DOI":"10.1016\/j.engappai.2009.07.002","volume":"23","author":"LJ Zeballos","year":"2010","unstructured":"Zeballos LJ, Quiroga OD, Henning GP (2010b) A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations. Eng Appl Artif Intell 23(2):229\u2013248","journal-title":"Eng Appl Artif Intell"},{"key":"9667_CR527","unstructured":"Zebullos L, Henning GP (2003) A constraint programming approach to the multi-stage batch scheduling problem. In: Foundation of computer-aided operations (FOCAPO), pp 343\u2013346"},{"issue":"13","key":"9667_CR528","first-page":"3821","volume":"9","author":"S Zhan","year":"2012","unstructured":"Zhan S, Huo H (2012) Improved PSO-based task scheduling algorithm in cloud computing. J Inf Comput Sci 9(13):3821\u20133829","journal-title":"J Inf Comput Sci"},{"key":"9667_CR529","doi-asserted-by":"publisher","first-page":"3361","DOI":"10.1016\/j.jclepro.2015.09.097","volume":"112","author":"R Zhang","year":"2016","unstructured":"Zhang R, Chiong R (2016) Solving the energy-efficient job shop scheduling problem: a multi-objective genetic algorithm with enhanced local search for minimizing the total weighted tardiness and total energy consumption. J Clean Prod 112:3361\u20133375","journal-title":"J Clean Prod"},{"issue":"2","key":"9667_CR530","doi-asserted-by":"publisher","first-page":"434","DOI":"10.1016\/j.ejor.2015.01.032","volume":"244","author":"L Zhang","year":"2015","unstructured":"Zhang L, Wong TN (2015) An object-coding genetic algorithm for integrated process planning and scheduling. Eur J Oper Res 244(2):434\u2013444","journal-title":"Eur J Oper Res"},{"issue":"1","key":"9667_CR531","doi-asserted-by":"publisher","first-page":"79","DOI":"10.1016\/j.asoc.2009.06.008","volume":"10","author":"R Zhang","year":"2010","unstructured":"Zhang R, Wu C (2010) A hybrid immune simulated annealing algorithm for the job shop scheduling problem. Appl Soft Comput 10(1):79\u201389","journal-title":"Appl Soft Comput"},{"issue":"1","key":"9667_CR532","doi-asserted-by":"publisher","first-page":"83","DOI":"10.1016\/j.ijproman.2005.06.006","volume":"24","author":"H Zhang","year":"2006","unstructured":"Zhang H, Li H, Tam CM (2006) Particle swarm optimization for resource-constrained project scheduling. Int J Proj Manag 24(1):83\u201392","journal-title":"Int J Proj Manag"},{"issue":"7","key":"9667_CR533","doi-asserted-by":"publisher","first-page":"1713","DOI":"10.1016\/j.cor.2011.10.007","volume":"39","author":"Q Zhang","year":"2012","unstructured":"Zhang Q, Manier H, Manier M-A (2012a) A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times. Comput Oper Res 39(7):1713\u20131723","journal-title":"Comput Oper Res"},{"key":"9667_CR534","doi-asserted-by":"crossref","unstructured":"Zhang X, Lv Z, Song X (2012) Model and solution for hot strip rolling scheduling problem based on constraint programming method. In: 2012 IEEE 12th international conference on computer and information technology (CIT), IEEE","DOI":"10.1109\/CIT.2012.96"},{"issue":"6","key":"9667_CR535","doi-asserted-by":"publisher","first-page":"2816","DOI":"10.1016\/j.eswa.2013.10.014","volume":"41","author":"Z Zhang","year":"2014","unstructured":"Zhang Z, Zhang N, Feng Z (2014) Multi-satellite control resource scheduling based on ant colony optimization. Expert Syst Appl 41(6):2816\u20132823","journal-title":"Expert Syst Appl"},{"issue":"3","key":"9667_CR536","doi-asserted-by":"publisher","first-page":"160","DOI":"10.1016\/j.orhc.2014.05.003","volume":"3","author":"Z Zhao","year":"2014","unstructured":"Zhao Z, Li X (2014) Scheduling elective surgeries with sequence-dependent setup times to multiple operating rooms using constraint programming. Oper Res Health Care 3(3):160\u2013167","journal-title":"Oper Res Health Care"},{"issue":"9\u201312","key":"9667_CR537","doi-asserted-by":"publisher","first-page":"1063","DOI":"10.1007\/s00170-011-3646-2","volume":"60","author":"Y-l Zheng","year":"2012","unstructured":"Zheng Y-l, Li Y-x, Lei D-m (2012) Multi-objective swarm-based neighborhood search for fuzzy flexible job shop scheduling. Int J Adv Manuf Technol 60(9\u201312):1063\u20131069","journal-title":"Int J Adv Manuf Technol"},{"key":"9667_CR538","doi-asserted-by":"crossref","unstructured":"Zibran MF, Roy CK (2011) A constraint programming approach to conflict-aware optimal scheduling of prioritized code clone refactoring. In: 2011 11th IEEE working conference on source code analysis and manipulation, IEEE","DOI":"10.1109\/SCAM.2011.21"}],"container-title":["Artificial Intelligence Review"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10462-018-9667-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10462-018-9667-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10462-018-9667-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,4]],"date-time":"2026-04-04T03:08:39Z","timestamp":1775272119000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10462-018-9667-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,11,19]]},"references-count":538,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2020,1]]}},"alternative-id":["9667"],"URL":"https:\/\/doi.org\/10.1007\/s10462-018-9667-6","relation":{},"ISSN":["0269-2821","1573-7462"],"issn-type":[{"value":"0269-2821","type":"print"},{"value":"1573-7462","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,11,19]]},"assertion":[{"value":"19 November 2018","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}