{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,5]],"date-time":"2026-11-05T15:02:21Z","timestamp":1793890941676,"version":"4.8.0"},"reference-count":288,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2022,8,25]],"date-time":"2022-08-25T00:00:00Z","timestamp":1661385600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2022,8,25]],"date-time":"2022-08-25T00:00:00Z","timestamp":1661385600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"funder":[{"DOI":"10.13039\/501100004488","name":"Hrvatska Zaklada za Znanost","doi-asserted-by":"publisher","award":["IP-2019-04-4333"],"award-info":[{"award-number":["IP-2019-04-4333"]}],"id":[{"id":"10.13039\/501100004488","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Artif Intell Rev"],"published-print":{"date-parts":[[2023,4]]},"DOI":"10.1007\/s10462-022-10247-9","type":"journal-article","created":{"date-parts":[[2022,8,24]],"date-time":"2022-08-24T23:36:12Z","timestamp":1661384172000},"page":"3181-3289","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":77,"title":["Heuristic and metaheuristic methods for the parallel unrelated machines scheduling problem: a survey"],"prefix":"10.1007","volume":"56","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-8732-4769","authenticated-orcid":false,"given":"Marko","family":"\u0189urasevi\u0107","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Domagoj","family":"Jakobovi\u0107","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2022,8,25]]},"reference":[{"issue":"3","key":"10247_CR1","doi-asserted-by":"publisher","first-page":"525","DOI":"10.1108\/JM2-02-2016-0011","volume":"12","author":"M Abedi","year":"2017","unstructured":"Abedi M, Seidgar H, Fazlollahtabar H (2017) Hybrid scheduling and maintenance problem using artificial neural network based meta-heuristics. J Model Manag 12(3):525\u2013550. https:\/\/doi.org\/10.1108\/JM2-02-2016-0011","journal-title":"J Model Manag"},{"issue":"4","key":"10247_CR2","doi-asserted-by":"publisher","first-page":"706","DOI":"10.1080\/0305215X.2015.1042475","volume":"48","author":"M Afzalirad","year":"2016","unstructured":"Afzalirad M, Rezaeian J (2016) Design of high-performing hybrid meta-heuristics for unrelated parallel machine scheduling with machine eligibility and precedence constraints. Eng Optim 48(4):706\u2013726. https:\/\/doi.org\/10.1080\/0305215X.2015.1042475","journal-title":"Eng Optim"},{"key":"10247_CR3","doi-asserted-by":"publisher","first-page":"40","DOI":"10.1016\/j.cie.2016.05.020","volume":"98","author":"M Afzalirad","year":"2016","unstructured":"Afzalirad M, Rezaeian J (2016) Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions. Comput Ind Eng 98:40\u201352. https:\/\/doi.org\/10.1016\/j.cie.2016.05.020","journal-title":"Comput Ind Eng"},{"key":"10247_CR4","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1016\/j.asoc.2016.10.039","volume":"50","author":"M Afzalirad","year":"2017","unstructured":"Afzalirad M, Rezaeian J (2017) A realistic variant of bi-objective unrelated parallel machine scheduling problem: Nsga-ii and moaco approaches. Appl Soft Comput 50:109\u2013123. https:\/\/doi.org\/10.1016\/j.asoc.2016.10.039","journal-title":"Appl Soft Comput"},{"issue":"2","key":"10247_CR5","doi-asserted-by":"publisher","first-page":"423","DOI":"10.1007\/s10845-015-1117-6","volume":"29","author":"M Afzalirad","year":"2015","unstructured":"Afzalirad M, Shafipour M (2015) Design of an efficient genetic algorithm for resource-constrained unrelated parallel machine scheduling problem with machine eligibility restrictions. J Intell Manuf 29(2):423\u2013437. https:\/\/doi.org\/10.1007\/s10845-015-1117-6","journal-title":"J Intell Manuf"},{"key":"10247_CR6","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1504\/WRSTSD.2013.050784","volume":"10","author":"M Ahemad","year":"2013","unstructured":"Ahemad M, Shrivastava R (2013) Green manufacturing (gm): past, present and future(a state of art review). World Rev Sci 10:17\u201355. https:\/\/doi.org\/10.1504\/WRSTSD.2013.050784","journal-title":"World Rev Sci"},{"key":"10247_CR7","doi-asserted-by":"publisher","first-page":"866","DOI":"10.1016\/j.jclepro.2018.09.100","volume":"205","author":"M Akbar","year":"2018","unstructured":"Akbar M, Irohara T (2018) Scheduling for sustainable manufacturing: a review. J Clean Prod 205:866\u2013883. https:\/\/doi.org\/10.1016\/j.jclepro.2018.09.100","journal-title":"J Clean Prod"},{"key":"10247_CR8","doi-asserted-by":"publisher","first-page":"171533","DOI":"10.1109\/ACCESS.2019.2955975","volume":"7","author":"IM Al-harkan","year":"2019","unstructured":"Al-harkan IM, Qamhan AA (2019) Optimize unrelated parallel machines scheduling problems with multiple limited additional resources, sequence-dependent setup times and release date constraints. IEEE Access 7:171533\u2013171547. https:\/\/doi.org\/10.1109\/ACCESS.2019.2955975","journal-title":"IEEE Access"},{"key":"10247_CR9","doi-asserted-by":"publisher","DOI":"10.3390\/pr9040654","author":"IM Al-harkan","year":"2021","unstructured":"Al-harkan IM, Qamhan AA, Badwelan A, Alsamhan A, Hidri L (2021) Modified harmony search algorithm for resource-constrained parallel machine scheduling problem with release dates and sequence-dependent setup times. Processes. https:\/\/doi.org\/10.3390\/pr9040654","journal-title":"Processes"},{"issue":"2","key":"10247_CR10","doi-asserted-by":"publisher","first-page":"345","DOI":"10.1016\/j.ejor.2015.04.004","volume":"246","author":"A Allahverdi","year":"2015","unstructured":"Allahverdi A (2015) The third comprehensive survey on scheduling problems with setup times\/costs. Eur J Oper Res 246(2):345\u2013378. https:\/\/doi.org\/10.1016\/j.ejor.2015.04.004","journal-title":"Eur J Oper Res"},{"issue":"3","key":"10247_CR11","doi-asserted-by":"publisher","first-page":"665","DOI":"10.1016\/j.ejor.2016.05.036","volume":"255","author":"A Allahverdi","year":"2016","unstructured":"Allahverdi A (2016) A survey of scheduling problems with no-wait in process. Eur J Oper Res 255(3):665\u2013686. https:\/\/doi.org\/10.1016\/j.ejor.2016.05.036","journal-title":"Eur J Oper Res"},{"issue":"2","key":"10247_CR12","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1016\/S0305-0483(98)00042-5","volume":"27","author":"A Allahverdi","year":"1999","unstructured":"Allahverdi A, Gupta JN, Aldowaisan T (1999) A review of scheduling research involving setup considerations. Omega 27(2):219\u2013239. https:\/\/doi.org\/10.1016\/S0305-0483(98)00042-5","journal-title":"Omega"},{"issue":"3","key":"10247_CR13","doi-asserted-by":"publisher","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A Allahverdi","year":"2008","unstructured":"Allahverdi A, Ng C, Cheng T, Kovalyov MY (2008) A survey of scheduling problems with setup times or costs. Eur J Oper Res 187(3):985\u20131032. https:\/\/doi.org\/10.1016\/j.ejor.2006.06.060","journal-title":"Eur J Oper Res"},{"issue":"14","key":"10247_CR14","doi-asserted-by":"publisher","first-page":"9545","DOI":"10.1007\/s00500-021-05889-w","volume":"25","author":"MAA Al-qaness","year":"2021","unstructured":"Al-qaness MAA, Ewees AA, Elaziz MA (2021) Modified whale optimization algorithm for solving unrelated parallel machine scheduling problems. Soft Comput 25(14):9545\u20139557. https:\/\/doi.org\/10.1007\/s00500-021-05889-w","journal-title":"Soft Comput"},{"key":"10247_CR15","unstructured":"Al-Salem A, Armacost R (2002) Unrelated machines scheduling with machine eligibility restrictions. 15:193\u2013210"},{"key":"10247_CR16","doi-asserted-by":"publisher","unstructured":"Anagnostopoulos G, Rabadi G (2002) A simulated annealing algorithm for the unrelated parallel machine scheduling problem. In: Proceedings of the 5th biannual world automation congress, vol\u00a014, pp 115\u2013120. https:\/\/doi.org\/10.1109\/WAC.2002.1049430","DOI":"10.1109\/WAC.2002.1049430"},{"issue":"3","key":"10247_CR17","doi-asserted-by":"publisher","first-page":"415","DOI":"10.1007\/s12065-019-00305-7","volume":"13","author":"OA Ar\u0131k","year":"2019","unstructured":"Ar\u0131k OA (2019) Comparisons of metaheuristic algorithms for unrelated parallel machine weighted earliness\/tardiness scheduling problems. Evolut Intell 13(3):415\u2013425. https:\/\/doi.org\/10.1007\/s12065-019-00305-7","journal-title":"Evolut Intell"},{"key":"10247_CR18","doi-asserted-by":"publisher","unstructured":"Arnaout J-P, Musa R, Rabadi G (2008) Ant colony optimization algorithm to parallel machine scheduling problem with setups. In: 2008 IEEE international conference on automation science and engineering, pp 578\u2013582. https:\/\/doi.org\/10.1109\/COASE.2008.4626566","DOI":"10.1109\/COASE.2008.4626566"},{"key":"10247_CR19","unstructured":"Arnaout J-PM, Rabadi G, Mun JH (2006) A dynamic heuristic for the stochastic unrelated parallel machine scheduling problem"},{"key":"10247_CR20","doi-asserted-by":"publisher","unstructured":"Arnaout J-P, Rabadi G (2005) Minimizing the total weighted completion time on unrelated parallel machines with stochastic times. In: Proceedings of the winter simulation conference, 2005. https:\/\/doi.org\/10.1109\/WSC.2005.1574499","DOI":"10.1109\/WSC.2005.1574499"},{"issue":"1\u20132","key":"10247_CR21","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1007\/s10479-019-03138-w","volume":"285","author":"J-P Arnaout","year":"2019","unstructured":"Arnaout J-P (2019) A worm optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times. Ann Oper Res 285(1\u20132):273\u2013293. https:\/\/doi.org\/10.1007\/s10479-019-03138-w","journal-title":"Ann Oper Res"},{"issue":"6","key":"10247_CR22","doi-asserted-by":"publisher","first-page":"693","DOI":"10.1007\/s10845-009-0246-1","volume":"21","author":"J-P Arnaout","year":"2009","unstructured":"Arnaout J-P, Rabadi G, Musa R (2009) A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times. J Intell Manuf 21(6):693\u2013701. https:\/\/doi.org\/10.1007\/s10845-009-0246-1","journal-title":"J Intell Manuf"},{"issue":"1","key":"10247_CR23","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1007\/s10845-012-0672-3","volume":"25","author":"J-P Arnaout","year":"2012","unstructured":"Arnaout J-P, Musa R, Rabadi G (2012) A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines\u2013part II: enhancements and experimentations. J Intell Manuf 25(1):43\u201353. https:\/\/doi.org\/10.1007\/s10845-012-0672-3","journal-title":"J Intell Manuf"},{"key":"10247_CR24","doi-asserted-by":"publisher","first-page":"84","DOI":"10.1016\/j.cie.2016.12.038","volume":"105","author":"JEC Arroyo","year":"2017","unstructured":"Arroyo JEC, Leung JY-T (2017) An effective iterated greedy algorithm for scheduling unrelated parallel batch machines with non-identical capacities and unequal ready times. Comput Ind Eng 105:84\u2013100. https:\/\/doi.org\/10.1016\/j.cie.2016.12.038","journal-title":"Comput Ind Eng"},{"key":"10247_CR25","doi-asserted-by":"publisher","first-page":"117","DOI":"10.1016\/j.cor.2016.08.015","volume":"78","author":"JEC Arroyo","year":"2017","unstructured":"Arroyo JEC, Leung JY-T (2017) Scheduling unrelated parallel batch processing machines with non-identical job sizes and unequal ready times. Comput Oper Res 78:117\u2013128. https:\/\/doi.org\/10.1016\/j.cor.2016.08.015","journal-title":"Comput Oper Res"},{"key":"10247_CR26","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1016\/j.engappai.2018.10.012","volume":"77","author":"JEC Arroyo","year":"2019","unstructured":"Arroyo JEC, Leung JY-T, Tavares RG (2019) An iterated greedy algorithm for total flow time minimization in unrelated parallel batch machines with unequal job release times. Eng Appl Artif Intell 77:239\u2013254. https:\/\/doi.org\/10.1016\/j.engappai.2018.10.012","journal-title":"Eng Appl Artif Intell"},{"issue":"9\u201312","key":"10247_CR27","doi-asserted-by":"publisher","first-page":"1705","DOI":"10.1007\/s00170-014-6390-6","volume":"76","author":"O Avalos-Rosales","year":"2014","unstructured":"Avalos-Rosales O, Angel-Bello F, Alvarez A (2014) Efficient metaheuristic algorithm and re-formulations for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times. Int J Adv Manuf Technol 76(9\u201312):1705\u20131718. https:\/\/doi.org\/10.1007\/s00170-014-6390-6","journal-title":"Int J Adv Manuf Technol"},{"key":"10247_CR28","doi-asserted-by":"publisher","first-page":"364","DOI":"10.1016\/j.cie.2018.07.006","volume":"123","author":"O Avalos-Rosales","year":"2018","unstructured":"Avalos-Rosales O, Angel-Bello F, Alvarez A, Cardona-Valdes Y (2018) Including preventive maintenance activities in an unrelated parallel machine environment with dependent setup times. Comput Ind Eng 123:364\u2013377. https:\/\/doi.org\/10.1016\/j.cie.2018.07.006","journal-title":"Comput Ind Eng"},{"key":"10247_CR29","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1016\/j.cie.2014.11.010","volume":"86","author":"H Babaei","year":"2015","unstructured":"Babaei H, Karimpour J, Hadidi A (2015) A survey of approaches for university course timetabling problem. Comput Ind Eng 86:43\u201359. https:\/\/doi.org\/10.1016\/j.cie.2014.11.010 (Applications of Computational Intelligence and Fuzzy Logic to Manufacturing and Service Systems)","journal-title":"Comput Ind Eng"},{"issue":"6","key":"10247_CR30","doi-asserted-by":"publisher","first-page":"6814","DOI":"10.1016\/j.eswa.2010.12.064","volume":"38","author":"S Balin","year":"2011","unstructured":"Balin S (2011) Non-identical parallel machine scheduling using genetic algorithm. Exp Syst Appl 38(6):6814\u20136821. https:\/\/doi.org\/10.1016\/j.eswa.2010.12.064","journal-title":"Exp Syst Appl"},{"issue":"10","key":"10247_CR31","doi-asserted-by":"publisher","first-page":"6718","DOI":"10.1016\/j.apm.2013.01.050","volume":"37","author":"S Bandyopadhyay","year":"2013","unstructured":"Bandyopadhyay S, Bhattacharya R (2013) Solving multi-objective parallel machine scheduling problem by a modified NSGA-II. Appl Math Model 37(10):6718\u20136729. https:\/\/doi.org\/10.1016\/j.apm.2013.01.050","journal-title":"Appl Math Model"},{"issue":"4\u20135","key":"10247_CR32","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1016\/s0895-7177(00)00250-8","volume":"33","author":"J Bank","year":"2001","unstructured":"Bank J, Werner F (2001) Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties. Math Comput Model 33(4\u20135):363\u2013383. https:\/\/doi.org\/10.1016\/s0895-7177(00)00250-8","journal-title":"Math Comput Model"},{"key":"10247_CR33","doi-asserted-by":"publisher","first-page":"46","DOI":"10.1016\/j.cor.2018.10.010","volume":"103","author":"G Bektur","year":"2019","unstructured":"Bektur G, Sarac T (2019) A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server. Comput Oper Res 103:46\u201363. https:\/\/doi.org\/10.1016\/j.cor.2018.10.010","journal-title":"Comput Oper Res"},{"issue":"12","key":"10247_CR34","doi-asserted-by":"publisher","first-page":"2231","DOI":"10.1002\/spe.2890","volume":"50","author":"AK Bhardwaj","year":"2020","unstructured":"Bhardwaj AK, Gajpal Y, Surti C, Gill SS (2020) HEART: unrelated parallel machines problem with precedence constraints for task scheduling in cloud computing using heuristic and meta-heuristic algorithms. Softw: Pract Exp 50(12):2231\u20132251. https:\/\/doi.org\/10.1002\/spe.2890","journal-title":"Softw: Pract Exp"},{"issue":"5","key":"10247_CR35","doi-asserted-by":"publisher","first-page":"1621","DOI":"10.1007\/s10845-010-0464-6","volume":"23","author":"A Bilyk","year":"2010","unstructured":"Bilyk A, M\u00f6nch L (2010) A variable neighborhood search approach for planning and scheduling of jobs on unrelated parallel machines. J Intell Manuf 23(5):1621\u20131635. https:\/\/doi.org\/10.1007\/s10845-010-0464-6","journal-title":"J Intell Manuf"},{"issue":"4","key":"10247_CR36","doi-asserted-by":"publisher","first-page":"367","DOI":"10.1007\/s10951-014-0397-6","volume":"19","author":"A Bitar","year":"2014","unstructured":"Bitar A, Dauz\u00e8re-P\u00e9r\u00e8s S, Yugma C, Roussel R (2014) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing. J Sched 19(4):367\u2013376. https:\/\/doi.org\/10.1007\/s10951-014-0397-6","journal-title":"J Sched"},{"issue":"10","key":"10247_CR37","doi-asserted-by":"publisher","first-page":"9021","DOI":"10.1016\/j.eswa.2012.02.032","volume":"39","author":"MA Bozorgirad","year":"2012","unstructured":"Bozorgirad MA, Logendran R (2012) Sequence-dependent group scheduling problem on unrelated-parallel machines. Exp Syst Appl 39(10):9021\u20139030. https:\/\/doi.org\/10.1016\/j.eswa.2012.02.032","journal-title":"Exp Syst Appl"},{"issue":"1","key":"10247_CR38","doi-asserted-by":"publisher","first-page":"110","DOI":"10.1109\/TEVC.2015.2429314","volume":"20","author":"J Branke","year":"2016","unstructured":"Branke J, Nguyen S, Pickardt CW, Zhang M (2016) Automated design of production scheduling heuristics: a review. IEEE Trans Evolut Comput 20(1):110\u2013124. https:\/\/doi.org\/10.1109\/TEVC.2015.2429314","journal-title":"IEEE Trans Evolut Comput"},{"issue":"6","key":"10247_CR39","doi-asserted-by":"publisher","first-page":"810","DOI":"10.1006\/jpdc.2000.1714","volume":"61","author":"TD Braun","year":"2001","unstructured":"Braun TD, Siegel HJ, Beck N, B\u00f6l\u00f6ni LL, Maheswaran M, Reuther AI, Robertson JP, Theys MD, Yao B, Hensgen D, Freund RF (2001) A comparison of eleven static heuristics for mapping a class of independent tasks onto heterogeneous distributed computing systems. J Parallel Distrib Comput 61(6):810\u2013837. https:\/\/doi.org\/10.1006\/jpdc.2000.1714","journal-title":"J Parallel Distrib Comput"},{"key":"10247_CR40","doi-asserted-by":"publisher","unstructured":"Braun T, Siegal H, Beck N, Boloni L, Maheswaran M, Reuther A, Robertson J, Theys M, Yao B, Hensgen D, Freund R (1999) A comparison study of static mapping heuristics for a class of meta-tasks on heterogeneous computing systems. In: Proceedings. Eighth heterogeneous computing workshop (HCW\u201999), pp 15\u201329. https:\/\/doi.org\/10.1109\/HCW.1999.765093","DOI":"10.1109\/HCW.1999.765093"},{"issue":"1","key":"10247_CR41","doi-asserted-by":"publisher","first-page":"461","DOI":"10.1007\/s11227-011-0729-7","volume":"62","author":"LD Brice\u00f1o","year":"2012","unstructured":"Brice\u00f1o LD, Siegel HJ, Maciejewski AA, Oltikar M (2012) Characterization of the iterative application of makespan heuristics on non-makespan machines in a heterogeneous parallel and distributed environment. J Supercomput 62(1):461\u2013485. https:\/\/doi.org\/10.1007\/s11227-011-0729-7","journal-title":"J Supercomput"},{"issue":"9\u201312","key":"10247_CR42","doi-asserted-by":"publisher","first-page":"2105","DOI":"10.1007\/s00170-014-6614-9","volume":"77","author":"E Caniyilmaz","year":"2014","unstructured":"Caniyilmaz E, Benli B, Ilkay MS (2014) An artificial bee colony algorithm approach for unrelated parallel machine scheduling with processing set restrictions, job sequence-dependent setup times, and due date. Int J Adv Manuf Technol 77(9\u201312):2105\u20132115. https:\/\/doi.org\/10.1007\/s00170-014-6614-9","journal-title":"Int J Adv Manuf Technol"},{"issue":"8","key":"10247_CR43","doi-asserted-by":"publisher","first-page":"1995","DOI":"10.1016\/j.cor.2004.01.001","volume":"32","author":"D Cao","year":"2005","unstructured":"Cao D, Chen M, Wan G (2005) Parallel machine selection and job scheduling to minimize machine cost and job tardiness. Comput Oper Res 32(8):1995\u20132012. https:\/\/doi.org\/10.1016\/j.cor.2004.01.001","journal-title":"Comput Oper Res"},{"key":"10247_CR44","doi-asserted-by":"publisher","unstructured":"Cappadonna FA, Costa A, Fichera S (2012) Three genetic algorithm approaches to the unrelated parallel machine scheduling problem with limited human resources. In: Proceedings of the 4th international joint conference on computational intelligence\u2014ECTA, (IJCCI 2012), pp 170\u2013175. INSTICC, SciTePress. https:\/\/doi.org\/10.5220\/0004116501700175","DOI":"10.5220\/0004116501700175"},{"key":"10247_CR45","doi-asserted-by":"publisher","first-page":"450","DOI":"10.1016\/j.procir.2013.09.077","volume":"12","author":"F Cappadonna","year":"2013","unstructured":"Cappadonna F, Costa A, Fichera S (2013) Makespan minimization of unrelated parallel machines with limited human resources. Procedia CIRP 12:450\u2013455. https:\/\/doi.org\/10.1016\/j.procir.2013.09.077 (Eighth CIRP Conference on Intelligent Computation in Manufacturing Engineering)","journal-title":"Procedia CIRP"},{"issue":"2","key":"10247_CR46","doi-asserted-by":"publisher","first-page":"405","DOI":"10.1080\/00207540601138452","volume":"46","author":"G Celano","year":"2008","unstructured":"Celano G, Costa A, Fichera S (2008) Scheduling of unrelated parallel manufacturing cells with limited human resources. Int J Prod Res 46(2):405\u2013427. https:\/\/doi.org\/10.1080\/00207540601138452","journal-title":"Int J Prod Res"},{"issue":"1","key":"10247_CR47","doi-asserted-by":"publisher","first-page":"1263","DOI":"10.1016\/j.asoc.2010.03.003","volume":"11","author":"P-C Chang","year":"2011","unstructured":"Chang P-C, Chen S-H (2011) Integrating dominance properties with genetic algorithms for parallel machine scheduling problems with setup times. Appl Soft Comput 11(1):1263\u20131274. https:\/\/doi.org\/10.1016\/j.asoc.2010.03.003","journal-title":"Appl Soft Comput"},{"issue":"4","key":"10247_CR48","doi-asserted-by":"publisher","first-page":"503","DOI":"10.1080\/0305215X.2013.786062","volume":"46","author":"Y-C Chang","year":"2014","unstructured":"Chang Y-C, Li VC, Chiang C-J (2014) An ant colony optimization heuristic for an integrated production and distribution scheduling problem. Eng Optim 46(4):503\u2013520. https:\/\/doi.org\/10.1080\/0305215X.2013.786062","journal-title":"Eng Optim"},{"key":"10247_CR49","doi-asserted-by":"publisher","first-page":"230","DOI":"10.1007\/978-3-642-16239-8_31","volume-title":"Artificial intelligence applications and innovations","author":"C Charalambous","year":"2010","unstructured":"Charalambous C, Fleszar K, Hindi KS (2010) A hybrid searching method for the unrelated parallel machine scheduling problem. In: Papadopoulos H, Andreou AS, Bramer M (eds) Artificial intelligence applications and innovations. Springer, Berlin, pp 230\u2013237"},{"issue":"3","key":"10247_CR50","doi-asserted-by":"publisher","first-page":"551","DOI":"10.1111\/itor.12199","volume":"23","author":"IA Chaudhry","year":"2015","unstructured":"Chaudhry IA, Khan AA (2015) A research survey: review of flexible job shop scheduling techniques. Int Trans Oper Res 23(3):551\u2013591. https:\/\/doi.org\/10.1111\/itor.12199","journal-title":"Int Trans Oper Res"},{"key":"10247_CR51","doi-asserted-by":"publisher","first-page":"688","DOI":"10.1016\/j.jclepro.2017.04.018","volume":"156","author":"A Che","year":"2017","unstructured":"Che A, Zhang S, Wu X (2017) Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs. J Clean Prod 156:688\u2013697. https:\/\/doi.org\/10.1016\/j.jclepro.2017.04.018","journal-title":"J Clean Prod"},{"key":"10247_CR52","doi-asserted-by":"publisher","unstructured":"Chen C-L (2008) An iterated local search for unrelated parallel machines problem with unequal ready times. In: 2008 IEEE international conference on automation and logistics, pp 2044\u20132047. https:\/\/doi.org\/10.1109\/ICAL.2008.4636499","DOI":"10.1109\/ICAL.2008.4636499"},{"issue":"3","key":"10247_CR53","doi-asserted-by":"publisher","first-page":"285","DOI":"10.1007\/s00170-003-1622-1","volume":"26","author":"J-F Chen","year":"2004","unstructured":"Chen J-F (2004) Unrelated parallel machine scheduling with secondary resource constraints. Int J Adv Manuf Technol 26(3):285\u2013292. https:\/\/doi.org\/10.1007\/s00170-003-1622-1","journal-title":"Int J Adv Manuf Technol"},{"issue":"5\u20136","key":"10247_CR54","doi-asserted-by":"publisher","first-page":"557","DOI":"10.1007\/bf02729109","volume":"29","author":"J-F Chen","year":"2006","unstructured":"Chen J-F (2006) Minimization of maximum tardiness on unrelated parallel machines with process restrictions and setups. Int J Adv Manuf Technol 29(5\u20136):557\u2013563. https:\/\/doi.org\/10.1007\/bf02729109","journal-title":"Int J Adv Manuf Technol"},{"issue":"11\u201312","key":"10247_CR55","doi-asserted-by":"publisher","first-page":"1204","DOI":"10.1007\/s00170-008-1917-3","volume":"44","author":"J-F Chen","year":"2009","unstructured":"Chen J-F (2009) Scheduling on unrelated parallel machines with sequence- and machine-dependent setup times and due-date constraints. Int J Adv Manuf Technol 44(11\u201312):1204\u20131212. https:\/\/doi.org\/10.1007\/s00170-008-1917-3","journal-title":"Int J Adv Manuf Technol"},{"issue":"5\u20138","key":"10247_CR56","doi-asserted-by":"publisher","first-page":"693","DOI":"10.1007\/s00170-011-3623-9","volume":"60","author":"C-L Chen","year":"2011","unstructured":"Chen C-L (2011) Iterated hybrid metaheuristic algorithms for unrelated parallel machines problem with unequal ready times and sequence-dependent setup times. Int J Adv Manuf Technol 60(5\u20138):693\u2013705. https:\/\/doi.org\/10.1007\/s00170-011-3623-9","journal-title":"Int J Adv Manuf Technol"},{"issue":"6","key":"10247_CR57","doi-asserted-by":"publisher","first-page":"1099","DOI":"10.1007\/s10845-013-0842-y","volume":"26","author":"J-F Chen","year":"2013","unstructured":"Chen J-F (2013) Unrelated parallel-machine scheduling to minimize total weighted completion time. J Intell Manuf 26(6):1099\u20131112. https:\/\/doi.org\/10.1007\/s10845-013-0842-y","journal-title":"J Intell Manuf"},{"issue":"1\u20132","key":"10247_CR58","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1007\/s00170-008-1692-1","volume":"43","author":"C-L Chen","year":"2008","unstructured":"Chen C-L, Chen C-L (2008) Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times. Int J Adv Manuf Technol 43(1\u20132):161\u2013169. https:\/\/doi.org\/10.1007\/s00170-008-1692-1","journal-title":"Int J Adv Manuf Technol"},{"issue":"1","key":"10247_CR59","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1016\/j.omega.2004.07.023","volume":"34","author":"J-F Chen","year":"2006","unstructured":"Chen J-F, Wu T-H (2006) Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints. Omega 34(1):81\u201389. https:\/\/doi.org\/10.1016\/j.omega.2004.07.023","journal-title":"Omega"},{"key":"10247_CR60","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.jmsy.2016.10.005","volume":"42","author":"C-Y Cheng","year":"2017","unstructured":"Cheng C-Y, Huang L-W (2017) Minimizing total earliness and tardiness through unrelated parallel machine scheduling using distributed release time control. J Manuf Syst 42:1\u201310. https:\/\/doi.org\/10.1016\/j.jmsy.2016.10.005","journal-title":"J Manuf Syst"},{"issue":"3","key":"10247_CR61","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1016\/0377-2217(90)90215-W","volume":"47","author":"T Cheng","year":"1990","unstructured":"Cheng T, Sin C (1990) A state-of-the-art review of parallel-machine scheduling research. Eur J Oper Res 47(3):271\u2013292. https:\/\/doi.org\/10.1016\/0377-2217(90)90215-W","journal-title":"Eur J Oper Res"},{"key":"10247_CR62","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2021.107280","volume":"105","author":"C-Y Cheng","year":"2021","unstructured":"Cheng C-Y, Pourhejazy P, Ying K-C, Lin C-F (2021) Unsupervised learning-based artificial bee colony for minimizing non-value-adding operations. Appl Soft Comput 105:107280. https:\/\/doi.org\/10.1016\/j.asoc.2021.107280","journal-title":"Appl Soft Comput"},{"key":"10247_CR63","doi-asserted-by":"publisher","unstructured":"Chen B, Potts CN, Woeginger GJ (1998) A review of machine scheduling: complexity, algorithms and approximability. In: Handbook of combinatorial optimization. Springer, pp 1493\u20131641. https:\/\/doi.org\/10.1007\/978-1-4613-0303-9_25","DOI":"10.1007\/978-1-4613-0303-9_25"},{"key":"10247_CR64","doi-asserted-by":"publisher","unstructured":"Chyu C-C, Chang W-S (2010) A competitive evolution strategy memetic algorithm for unrelated parallel machine scheduling to minimize total weighted tardiness and flow time. In: The 40th international conference on computers industrial engineering, pp 1\u20136. https:\/\/doi.org\/10.1109\/ICCIE.2010.5668388","DOI":"10.1109\/ICCIE.2010.5668388"},{"issue":"5\u20138","key":"10247_CR65","doi-asserted-by":"publisher","first-page":"697","DOI":"10.1007\/s00170-009-2419-7","volume":"49","author":"C-C Chyu","year":"2009","unstructured":"Chyu C-C, Chang W-S (2009) A pareto evolutionary algorithm approach to bi-objective unrelated parallel machine scheduling problems. Int J Adv Manuf Technol 49(5\u20138):697\u2013708. https:\/\/doi.org\/10.1007\/s00170-009-2419-7","journal-title":"Int J Adv Manuf Technol"},{"issue":"7","key":"10247_CR66","doi-asserted-by":"publisher","first-page":"1087","DOI":"10.1016\/S0305-0548(02)00059-X","volume":"30","author":"JK Cochran","year":"2003","unstructured":"Cochran JK, Horng S-M, Fowler JW (2003) A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Comput Oper Res 30(7):1087\u20131102. https:\/\/doi.org\/10.1016\/S0305-0548(02)00059-X","journal-title":"Comput Oper Res"},{"issue":"9\u201312","key":"10247_CR67","doi-asserted-by":"publisher","first-page":"2799","DOI":"10.1007\/s00170-013-5221-5","volume":"69","author":"A Costa","year":"2013","unstructured":"Costa A, Cappadonna FA, Fichera S (2013) A hybrid genetic algorithm for job sequencing and worker allocation in parallel unrelated machines with sequence-dependent setup times. Int J Adv Manuf Technol 69(9\u201312):2799\u20132817. https:\/\/doi.org\/10.1007\/s00170-013-5221-5","journal-title":"Int J Adv Manuf Technol"},{"key":"10247_CR68","doi-asserted-by":"publisher","unstructured":"Cota LP, Guimar\u00e3es FG, de Oliveira FB, Freitas Souza MJ (2017) An adaptive large neighborhood search with learning automata for the unrelated parallel machine scheduling problem. In: 2017 IEEE congress on evolutionary computation (CEC), pp 185\u2013192. https:\/\/doi.org\/10.1109\/CEC.2017.7969312","DOI":"10.1109\/CEC.2017.7969312"},{"key":"10247_CR69","doi-asserted-by":"publisher","unstructured":"Cota LP, Haddad MN, Freitas Souza MJ, Coelho VN (2014) Airp: a heuristic algorithm for solving the unrelated parallel machine scheduling problem. In: 2014 IEEE congress on evolutionary computation (CEC), pp 1855\u20131862. https:\/\/doi.org\/10.1109\/CEC.2014.6900245","DOI":"10.1109\/CEC.2014.6900245"},{"key":"10247_CR70","doi-asserted-by":"publisher","unstructured":"Cruz-Chavez MA, Juarez-Perez F, Avila-Melgar EY, Martinez-Oropeza A (2009) Simulated annealing algorithm for the weighted unrelated parallel machines problem. In: 2009 Electronics, robotics and automotive mechanics conference (CERMA), pp 94\u201399. https:\/\/doi.org\/10.1109\/CERMA.2009.46","DOI":"10.1109\/CERMA.2009.46"},{"issue":"3","key":"10247_CR71","doi-asserted-by":"publisher","first-page":"809","DOI":"10.1108\/jm2-12-2018-0209","volume":"15","author":"LR de Abreu","year":"2020","unstructured":"de Abreu LR, de Athayde Prata B (2020) A genetic algorithm with neighborhood search procedures for unrelated parallel machine scheduling problem with sequence-dependent setup times. J Model Manag 15(3):809\u2013828. https:\/\/doi.org\/10.1108\/jm2-12-2018-0209","journal-title":"J Model Manag"},{"issue":"2","key":"10247_CR72","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1093\/imaman\/dpm016","volume":"18","author":"MR de Paula","year":"2007","unstructured":"de Paula MR, Ravetti MG, Mateus GR, Pardalos PM (2007) Solving parallel machines scheduling problems with sequence-dependent setup times using variable neighbourhood search. IMA J Manag Math 18(2):101\u2013115. https:\/\/doi.org\/10.1093\/imaman\/dpm016","journal-title":"IMA J Manag Math"},{"issue":"4","key":"10247_CR73","doi-asserted-by":"publisher","first-page":"586","DOI":"10.1111\/j.1540-5915.1980.tb01163.x","volume":"11","author":"P De","year":"1980","unstructured":"De P, Morton TE (1980) Scheduling to minimize makespan on unequal parallel processors. Decis Sci 11(4):586\u2013602. https:\/\/doi.org\/10.1111\/j.1540-5915.1980.tb01163.x","journal-title":"Decis Sci"},{"key":"10247_CR74","doi-asserted-by":"publisher","unstructured":"de C. M. Nogueira JP, Arroyo JEC, Villadiego HMM, Gon\u00e7alves LB (2014) Hybrid grasp heuristics to solve an unrelated parallel machine scheduling problem with earliness and tardiness penalties. Electronic Notes in Theoretical Computer Science 302:53\u201372. https:\/\/doi.org\/10.1016\/j.entcs.2014.01.020 (Proceedings of the XXXIX Latin American computing conference (CLEI 2013))","DOI":"10.1016\/j.entcs.2014.01.020"},{"issue":"1","key":"10247_CR75","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1016\/S0925-5273(01)00110-4","volume":"74","author":"C Dhaenens-Flipo","year":"2001","unstructured":"Dhaenens-Flipo C (2001) A bicriterion approach to deal with a constrained single-objective problem. Int J Prod Econ 74(1):93\u2013101. https:\/\/doi.org\/10.1016\/S0925-5273(01)00110-4 (Poductive Systems: Strategy, Control, and Management)","journal-title":"Int J Prod Econ"},{"key":"10247_CR76","doi-asserted-by":"publisher","unstructured":"Diana RO, Filho MFdF, Souza SRd, Silva MAL (2013) A clonal selection algorithm for makespan minimization on unrelated parallel machines with sequence dependent setup times. In: 2013 Brazilian conference on intelligent systems, pp 57\u201363. https:\/\/doi.org\/10.1109\/BRACIS.2013.18","DOI":"10.1109\/BRACIS.2013.18"},{"key":"10247_CR77","doi-asserted-by":"publisher","unstructured":"Diana ROM, de Souza SR, Wanner EF, Filho MFF (2017) Hybrid metaheuristic for combinatorial optimization based on immune network for optimization and vns. In: Proceedings of the genetic and evolutionary computation conference, GECCO \u201917, pp 251\u2013258, New York, NY, USA. Association for Computing Machinery https:\/\/doi.org\/10.1145\/3071178.3071269","DOI":"10.1145\/3071178.3071269"},{"key":"10247_CR78","doi-asserted-by":"publisher","first-page":"94","DOI":"10.1016\/j.neucom.2014.06.091","volume":"163","author":"ROM Diana","year":"2015","unstructured":"Diana ROM, de Fran\u00e7a Filho MF, de Souza SR, de Almeida Vitor JF (2015) An immune-inspired algorithm for an unrelated parallel machines\u2019 scheduling problem with sequence and machine dependent setup-times for makespan minimisation. Neurocomputing 163:94\u2013105. https:\/\/doi.org\/10.1016\/j.neucom.2014.06.091 (Recent Advancements in Hybrid Artificial Intelligence Systems and its Application to Real-World Problems Progress in Intelligent Systems Mining Humanistic Data)","journal-title":"Neurocomputing"},{"key":"10247_CR79","doi-asserted-by":"publisher","first-page":"191","DOI":"10.1016\/j.endm.2018.03.025","volume":"66","author":"RO Diana","year":"2018","unstructured":"Diana RO, de Souza SR, Filho MF (2018) A variable neighborhood descent as ils local search to the minimization of the total weighted tardiness on unrelated parallel machines and sequence dependent setup times. Electron Notes Discret Math 66:191\u2013198. https:\/\/doi.org\/10.1016\/j.endm.2018.03.025 (5th International Conference on Variable Neighborhood Search)","journal-title":"Electron Notes Discret Math"},{"issue":"4","key":"10247_CR80","doi-asserted-by":"publisher","first-page":"828","DOI":"10.3182\/20090603-3-RU-2001.0553","volume":"42","author":"A Dolgui","year":"2009","unstructured":"Dolgui A, Eremeev AV, Kovalyov MY, Kuznetsov PM (2009) Multi-product lot-sizing and scheduling on unrelated parallel machines to minimize makespan. IFAC Proc Vol 42(4):828\u2013833. https:\/\/doi.org\/10.3182\/20090603-3-RU-2001.0553 (13th IFAC Symposium on Information Control Problems in Manufacturing)","journal-title":"IFAC Proc Vol"},{"key":"10247_CR81","doi-asserted-by":"publisher","first-page":"34","DOI":"10.1007\/978-3-540-24680-0_5","volume-title":"Grid and cooperative computing","author":"H Du\u00a0Kim","year":"2004","unstructured":"Du\u00a0Kim H, Kim JS (2004) An online scheduling algorithm for grid computing systems. In: Li M, Sun X-H, Deng Q, Ni J (eds) Grid and cooperative computing. Springer, Berlin, pp 34\u201339"},{"issue":"1\u20132","key":"10247_CR82","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1007\/s10710-017-9302-3","volume":"19","author":"M \u0110urasevi\u0107","year":"2017","unstructured":"\u0110urasevi\u0107 M, Jakobovi\u0107 D (2017) Comparison of ensemble learning methods for creating ensembles of dispatching rules for the unrelated machines environment. Genet Program Evolvable Mach 19(1\u20132):53\u201392. https:\/\/doi.org\/10.1007\/s10710-017-9302-3","journal-title":"Genet Program Evolvable Mach"},{"issue":"1\u20132","key":"10247_CR83","doi-asserted-by":"publisher","first-page":"9","DOI":"10.1007\/s10710-017-9310-3","volume":"19","author":"M \u0110urasevi\u0107","year":"2017","unstructured":"\u0110urasevi\u0107 M, Jakobovi\u0107 D (2017) Evolving dispatching rules for optimising many-objective criteria in the unrelated machines environment. Genet Program Evolvable Mach 19(1\u20132):9\u201351. https:\/\/doi.org\/10.1007\/s10710-017-9310-3","journal-title":"Genet Program Evolvable Mach"},{"key":"10247_CR84","doi-asserted-by":"publisher","first-page":"555","DOI":"10.1016\/j.eswa.2018.06.053","volume":"113","author":"M \u0110urasevi\u0107","year":"2018","unstructured":"\u0110urasevi\u0107 M, Jakobovi\u0107 D (2018) A survey of dispatching rules for the dynamic unrelated machines environment. Exp Syst Appl 113:555\u2013569. https:\/\/doi.org\/10.1016\/j.eswa.2018.06.053","journal-title":"Exp Syst Appl"},{"issue":"6","key":"10247_CR85","doi-asserted-by":"publisher","first-page":"959","DOI":"10.1007\/s10732-019-09416-x","volume":"25","author":"M \u0110urasevi\u0107","year":"2019","unstructured":"\u0110urasevi\u0107 M, Jakobovi\u0107 D (2019) Creating dispatching rules by simple ensemble combination. J Heuristics 25(6):959\u20131013. https:\/\/doi.org\/10.1007\/s10732-019-09416-x","journal-title":"J Heuristics"},{"issue":"10","key":"10247_CR86","doi-asserted-by":"publisher","first-page":"5043","DOI":"10.1007\/s00521-020-05292-w","volume":"33","author":"M \u0110urasevi\u0107","year":"2020","unstructured":"\u0110urasevi\u0107 M, Jakobovi\u0107 D (2020) Automatic design of dispatching rules for static scheduling conditions. Neural Comput Appl 33(10):5043\u20135068. https:\/\/doi.org\/10.1007\/s00521-020-05292-w","journal-title":"Neural Comput Appl"},{"key":"10247_CR87","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2020.106637","volume":"96","author":"M \u0110urasevi\u0107","year":"2020","unstructured":"\u0110urasevi\u0107 M, Jakobovi\u0107 D (2020) Comparison of schedule generation schemes for designing dispatching rules with genetic programming in the unrelated machines environment. Appl Soft Comput 96:106637. https:\/\/doi.org\/10.1016\/j.asoc.2020.106637","journal-title":"Appl Soft Comput"},{"key":"10247_CR88","doi-asserted-by":"publisher","DOI":"10.1016\/j.jocs.2022.101649","volume":"61","author":"M \u0110urasevi\u0107","year":"2022","unstructured":"\u0110urasevi\u0107 M, Jakobovi\u0107 D (2022) Selection of dispatching rules evolved by genetic programming in dynamic unrelated machines scheduling based on problem characteristics. J Comput Sci 61:101649. https:\/\/doi.org\/10.1016\/j.jocs.2022.101649","journal-title":"J Comput Sci"},{"key":"10247_CR89","doi-asserted-by":"publisher","first-page":"419","DOI":"10.1016\/j.asoc.2016.07.025","volume":"48","author":"M \u0110urasevi\u0107","year":"2016","unstructured":"\u0110urasevi\u0107 M, Jakobovi\u0107 D, Kne\u017eevi\u0107 K (2016) Adaptive scheduling on unrelated machines with genetic programming. Appl Soft Comput 48:419\u2013430. https:\/\/doi.org\/10.1016\/j.asoc.2016.07.025","journal-title":"Appl Soft Comput"},{"key":"10247_CR90","doi-asserted-by":"publisher","unstructured":"\u0110urasevi\u0107 M, Jakobovi\u0107 D (2016) Comparison of solution representations for scheduling in the unrelated machines environment. In: 2016 39th international convention on information and communication technology, electronics and microelectronics (MIPRO), pp 1336\u20131342. https:\/\/doi.org\/10.1109\/MIPRO.2016.7522347","DOI":"10.1109\/MIPRO.2016.7522347"},{"key":"10247_CR91","doi-asserted-by":"publisher","unstructured":"e\u00a0Santos AS, Madureira AM (2014) Ordered minimum completion time heuristic for unrelated parallel-machines problems. In: 2014 9th Iberian conference on information systems and technologies (CISTI), pp 1\u20136. https:\/\/doi.org\/10.1109\/CISTI.2014.6876939","DOI":"10.1109\/CISTI.2014.6876939"},{"issue":"2","key":"10247_CR92","doi-asserted-by":"publisher","first-page":"25","DOI":"10.13189\/mst.2015.030201","volume":"3","author":"E Ebrahimi","year":"2015","unstructured":"Ebrahimi E, Rezaeian J (2015) Unrelated parallel machines scheduling with the effect of aging and learning under multi maintenance activities. Manuf Sci Technol 3(2):25\u201331. https:\/\/doi.org\/10.13189\/mst.2015.030201","journal-title":"Manuf Sci Technol"},{"key":"10247_CR93","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2019\/5075671","volume":"2019","author":"T Erdeli\u0107","year":"2019","unstructured":"Erdeli\u0107 T, Cari\u0107 T (2019) A survey on the electric vehicle routing problem: variants and solution approaches. J Adv Transp 2019:1\u201348. https:\/\/doi.org\/10.1155\/2019\/5075671","journal-title":"J Adv Transp"},{"issue":"1","key":"10247_CR94","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/S0377-2217(03)00095-X","volume":"153","author":"A Ernst","year":"2004","unstructured":"Ernst A, Jiang H, Krishnamoorthy M, Sier D (2004) Staff scheduling and rostering: a review of applications, methods and models. Eur J Oper Res 153(1):3\u201327. https:\/\/doi.org\/10.1016\/S0377-2217(03)00095-X (Timetabling and Rostering)","journal-title":"Eur J Oper Res"},{"issue":"19","key":"10247_CR95","doi-asserted-by":"publisher","first-page":"5841","DOI":"10.1080\/00207543.2014.920966","volume":"52","author":"DY Eroglu","year":"2014","unstructured":"Eroglu DY, Ozmutlu HC, Ozmutlu S (2014) Genetic algorithm with local search for the unrelated parallel machine scheduling problem with sequence-dependent set-up times. Int J Prod Res 52(19):5841\u20135856. https:\/\/doi.org\/10.1080\/00207543.2014.920966","journal-title":"Int J Prod Res"},{"key":"10247_CR96","doi-asserted-by":"publisher","first-page":"285","DOI":"10.1016\/j.apm.2021.01.017","volume":"94","author":"AA Ewees","year":"2021","unstructured":"Ewees AA, Al-qaness MA, Abd Elaziz M (2021) Enhanced salp swarm algorithm based on firefly algorithm for unrelated parallel machine scheduling with setup times. Appl Math Model 94:285\u2013305. https:\/\/doi.org\/10.1016\/j.apm.2021.01.017","journal-title":"Appl Math Model"},{"key":"10247_CR97","doi-asserted-by":"publisher","first-page":"15","DOI":"10.1016\/j.knosys.2019.02.005","volume":"172","author":"AE Ezugwu","year":"2019","unstructured":"Ezugwu AE (2019) Enhanced symbiotic organisms search algorithm for unrelated parallel machines manufacturing scheduling with setup times. Knowl-Based Syst 172:15\u201332. https:\/\/doi.org\/10.1016\/j.knosys.2019.02.005","journal-title":"Knowl-Based Syst"},{"key":"10247_CR98","doi-asserted-by":"publisher","first-page":"54459","DOI":"10.1109\/ACCESS.2018.2872110","volume":"6","author":"AE Ezugwu","year":"2018","unstructured":"Ezugwu AE, Akutsah F (2018) An improved firefly algorithm for the unrelated parallel machines scheduling problem with sequence-dependent setup times. IEEE Access 6:54459\u201354478. https:\/\/doi.org\/10.1109\/ACCESS.2018.2872110","journal-title":"IEEE Access"},{"issue":"7","key":"10247_CR99","doi-asserted-by":"publisher","DOI":"10.1371\/journal.pone.0200030","volume":"13","author":"AE Ezugwu","year":"2018","unstructured":"Ezugwu AE, Adeleke OJ, Viriri S (2018) Symbiotic organisms search algorithm for the unrelated parallel machines scheduling with sequence-dependent setup times. PLoS ONE 13(7):e0200030. https:\/\/doi.org\/10.1371\/journal.pone.0200030","journal-title":"PLoS ONE"},{"key":"10247_CR100","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswax.2020.100022","volume":"5","author":"L Fanjul-Peyro","year":"2020","unstructured":"Fanjul-Peyro L (2020) Models and an exact method for the unrelated parallel machine scheduling problem with setups and resources. Exp Syst Appl: X 5:100022. https:\/\/doi.org\/10.1016\/j.eswax.2020.100022","journal-title":"Exp Syst Appl: X"},{"issue":"1","key":"10247_CR101","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1016\/j.ejor.2010.03.030","volume":"207","author":"L Fanjul-Peyro","year":"2010","unstructured":"Fanjul-Peyro L, Ruiz R (2010) Iterated greedy local search methods for unrelated parallel machine scheduling. Eur J Oper Res 207(1):55\u201369. https:\/\/doi.org\/10.1016\/j.ejor.2010.03.030","journal-title":"Eur J Oper Res"},{"issue":"1","key":"10247_CR102","doi-asserted-by":"publisher","first-page":"301","DOI":"10.1016\/j.cor.2010.05.005","volume":"38","author":"L Fanjul-Peyro","year":"2011","unstructured":"Fanjul-Peyro L, Ruiz R (2011) Size-reduction heuristics for the unrelated parallel machines scheduling problem. Comput Oper Res 38(1):301\u2013309. https:\/\/doi.org\/10.1016\/j.cor.2010.05.005 (Project Management and Scheduling)","journal-title":"Comput Oper Res"},{"issue":"7","key":"10247_CR103","doi-asserted-by":"publisher","first-page":"1745","DOI":"10.1016\/j.cor.2011.10.012","volume":"39","author":"L Fanjul-Peyro","year":"2012","unstructured":"Fanjul-Peyro L, Ruiz R (2012) Scheduling unrelated parallel machines with optional machines and jobs selection. Comput Oper Res 39(7):1745\u20131753. https:\/\/doi.org\/10.1016\/j.cor.2011.10.012","journal-title":"Comput Oper Res"},{"issue":"2","key":"10247_CR104","doi-asserted-by":"publisher","first-page":"482","DOI":"10.1016\/j.ejor.2017.01.002","volume":"260","author":"L Fanjul-Peyro","year":"2017","unstructured":"Fanjul-Peyro L, Perea F, Ruiz R (2017) Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources. Eur J Oper Res 260(2):482\u2013493. https:\/\/doi.org\/10.1016\/j.ejor.2017.01.002","journal-title":"Eur J Oper Res"},{"issue":"5","key":"10247_CR105","doi-asserted-by":"publisher","first-page":"1949","DOI":"10.1007\/s10845-011-0522-8","volume":"23","author":"K Fleszar","year":"2011","unstructured":"Fleszar K, Charalambous C, Hindi KS (2011) A variable neighborhood descent heuristic for the problem of makespan minimisation on unrelated parallel machines with setup times. J Intell Manuf 23(5):1949\u20131958. https:\/\/doi.org\/10.1007\/s10845-011-0522-8","journal-title":"J Intell Manuf"},{"key":"10247_CR106","doi-asserted-by":"publisher","unstructured":"Gao J (2005) A parallel hybrid genetic algorithm for solving a kind of non-identical parallel machine scheduling problems. In: Eighth international conference on high-performance computing in Asia-Pacific region (HPCASIA\u201905), pp 4 pp.\u2013472. https:\/\/doi.org\/10.1109\/HPCASIA.2005.8","DOI":"10.1109\/HPCASIA.2005.8"},{"issue":"4","key":"10247_CR107","doi-asserted-by":"publisher","first-page":"602","DOI":"10.1016\/j.cie.2009.12.009","volume":"58","author":"J Gao","year":"2010","unstructured":"Gao J (2010) A novel artificial immune system for solving multiobjective scheduling problems subject to special process constraint. Comput Ind Eng 58(4):602\u2013609. https:\/\/doi.org\/10.1016\/j.cie.2009.12.009","journal-title":"Comput Ind Eng"},{"issue":"1\u20132","key":"10247_CR108","doi-asserted-by":"publisher","first-page":"151","DOI":"10.1007\/s00170-008-1683-2","volume":"43","author":"J Gao","year":"2008","unstructured":"Gao J, He G, Wang Y (2008) A new parallel genetic algorithm for solving multiobjective scheduling problems subjected to special process constraint. Int J Adv Manuf Technol 43(1\u20132):151\u2013160. https:\/\/doi.org\/10.1007\/s00170-008-1683-2","journal-title":"Int J Adv Manuf Technol"},{"key":"10247_CR109","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1016\/j.cie.2018.05.014","volume":"121","author":"R Gedik","year":"2018","unstructured":"Gedik R, Kalathia D, Egilmez G, Kirac E (2018) A constraint programming approach for solving unrelated parallel machine scheduling problem. Comput Ind Eng 121:139\u2013149. https:\/\/doi.org\/10.1016\/j.cie.2018.05.014","journal-title":"Comput Ind Eng"},{"key":"10247_CR110","doi-asserted-by":"publisher","unstructured":"Ghaleb M, Taghipour S, Zolfagharinia H (2020) Joint optimization of maintenance and production scheduling for unrelated parallel-machine system. In: 2020 Asia-Pacific international symposium on advanced reliability and maintenance modeling (APARM). IEEE. https:\/\/doi.org\/10.1109\/aparm49247.2020.9209399","DOI":"10.1109\/aparm49247.2020.9209399"},{"issue":"2","key":"10247_CR111","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1016\/0895-7177(94)90205-4","volume":"20","author":"C Glass","year":"1994","unstructured":"Glass C, Potts C, Shade P (1994) Unrelated parallel machine scheduling using local search. Math Comput Model 20(2):41\u201352. https:\/\/doi.org\/10.1016\/0895-7177(94)90205-4","journal-title":"Math Comput Model"},{"key":"10247_CR112","doi-asserted-by":"publisher","unstructured":"Golconda KS, Dogan A, \u00d6zg\u00fcner F (2004) Static mapping heuristics for tasks with hard deadlines in real-time heterogeneous systems. In: Aykanat C, Dayar T, Korpeoglu I (eds) Computer and information sciences\u2014ISCIS 2004, 19th international symposium, Kemer-Antalya, Turkey, October 27-29, 2004. Proceedings, volume 3280 of Lecture Notes in Computer Science, pp 827\u2013836. Springer. https:\/\/doi.org\/10.1007\/978-3-540-30182-0_83","DOI":"10.1007\/978-3-540-30182-0_83"},{"key":"10247_CR113","doi-asserted-by":"publisher","unstructured":"Graham R, Lawler E, Lenstra J, Kan A (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. In: Hammer P, Johnson E, Korte B (eds), Discrete optimization II, volume\u00a05 of Annals of Discrete Mathematics, pp 287\u2013326. Elsevier. https:\/\/doi.org\/10.1016\/S0167-5060(08)70356-X","DOI":"10.1016\/S0167-5060(08)70356-X"},{"issue":"03","key":"10247_CR114","doi-asserted-by":"publisher","first-page":"399","DOI":"10.1142\/s0218213007003175","volume":"16","author":"Y Guo","year":"2007","unstructured":"Guo Y, Lim A, Rodrigues B, Yang L (2007) Minimizing the makespan for unrelated parallel machines. Int J Artif Intell Tools 16(03):399\u2013415. https:\/\/doi.org\/10.1142\/s0218213007003175","journal-title":"Int J Artif Intell Tools"},{"key":"10247_CR115","doi-asserted-by":"publisher","unstructured":"Haddad MN, Coelho IM, Souza MJF, Ochi LS, Santos HG, Martins AX (2012) Garp: a new genetic algorithm for the unrelated parallel machine scheduling problem with setup times. In: 2012 31st international conference of the Chilean computer science society, pp 152\u2013160. https:\/\/doi.org\/10.1109\/SCCC.2012.25","DOI":"10.1109\/SCCC.2012.25"},{"issue":"3","key":"10247_CR116","doi-asserted-by":"publisher","first-page":"323","DOI":"10.1016\/0305-0548(91)90034-O","volume":"18","author":"A Hariri","year":"1991","unstructured":"Hariri A, Potts C (1991) Heuristics for scheduling unrelated parallel machines. Comput Oper Res 18(3):323\u2013331. https:\/\/doi.org\/10.1016\/0305-0548(91)90034-O","journal-title":"Comput Oper Res"},{"issue":"2","key":"10247_CR117","doi-asserted-by":"publisher","first-page":"191","DOI":"10.1007\/s10710-005-7580-7","volume":"6","author":"E Hart","year":"2005","unstructured":"Hart E, Ross P, Corne D (2005) Evolutionary scheduling: a review. Genet Program Evolvable Mach 6(2):191\u2013220. https:\/\/doi.org\/10.1007\/s10710-005-7580-7","journal-title":"Genet Program Evolvable Mach"},{"key":"10247_CR118","doi-asserted-by":"publisher","unstructured":"Hassan Abdel-Jabbar M-A, Kacem I, Martin S (2014) Unrelated parallel machines with precedence constraints: application to cloud computing. In: 2014 IEEE 3rd international conference on cloud networking (CloudNet), pp 438\u2013442. https:\/\/doi.org\/10.1109\/CloudNet.2014.6969034","DOI":"10.1109\/CloudNet.2014.6969034"},{"key":"10247_CR119","first-page":"182","volume":"3","author":"M Helal","year":"2006","unstructured":"Helal M, Rabadi G, Al-Salem A (2006) A tabu search algorithm to minimize the makespan for the unrelated parallel machines scheduling problem with setup times. Int J Oper Res 3:182\u2013192","journal-title":"Int J Oper Res"},{"issue":"3","key":"10247_CR120","doi-asserted-by":"publisher","first-page":"528","DOI":"10.1016\/S0377-2217(96)00247-0","volume":"102","author":"J Herrmann","year":"1997","unstructured":"Herrmann J, Proth J-M, Sauer N (1997) Heuristics for unrelated machine scheduling with precedence constraints. Eur J Oper Res 102(3):528\u2013537. https:\/\/doi.org\/10.1016\/S0377-2217(96)00247-0","journal-title":"Eur J Oper Res"},{"issue":"2","key":"10247_CR121","doi-asserted-by":"publisher","first-page":"280","DOI":"10.1145\/322003.322011","volume":"24","author":"OH Ibarra","year":"1977","unstructured":"Ibarra OH, Kim CE (1977) Heuristic algorithms for scheduling independent tasks on nonidentical processors. J ACM 24(2):280\u2013289. https:\/\/doi.org\/10.1145\/322003.322011","journal-title":"J ACM"},{"key":"10247_CR122","doi-asserted-by":"publisher","unstructured":"Izakian H, Abraham A, Snasel V (2009) Comparison of heuristics for scheduling independent tasks on heterogeneous distributed environments. In: 2009 international joint conference on computational sciences and optimization, vol\u00a01, pp 8\u201312. https:\/\/doi.org\/10.1109\/CSO.2009.487","DOI":"10.1109\/CSO.2009.487"},{"key":"10247_CR123","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2020.114548","volume":"172","author":"K Jaklinovi\u0107","year":"2021","unstructured":"Jaklinovi\u0107 K, \u0110urasevi\u0107 M, Jakobovi\u0107 D (2021) Designing dispatching rules with genetic programming for the unrelated machines environment with constraints. Exp Syst Appl 172:114548. https:\/\/doi.org\/10.1016\/j.eswa.2020.114548","journal-title":"Exp Syst Appl"},{"issue":"2","key":"10247_CR124","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1007\/s10845-009-0285-7","volume":"22","author":"F Jolai","year":"2009","unstructured":"Jolai F, Amalnick MS, Alinaghian M, Shakhsi-Niaei M, Omrani H (2009) A hybrid memetic algorithm for maximizing the weighted number of just-in-time jobs on unrelated parallel machines. J Intell Manuf 22(2):247\u2013261. https:\/\/doi.org\/10.1007\/s10845-009-0285-7","journal-title":"J Intell Manuf"},{"key":"10247_CR125","doi-asserted-by":"publisher","first-page":"102","DOI":"10.1016\/j.cie.2015.02.029","volume":"85","author":"CM Joo","year":"2015","unstructured":"Joo CM, Kim BS (2015) Hybrid genetic algorithms with dispatching rules for unrelated parallel machine scheduling with setup time and production availability. Comput Ind Eng 85:102\u2013109. https:\/\/doi.org\/10.1016\/j.cie.2015.02.029","journal-title":"Comput Ind Eng"},{"key":"10247_CR126","doi-asserted-by":"publisher","first-page":"457","DOI":"10.1016\/j.asoc.2016.12.038","volume":"53","author":"CM Joo","year":"2017","unstructured":"Joo CM, Kim BS (2017) Rule-based meta-heuristics for integrated scheduling of unrelated parallel machines, batches, and heterogeneous delivery trucks. Appl Soft Comput 53:457\u2013476. https:\/\/doi.org\/10.1016\/j.asoc.2016.12.038","journal-title":"Appl Soft Comput"},{"issue":"1","key":"10247_CR127","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1016\/j.cie.2004.07.007","volume":"48","author":"C Jou","year":"2005","unstructured":"Jou C (2005) A genetic algorithm with sub-indexed partitioning genes and its application to production scheduling of parallel machines. Comput Ind Eng 48(1):39\u201354. https:\/\/doi.org\/10.1016\/j.cie.2004.07.007 (Selected Papers from the 31st. International Conference on Computers and Industrial Engineering)","journal-title":"Comput Ind Eng"},{"key":"10247_CR128","doi-asserted-by":"publisher","DOI":"10.3390\/math7111120","author":"H Jouhari","year":"2019","unstructured":"Jouhari H, Lei D, Al-qaness AA, Abd Elaziz M, Ewees AA, Farouk O (2019) Sine-cosine algorithm to enhance simulated annealing for unrelated parallel machine scheduling with setup times. Mathematics. https:\/\/doi.org\/10.3390\/math7111120","journal-title":"Mathematics"},{"key":"10247_CR129","doi-asserted-by":"publisher","DOI":"10.3390\/sym12091460","author":"H Jouhari","year":"2020","unstructured":"Jouhari H, Lei D, Al-qaness MAA, Elaziz MA, Dama\u0161evi\u010dius R, Korytkowski M, Ewees AA (2020) Modified Harris Hawks optimizer for solving machine scheduling problems. Symmetry. https:\/\/doi.org\/10.3390\/sym12091460","journal-title":"Symmetry"},{"key":"10247_CR130","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2021.107521","volume":"110","author":"R Jovanovic","year":"2021","unstructured":"Jovanovic R, Vo\u00df S (2021) Fixed set search application for minimizing the makespan on unrelated parallel machines with sequence-dependent setup times. Appl Soft Comput 110:107521. https:\/\/doi.org\/10.1016\/j.asoc.2021.107521","journal-title":"Appl Soft Comput"},{"issue":"19","key":"10247_CR131","doi-asserted-by":"publisher","first-page":"5857","DOI":"10.1080\/00207543.2014.923124","volume":"52","author":"V Kayvanfar","year":"2014","unstructured":"Kayvanfar V, Teymourian E (2014) Hybrid intelligent water drops algorithm to unrelated parallel machines scheduling problem: a just-in-time approach. Int J Prod Res 52(19):5857\u20135879. https:\/\/doi.org\/10.1080\/00207543.2014.923124","journal-title":"Int J Prod Res"},{"issue":"6","key":"10247_CR132","doi-asserted-by":"publisher","first-page":"1225","DOI":"10.1016\/j.cor.2010.12.003","volume":"39","author":"T Keskinturk","year":"2012","unstructured":"Keskinturk T, Yildirim MB, Barut M (2012) An ant colony optimization algorithm for load balancing in parallel machines with sequence-dependent setup times. Comput Oper Res 39(6):1225\u20131235. https:\/\/doi.org\/10.1016\/j.cor.2010.12.003 (Special Issue on Scheduling in Manufacturing Systems)","journal-title":"Comput Oper Res"},{"key":"10247_CR133","doi-asserted-by":"publisher","unstructured":"Kim S-I, Choi H-S, Lee D-H (2006) Tabu search heuristics for parallel machine scheduling with sequence-dependent setup and ready times. In: Computational science and its applications\u2014ICCSA 2006. Springer, Berlin, pp 728\u2013737. https:\/\/doi.org\/10.1007\/11751595_77","DOI":"10.1007\/11751595_77"},{"issue":"3","key":"10247_CR134","doi-asserted-by":"publisher","first-page":"223","DOI":"10.1016\/S0736-5845(02)00013-3","volume":"18","author":"D-W Kim","year":"2002","unstructured":"Kim D-W, Kim K-H, Jang W, Frank Chen F (2002) Unrelated parallel machine scheduling with setup times using simulated annealing. Robot Comput-Integr Manuf 18(3):223\u2013231. https:\/\/doi.org\/10.1016\/S0736-5845(02)00013-3 (11th International Conference on Flexible Automation and Intelligent Manufacturing)","journal-title":"Robot Comput-Integr Manuf"},{"issue":"1","key":"10247_CR135","doi-asserted-by":"publisher","first-page":"173","DOI":"10.1016\/S0736-5845(02)00077-7","volume":"19","author":"D-W Kim","year":"2003","unstructured":"Kim D-W, Na D-G, Frank Chen F (2003) Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective. Robot Comput-Integr Manuf 19(1):173\u2013181. https:\/\/doi.org\/10.1016\/S0736-5845(02)00077-7 (12th International Conference on Flexible Automation and Intellig ent Manufacturing)","journal-title":"Robot Comput-Integr Manuf"},{"issue":"6","key":"10247_CR136","doi-asserted-by":"publisher","first-page":"1087","DOI":"10.1243\/09544054JEM779","volume":"221","author":"S-I Kim","year":"2007","unstructured":"Kim S-I, Choi H-S, Lee D-H (2007) Scheduling algorithms for parallel machines with sequence-dependent set-up and distinct ready times: minimizing total tardiness. Proc Inst Mech Eng Part B: J Eng Manuf 221(6):1087\u20131096. https:\/\/doi.org\/10.1243\/09544054JEM779","journal-title":"Proc Inst Mech Eng Part B: J Eng Manuf"},{"key":"10247_CR137","doi-asserted-by":"publisher","unstructured":"Klemmt A, Weigert G, Almeder C, M\u00f6nch L (2009) A comparison of MIP-based decomposition techniques and VNS approaches for batch scheduling problems. In: Proceedings of the 2009 winter simulation conference (WSC), pp 1686\u20131694. https:\/\/doi.org\/10.1109\/WSC.2009.5429173","DOI":"10.1109\/WSC.2009.5429173"},{"issue":"3\u20134","key":"10247_CR138","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1007\/s10710-010-9112-3","volume":"11","author":"JR Koza","year":"2010","unstructured":"Koza JR (2010) Human-competitive results produced by genetic programming. Genet Program Evolvable Mach 11(3\u20134):251\u2013284. https:\/\/doi.org\/10.1007\/s10710-010-9112-3","journal-title":"Genet Program Evolvable Mach"},{"issue":"1","key":"10247_CR139","doi-asserted-by":"publisher","first-page":"21","DOI":"10.1007\/s10951-017-0549-6","volume":"22","author":"A Kramer","year":"2017","unstructured":"Kramer A, Subramanian A (2017) A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems. J Sched 22(1):21\u201357. https:\/\/doi.org\/10.1007\/s10951-017-0549-6","journal-title":"J Sched"},{"key":"10247_CR140","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2021.107650","volume":"161","author":"I Kucukoglu","year":"2021","unstructured":"Kucukoglu I, Dewil R, Cattrysse D (2021) The electric vehicle routing problem and its variations: a literature review. Comput Ind Eng 161:107650. https:\/\/doi.org\/10.1016\/j.cie.2021.107650","journal-title":"Comput Ind Eng"},{"issue":"9\u201312","key":"10247_CR141","doi-asserted-by":"publisher","first-page":"2081","DOI":"10.1007\/s00170-013-5192-6","volume":"69","author":"J-H Lee","year":"2013","unstructured":"Lee J-H, Yu J-M, Lee D-H (2013) A tabu search algorithm for unrelated parallel machine scheduling with sequence- and machine-dependent setups: minimizing total tardiness. Int J Adv Manuf Technol 69(9\u201312):2081\u20132089. https:\/\/doi.org\/10.1007\/s00170-013-5192-6","journal-title":"Int J Adv Manuf Technol"},{"key":"10247_CR142","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1016\/j.cie.2014.05.012","volume":"74","author":"C-H Lee","year":"2014","unstructured":"Lee C-H, Liao C-J, Chao C-W (2014) Unrelated parallel machine scheduling with dedicated machines and common deadline. Comput Ind Eng 74:161\u2013168. https:\/\/doi.org\/10.1016\/j.cie.2014.05.012","journal-title":"Comput Ind Eng"},{"key":"10247_CR143","doi-asserted-by":"publisher","DOI":"10.1016\/j.swevo.2020.100739","volume":"58","author":"D Lei","year":"2020","unstructured":"Lei D, Cai J (2020) Multi-population meta-heuristics for production scheduling: a survey. Swarm Evolut Comput 58:100739. https:\/\/doi.org\/10.1016\/j.swevo.2020.100739","journal-title":"Swarm Evolut Comput"},{"key":"10247_CR144","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.106320","volume":"141","author":"D Lei","year":"2020","unstructured":"Lei D, Liu M (2020) An artificial bee colony with division for distributed unrelated parallel machine scheduling with preventive maintenance. Comput Ind Eng 141:106320. https:\/\/doi.org\/10.1016\/j.cie.2020.106320","journal-title":"Comput Ind Eng"},{"key":"10247_CR145","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2020.1775911","author":"D Lei","year":"2020","unstructured":"Lei D, Yuan Y, Cai J (2020) An improved artificial bee colony for multi-objective distributed unrelated parallel machine scheduling. Int J Prod Res. https:\/\/doi.org\/10.1080\/00207543.2020.1775911","journal-title":"Int J Prod Res"},{"issue":"2","key":"10247_CR146","doi-asserted-by":"publisher","first-page":"597","DOI":"10.1080\/00207543.2019.1598596","volume":"58","author":"D Lei","year":"2020","unstructured":"Lei D, Yuan Y, Cai J, Bai D (2020) An imperialist competitive algorithm with memory for distributed unrelated parallel machines scheduling. Int J Prod Res 58(2):597\u2013614. https:\/\/doi.org\/10.1080\/00207543.2019.1598596","journal-title":"Int J Prod Res"},{"key":"10247_CR147","doi-asserted-by":"publisher","unstructured":"Lensen A, Xue B, Zhang M (2021) Genetic programming for manifold learning: preserving local topology. https:\/\/doi.org\/10.25455\/wgtn.16416828.v1","DOI":"10.25455\/wgtn.16416828.v1"},{"issue":"1\u20133","key":"10247_CR148","doi-asserted-by":"publisher","first-page":"259","DOI":"10.1007\/bf01585745","volume":"46","author":"JK Lenstra","year":"1990","unstructured":"Lenstra JK, Shmoys DB, Tardos \u00c9 (1990) Approximation algorithms for scheduling unrelated parallel machines. Math Program 46(1\u20133):259\u2013271. https:\/\/doi.org\/10.1007\/bf01585745","journal-title":"Math Program"},{"key":"10247_CR149","doi-asserted-by":"publisher","DOI":"10.1201\/9780203489802","volume-title":"Handbook of scheduling?: algorithms, models, and performance analysis","author":"JY-T Leung","year":"2004","unstructured":"Leung JY-T (2004) Handbook of scheduling?: algorithms, models, and performance analysis. Chapman & Hall\/CRC, Boca Raton"},{"issue":"12","key":"10247_CR150","doi-asserted-by":"publisher","first-page":"2983","DOI":"10.1016\/j.cor.2013.06.016","volume":"40","author":"X Li","year":"2013","unstructured":"Li X, Huang Y, Tan Q, Chen H (2013) Scheduling unrelated parallel batch processing machines with non-identical job sizes. Comput Oper Res 40(12):2983\u20132990. https:\/\/doi.org\/10.1016\/j.cor.2013.06.016","journal-title":"Comput Oper Res"},{"issue":"1\u20134","key":"10247_CR151","doi-asserted-by":"publisher","first-page":"213","DOI":"10.1007\/s00170-015-7657-2","volume":"84","author":"Z Li","year":"2015","unstructured":"Li Z, Yang H, Zhang S, Liu G (2015) Unrelated parallel machine scheduling problem with energy and tardiness cost. Int J Adv Manuf Technol 84(1\u20134):213\u2013226. https:\/\/doi.org\/10.1007\/s00170-015-7657-2","journal-title":"Int J Adv Manuf Technol"},{"key":"10247_CR152","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2015\/907034","volume":"2015","author":"P Liang","year":"2015","unstructured":"Liang P, dong Yang H, sheng Liu G, hua Guo J (2015) An ant optimization model for unrelated parallel machine scheduling with energy consumption and total tardiness. Math Probl Eng 2015:1\u20138. https:\/\/doi.org\/10.1155\/2015\/907034","journal-title":"Math Probl Eng"},{"key":"10247_CR153","doi-asserted-by":"publisher","first-page":"180","DOI":"10.1016\/j.asoc.2014.02.026","volume":"21","author":"T Liao","year":"2014","unstructured":"Liao T, Chang P, Kuo R, Liao C-J (2014) A comparison of five hybrid metaheuristic algorithms for unrelated parallel-machine scheduling and inbound trucks sequencing in multi-door cross docking systems. Appl Soft Comput 21:180\u2013193. https:\/\/doi.org\/10.1016\/j.asoc.2014.02.026","journal-title":"Appl Soft Comput"},{"issue":"16","key":"10247_CR154","doi-asserted-by":"publisher","first-page":"4839","DOI":"10.1080\/00207543.2015.1118574","volume":"54","author":"C-J Liao","year":"2016","unstructured":"Liao C-J, Lee C-H, Tsai H-T (2016) Scheduling with multi-attribute set-up times on unrelated parallel machines. Int J Prod Res 54(16):4839\u20134853. https:\/\/doi.org\/10.1080\/00207543.2015.1118574","journal-title":"Int J Prod Res"},{"key":"10247_CR155","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2013\/409486","volume":"2013","author":"Y-K Lin","year":"2013","unstructured":"Lin Y-K (2013) Particle swarm optimization algorithm for unrelated parallel machine scheduling with release dates. Math Probl Eng 2013:1\u20139. https:\/\/doi.org\/10.1155\/2013\/409486","journal-title":"Math Probl Eng"},{"issue":"4","key":"10247_CR156","doi-asserted-by":"publisher","first-page":"1200","DOI":"10.1080\/00207543.2013.848305","volume":"52","author":"Y-K Lin","year":"2014","unstructured":"Lin Y-K, Hsieh F-Y (2014) Unrelated parallel machine scheduling with setup times and ready times. Int J Prod Res 52(4):1200\u20131214. https:\/\/doi.org\/10.1080\/00207543.2013.848305","journal-title":"Int J Prod Res"},{"key":"10247_CR157","doi-asserted-by":"publisher","DOI":"10.3390\/math9070768","author":"D-Y Lin","year":"2021","unstructured":"Lin D-Y, Huang T-Y (2021) A hybrid metaheuristic for the unrelated parallel machine scheduling problem. Mathematics. https:\/\/doi.org\/10.3390\/math9070768","journal-title":"Mathematics"},{"key":"10247_CR158","doi-asserted-by":"publisher","first-page":"28","DOI":"10.1016\/j.cor.2015.04.025","volume":"64","author":"Y-K Lin","year":"2015","unstructured":"Lin Y-K, Lin H-C (2015) Bicriteria scheduling problem for unrelated parallel machines with release dates. Comput Oper Res 64:28\u201339. https:\/\/doi.org\/10.1016\/j.cor.2015.04.025","journal-title":"Comput Oper Res"},{"key":"10247_CR159","doi-asserted-by":"publisher","first-page":"172","DOI":"10.1016\/j.cor.2014.05.013","volume":"51","author":"S-W Lin","year":"2014","unstructured":"Lin S-W, Ying K-C (2014) Abc-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times. Comput Oper Res 51:172\u2013181. https:\/\/doi.org\/10.1016\/j.cor.2014.05.013","journal-title":"Comput Oper Res"},{"issue":"4","key":"10247_CR160","doi-asserted-by":"publisher","first-page":"1065","DOI":"10.1080\/00207543.2014.942011","volume":"53","author":"S-W Lin","year":"2015","unstructured":"Lin S-W, Ying K-C (2015) A multi-point simulated annealing heuristic for solving multiple objective unrelated parallel machine scheduling problems. Int J Prod Res 53(4):1065\u20131076. https:\/\/doi.org\/10.1080\/00207543.2014.942011","journal-title":"Int J Prod Res"},{"issue":"1\u20134","key":"10247_CR161","doi-asserted-by":"publisher","first-page":"353","DOI":"10.1007\/s00170-010-2824-y","volume":"53","author":"S-W Lin","year":"2010","unstructured":"Lin S-W, Lu C-C, Ying K-C (2010) Minimization of total tardiness on unrelated parallel machines with sequence- and machine-dependent setup times under due date constraints. Int J Adv Manuf Technol 53(1\u20134):353\u2013361. https:\/\/doi.org\/10.1007\/s00170-010-2824-y","journal-title":"Int J Adv Manuf Technol"},{"issue":"6","key":"10247_CR162","doi-asserted-by":"publisher","first-page":"901","DOI":"10.1016\/j.cor.2010.08.018","volume":"38","author":"Y Lin","year":"2011","unstructured":"Lin Y, Pfund M, Fowler J (2011) Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems. Comput Oper Res 38(6):901\u2013916. https:\/\/doi.org\/10.1016\/j.cor.2010.08.018","journal-title":"Comput Oper Res"},{"issue":"1\u20134","key":"10247_CR163","doi-asserted-by":"publisher","first-page":"35","DOI":"10.1007\/s00170-013-4766-7","volume":"67","author":"C-W Lin","year":"2013","unstructured":"Lin C-W, Lin Y-K, Hsieh H-T (2013) Ant colony optimization for unrelated parallel machine scheduling. Int J Adv Manuf Technol 67(1\u20134):35\u201345. https:\/\/doi.org\/10.1007\/s00170-013-4766-7","journal-title":"Int J Adv Manuf Technol"},{"issue":"2","key":"10247_CR164","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1016\/j.ejor.2012.10.008","volume":"227","author":"Y-K Lin","year":"2013","unstructured":"Lin Y-K, Fowler JW, Pfund ME (2013) Multiple-objective heuristics for scheduling unrelated parallel machines. Eur J Oper Res 227(2):239\u2013253. https:\/\/doi.org\/10.1016\/j.ejor.2012.10.008","journal-title":"Eur J Oper Res"},{"issue":"4","key":"10247_CR165","doi-asserted-by":"publisher","first-page":"1110","DOI":"10.1080\/00207543.2015.1047981","volume":"54","author":"S-W Lin","year":"2016","unstructured":"Lin S-W, Ying K-C, Wu W-J, Chiang Y-I (2016) Multi-objective unrelated parallel machine scheduling: a tabu-enhanced iterated pareto greedy algorithm. Int J Prod Res 54(4):1110\u20131121. https:\/\/doi.org\/10.1080\/00207543.2015.1047981","journal-title":"Int J Prod Res"},{"key":"10247_CR166","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2013\/537127","volume":"2013","author":"C Liu","year":"2013","unstructured":"Liu C (2013) A hybrid genetic algorithm to minimize total tardiness for unrelated parallel machine scheduling with precedence constraints. Math Probl Eng 2013:1\u201311. https:\/\/doi.org\/10.1155\/2013\/537127","journal-title":"Math Probl Eng"},{"key":"10247_CR167","doi-asserted-by":"publisher","DOI":"10.4304\/jsw.6.6.1146-1153","author":"C Liu","year":"2011","unstructured":"Liu C, Yang S (2011) A heuristic serial schedule algorithm for unrelated parallel machine scheduling with precedence constraints. J Softw. https:\/\/doi.org\/10.4304\/jsw.6.6.1146-1153","journal-title":"J Softw"},{"issue":"4","key":"10247_CR168","doi-asserted-by":"publisher","first-page":"359","DOI":"10.1080\/07408170490279598","volume":"36","author":"R Logendran","year":"2004","unstructured":"Logendran R, Subur F (2004) Unrelated parallel machine scheduling with job splitting. IIE Trans 36(4):359\u2013372. https:\/\/doi.org\/10.1080\/07408170490279598","journal-title":"IIE Trans"},{"key":"10247_CR169","doi-asserted-by":"publisher","first-page":"3420","DOI":"10.1016\/j.cor.2006.02.006","volume":"34","author":"R Logendran","year":"2007","unstructured":"Logendran R, McDonell B, Smucker B (2007) Scheduling unrelated parallel machines with sequence-dependent setups. Comput Oper Res 34:3420\u20133438. https:\/\/doi.org\/10.1016\/j.cor.2006.02.006","journal-title":"Comput Oper Res"},{"key":"10247_CR170","doi-asserted-by":"publisher","first-page":"28","DOI":"10.1016\/j.eswa.2016.08.039","volume":"65","author":"X long Zheng","year":"2016","unstructured":"long Zheng X, Wang L (2016) A two-stage adaptive fruit fly optimization algorithm for unrelated parallel machine scheduling problem with additional resource constraints. Exp Syst Appl 65:28\u201339. https:\/\/doi.org\/10.1016\/j.eswa.2016.08.039","journal-title":"Exp Syst Appl"},{"issue":"4","key":"10247_CR171","doi-asserted-by":"publisher","first-page":"286","DOI":"10.1080\/21681015.2016.1139005","volume":"33","author":"C Low","year":"2016","unstructured":"Low C, Wu G-H (2016) Unrelated parallel-machine scheduling with controllable processing times and eligibility constraints to minimize the makespan. J Ind Prod Eng 33(4):286\u2013293. https:\/\/doi.org\/10.1080\/21681015.2016.1139005","journal-title":"J Ind Prod Eng"},{"key":"10247_CR172","doi-asserted-by":"publisher","unstructured":"Low C, Li R-K, Wu G-H (2013) Ant colony optimization algorithms for unrelated parallel machine scheduling with controllable processing times and eligibility constraints. In: Proceedings of the institute of industrial engineers Asian conference 2013. Springer, Singapore, pp 79\u201387. https:\/\/doi.org\/10.1007\/978-981-4451-98-7_10","DOI":"10.1007\/978-981-4451-98-7_10"},{"key":"10247_CR173","doi-asserted-by":"publisher","first-page":"168","DOI":"10.1016\/j.asoc.2018.02.018","volume":"66","author":"S Lu","year":"2018","unstructured":"Lu S, Liu X, Pei J, Thai MT, Pardalos PM (2018) A hybrid abc-ts algorithm for the unrelated parallel-batching machines scheduling problem with deteriorating jobs and maintenance activity. Appl Soft Comput 66:168\u2013182. https:\/\/doi.org\/10.1016\/j.asoc.2018.02.018","journal-title":"Appl Soft Comput"},{"issue":"6","key":"10247_CR174","doi-asserted-by":"publisher","first-page":"695","DOI":"10.1016\/j.jpdc.2007.03.003","volume":"67","author":"P Luo","year":"2007","unstructured":"Luo P, L\u00fc K, Shi Z (2007) A revisit of fast greedy heuristics for mapping a class of independent tasks onto heterogeneous computing systems. J Parallel Distrib Comput 67(6):695\u2013714. https:\/\/doi.org\/10.1016\/j.jpdc.2007.03.003","journal-title":"J Parallel Distrib Comput"},{"key":"10247_CR175","doi-asserted-by":"publisher","unstructured":"Lu H, Qiao F (2017) An improved genetic algorithm for a parallel machine scheduling problem with energy consideration. In: 2017 13th IEEE conference on automation science and engineering (CASE), pp 1487\u20131492. https:\/\/doi.org\/10.1109\/COASE.2017.8256314","DOI":"10.1109\/COASE.2017.8256314"},{"issue":"2","key":"10247_CR176","doi-asserted-by":"publisher","first-page":"107","DOI":"10.1006\/jpdc.1999.1581","volume":"59","author":"M Maheswaran","year":"1999","unstructured":"Maheswaran M, Ali S, Siegel HJ, Hensgen D, Freund RF (1999) Dynamic mapping of a class of independent tasks onto heterogeneous computing systems. J Parallel Distrib Comput 59(2):107\u2013131. https:\/\/doi.org\/10.1006\/jpdc.1999.1581","journal-title":"J Parallel Distrib Comput"},{"issue":"3","key":"10247_CR177","doi-asserted-by":"publisher","first-page":"391","DOI":"10.1007\/s12046-017-0611-2","volume":"42","author":"VK Manupati","year":"2017","unstructured":"Manupati VK, Rajyalakshmi G, Chan FTS, Thakkar JJ (2017) A hybrid multi-objective evolutionary algorithm approach for handling sequence- and machine-dependent set-up times in unrelated parallel machine scheduling problem. S\u0101dhan\u0101 42(3):391\u2013403. https:\/\/doi.org\/10.1007\/s12046-017-0611-2","journal-title":"S\u0101dhan\u0101"},{"key":"10247_CR178","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2020.104886","volume":"117","author":"RO Marinho Diana","year":"2020","unstructured":"Marinho Diana RO, de Souza SR (2020) Analysis of variable neighborhood descent as a local search operator for total weighted tardiness problem on unrelated parallel machines. Comput Oper Res 117:104886. https:\/\/doi.org\/10.1016\/j.cor.2020.104886","journal-title":"Comput Oper Res"},{"issue":"2","key":"10247_CR179","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1080\/10170669.2010.546165","volume":"28","author":"Y Mehravaran","year":"2011","unstructured":"Mehravaran Y, Logendran R (2011) Bicriteria supply chain scheduling on unrelated-parallel machines. J Chin Inst Ind Eng 28(2):91\u2013101. https:\/\/doi.org\/10.1080\/10170669.2010.546165","journal-title":"J Chin Inst Ind Eng"},{"issue":"4","key":"10247_CR180","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1016\/j.rcim.2004.12.005","volume":"22","author":"L Min","year":"2006","unstructured":"Min L, Cheng W (2006) Genetic algorithms for the optimal common due date assignment and the optimal scheduling policy in parallel machine earliness\/tardiness scheduling problems. Robot Comput-Integr Manuf 22(4):279\u2013287. https:\/\/doi.org\/10.1016\/j.rcim.2004.12.005","journal-title":"Robot Comput-Integr Manuf"},{"key":"10247_CR181","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2020.123691","volume":"279","author":"R Moghdani","year":"2021","unstructured":"Moghdani R, Salimifard K, Demir E, Benyettou A (2021) The green vehicle routing problem: a systematic literature review. J Clean Prod 279:123691. https:\/\/doi.org\/10.1016\/j.jclepro.2020.123691","journal-title":"J Clean Prod"},{"key":"10247_CR182","unstructured":"Mokotoff E (2001) Parallel machine scheduling problems: a survey. Asia-Pac J Oper Res 18"},{"key":"10247_CR183","volume-title":"Heuristic scheduling systems: with applications to production systems and project management","author":"TE Morton","year":"1993","unstructured":"Morton TE, Pentico DW (1993) Heuristic scheduling systems: with applications to production systems and project management. Wiley, New York"},{"issue":"4","key":"10247_CR184","doi-asserted-by":"publisher","first-page":"679","DOI":"10.3923\/itj.2008.679.683","volume":"7","author":"EU Munir","year":"2008","unstructured":"Munir EU, Li J, Shi S, Zou Z, Yang D (2008) MaxStd: a task scheduling heuristic for heterogeneous computing environment. Inf Technol J 7(4):679\u2013683. https:\/\/doi.org\/10.3923\/itj.2008.679.683","journal-title":"Inf Technol J"},{"key":"10247_CR185","doi-asserted-by":"publisher","unstructured":"Na D-G, Kim D-W, Jang W, Chen FF (2006) Scheduling unrelated parallel machines to minimize total weighted tardiness. In: 2006 IEEE International conference on service operations and logistics, and informatics, pp 758\u2013763. https:\/\/doi.org\/10.1109\/SOLI.2006.329085","DOI":"10.1109\/SOLI.2006.329085"},{"key":"10247_CR186","doi-asserted-by":"publisher","DOI":"10.3390\/su13105470","author":"R Nanthapodej","year":"2021","unstructured":"Nanthapodej R, Liu C-H, Nitisiri K, Pattanapairoj S (2021) Hybrid differential evolution algorithm and adaptive large neighborhood search to solve parallel machine scheduling to minimize energy consumption in consideration of machine-load balance problems. Sustainability. https:\/\/doi.org\/10.3390\/su13105470","journal-title":"Sustainability"},{"key":"10247_CR187","doi-asserted-by":"publisher","DOI":"10.3390\/app11115311","author":"R Nanthapodej","year":"2021","unstructured":"Nanthapodej R, Liu C-H, Nitisiri K, Pattanapairoj S (2021) Variable neighborhood strategy adaptive search to solve parallel-machine scheduling to minimize energy consumption while considering job priority and control makespan. Appl Sci. https:\/\/doi.org\/10.3390\/app11115311","journal-title":"Appl Sci"},{"issue":"1","key":"10247_CR188","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","volume":"11","author":"M Nawaz","year":"1983","unstructured":"Nawaz M, Enscore EE, Ham I (1983) A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega 11(1):91\u201395. https:\/\/doi.org\/10.1016\/0305-0483(83)90088-9","journal-title":"Omega"},{"issue":"1","key":"10247_CR189","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1007\/s40747-017-0036-x","volume":"3","author":"S Nguyen","year":"2017","unstructured":"Nguyen S, Mei Y, Zhang M (2017) Genetic programming for production scheduling: a survey with a unified framework. Complex Intell Syst 3(1):41\u201366. https:\/\/doi.org\/10.1007\/s40747-017-0036-x","journal-title":"Complex Intell Syst"},{"key":"10247_CR190","doi-asserted-by":"publisher","first-page":"1967","DOI":"10.4028\/www.scientific.net\/kem.467-469.1967","volume":"467\u2013469","author":"Q Niu","year":"2011","unstructured":"Niu Q, Zhou F, Zhou TJ (2011) An adaptive clonal selection algorithm with stage mutation operation for unrelated parallel machine scheduling problem with sequence-dependent setup times. Key Eng Mater 467\u2013469:1967\u20131972. https:\/\/doi.org\/10.4028\/www.scientific.net\/kem.467-469.1967","journal-title":"Key Eng Mater"},{"key":"10247_CR191","doi-asserted-by":"publisher","unstructured":"Nohra\u00a0Haddad M, Perdig\u00e3o Cota L, Jamilson Freitas\u00a0Souza M, Maculan N (2014). Aiv: a heuristic algorithm based on iterated local search and variable neighborhood descent for solving the unrelated parallel machine scheduling problem with setup times. In: Proceedings of the 16th international conference on enterprise information systems\u2014volume 1, ICEIS 2014, pp 376\u2013383, Setubal, PRT. SCITEPRESS\u2014Science and Technology Publications, Lda. https:\/\/doi.org\/10.5220\/0004884603760383","DOI":"10.5220\/0004884603760383"},{"issue":"11","key":"10247_CR192","doi-asserted-by":"publisher","first-page":"8494","DOI":"10.1007\/s11227-019-03121-z","volume":"76","author":"F Orts","year":"2020","unstructured":"Orts F, Ortega G, Puertas AM, Garc\u00eda I, Garz\u00f3n EM (2020) On solving the unrelated parallel machine scheduling problem: active microrheology as a case study. J Supercomput 76(11):8494\u20138509. https:\/\/doi.org\/10.1007\/s11227-019-03121-z","journal-title":"J Supercomput"},{"issue":"4","key":"10247_CR193","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1007\/s10951-008-0090-8","volume":"12","author":"D Ouelhadj","year":"2008","unstructured":"Ouelhadj D, Petrovic S (2008) A survey of dynamic scheduling in manufacturing systems. J Sched 12(4):417\u2013431. https:\/\/doi.org\/10.1007\/s10951-008-0090-8","journal-title":"J Sched"},{"issue":"9","key":"10247_CR194","doi-asserted-by":"publisher","first-page":"5660","DOI":"10.1016\/j.apm.2016.01.006","volume":"40","author":"S \u00d6zpeynirci","year":"2016","unstructured":"\u00d6zpeynirci S, G\u00f6kg\u00fcr B, Hnich B (2016) Parallel machine scheduling with tool loading. Appl Math Model 40(9):5660\u20135671. https:\/\/doi.org\/10.1016\/j.apm.2016.01.006","journal-title":"Appl Math Model"},{"key":"10247_CR195","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2018\/5914360","volume":"2018","author":"Z Pan","year":"2018","unstructured":"Pan Z, Lei D, Zhang Q (2018) A new imperialist competitive algorithm for multiobjective low carbon parallel machines scheduling. Math Probl Eng 2018:1\u201313. https:\/\/doi.org\/10.1155\/2018\/5914360","journal-title":"Math Probl Eng"},{"key":"10247_CR196","doi-asserted-by":"publisher","DOI":"10.1109\/TCYB.2020.3026571","author":"Z Pan","year":"2020","unstructured":"Pan Z, Lei D, Wang L (2020) A knowledge-based two-population optimization algorithm for distributed energy-efficient parallel machines scheduling. IEEE Trans Cybern. https:\/\/doi.org\/10.1109\/TCYB.2020.3026571","journal-title":"IEEE Trans Cybern"},{"issue":"1","key":"10247_CR197","doi-asserted-by":"publisher","first-page":"45","DOI":"10.1287\/opre.25.1.45","volume":"25","author":"SS Panwalkar","year":"1977","unstructured":"Panwalkar SS, Iskander W (1977) A survey of scheduling rules. Oper Res 25(1):45\u201361 (Full publication date: Jan. - Feb., 1977)","journal-title":"Oper Res"},{"issue":"1","key":"10247_CR198","doi-asserted-by":"publisher","first-page":"49","DOI":"10.1016\/j.ins.2003.05.012","volume":"166","author":"J Peng","year":"2004","unstructured":"Peng J, Liu B (2004) Parallel machine scheduling models with fuzzy processing times. Inf Sci 166(1):49\u201366. https:\/\/doi.org\/10.1016\/j.ins.2003.05.012","journal-title":"Inf Sci"},{"key":"10247_CR199","doi-asserted-by":"publisher","first-page":"131","DOI":"10.1016\/j.cie.2019.03.034","volume":"131","author":"P Perez-Gonzalez","year":"2019","unstructured":"Perez-Gonzalez P, Fernandez-Viagas V, Zamora Garc\u00eda M, Framinan JM (2019) Constructive heuristics for the unrelated parallel machines scheduling problem with machine eligibility and setup times. Comput Ind Eng 131:131\u2013145. https:\/\/doi.org\/10.1016\/j.cie.2019.03.034","journal-title":"Comput Ind Eng"},{"issue":"9","key":"10247_CR200","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1016\/0895-7177(96)00150-1","volume":"24","author":"N Piersma","year":"1996","unstructured":"Piersma N, van Dijk W (1996) A local search heuristic for unrelated parallel machine scheduling with efficient neighborhood search. Math Comput Model 24(9):11\u201319. https:\/\/doi.org\/10.1016\/0895-7177(96)00150-1","journal-title":"Math Comput Model"},{"key":"10247_CR201","volume-title":"Scheduling: theory, algorithms, and systems","author":"ML Pinedo","year":"2008","unstructured":"Pinedo ML (2008) Scheduling: theory, algorithms, and systems, 3rd edn. Springer, Berlin","edition":"3"},{"key":"10247_CR202","doi-asserted-by":"publisher","unstructured":"Pinheiro JCSN, Arroyo JEC, Fialho LB (2020) Scheduling unrelated parallel machines with family setups and resource constraints to minimize total tardiness. In: Proceedings of the 2020 genetic and evolutionary computation conference companion, GECCO \u201920, pp 1409\u20131417, New York, NY, USA. Association for Computing Machinery. https:\/\/doi.org\/10.1145\/3377929.3398150","DOI":"10.1145\/3377929.3398150"},{"key":"10247_CR203","doi-asserted-by":"publisher","first-page":"22886","DOI":"10.1109\/ACCESS.2022.3151346","volume":"10","author":"L Planini\u0107","year":"2022","unstructured":"Planini\u0107 L, Backovi\u0107 H, \u0110urasevi\u0107 M, Jakobovi\u0107 D (2022) A comparative study of dispatching rule representations in evolutionary algorithms for the dynamic unrelated machines environment. IEEE Access 10:22886\u201322901. https:\/\/doi.org\/10.1109\/ACCESS.2022.3151346","journal-title":"IEEE Access"},{"key":"10247_CR204","doi-asserted-by":"publisher","unstructured":"Planini\u0107 L, \u0110urasevi\u0107 M, Jakobovi\u0107 D (2021a) Towards interpretable dispatching rules: application of expression simplification methods. In: 2021 IEEE symposium series on computational intelligence (SSCI), pp 01\u201308. https:\/\/doi.org\/10.1109\/SSCI50451.2021.9659842","DOI":"10.1109\/SSCI50451.2021.9659842"},{"key":"10247_CR205","doi-asserted-by":"publisher","unstructured":"Planini\u0107 L, \u0110urasevi\u0107 M, Jakobovi\u0107 D (2021b) On the application of $$\\epsilon$$-lexicase selection in the generation of dispatching rules. In: 2021 IEEE congress on evolutionary computation (CEC), pp 2125\u20132132. https:\/\/doi.org\/10.1109\/CEC45853.2021.9504982","DOI":"10.1109\/CEC45853.2021.9504982"},{"key":"10247_CR206","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1016\/j.cor.2013.10.013","volume":"44","author":"S Polyakovskiy","year":"2014","unstructured":"Polyakovskiy S, M\u2019Hallah R (2014) A multi-agent system for the weighted earliness tardiness parallel machine problem. Comput Oper Res 44:115\u2013136. https:\/\/doi.org\/10.1016\/j.cor.2013.10.013","journal-title":"Comput Oper Res"},{"issue":"1","key":"10247_CR207","doi-asserted-by":"publisher","first-page":"83","DOI":"10.1017\/S0890060413000516","volume":"28","author":"P Priore","year":"2014","unstructured":"Priore P, G\u00f3mez A, Pino R, Rosillo R (2014) Dynamic scheduling of manufacturing systems using machine learning: an updated review. Artif Intell Eng Des Anal Manuf 28(1):83\u201397. https:\/\/doi.org\/10.1017\/S0890060413000516","journal-title":"Artif Intell Eng Des Anal Manuf"},{"issue":"1","key":"10247_CR208","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1007\/s10845-005-5514-0","volume":"17","author":"G Rabadi","year":"2006","unstructured":"Rabadi G, Moraga RJ, Al-Salem A (2006) Heuristics for the unrelated parallel machine scheduling problem with setup times. J Intell Manuf 17(1):85\u201397. https:\/\/doi.org\/10.1007\/s10845-005-5514-0","journal-title":"J Intell Manuf"},{"key":"10247_CR209","doi-asserted-by":"publisher","DOI":"10.7763\/ijmlc.2012.v2.147","author":"MK Rafsanjani","year":"2012","unstructured":"Rafsanjani MK, Bardsiri AK (2012) A new heuristic approach for scheduling independent tasks on heterogeneous computing systems. Int J Mach Learn Comput. https:\/\/doi.org\/10.7763\/ijmlc.2012.v2.147","journal-title":"Int J Mach Learn Comput"},{"issue":"1","key":"10247_CR210","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1504\/ijsom.2008.015941","volume":"4","author":"K Raja","year":"2008","unstructured":"Raja K, Arumugam C, Selladurai V (2008) Non-identical parallel-machine scheduling using genetic algorithm and fuzzy logic approach. Int J Serv Oper Manag 4(1):72. https:\/\/doi.org\/10.1504\/ijsom.2008.015941","journal-title":"Int J Serv Oper Manag"},{"key":"10247_CR211","doi-asserted-by":"publisher","first-page":"15","DOI":"10.1016\/j.cie.2014.09.006","volume":"77","author":"M Rambod","year":"2014","unstructured":"Rambod M, Rezaeian J (2014) Robust meta-heuristics implementation for unrelated parallel machines scheduling problem with rework processes and machine eligibility restrictions. Comput Ind Eng 77:15\u201328. https:\/\/doi.org\/10.1016\/j.cie.2014.09.006","journal-title":"Comput Ind Eng"},{"issue":"6","key":"10247_CR212","doi-asserted-by":"publisher","first-page":"1887","DOI":"10.1016\/j.scient.2012.05.004","volume":"19","author":"R Ramezanian","year":"2012","unstructured":"Ramezanian R, Saidi-Mehrabad M (2012) Multi-product unrelated parallel machines scheduling problem with rework processes. Sci Iran 19(6):1887\u20131893. https:\/\/doi.org\/10.1016\/j.scient.2012.05.004","journal-title":"Sci Iran"},{"issue":"4","key":"10247_CR213","doi-asserted-by":"publisher","first-page":"969","DOI":"10.1080\/002075497195489","volume":"35","author":"SU Randhawa","year":"1997","unstructured":"Randhawa SU, Kuo C-H (1997) Evaluating scheduling heuristics for non-identical parallel processors. Int J Prod Res 35(4):969\u2013981. https:\/\/doi.org\/10.1080\/002075497195489","journal-title":"Int J Prod Res"},{"issue":"1","key":"10247_CR214","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1080\/00207549508930137","volume":"33","author":"SU Randhawa","year":"1995","unstructured":"Randhawa SU, Smith TA (1995) An experimental investigation of scheduling non-identical, parallel processors with sequence-dependent set-up times and due dates. Int J Prod Res 33(1):59\u201369. https:\/\/doi.org\/10.1080\/00207549508930137","journal-title":"Int J Prod Res"},{"issue":"4","key":"10247_CR215","doi-asserted-by":"publisher","first-page":"380","DOI":"10.1504\/ijor.2007.014169","volume":"2","author":"MG Ravetti","year":"2007","unstructured":"Ravetti MG, Mateus GR, Rocha PL, Pardalos PM (2007) A scheduling problem with unrelated parallel machines and sequence dependent setups. Int J Oper Res 2(4):380. https:\/\/doi.org\/10.1504\/ijor.2007.014169","journal-title":"Int J Oper Res"},{"issue":"12","key":"10247_CR216","first-page":"1863","volume":"30","author":"J Rezaeian Zeidi","year":"2017","unstructured":"Rezaeian Zeidi J, Zarei M, Shokoufi K (2017) Pareto-based multi-criteria evolutionary algorithm for parallel machines scheduling problem with sequence-dependent setup times. Int J Eng 30(12):1863\u20131869","journal-title":"Int J Eng"},{"key":"10247_CR217","unstructured":"Ritchie G, Levine J (2003) A fast, effective local search for scheduling independent jobs in heterogeneous computing environments"},{"key":"10247_CR218","doi-asserted-by":"publisher","unstructured":"Rodriguez FJ, Garc\u00eda-Mart\u00ednez C, Blum C, Lozano M (2012) An artificial bee colony algorithm for the unrelated parallel machines scheduling problem. In: Lecture Notes in Computer Science. Springer, Berlin, pp 143\u2013152. https:\/\/doi.org\/10.1007\/978-3-642-32964-7_15","DOI":"10.1007\/978-3-642-32964-7_15"},{"issue":"1","key":"10247_CR219","doi-asserted-by":"publisher","first-page":"383","DOI":"10.1007\/s10479-012-1164-8","volume":"201","author":"FJ Rodriguez","year":"2012","unstructured":"Rodriguez FJ, Blum C, Garc\u00eda-Mart\u00ednez C, Lozano M (2012) GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times. Ann Oper Res 201(1):383\u2013401. https:\/\/doi.org\/10.1007\/s10479-012-1164-8","journal-title":"Ann Oper Res"},{"issue":"7","key":"10247_CR220","doi-asserted-by":"publisher","first-page":"1829","DOI":"10.1016\/j.cor.2013.01.018","volume":"40","author":"FJ Rodriguez","year":"2013","unstructured":"Rodriguez FJ, Lozano M, Blum C, Garc\u00eda-Mart\u00ednez C (2013) An iterated greedy algorithm for the large-scale unrelated parallel machines scheduling problem. Comput Oper Res 40(7):1829\u20131841. https:\/\/doi.org\/10.1016\/j.cor.2013.01.018","journal-title":"Comput Oper Res"},{"issue":"1","key":"10247_CR221","doi-asserted-by":"publisher","first-page":"32","DOI":"10.1287\/ijoc.1030.0048","volume":"17","author":"S Rojanasoonthon","year":"2005","unstructured":"Rojanasoonthon S, Bard J (2005) A GRASP for parallel machine scheduling with time windows. INFORMS J Comput 17(1):32\u201351. https:\/\/doi.org\/10.1287\/ijoc.1030.0048","journal-title":"INFORMS J Comput"},{"issue":"5\u20138","key":"10247_CR222","doi-asserted-by":"publisher","first-page":"777","DOI":"10.1007\/s00170-011-3318-2","volume":"57","author":"R Ruiz","year":"2011","unstructured":"Ruiz R, Andr\u00e9s-Romano C (2011) Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times. Int J Adv Manuf Technol 57(5\u20138):777\u2013794. https:\/\/doi.org\/10.1007\/s00170-011-3318-2","journal-title":"Int J Adv Manuf Technol"},{"key":"10247_CR223","doi-asserted-by":"publisher","first-page":"488","DOI":"10.1016\/j.asoc.2015.12.035","volume":"41","author":"MS Salehi Mir","year":"2016","unstructured":"Salehi Mir MS, Rezaeian J (2016) A robust hybrid approach based on particle swarm optimization and genetic algorithm to minimize the total machine load on unrelated parallel machines. Appl Soft Comput 41:488\u2013504. https:\/\/doi.org\/10.1016\/j.asoc.2015.12.035","journal-title":"Appl Soft Comput"},{"issue":"2","key":"10247_CR224","doi-asserted-by":"publisher","first-page":"707","DOI":"10.1111\/itor.12316","volume":"26","author":"HG Santos","year":"2016","unstructured":"Santos HG, Toffolo TA, Silva CL, Berghe GV (2016) Analysis of stochastic local search methods for the unrelated parallel machine scheduling problem. Int Trans Oper Res 26(2):707\u2013724. https:\/\/doi.org\/10.1111\/itor.12316","journal-title":"Int Trans Oper Res"},{"key":"10247_CR225","doi-asserted-by":"publisher","first-page":"107","DOI":"10.1016\/j.cor.2014.08.002","volume":"53","author":"V Sels","year":"2015","unstructured":"Sels V, Coelho J, Manuel Dias A, Vanhoucke M (2015) Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem. Comput Oper Res 53:107\u2013117. https:\/\/doi.org\/10.1016\/j.cor.2014.08.002","journal-title":"Comput Oper Res"},{"key":"10247_CR226","doi-asserted-by":"publisher","first-page":"71","DOI":"10.1016\/j.cor.2017.06.019","volume":"88","author":"B Shahidi-Zadeh","year":"2017","unstructured":"Shahidi-Zadeh B, Tavakkoli-Moghaddam R, Taheri-Moghadam A, Rastgar I (2017) Solving a bi-objective unrelated parallel batch processing machines scheduling problem: a comparison study. Comput Oper Res 88:71\u201390. https:\/\/doi.org\/10.1016\/j.cor.2017.06.019","journal-title":"Comput Oper Res"},{"key":"10247_CR227","doi-asserted-by":"publisher","first-page":"174","DOI":"10.1016\/j.asoc.2017.08.014","volume":"61","author":"O Shahvari","year":"2017","unstructured":"Shahvari O, Logendran R (2017) A bi-objective batch processing problem with dual-resources on unrelated-parallel machines. Appl Soft Comput 61:174\u2013192. https:\/\/doi.org\/10.1016\/j.asoc.2017.08.014","journal-title":"Appl Soft Comput"},{"issue":"C","key":"10247_CR228","doi-asserted-by":"publisher","first-page":"154","DOI":"10.1016\/j.cor.2016.07.021","volume":"77","author":"O Shahvari","year":"2017","unstructured":"Shahvari O, Logendran R (2017) An enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes. Comput Oper Res 77(C):154\u2013176. https:\/\/doi.org\/10.1016\/j.cor.2016.07.021","journal-title":"Comput Oper Res"},{"key":"10247_CR229","unstructured":"Shahvari O, Logendran R (2015) Bi-criteria batch scheduling on unrelated-parallel machines"},{"issue":"1","key":"10247_CR230","doi-asserted-by":"publisher","first-page":"517","DOI":"10.1007\/s10479-014-1538-1","volume":"222","author":"M Siepak","year":"2014","unstructured":"Siepak M, J\u00f3zefczyk J (2014) Solution algorithms for unrelated machines minmax regret scheduling problem with interval processing times and the total flow time criterion. Ann Oper Res 222(1):517\u2013533. https:\/\/doi.org\/10.1007\/s10479-014-1538-1","journal-title":"Ann Oper Res"},{"issue":"1","key":"10247_CR231","doi-asserted-by":"publisher","first-page":"76","DOI":"10.1016\/j.cie.2006.01.001","volume":"50","author":"C Silva","year":"2006","unstructured":"Silva C, Magalhaes JM (2006) Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry. Comput Ind Eng 50(1):76\u201389. https:\/\/doi.org\/10.1016\/j.cie.2006.01.001","journal-title":"Comput Ind Eng"},{"issue":"1","key":"10247_CR232","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2010.09.042","volume":"212","author":"SA Slotnick","year":"2011","unstructured":"Slotnick SA (2011) Order acceptance and scheduling: a taxonomy and review. Eur J Oper Res 212(1):1\u201311. https:\/\/doi.org\/10.1016\/j.ejor.2010.09.042","journal-title":"Eur J Oper Res"},{"key":"10247_CR233","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2019.119428","volume":"249","author":"H Soleimani","year":"2020","unstructured":"Soleimani H, Ghaderi H, Tsai P-W, Zarbakhshnia N, Maleki M (2020) Scheduling of unrelated parallel machines considering sequence-related setup time, start time-dependent deterioration, position-dependent learning and power consumption minimization. J Clean Prod 249:119428. https:\/\/doi.org\/10.1016\/j.jclepro.2019.119428","journal-title":"J Clean Prod"},{"issue":"1","key":"10247_CR234","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1111\/itor.12001","volume":"22","author":"K S\u00f6rensen","year":"2013","unstructured":"S\u00f6rensen K (2013) Metaheuristics-the metaphor exposed. Int Trans Oper Res 22(1):3\u201318. https:\/\/doi.org\/10.1111\/itor.12001","journal-title":"Int Trans Oper Res"},{"issue":"8","key":"10247_CR235","doi-asserted-by":"publisher","first-page":"886","DOI":"10.2307\/3009970","volume":"49","author":"B Srivastava","year":"1998","unstructured":"Srivastava B (1998) An effective heuristic for minimising makespan on unrelated parallel machines. J Oper Res Soc 49(8):886. https:\/\/doi.org\/10.2307\/3009970","journal-title":"J Oper Res Soc"},{"issue":"22","key":"10247_CR236","doi-asserted-by":"publisher","first-page":"6747","DOI":"10.1080\/00207543.2016.1173248","volume":"54","author":"J Strohhecker","year":"2016","unstructured":"Strohhecker J, Hamann M, Thun J-H (2016) Loading and sequencing heuristics for job scheduling on two unrelated parallel machines with long, sequence-dependent set-up times. Int J Prod Res 54(22):6747\u20136767. https:\/\/doi.org\/10.1080\/00207543.2016.1173248","journal-title":"Int J Prod Res"},{"issue":"2","key":"10247_CR237","doi-asserted-by":"publisher","first-page":"223","DOI":"10.1016\/0925-5273(94)90038-8","volume":"34","author":"V Suresh","year":"1994","unstructured":"Suresh V, Chaudhuri D (1994) Minimizing maximum tardiness for unrelated parallel machines. Int J Prod Econ 34(2):223\u2013229. https:\/\/doi.org\/10.1016\/0925-5273(94)90038-8","journal-title":"Int J Prod Econ"},{"issue":"1","key":"10247_CR238","doi-asserted-by":"publisher","first-page":"77","DOI":"10.1016\/0360-8352(95)00028-3","volume":"30","author":"V Suresh","year":"1996","unstructured":"Suresh V, Chaudhuri D (1996) Bicriteria scheduling problem for unrelated parallel machines. Comput Ind Eng 30(1):77\u201382. https:\/\/doi.org\/10.1016\/0360-8352(95)00028-3","journal-title":"Comput Ind Eng"},{"issue":"4","key":"10247_CR239","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1080\/09537289608930367","volume":"7","author":"V Suresh","year":"1996","unstructured":"Suresh V, Ghaudhuri D (1996) Scheduling of unrelated parallel machines when machine availability is specified. Prod Plan Control 7(4):393\u2013400. https:\/\/doi.org\/10.1080\/09537289608930367","journal-title":"Prod Plan Control"},{"issue":"5","key":"10247_CR240","doi-asserted-by":"publisher","first-page":"552","DOI":"10.1080\/07408170701781951","volume":"40","author":"HA Taboada","year":"2008","unstructured":"Taboada HA, Coit DW (2008) Multi-objective scheduling problems: determination of pruned pareto sets. IIE Trans 40(5):552\u2013564. https:\/\/doi.org\/10.1080\/07408170701781951","journal-title":"IIE Trans"},{"key":"10247_CR241","doi-asserted-by":"publisher","unstructured":"Tamaki H, Hasegawa Y, Kozasa J, Araki M (1993) Application of search methods to scheduling problem in plastics forming plant: a binary representation approach. In: Proceedings of 32nd IEEE conference on decision and control, vol 4, pp 3845\u20133850. https:\/\/doi.org\/10.1109\/CDC.1993.325943","DOI":"10.1109\/CDC.1993.325943"},{"issue":"12","key":"10247_CR242","doi-asserted-by":"publisher","first-page":"3224","DOI":"10.1016\/j.cor.2009.02.012","volume":"36","author":"R Tavakkoli-Moghaddam","year":"2009","unstructured":"Tavakkoli-Moghaddam R, Taheri F, Bazzazi M, Izadi M, Sassani F (2009) Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints. Comput Oper Res 36(12):3224\u20133230. https:\/\/doi.org\/10.1016\/j.cor.2009.02.012 (New developments on hub location)","journal-title":"Comput Oper Res"},{"key":"10247_CR243","doi-asserted-by":"publisher","first-page":"249","DOI":"10.1007\/978-3-030-41964-6_22","volume-title":"Intelligent information and database systems","author":"M Terzi","year":"2020","unstructured":"Terzi M, Arbaoui T, Yalaoui F, Benatchba K (2020) Solving the unrelated parallel machine scheduling problem with setups using late acceptance hill climbing. In: Nguyen NT, Jearanaitanakij K, Selamat A, Trawi\u0144ski B, Chittayasothorn S (eds) Intelligent information and database systems. Springer, Cham, pp 249\u2013258"},{"issue":"12","key":"10247_CR244","doi-asserted-by":"publisher","first-page":"4750","DOI":"10.1016\/j.asoc.2013.07.029","volume":"13","author":"S Torabi","year":"2013","unstructured":"Torabi S, Sahebjamnia N, Mansouri S, Bajestani MA (2013) A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem. Appl Soft Comput 13(12):4750\u20134762. https:\/\/doi.org\/10.1016\/j.asoc.2013.07.029","journal-title":"Appl Soft Comput"},{"issue":"1","key":"10247_CR245","doi-asserted-by":"publisher","first-page":"36607","DOI":"10.4025\/actascitechnol.v40i1.36607","volume":"40","author":"E Tozzo","year":"2018","unstructured":"Tozzo E, Cotrim SL, Galdamez EVC, Leal GCL (2018) A genetic algorithm and variable neighborhood search for the unrelated parallel machine scheduling problem with sequence dependent setup time. Acta Scientiarum Technol 40(1):36607. https:\/\/doi.org\/10.4025\/actascitechnol.v40i1.36607","journal-title":"Acta Scientiarum Technol"},{"issue":"8","key":"10247_CR246","doi-asserted-by":"publisher","first-page":"11118","DOI":"10.1016\/j.eswa.2009.02.071","volume":"36","author":"L-Y Tseng","year":"2009","unstructured":"Tseng L-Y, Chin Y-H, Wang S-C (2009) A minimized makespan scheduler with multiple factors for grid computing systems. Exp Syst Appl 36(8):11118\u201311130. https:\/\/doi.org\/10.1016\/j.eswa.2009.02.071","journal-title":"Exp Syst Appl"},{"key":"10247_CR247","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2022.116909","author":"L Ulaga","year":"2022","unstructured":"Ulaga L, \u0110urasevi\u0107 M, Jakobovi\u0107 D (2022) Local search based methods for scheduling in the unrelated parallel machines environment. Exp Syst Appl. https:\/\/doi.org\/10.1016\/j.eswa.2022.116909","journal-title":"Exp Syst Appl"},{"issue":"3","key":"10247_CR248","doi-asserted-by":"publisher","first-page":"612","DOI":"10.1016\/j.ejor.2011.01.011","volume":"211","author":"E Vallada","year":"2011","unstructured":"Vallada E, Ruiz R (2011) A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times. Eur J Oper Res 211(3):612\u2013622. https:\/\/doi.org\/10.1016\/j.ejor.2011.01.011","journal-title":"Eur J Oper Res"},{"key":"10247_CR249","doi-asserted-by":"publisher","first-page":"415","DOI":"10.1016\/j.cor.2019.07.016","volume":"111","author":"E Vallada","year":"2019","unstructured":"Vallada E, Villa F, Fanjul-Peyro L (2019) Enriched metaheuristics for the resource constrained unrelated parallel machine scheduling problem. Comput Oper Res 111:415\u2013424. https:\/\/doi.org\/10.1016\/j.cor.2019.07.016","journal-title":"Comput Oper Res"},{"issue":"3","key":"10247_CR250","doi-asserted-by":"publisher","first-page":"577","DOI":"10.1016\/S0377-2217(03)00376-X","volume":"158","author":"N Van Hop","year":"2004","unstructured":"Van Hop N, Nagarur NN (2004) The scheduling problem of PCBS for multiple non-identical parallel machines. Eur J Oper Res 158(3):577\u2013594. https:\/\/doi.org\/10.1016\/S0377-2217(03)00376-X","journal-title":"Eur J Oper Res"},{"issue":"1","key":"10247_CR251","doi-asserted-by":"publisher","first-page":"18","DOI":"10.1080\/21681015.2020.1829111","volume":"38","author":"BK Van","year":"2021","unstructured":"Van BK, Hop NV (2021) Genetic algorithm with initial sequence for parallel machines scheduling with sequence dependent setup times based on earliness- tardiness. J Ind Prod Eng 38(1):18\u201328. https:\/\/doi.org\/10.1080\/21681015.2020.1829111","journal-title":"J Ind Prod Eng"},{"key":"10247_CR252","doi-asserted-by":"publisher","first-page":"28","DOI":"10.1016\/j.eswa.2017.09.054","volume":"93","author":"F Villa","year":"2018","unstructured":"Villa F, Vallada E, Fanjul-Peyro L (2018) Heuristic algorithms for the unrelated parallel machine scheduling problem with one scarce additional resource. Exp Syst Appl 93:28\u201338. https:\/\/doi.org\/10.1016\/j.eswa.2017.09.054","journal-title":"Exp Syst Appl"},{"key":"10247_CR253","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2019.106030","volume":"137","author":"I Vla\u0161i\u0107","year":"2019","unstructured":"Vla\u0161i\u0107 I, \u0110urasevi\u0107 M, Jakobovi\u0107 D (2019) Improving genetic algorithm performance by population initialisation with dispatching rules. Comput Ind Eng 137:106030. https:\/\/doi.org\/10.1016\/j.cie.2019.106030","journal-title":"Comput Ind Eng"},{"key":"10247_CR254","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2020.105005","volume":"123","author":"I Vla\u0161i\u0107","year":"2020","unstructured":"Vla\u0161i\u0107 I, \u0110urasevi\u0107 M, Jakobovi\u0107 D (2020) A comparative study of solution representations for the unrelated machines environment. Comput Oper Res 123:105005. https:\/\/doi.org\/10.1016\/j.cor.2020.105005","journal-title":"Comput Oper Res"},{"issue":"2","key":"10247_CR255","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1287\/ijoc.14.2.175.119","volume":"14","author":"T Vredeveld","year":"2002","unstructured":"Vredeveld T, Hurkens C (2002) Experimental comparison of approximation algorithms for scheduling unrelated parallel machines. INFORMS J Comput 14(2):175\u2013189. https:\/\/doi.org\/10.1287\/ijoc.14.2.175.119","journal-title":"INFORMS J Comput"},{"key":"10247_CR256","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1016\/j.omega.2018.07.005","volume":"83","author":"H Wang","year":"2019","unstructured":"Wang H, Alidaee B (2019) Effective heuristic for large-scale unrelated parallel machines scheduling problems. Omega 83:261\u2013274. https:\/\/doi.org\/10.1016\/j.omega.2018.07.005","journal-title":"Omega"},{"key":"10247_CR257","doi-asserted-by":"publisher","first-page":"121223","DOI":"10.1109\/ACCESS.2019.2937747","volume":"7","author":"M Wang","year":"2019","unstructured":"Wang M, Pan G (2019) A novel imperialist competitive algorithm with multi-elite individuals guidance for multi-object unrelated parallel machine scheduling problem. IEEE Access 7:121223\u2013121235. https:\/\/doi.org\/10.1109\/ACCESS.2019.2937747","journal-title":"IEEE Access"},{"issue":"3","key":"10247_CR258","doi-asserted-by":"publisher","first-page":"343","DOI":"10.1007\/s10696-012-9150-7","volume":"25","author":"I-L Wang","year":"2012","unstructured":"Wang I-L, Wang Y-C, Chen C-W (2012) Scheduling unrelated parallel machines in semiconductor manufacturing by problem reduction and local search heuristics. Flex Servi Manuf J 25(3):343\u2013366. https:\/\/doi.org\/10.1007\/s10696-012-9150-7","journal-title":"Flex Servi Manuf J"},{"issue":"5","key":"10247_CR259","doi-asserted-by":"publisher","first-page":"1196","DOI":"10.1016\/j.cor.2012.12.007","volume":"40","author":"W-L Wang","year":"2013","unstructured":"Wang W-L, Wang H-Y, Zhao Y-W, Zhang L-P, Xu X-L (2013) Parallel machine scheduling with splitting jobs by a hybrid differential evolution algorithm. Comput Oper Res 40(5):1196\u20131206. https:\/\/doi.org\/10.1016\/j.cor.2012.12.007","journal-title":"Comput Oper Res"},{"issue":"3","key":"10247_CR260","doi-asserted-by":"publisher","first-page":"235","DOI":"10.1109\/JAS.2016.7508797","volume":"3","author":"L Wang","year":"2016","unstructured":"Wang L, Wang S, Zheng X (2016) A hybrid estimation of distribution algorithm for unrelated parallel machine scheduling with sequence-dependent setup times. IEEE\/CAA J Autom Sin 3(3):235\u2013246. https:\/\/doi.org\/10.1109\/JAS.2016.7508797","journal-title":"IEEE\/CAA J Autom Sin"},{"issue":"11","key":"10247_CR261","doi-asserted-by":"publisher","first-page":"4598","DOI":"10.1109\/TSMC.2018.2855700","volume":"50","author":"M-Z Wang","year":"2020","unstructured":"Wang M-Z, Zhang L-L, Choi T-M (2020) Bi-objective optimal scheduling with raw material\u2019s shelf-life constraints in unrelated parallel machines production. IEEE Trans Syst Man Cybern: Syst 50(11):4598\u20134610. https:\/\/doi.org\/10.1109\/TSMC.2018.2855700","journal-title":"IEEE Trans Syst Man Cybern: Syst"},{"key":"10247_CR262","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.106505","volume":"145","author":"X Wang","year":"2020","unstructured":"Wang X, Li Z, Chen Q, Mao N (2020) Meta-heuristics for unrelated parallel machines scheduling with random rework to minimize expected total weighted tardiness. Comput Ind Eng 145:106505. https:\/\/doi.org\/10.1016\/j.cie.2020.106505","journal-title":"Comput Ind Eng"},{"issue":"3","key":"10247_CR263","doi-asserted-by":"publisher","first-page":"215","DOI":"10.1016\/S0925-5273(00)00066-9","volume":"70","author":"MX Weng","year":"2001","unstructured":"Weng MX, Lu J, Ren H (2001) Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective. Int J Prod Econ 70(3):215\u2013226. https:\/\/doi.org\/10.1016\/S0925-5273(00)00066-9","journal-title":"Int J Prod Econ"},{"issue":"1","key":"10247_CR264","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1109\/4235.585893","volume":"1","author":"D Wolpert","year":"1997","unstructured":"Wolpert D, Macready W (1997) No free lunch theorems for optimization. IEEE Trans Evolut Comput 1(1):67\u201382. https:\/\/doi.org\/10.1109\/4235.585893","journal-title":"IEEE Trans Evolut Comput"},{"key":"10247_CR265","volume-title":"Scheduling unrelated parallel machines-algorithms, complexity, and performance","author":"A Wotzlaw","year":"2007","unstructured":"Wotzlaw A (2007) Scheduling unrelated parallel machines-algorithms, complexity, and performance. VDM Verlag, Saarbr\u00fccken, DEU"},{"key":"10247_CR266","doi-asserted-by":"publisher","unstructured":"Wu M-Y, Shu W (2001) A high-performance mapping algorithm for heterogeneous computing systems. In: Proceedings 15th international parallel and distributed processing symposium. IPDPS 2001. https:\/\/doi.org\/10.1109\/IPDPS.2001.925020","DOI":"10.1109\/IPDPS.2001.925020"},{"key":"10247_CR267","doi-asserted-by":"publisher","first-page":"155","DOI":"10.1016\/j.omega.2018.01.001","volume":"82","author":"X Wu","year":"2019","unstructured":"Wu X, Che A (2019) A memetic differential evolution algorithm for energy-efficient parallel machine scheduling. Omega 82:155\u2013165. https:\/\/doi.org\/10.1016\/j.omega.2018.01.001","journal-title":"Omega"},{"key":"10247_CR268","doi-asserted-by":"publisher","first-page":"26","DOI":"10.1016\/j.ijpe.2018.04.013","volume":"201","author":"L Wu","year":"2018","unstructured":"Wu L, Wang S (2018) Exact and heuristic methods to solve the parallel machine scheduling problem with multi-processor tasks. Int J Prod Econ 201:26\u201340. https:\/\/doi.org\/10.1016\/j.ijpe.2018.04.013","journal-title":"Int J Prod Econ"},{"key":"10247_CR269","doi-asserted-by":"publisher","first-page":"19","DOI":"10.1504\/IJWGS.2007.012635","volume":"3","author":"F Xhafa","year":"2007","unstructured":"Xhafa F, Barolli L, Durresi A (2007) Batch mode scheduling in grid systems. IJWGS 3:19\u201337. https:\/\/doi.org\/10.1504\/IJWGS.2007.012635","journal-title":"IJWGS"},{"issue":"1","key":"10247_CR270","doi-asserted-by":"publisher","first-page":"244","DOI":"10.1109\/TASE.2013.2291899","volume":"12","author":"X Xu","year":"2015","unstructured":"Xu X, Ma Y, Zhou Z, Zhao Y (2015) Customer order scheduling on unrelated parallel machines to minimize total completion time. IEEE Trans Autom Sci Eng 12(1):244\u2013257. https:\/\/doi.org\/10.1109\/TASE.2013.2291899","journal-title":"IEEE Trans Autom Sci Eng"},{"key":"10247_CR271","doi-asserted-by":"publisher","unstructured":"Xu S, Bean JC (2007) A genetic algorithm for scheduling parallel non-identical batch processing machines. In: 2007 IEEE symposium on computational intelligence in scheduling, pp 143\u2013150. https:\/\/doi.org\/10.1109\/SCIS.2007.367682","DOI":"10.1109\/SCIS.2007.367682"},{"issue":"09","key":"10247_CR272","doi-asserted-by":"publisher","first-page":"2150035","DOI":"10.1142\/s0129065721500350","volume":"31","author":"Y Xue","year":"2021","unstructured":"Xue Y, Jiang P, Neri F, Liang J (2021) A multi-objective evolutionary approach based on graph-in-graph for neural architecture search of convolutional neural networks. Int J Neural Syst 31(09):2150035. https:\/\/doi.org\/10.1142\/s0129065721500350","journal-title":"Int J Neural Syst"},{"issue":"3","key":"10247_CR273","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1109\/MCI.2021.3084435","volume":"16","author":"Y Xue","year":"2021","unstructured":"Xue Y, Wang Y, Liang J, Slowik A (2021) A self-adaptive mutation neural architecture search algorithm based on blocks. IEEE Comput Intell Mag 16(3):67\u201378. https:\/\/doi.org\/10.1109\/MCI.2021.3084435","journal-title":"IEEE Comput Intell Mag"},{"issue":"2","key":"10247_CR274","doi-asserted-by":"publisher","first-page":"355","DOI":"10.1109\/TETCI.2021.3074147","volume":"6","author":"Y Xue","year":"2022","unstructured":"Xue Y, Tang Y, Xu X, Liang J, Neri F (2022) Multi-objective feature selection with missing data in classification. IEEE Trans Emerg Top Comput Intell 6(2):355\u2013364. https:\/\/doi.org\/10.1109\/TETCI.2021.3074147","journal-title":"IEEE Trans Emerg Top Comput Intell"},{"issue":"1\u20134","key":"10247_CR275","doi-asserted-by":"publisher","first-page":"269","DOI":"10.1007\/s00170-013-4773-8","volume":"67","author":"L Yang-Kuei","year":"2013","unstructured":"Yang-Kuei L, Chi-Wei L (2013) Dispatching rules for unrelated parallel machine scheduling with release dates. Int J Adv Manuf Technol 67(1\u20134):269\u2013279. https:\/\/doi.org\/10.1007\/s00170-013-4773-8","journal-title":"Int J Adv Manuf Technol"},{"issue":"3","key":"10247_CR276","doi-asserted-by":"publisher","first-page":"1501","DOI":"10.1051\/ro\/2021062","volume":"55","author":"Zarook Yaser","year":"2021","unstructured":"Yaser Zarook, Javad Rezaeian, Iraj Mahdavi, Masoud Yaghini (2021) Efficient algorithms to minimize makespan of the unrelated parallel batch-processing machines scheduling problem with unequal job ready times. RAIRO-Oper Res 55(3):1501\u20131522. https:\/\/doi.org\/10.1051\/ro\/2021062","journal-title":"RAIRO-Oper Res"},{"key":"10247_CR277","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2019.112959","volume":"141","author":"JC Yepes-Borrero","year":"2020","unstructured":"Yepes-Borrero JC, Villa F, Perea F, Caballero-Villalobos JP (2020) Grasp algorithm for the unrelated parallel machine scheduling problem with setup times and additional resources. Exp Syst Appl 141:112959. https:\/\/doi.org\/10.1016\/j.eswa.2019.112959","journal-title":"Exp Syst Appl"},{"issue":"2","key":"10247_CR278","doi-asserted-by":"publisher","first-page":"443","DOI":"10.1016\/j.ejor.2020.10.052","volume":"292","author":"JC Yepes-Borrero","year":"2021","unstructured":"Yepes-Borrero JC, Perea F, Ruiz R, Villa F (2021) Bi-objective parallel machine scheduling with additional resources during setups. Eur J Oper Res 292(2):443\u2013455. https:\/\/doi.org\/10.1016\/j.ejor.2020.10.052","journal-title":"Eur J Oper Res"},{"key":"10247_CR279","unstructured":"Yildirim M, Duman E, Krishnan K, Senniappan K (2007) Parallel machine scheduling with load balancing and sequence dependent setups. Int J Oper Res (Taichung) 1"},{"key":"10247_CR280","first-page":"3279","volume":"8","author":"K-C Ying","year":"2012","unstructured":"Ying K-C, Lin S-W (2012) Unrelated parallel machine scheduling with sequence-and machine-dependent setup times and due date constraints. Int J Innov Comput Inf Control 8:3279\u20133297","journal-title":"Int J Innov Comput Inf Control"},{"issue":"5","key":"10247_CR281","doi-asserted-by":"publisher","first-page":"1795","DOI":"10.1007\/s10845-010-0483-3","volume":"23","author":"K-C Ying","year":"2010","unstructured":"Ying K-C, Lee Z-J, Lin S-W (2010) Makespan minimization for scheduling unrelated parallel machines with setup times. J Intell Manuf 23(5):1795\u20131803. https:\/\/doi.org\/10.1007\/s10845-010-0483-3","journal-title":"J Intell Manuf"},{"key":"10247_CR282","doi-asserted-by":"publisher","unstructured":"Yu L, Shih HM, Pfund M, Carlyle WM, Fowler JW (2002) IIE Transactions 34(11):921\u2013931. https:\/\/doi.org\/10.1023\/a:1016185412209","DOI":"10.1023\/a:1016185412209"},{"issue":"9\u201312","key":"10247_CR283","doi-asserted-by":"publisher","first-page":"1487","DOI":"10.1007\/s00170-015-7215-y","volume":"81","author":"JR Zeidi","year":"2015","unstructured":"Zeidi JR, MohammadHosseini S (2015) Scheduling unrelated parallel machines with sequence-dependent setup times. Int J Adv Manuf Technol 81(9\u201312):1487\u20131496. https:\/\/doi.org\/10.1007\/s00170-015-7215-y","journal-title":"Int J Adv Manuf Technol"},{"issue":"9\u201310","key":"10247_CR284","doi-asserted-by":"publisher","first-page":"968","DOI":"10.1007\/s00170-006-0662-8","volume":"34","author":"Z Zhang","year":"2006","unstructured":"Zhang Z, Zheng L, Weng MX (2006) Dynamic parallel machine scheduling with mean weighted tardiness objective by q-learning. Int J Adv Manuf Technol 34(9\u201310):968\u2013980. https:\/\/doi.org\/10.1007\/s00170-006-0662-8","journal-title":"Int J Adv Manuf Technol"},{"key":"10247_CR285","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2021.114843","volume":"175","author":"L Zhang","year":"2021","unstructured":"Zhang L, Deng Q, Lin R, Gong G, Han W (2021) A combinatorial evolutionary algorithm for unrelated parallel machine scheduling problem with sequence and machine-dependent setup times, limited worker resources and learning effect. Exp Syst Appl 175:114843. https:\/\/doi.org\/10.1016\/j.eswa.2021.114843","journal-title":"Exp Syst Appl"},{"issue":"5","key":"10247_CR286","doi-asserted-by":"publisher","first-page":"790","DOI":"10.1109\/TSMC.2016.2616347","volume":"48","author":"X-L Zheng","year":"2018","unstructured":"Zheng X-L, Wang L (2018) A collaborative multiobjective fruit fly optimization algorithm for the resource constrained unrelated parallel machine green scheduling problem. IEEE Trans Syst Man Cybern: Syst 48(5):790\u2013800. https:\/\/doi.org\/10.1109\/TSMC.2016.2616347","journal-title":"IEEE Trans Syst Man Cybern: Syst"},{"key":"10247_CR287","doi-asserted-by":"publisher","first-page":"254","DOI":"10.1016\/j.amc.2018.04.024","volume":"334","author":"S Zhou","year":"2018","unstructured":"Zhou S, Xie J, Du N, Pang Y (2018) A random-keys genetic algorithm for scheduling unrelated parallel batch processing machines with different capacities and arbitrary job sizes. Appl Math Comput 334:254\u2013268. https:\/\/doi.org\/10.1016\/j.amc.2018.04.024","journal-title":"Appl Math Comput"},{"key":"10247_CR288","doi-asserted-by":"publisher","unstructured":"Zhou H, Li Z, Wu X (2007) Scheduling unrelated parallel machine to minimize total weighted tardiness using ant colony optimization. In: 2007 IEEE international conference on automation and logistics, pp 132\u2013136. https:\/\/doi.org\/10.1109\/ICAL.2007.4338544","DOI":"10.1109\/ICAL.2007.4338544"}],"container-title":["Artificial Intelligence Review"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10462-022-10247-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10462-022-10247-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10462-022-10247-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,3,26]],"date-time":"2023-03-26T18:19:57Z","timestamp":1679854797000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10462-022-10247-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,8,25]]},"references-count":288,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2023,4]]}},"alternative-id":["10247"],"URL":"https:\/\/doi.org\/10.1007\/s10462-022-10247-9","relation":{},"ISSN":["0269-2821","1573-7462"],"issn-type":[{"value":"0269-2821","type":"print"},{"value":"1573-7462","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,8,25]]},"assertion":[{"value":"25 August 2022","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"Not applicable","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflicts of interest\/Competing interests"}}]}}