{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,4]],"date-time":"2026-10-04T02:00:03Z","timestamp":1791079203984,"version":"4.1.0"},"reference-count":21,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2005,9,1]],"date-time":"2005-09-01T00:00:00Z","timestamp":1125532800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2005,9]]},"DOI":"10.1007\/s10479-005-2443-4","type":"journal-article","created":{"date-parts":[[2005,8,30]],"date-time":"2005-08-30T02:51:26Z","timestamp":1125370286000},"page":"21-52","source":"Crossref","is-referenced-by-count":52,"title":["Schedule Generation Schemes for the Job-Shop Problem with Sequence-Dependent Setup Times: Dominance Properties and Computational Analysis"],"prefix":"10.1007","volume":"138","author":[{"given":"Christian","family":"Artigues","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Pierre","family":"Lopez","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Pierre-Dimitri","family":"Ayache","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","reference":[{"key":"2443_CR1","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","volume":"34","author":"J. Adams","year":"1988","unstructured":"Adams, J., E. Balas, and D. Zawack. (1988). \u201cThe Shifting Bottleneck Procedure for Jobshop Scheduling.\u201d Management Science 34, 391\u2013401.","journal-title":"Management Science"},{"key":"2443_CR2","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1016\/S0305-0483(98)00042-5","volume":"27","author":"A. Allahverdi","year":"1999","unstructured":"Allahverdi, A., J.N.D. Gupta, and T. Aldowaisan. (1999). \u201cA Review of Scheduling Research Involving Setup Considerations.\u201d Omega 27, 219\u2013239.","journal-title":"Omega"},{"issue":"2","key":"2443_CR3","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1080\/09537280110069757","volume":"13","author":"C. Artigues","year":"2002","unstructured":"Artigues, C. and F. Roubellat. (2002). \u201cAn Efficient Algorithm for Operation Insertion in Practical Jobshop Schedules.\u201d Production Planning and Control 13(2), 175\u2013186.","journal-title":"Production Planning and Control"},{"key":"2443_CR4","unstructured":"Baker, K.R. (1974). Introduction to Sequencing and Scheduling. Wiley."},{"key":"2443_CR5","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1007\/BF01539706","volume":"18","author":"P. Brucker","year":"1996","unstructured":"Brucker, P. and O. Thiele. (1996). \u201cA Branch and Bound Method for the General-Shop Problem with Sequence-Dependent Setup Times.\u201d Operations Research Spektrum 18, 145\u2013161.","journal-title":"Operations Research Spektrum"},{"issue":"1","key":"2443_CR6","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1051\/ro:2000103","volume":"34","author":"J. Carlier","year":"2000","unstructured":"Carlier, J. and E. N\u00e9ron. (2000). \u201cAn Exact Method for Solving the Multi-Processor Flow-Shop.\u201d RAIRO Operations Research 34(1), 1\u201325.","journal-title":"RAIRO Operations Research"},{"key":"2443_CR7","unstructured":"Focacci, F., P. Laborie, and W. Nuijten. (2000). \u201cSolving Scheduling Problems With Setup Times and Alternative Resources.\u201d In Fifth International Conference on Artificial Intelligence Planning and Scheduling Breckenbridge, Colorado, pp. 92\u2013101."},{"issue":"4","key":"2443_CR8","doi-asserted-by":"crossref","first-page":"487","DOI":"10.1287\/opre.8.4.487","volume":"8","author":"B. Giffler","year":"1960","unstructured":"Giffler, B. and G.L. Thompson. (1960). \u201cAlgorithms for Solving Production Scheduling Problems.\u201d Operations Research 8(4), 487\u2013503.","journal-title":"Operations Research"},{"issue":"5","key":"2443_CR9","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1080\/00207548208947793","volume":"20","author":"S.K. Gupta","year":"1986","unstructured":"Gupta, S.K. (1986). \u201cN Jobs and m Machines Job-Shop Problems with Sequence-Dependent Set-up Times.\u201d International Journal of Production Research 20(5), 643\u2013656.","journal-title":"International Journal of Production Research"},{"key":"2443_CR10","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/S0167-6377(01)00104-3","volume":"29","author":"J. Hurink","year":"2001","unstructured":"Hurink, J. and S. Knust. (2001). \u201cList Scheduling in a Parallel Machine Environment with Precedence Constraints and Setup Times.\u201d Operations Research Letters 29, 231\u2013239.","journal-title":"Operations Research Letters"},{"issue":"7","key":"2443_CR11","doi-asserted-by":"crossref","first-page":"1503","DOI":"10.1080\/00207549408957019","volume":"32","author":"S.C. Kim","year":"1994","unstructured":"Kim, S.C. and P.M. Bobrowski. (1994). \u201cImpact of Sequence-Dependent Setup Time on Job Shop Scheduling Performance.\u201d International Journal of Production Research 32(7), 1503\u20131520.","journal-title":"International Journal of Production Research"},{"key":"2443_CR12","doi-asserted-by":"crossref","unstructured":"Kolisch, R. (1995). Project Scheduling Under Resource constraints. Physica-Verlag.","DOI":"10.1007\/978-3-642-50296-5"},{"key":"2443_CR13","doi-asserted-by":"crossref","first-page":"320","DOI":"10.1016\/0377-2217(95)00357-6","volume":"90","author":"R. Kolisch","year":"1996","unstructured":"Kolisch, R. (1996). \u201cSerial and Parallel Resource-Constrained Project Scheduling Methods Revisited: Theory and Computation.\u201d European Journal of Operational Research 90, 320\u2013333.","journal-title":"European Journal of Operational Research"},{"key":"2443_CR14","unstructured":"Noivo, J.A. and H. Ramalhinho-Louren\u00e7o. (1998). \u201cSolving Two Production Scheduling Problems with Sequence-Dependent Set-Up Times.\u201d Economic Working Paper Series n. 338, Department of Economics and Business, Universitat Pompeu Fabra."},{"key":"2443_CR15","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1016\/0167-6377(93)90089-Y","volume":"14","author":"I.M. Ovacik","year":"1993","unstructured":"Ovacik, I.M. and R. Uzsoy. (1993). \u201cWorst-Case Error Bounds for Parallel Machine Scheduling Problems with Bounded Sequence-Dependent Setup Times.\u201d Operations Research Letters 14, 251\u2013256.","journal-title":"Operations Research Letters"},{"key":"2443_CR16","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/0278-6125(94)90023-X","volume":"13","author":"I.M. Ovacik","year":"1994","unstructured":"Ovacik, I.M. and R. Uzsoy. (1994). \u201cExploiting Shop Floor Status Information to Schedule Complex Job Shops.\u201d Journal of Manufacturing Systems 13, 73\u201384.","journal-title":"Journal of Manufacturing Systems"},{"key":"2443_CR17","doi-asserted-by":"crossref","first-page":"167","DOI":"10.1016\/0167-6377(95)00057-7","volume":"18","author":"J.M.J. Schutten","year":"1996","unstructured":"Schutten, J.M.J. (1996). \u201cList Scheduling Revisited.\u201d Operations Research Letters 18, 167\u2013170.","journal-title":"Operations Research Letters"},{"key":"2443_CR18","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1023\/A:1018955929512","volume":"83","author":"J.M.J. Schutten","year":"1998","unstructured":"Schutten, J.M.J. (1998). \u201cPractical Job Shop Scheduling.\u201d Annals of Operations Research 83, 161\u2013178.","journal-title":"Annals of Operations Research"},{"issue":"2","key":"2443_CR19","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1051\/ro:1999110","volume":"33","author":"Y.N. Sotskov","year":"1999","unstructured":"Sotskov, Y.N., T. Tautenhahn, and F. Werner. (1999). \u201cOn the Application of Insertion Techniques for Job Shop Problems with Setup Times.\u201d RAIRO Operations Research 33(2), 209\u2013245.","journal-title":"RAIRO Operations Research"},{"key":"2443_CR20","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1016\/0377-2217(93)E0294-8","volume":"80","author":"A. Sprecher","year":"1995","unstructured":"Sprecher, A., R. Kolisch, and A. Drexl. (1995). \u201cSemi-Active, Active, and Non-Delay Schedules for the Resource-Constrained Project Scheduling Problem.\u201d European Journal of Operational Research 80, 94\u2013102.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"2443_CR21","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1080\/002077299292498","volume":"30","author":"W.-H. Yang","year":"1999","unstructured":"Yang, W.-H. and C.-J. Liao. (1999). \u201cSurvey of Scheduling Research Involving Setup Times.\u201d International Journal of Systems Science 30(2), 143\u2013155.","journal-title":"International Journal of Systems Science"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-005-2443-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-005-2443-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-005-2443-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T17:59:34Z","timestamp":1559152774000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-005-2443-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005,9]]},"references-count":21,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2005,9]]}},"alternative-id":["2443"],"URL":"https:\/\/doi.org\/10.1007\/s10479-005-2443-4","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2005,9]]}}}