{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,24]],"date-time":"2026-01-24T07:16:05Z","timestamp":1769238965145,"version":"3.49.0"},"reference-count":34,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2007,1,9]],"date-time":"2007-01-09T00:00:00Z","timestamp":1168300800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2007,2,8]]},"DOI":"10.1007\/s10479-006-0157-x","type":"journal-article","created":{"date-parts":[[2007,1,8]],"date-time":"2007-01-08T16:18:09Z","timestamp":1168273089000},"page":"177-192","source":"Crossref","is-referenced-by-count":70,"title":["Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company"],"prefix":"10.1007","volume":"150","author":[{"given":"Fabrizio","family":"Marinelli","sequence":"first","affiliation":[]},{"given":"Maria Elena","family":"Nenni","sequence":"additional","affiliation":[]},{"given":"Antonio","family":"Sforza","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2007,1,9]]},"reference":[{"key":"157_CR1","doi-asserted-by":"crossref","first-page":"1341","DOI":"10.1287\/mnsc.38.9.1341","volume":"38","author":"R.H. Ahmadi","year":"1992","unstructured":"Ahmadi, R.H., S. Dasu, and C.S. Tang. (1992). \u201cThe Dynamic Line Allocation Problem.\u201d Management Science, 38, 1341\u20131353.","journal-title":"Management Science"},{"key":"157_CR2","doi-asserted-by":"crossref","first-page":"329","DOI":"10.1287\/opre.35.3.329","volume":"35","author":"H.C. Bahl","year":"1987","unstructured":"Bahl, H.C., J.N.D. Gupta, and L.P. Ritzman. (1987). \u201cDetermining Lot Sizes and Resource Requirements: A Review.\u201d Operations Research, 35, 329\u2013345.","journal-title":"Operations Research"},{"key":"157_CR3","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1016\/S0305-0548(99)00035-0","volume":"27","author":"J.B. Bankston","year":"2000","unstructured":"Bankston, J.B. and R.M. Harnett. (2000). \u201cAn Heuristic Algorithm for A Multi-Product, Single Machine Capacitated Production Scheduling Problem.\u201d Computers and Operations Research, 27, 77\u201392.","journal-title":"Computers and Operations Research"},{"issue":"10","key":"157_CR4","doi-asserted-by":"crossref","first-page":"1255","DOI":"10.1287\/mnsc.30.10.1255","volume":"30","author":"I. Barany","year":"1984","unstructured":"Barany, I., T.J. van Roy, and L.A. Wolsey. (1984). \u201cStrong Formulations for Multi-Item Capacitated Lot Sizing.\u201d Management Science, 30(10), 1255\u20131261.","journal-title":"Management Science"},{"key":"157_CR5","doi-asserted-by":"crossref","first-page":"38","DOI":"10.1016\/0377-2217(90)90296-N","volume":"46","author":"D. Cattrysse","year":"1990","unstructured":"Cattrysse, D., J. Maes, and L.N. van Wassenhove. (1990). \u201cSet Partitioning and Column Generation Heuristics for Capacitated Dynamic Lot Sizing.\u201d European Journal of Operational Research, 46, 38\u201347.","journal-title":"European Journal of Operational Research"},{"key":"157_CR6","doi-asserted-by":"crossref","first-page":"477","DOI":"10.1287\/mnsc.39.4.477","volume":"39","author":"D. Cattrysse","year":"1993","unstructured":"Cattrysse, D., R. Kuik, M. Salomon, and L.N. van Wassenhove. (1993). \u201cA Dual Ascent and Column Generation Heuristic for the Discrete Lot Sizing and Scheduling Problem with Set-up Times.\u201d Management Science, 39, 477\u2013486.","journal-title":"Management Science"},{"key":"157_CR7","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1007\/BF02248584","volume":"26","author":"W.-H. Chen","year":"1990","unstructured":"Chen, W.-H. and J.-M. Thizy. (1990). \u201cAnalysis of Relaxations for the Multi-item Capacitated Lot Sizing Problem.\u201d Annals of Operations Research, 26, 29\u201372.","journal-title":"Annals of Operations Research"},{"key":"157_CR8","doi-asserted-by":"crossref","unstructured":"Cheng, T.C.E. and C.C.S. Sin. (1990). \u201cA State-of-the-art Review of Parallel-machine Scheduling Research.\u201d European Journal of Operational Research, 47, 271\u2013292.","DOI":"10.1016\/0377-2217(90)90215-W"},{"key":"157_CR9","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1016\/0377-2217(94)90330-1","volume":"72","author":"R. De Matta","year":"1994","unstructured":"De Matta, R. and M. Guignard. (1994). \u201cStudying the Effects of Production Loss Due to Set-up in Dynamic Production Scheduling.\u201d European Journal of Operational Research, 72, 62\u201373.","journal-title":"European Journal of Operational Research"},{"key":"157_CR10","doi-asserted-by":"crossref","first-page":"564","DOI":"10.1080\/07408179508936772","volume":"27","author":"R. De Matta","year":"1995","unstructured":"De Matta, R. and M. Guignard. (1995). \u201cThe Performance of Rolling Production Schedules in a Process Industry.\u201d IIE Transactions, 27, 564\u2013573.","journal-title":"IIE Transactions"},{"issue":"3","key":"157_CR11","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1016\/S0925-5273(00)00021-9","volume":"67","author":"M. Diaby","year":"2000","unstructured":"Diaby, M. (2000). \u201cIntegrated Batch Size and Set-up Reduction Decisions in Multi-product, Dynamic Manufacturing Environments.\u201d International Journal of Production Economics, 67(3), 219\u2013233.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"157_CR12","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/S0377-2217(97)00030-1","volume":"99","author":"A. Drexl","year":"1997","unstructured":"Drexl, A. and A. Kimms. (1997). \u201cLot Sizing and Scheduling\u2014Survey and Extensions.\u201d European Journal of Operational Research, 99(2), 221\u2013235.","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"157_CR13","doi-asserted-by":"crossref","first-page":"698","DOI":"10.1287\/mnsc.44.5.698","volume":"44","author":"A. Drexl","year":"1998","unstructured":"Drexl, A. and C. Jordan. (1998). \u201cDiscrete Lot Sizing and Scheduling by Batch Sequencing.\u201d Management Science, 44(5), 698\u2013713.","journal-title":"Management Science"},{"key":"157_CR14","doi-asserted-by":"crossref","first-page":"587","DOI":"10.1287\/mnsc.24.6.587","volume":"24","author":"S.E. Elmaghraby","year":"1978","unstructured":"Elmaghraby, S.E. (1978). \u201cThe Economic Lot Scheduling Problem (ELSP): Review and Extensions.\u201d Management Science, 24, 587\u2013598.","journal-title":"Management Science"},{"issue":"6","key":"157_CR15","doi-asserted-by":"crossref","first-page":"832","DOI":"10.1287\/opre.35.6.832","volume":"35","author":"G.D. Eppen","year":"1987","unstructured":"Eppen, G.D. and R. Kipp Martin. (1987). \u201cSolving Multi-item Capacitated Lot Sizing Problems Using Variable Redefinition.\u201d Operations Research 35(6), 832\u2013848.","journal-title":"Operations Research"},{"issue":"1","key":"157_CR16","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1007\/BF01539800","volume":"19","author":"B. Fleishmann","year":"1997","unstructured":"Fleishmann, B., and H. Meyr. (1997). \u201cThe General Lot Sizing and Scheduling Problem.\u201d OR Spektrum 19(1), 11\u201321.","journal-title":"OR Spektrum"},{"key":"157_CR17","doi-asserted-by":"crossref","unstructured":"Gelders, L.F., J. Maes, and L.N. van Wassenhove. (1986). \u201cA Branch and Bound Algorithm for the Multi-item Single Level Capacitated Dynamic Lot Sizing Problem.\u201d In S. Axsater, C. Scheeweiss, and E. Silver (Eds), Multi-stage Production Planning and Inventory Control, Lecture Notes in Economic and Mathematical Systems, vol. 226, pp. 92\u2013108, (Berlin: Springer-Verlag).","DOI":"10.1007\/978-3-642-51693-1_5"},{"key":"157_CR18","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1007\/BF01539882","volume":"18","author":"K. Haase","year":"1996","unstructured":"Haase, K. (1996). \u201cCapacitated Lot Sizing with Sequence Dependent Setup Costs.\u201d OR Spektrum, 18, 51\u201359.","journal-title":"OR Spektrum"},{"key":"157_CR19","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1057\/jors.1996.13","volume":"47","author":"K.S. Hindi","year":"1996","unstructured":"Hindi, K.S. (1996). \u201cSolving the CLSP by a Tabu Search Heuristic.\u201d Journal of the Operational Research Society, 47, 151\u2013161.","journal-title":"Journal of the Operational Research Society"},{"key":"157_CR20","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1287\/mnsc.45.2.273","volume":"45","author":"S. Kang","year":"1999","unstructured":"Kang, S., K. Malik, and L.J. Thomas. (1999). \u201cLot Sizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs.\u201d Management Science, 45, 273\u2013289.","journal-title":"Management Science"},{"key":"157_CR21","doi-asserted-by":"crossref","first-page":"332","DOI":"10.1016\/0377-2217(94)90078-7","volume":"75","author":"\u00d6mer Kirca","year":"1994","unstructured":"Kirca, \u00d6mer. and M. K\u00f6kten. (1994). \u201cA New Heuristic Approach for the Multi-item Dynamic Lot Sizing Problem.\u201d European Journal of Operational Research, 75, 332\u2013341.","journal-title":"European Journal of Operational Research"},{"issue":"11","key":"157_CR22","doi-asserted-by":"crossref","first-page":"1145","DOI":"10.1057\/jors.1993.186","volume":"44","author":"R.C. Leachman","year":"1993","unstructured":"Leachman, R.C., A. Gascon, and Z.K. Xiong. (1993). \u201cMulti-item Single-machine Scheduling with Material Supply Constraints.\u201d Journal of Operational Research Society, 44(11), 1145\u20131153.","journal-title":"Journal of Operational Research Society"},{"key":"157_CR23","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1016\/0377-2217(91)90130-N","volume":"53","author":"J. Maes","year":"1991","unstructured":"Maes, J., J.O. McClain, L.N. van Wassenhove. (1991). \u201cMultilevel Capacitated Lot Sizing Complexity and LP Based Heuristics.\u201d European Journal of Operational Research, 53, 131\u2013148.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"157_CR24","doi-asserted-by":"crossref","first-page":"456","DOI":"10.1287\/opre.38.3.456","volume":"38","author":"T.L. Magnanti","year":"1990","unstructured":"Magnanti, T.L. and R. Vachani. (1990). \u201cA Strong Cutting Plane Algorithm for Production Scheduling with Changeover Costs.\u201d Operations Research, 38(3), 456\u2013473.","journal-title":"Operations Research"},{"issue":"2","key":"157_CR25","doi-asserted-by":"crossref","first-page":"311","DOI":"10.1016\/S0377-2217(99)00159-9","volume":"120","author":"H. Meyr","year":"2000","unstructured":"Meyr, H. (2000). \u201cSimultaneous Lot Sizing and Scheduling by Combining Local Search with Dual Reoptimization.\u201d European Journal of Operational Research, 120(2), 311\u2013326.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"157_CR26","doi-asserted-by":"crossref","first-page":"277","DOI":"10.1016\/S0377-2217(01)00373-3","volume":"139","author":"H. Meyr","year":"2002","unstructured":"Meyr, H. (2002). \u201cSimultaneous Lot Sizing and Scheduling on Parallel Machines.\u201d European Journal of Operational Research, 139(2), 277\u2013292.","journal-title":"European Journal of Operational Research"},{"key":"157_CR27","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1287\/mnsc.4.3.264","volume":"4","author":"J. Rogers","year":"1958","unstructured":"Rogers, J. (1958). \u201cA Computational Approach to the Economic Lot Scheduling Problem.\u201d Management Science, 4, 264\u2013291.","journal-title":"Management Science"},{"key":"157_CR28","doi-asserted-by":"crossref","first-page":"278","DOI":"10.1080\/07408178608974705","volume":"18","author":"V.L. Smith-Daniels","year":"1986","unstructured":"Smith-Daniels, V.L. and D.E. Smith-Daniels. (1986). \u201cA Mixed-integer Programming Model for Lot Sizing and Sequencing Packaging Lines in the Process Industries.\u201d IIE Transactions, 18, 278\u2013285.","journal-title":"IIE Transactions"},{"issue":"2","key":"157_CR29","first-page":"173","volume":"31","author":"C.R. Sox","year":"1999","unstructured":"Sox, C.R. and Y. Gao. (1999). \u201cThe Capacitated Lot Sizing Problem with Setup Carry-over.\u201d IIE Transactions, 31(2), 173\u2013181.","journal-title":"IIE Transactions"},{"issue":"1","key":"157_CR30","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1016\/S0377-2217(99)00031-4","volume":"121","author":"C.S. Sung","year":"2000","unstructured":"Sung, C.S., Y.H. Kim, and S.H. Yoon. (2000). \u201cA Problem Reduction and Decomposition Approach for Scheduling for A Flowshop of Batch Processing Machines.\u201d European Journal of Operational Research, 121(1), 179\u2013192.","journal-title":"European Journal of Operational Research"},{"key":"157_CR31","doi-asserted-by":"crossref","first-page":"7","DOI":"10.1016\/S0167-6377(96)00043-0","volume":"20","author":"C.A. van Eijl","year":"1997","unstructured":"van Eijl, C.A. and C.P.M. van Hoesel. (1997). \u201cOn the Discrete Lot Sizing and Scheduling Problem with Wagner-Whitin Costs.\u201d Operations Research Letters, 20, 7\u201313.","journal-title":"Operations Research Letters"},{"key":"157_CR32","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1287\/mnsc.5.1.89","volume":"5","author":"H.M. Wagner","year":"1958","unstructured":"Wagner, H.M. and T.M. Whitin. (1958). \u201cDynamic Version of the Economic Lot Size Model.\u201d Management Science, 5, 89\u201396.","journal-title":"Management Science"},{"issue":"1","key":"157_CR33","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1111\/j.1937-5956.1992.tb00341.x","volume":"1","author":"D.L. Woodruff","year":"1992","unstructured":"Woodruff, D.L. and M.L. Spearman. (1992). \u201cSequencing and Batching for Two Classes of Jobs with Deadlines and Setup Times.\u201d Production and Operations Management, 1(1), 87\u2013102.","journal-title":"Production and Operations Management"},{"key":"157_CR34","unstructured":"The milk and dairy products market in 2002, research notes by Ismea and the Osservatorio Latte di Cremona."}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-006-0157-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-006-0157-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-006-0157-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T14:07:37Z","timestamp":1559138857000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-006-0157-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,1,9]]},"references-count":34,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2007,2,8]]}},"alternative-id":["157"],"URL":"https:\/\/doi.org\/10.1007\/s10479-006-0157-x","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,1,9]]}}}