{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,28]],"date-time":"2026-04-28T13:38:16Z","timestamp":1777383496782,"version":"3.51.4"},"reference-count":19,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2007,7,7]],"date-time":"2007-07-07T00:00:00Z","timestamp":1183766400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2007,8,22]]},"DOI":"10.1007\/s10479-007-0212-2","type":"journal-article","created":{"date-parts":[[2007,7,17]],"date-time":"2007-07-17T02:21:41Z","timestamp":1184638901000},"page":"167-176","source":"Crossref","is-referenced-by-count":19,"title":["A branch-and-price approach for large-scale employee tour scheduling problems"],"prefix":"10.1007","volume":"155","author":[{"given":"Hua","family":"Ni","sequence":"first","affiliation":[]},{"given":"Hern\u00e1n","family":"Abeledo","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2007,7,7]]},"reference":[{"key":"212_CR1","unstructured":"ABACUS (1999). ABACUS 2.3. User\u2019s guide and reference manual. http:\/\/www.informatik.uni-koeln.de\/abacus\/ ."},{"key":"212_CR2","doi-asserted-by":"crossref","first-page":"745","DOI":"10.1016\/S0305-0548(02)00048-5","volume":"30","author":"J. F. Bard","year":"2003","unstructured":"Bard, J. F., Binici, C., & deSilva, A. H. (2003). Staff scheduling at the united states postal service. Computers and Operations Research, 30, 745\u2013771.","journal-title":"Computers and Operations Research"},{"key":"212_CR3","doi-asserted-by":"crossref","first-page":"501","DOI":"10.1287\/opre.29.3.501","volume":"29","author":"J. J. Bartholdi","year":"1981","unstructured":"Bartholdi, J. J. (1981). A guaranteed-accuracy round-off algorithm for cyclic scheduling and set covering. Operations Research, 29, 501\u2013510.","journal-title":"Operations Research"},{"key":"212_CR4","doi-asserted-by":"crossref","first-page":"1339","DOI":"10.1287\/mnsc.36.11.1339","volume":"36","author":"S. E. Bechtold","year":"1990","unstructured":"Bechtold, S. E., & Jacobs, L. W. (1990). Implicit modeling of flexible break assignments in optimal shift scheduling. Management Science, 36, 1339\u20131351.","journal-title":"Management Science"},{"key":"212_CR5","doi-asserted-by":"crossref","first-page":"683","DOI":"10.1111\/j.1540-5915.1991.tb00359.x","volume":"22","author":"S. E. Bechtold","year":"1991","unstructured":"Bechtold, S. E., Brusco, M. J., & Showalter, M. J. (1991). A comparative evaluation of labor tour scheduling methods. Decision Sciences, 22, 683\u2013699.","journal-title":"Decision Sciences"},{"key":"212_CR6","doi-asserted-by":"crossref","first-page":"540","DOI":"10.1016\/0377-2217(94)90230-5","volume":"74","author":"S. E. Bechtold","year":"1994","unstructured":"Bechtold, S. E., & Brusco, M. J. (1994). Working set generation methods for labor tour scheduling. European Journal of Operational Research, 74, 540\u2013551.","journal-title":"European Journal of Operational Research"},{"key":"212_CR7","doi-asserted-by":"crossref","first-page":"534","DOI":"10.1287\/mnsc.44.4.534","volume":"44","author":"M. J. Brusco","year":"1998","unstructured":"Brusco, M. J., & Jacobs, L. W. (1998). Personnel tour scheduling when starting-time restriction are present. Management Science, 44, 534\u2013547.","journal-title":"Management Science"},{"key":"212_CR8","doi-asserted-by":"crossref","first-page":"1630","DOI":"10.1287\/mnsc.46.12.1630.12074","volume":"46","author":"M. J. Brusco","year":"2000","unstructured":"Brusco, M. J., & Jacobs, L. W. (2000). Optimal models for meal-break and start-time flexibility in continuous tour scheduling. Management Science, 46, 1630\u20131641.","journal-title":"Management Science"},{"key":"212_CR9","doi-asserted-by":"crossref","first-page":"599","DOI":"10.1287\/mnsc.31.5.599","volume":"31","author":"R. N. Burns","year":"1985","unstructured":"Burns, R. N., & Carter, M. W. (1985). Work force size and single shift schedules with variable demands. Management Science, 31, 599\u2013607.","journal-title":"Management Science"},{"key":"212_CR10","doi-asserted-by":"crossref","first-page":"607","DOI":"10.1002\/nav.1037","volume":"48","author":"T. Cezik","year":"2001","unstructured":"Cezik, T., Gunluk, O., & Luss, H. (2001). An integer programming model for the weekly tour scheduling problem. Naval Research Logistics, 48, 607\u2013624.","journal-title":"Naval Research Logistics"},{"key":"212_CR11","first-page":"339","volume":"3","author":"G. B. Dantzig","year":"1954","unstructured":"Dantzig, G. B. (1954). A comment on Edie\u2019s traffic delays at toll booths. Operations Research Journal, 3, 339\u2013341.","journal-title":"Operations Research Journal"},{"key":"212_CR12","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1023\/B:ANOR.0000019100.08333.a7","volume":"128","author":"M. W. Isken","year":"2004","unstructured":"Isken, M. W. (2004). An implicit tour scheduling model with applications in health care. Annals of Operations Research, 128, 91\u2013110.","journal-title":"Annals of Operations Research"},{"key":"212_CR13","doi-asserted-by":"crossref","first-page":"1247","DOI":"10.1287\/mnsc.42.9.1247","volume":"42","author":"L. W. Jacobs","year":"1996","unstructured":"Jacobs, L. W., & Brusco, M. J. (1996). Overlapping start-time bands in implicit tour scheduling. Management Science, 42, 1247\u20131259.","journal-title":"Management Science"},{"key":"212_CR14","doi-asserted-by":"crossref","first-page":"1124","DOI":"10.1287\/mnsc.40.9.1124","volume":"40","author":"A. I. Z. Jarrah","year":"1994","unstructured":"Jarrah, A. I. Z., Bard, J. F., & deSilva, A. H. (1994). Solving large-scale tour scheduling problems. Management Science, 40, 1124\u20131144.","journal-title":"Management Science"},{"issue":"2","key":"212_CR15","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1016\/0272-6963(90)90096-V","volume":"9","author":"V. A. Mabert","year":"1988","unstructured":"Mabert, V. A., & Showalter, M. J. (1988). Measuring the impact of part-time workers in service organizations. Journal of Operations Management, 9(2), 209\u2013229.","journal-title":"Journal of Operations Management"},{"key":"212_CR16","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1002\/(SICI)1520-6750(200004)47:3<185::AID-NAV1>3.0.CO;2-7","volume":"47","author":"A. Mehrotra","year":"2000","unstructured":"Mehrotra, A., Murphy, K. E., & Trick, M. A. (2000). Optimal shift scheduling: a branch-and-price approach. Naval Research Logistics, 47, 185\u2013200.","journal-title":"Naval Research Logistics"},{"key":"212_CR17","first-page":"299","volume":"7","author":"S. L. Moondra","year":"1976","unstructured":"Moondra, S. L. (1976). An LP model for work force scheduling for banks. Journal of Bank Research, 7, 299\u2013301.","journal-title":"Journal of Bank Research"},{"key":"212_CR18","doi-asserted-by":"crossref","first-page":"942","DOI":"10.1287\/mnsc.29.8.942","volume":"29","author":"J. G. Morris","year":"1983","unstructured":"Morris, J. G., & Showalter, M. J. (1983). Simple approaches to shift, days-off and tour scheduling problems. Management Science, 29, 942\u2013950.","journal-title":"Management Science"},{"key":"212_CR19","unstructured":"Ni, H. (2003). A branch-and-price approach to employee tour scheduling. D.Sc. thesis, The George Washington University, Washington DC, USA."}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-007-0212-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-007-0212-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-007-0212-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T18:07:42Z","timestamp":1559153262000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-007-0212-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,7,7]]},"references-count":19,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2007,8,22]]}},"alternative-id":["212"],"URL":"https:\/\/doi.org\/10.1007\/s10479-007-0212-2","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,7,7]]}}}