{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,2,15]],"date-time":"2023-02-15T18:36:00Z","timestamp":1676486160458},"reference-count":15,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2007,11,14]],"date-time":"2007-11-14T00:00:00Z","timestamp":1194998400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2008,11]]},"DOI":"10.1007\/s10479-007-0258-1","type":"journal-article","created":{"date-parts":[[2007,11,13]],"date-time":"2007-11-13T09:29:12Z","timestamp":1194946152000},"page":"63-78","source":"Crossref","is-referenced-by-count":9,"title":["A Petri Net based algorithm for minimizing total tardiness in flexible manufacturing systems"],"prefix":"10.1007","volume":"164","author":[{"given":"Gonzalo","family":"Mej\u00eda","sequence":"first","affiliation":[]},{"given":"Carlos","family":"Montoya","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2007,11,14]]},"reference":[{"key":"258_CR1","volume-title":"Introduction to sequencing and scheduling","author":"K. R. Baker","year":"1974","unstructured":"Baker, K. R. (1974). Introduction to sequencing and scheduling. New York: Wiley."},{"key":"258_CR2","first-page":"158","volume":"22","author":"P. Brandimarte","year":"1993","unstructured":"Brandimarte, P. (1993). Routing and scheduling in a flexible job shop by tabu search. Annals of Operations Research, 22, 158\u2013183.","journal-title":"Annals of Operations Research"},{"key":"258_CR3","doi-asserted-by":"crossref","first-page":"139","DOI":"10.1023\/A:1008097430956","volume":"10","author":"M. D. Jeng","year":"1998","unstructured":"Jeng, M. D., & Chen, S. C. (1998). A\u00a0heuristic search approach using approximate solutions to Petri Net state equations for scheduling flexible manufacturing systems. The International Journal of Flexible Manufacturing Systems, 10, 139\u2013162.","journal-title":"The International Journal of Flexible Manufacturing Systems"},{"issue":"2","key":"258_CR4","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1109\/70.282537","volume":"10","author":"D. Y. Lee","year":"1994","unstructured":"Lee, D. Y., & DiCesare, F. (1994). Scheduling flexible manufacturing systems using Petri Nets and heuristic search. IEEE Transactions on Robotics and Automation, 10(2), 123\u2013131.","journal-title":"IEEE Transactions on Robotics and Automation"},{"key":"258_CR5","doi-asserted-by":"crossref","unstructured":"Mej\u00eda, G. (2003). Timed Petri Net modeling and optimization with heuristic search for flexible manufacturing workstations. In Proceedings of the 2003 IEEE emerging technologies and factory automation (ETFA), Lisbon, Portugal, September 16\u201319, 2003.","DOI":"10.1109\/ETFA.2003.1247708"},{"issue":"2","key":"258_CR6","doi-asserted-by":"crossref","first-page":"79","DOI":"10.1016\/S0278-6125(05)80009-3","volume":"34","author":"G. Mej\u00eda","year":"2005","unstructured":"Mej\u00eda, G., & Odrey, N. (2005). An approach using Petri Nets and improved heuristic search for manufacturing system scheduling. Journal of Manufacturing Systems, 34(2), 79\u201392.","journal-title":"Journal of Manufacturing Systems"},{"issue":"11","key":"258_CR7","doi-asserted-by":"crossref","first-page":"3001","DOI":"10.1080\/00207549608905075","volume":"34","author":"K. E. Moore","year":"1996","unstructured":"Moore, K. E., & Gupta, S. M. (1996). Petri Net models of flexible and automated manufacturing systems: A\u00a0survey. International Journal of Production Research, 34(11), 3001\u20133035.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"258_CR8","doi-asserted-by":"crossref","first-page":"541","DOI":"10.1109\/5.24143","volume":"77","author":"T. Murata","year":"1989","unstructured":"Murata, T. (1989). Petri Nets: Properties, analysis and applications. Proceedings of the IEEE, 77(4), 541\u2013580.","journal-title":"Proceedings of the IEEE"},{"key":"258_CR9","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1080\/00207548808947840","volume":"26","author":"P. S. Ow","year":"1988","unstructured":"Ow, P. S., & Morton, T. E. (1988). Filtered beam search in scheduling. International Journal of Production Research, 26, 35\u201362.","journal-title":"International Journal of Production Research"},{"key":"258_CR10","volume-title":"Operations scheduling with applications in manufacturing and services","author":"M. Pinedo","year":"1999","unstructured":"Pinedo, M., & Chao, X. (1999). Operations scheduling with applications in manufacturing and services. New York: McGraw-Hill."},{"key":"258_CR11","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1016\/S0166-3615(01)00124-5","volume":"47","author":"A. Reyes-Moro","year":"2002","unstructured":"Reyes-Moro, A., Yu, H., Kelleher, G., & Lloyd, S. (2002). Integrating Petri Nets and hybrid heuristic search for the scheduling of FMS. Computers in Industry, 47, 123\u2013138.","journal-title":"Computers in Industry"},{"key":"258_CR12","volume-title":"Artificial intelligence: A\u00a0modern approach","author":"S. Russell","year":"1995","unstructured":"Russell, S., & Norvig, P. (1995). Artificial intelligence: A\u00a0modern approach. Englewood Cliffs: Prentice-Hall."},{"issue":"2","key":"258_CR13","doi-asserted-by":"crossref","first-page":"390","DOI":"10.1016\/S0377-2217(98)00319-1","volume":"118","author":"I. Sabuncuoglu","year":"1999","unstructured":"Sabuncuoglu, I., & Bayiz, M. (1999). Job shop scheduling with Beam search. European Journal of Operational Research, 118(2), 390\u2013412.","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"258_CR14","doi-asserted-by":"crossref","first-page":"593","DOI":"10.1109\/41.334576","volume":"41","author":"T. Sun","year":"1994","unstructured":"Sun, T., Cheng, W., & Fu, L. (1994). A Petri Net based approach to modeling and scheduling for an FMS and a case study. IEEE Transactions on Industrial Electronics, 41(6), 593\u2013601.","journal-title":"IEEE Transactions on Industrial Electronics"},{"issue":"3","key":"258_CR15","doi-asserted-by":"crossref","first-page":"384","DOI":"10.1109\/66.705373","volume":"11","author":"H. H. Xiong","year":"1998","unstructured":"Xiong, H. H., & Zhou, M. C. (1998). Scheduling of semi-conductor test facility via Petri Nets and hybrid heuristic search. IEEE Transactions on Semiconductor Manufacturing, 11(3), 384\u2013393.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-007-0258-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-007-0258-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-007-0258-1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T14:07:43Z","timestamp":1559138863000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-007-0258-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,11,14]]},"references-count":15,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2008,11]]}},"alternative-id":["258"],"URL":"https:\/\/doi.org\/10.1007\/s10479-007-0258-1","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,11,14]]}}}