{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,6]],"date-time":"2026-10-06T01:33:58Z","timestamp":1791250438592,"version":"4.1.0"},"reference-count":46,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2007,12,1]],"date-time":"2007-12-01T00:00:00Z","timestamp":1196467200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2008,3]]},"DOI":"10.1007\/s10479-007-0283-0","type":"journal-article","created":{"date-parts":[[2007,11,30]],"date-time":"2007-11-30T11:05:17Z","timestamp":1196420717000},"page":"135-159","source":"Crossref","is-referenced-by-count":64,"title":["A branch and bound method for the job-shop problem with sequence-dependent setup times"],"prefix":"10.1007","volume":"159","author":[{"given":"Christian","family":"Artigues","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Dominique","family":"Feillet","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2007,12,1]]},"reference":[{"key":"283_CR1","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","volume":"34","author":"J. Adams","year":"1988","unstructured":"Adams, J., Balas, E., & Zawack, D. (1988). The shifting bottleneck procedure for job-shop scheduling. Management Science, 34, 391\u2013401.","journal-title":"Management Science"},{"key":"283_CR2","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1016\/S0305-0483(98)00042-5","volume":"27","author":"A. Allahverdi","year":"1999","unstructured":"Allahverdi, A., Gupta, J. N. D., & Aldowaisan, T. (1999). A review of scheduling research involving setup considerations. Omega, 27, 219\u2013239.","journal-title":"Omega"},{"key":"283_CR3","series-title":"Lecture notes in computer science","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1007\/978-3-540-24664-0_3","volume-title":"1st international conference on integration of AI and OR techniques in constraint programming for combinatorial optimization problems","author":"C. Artigues","year":"2004","unstructured":"Artigues, C., Belmokhtar, S., & Feillet, D. (2004). A new exact solution algorithm for the job shop problem with sequence-dependent setup times. In J. C. R\u00e9gin & M. Rueher (Eds.), 1st international conference on integration of AI and OR techniques in constraint programming for combinatorial optimization problems : Vol. 3011. Lecture notes in computer science (pp. 37\u201349). Berlin: Springer."},{"key":"283_CR4","unstructured":"Artigues, C., Buscaylet, F., & Feillet, D. (2005a). Lower and upper bound for the job shop scheduling problem with sequence-dependent setup times. In Proceedings of the second multidisciplinary international conference on scheduling: theory and applications (MISTA\u20192005). New York."},{"issue":"1","key":"283_CR5","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1007\/s10479-005-2443-4","volume":"138","author":"C. Artigues","year":"2005","unstructured":"Artigues, C., Lopez, P., & Ayache, P. D. (2005b). Schedule generation schemes and priority rules for the job-shop problem with sequence-dependent setup times: Dominance properties and computational analysis. Annals of Operations Research, 138(1), 21\u201352.","journal-title":"Annals of Operations Research"},{"key":"283_CR6","unstructured":"Balas, E. (1996). New classes of efficiently solvable generalized traveling salesman problems (Technical Report #MSRR-615). Graduate School of Industrial Administration, Carnegie Mellon University."},{"key":"283_CR7","doi-asserted-by":"crossref","first-page":"56","DOI":"10.1287\/ijoc.13.1.56.9748","volume":"13","author":"E. Balas","year":"2001","unstructured":"Balas, E., & Simonetti, N. (2001). Linear time dynamic programming algorithms for new classes of restricted TSPs. INFORMS, Journal on Computing, 13, 56\u201375.","journal-title":"INFORMS, Journal on Computing"},{"key":"283_CR8","unstructured":"Balas, E., Simonetti, N., & Vazacopoulos, A. (2005). Job shop scheduling with setup-times, deadlines and precedence constraints. In Proceedings of the second multidisciplinary international conference on scheduling: theory and applications (MISTA\u20192005). New York."},{"key":"283_CR9","series-title":"International series in operations research & management science","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-1479-4","volume-title":"Constraint-based scheduling","author":"P. Baptiste","year":"2001","unstructured":"Baptiste, P., Le Pape, C., & Nuijten, W. (2001). In Constraint-based scheduling : Vol. 39. International series in operations research & management science. Berlin: Springer."},{"issue":"1","key":"283_CR10","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0377-2217(95)00362-2","volume":"93","author":"J. Blazewicz","year":"1996","unstructured":"Blazewicz, J., Domschke, W., & Pesch, E. (1996). The job shop scheduling problem: Conventional and new solution techniques. European Journal of Operational Research, 93(1), 1\u201333.","journal-title":"European Journal of Operational Research"},{"key":"283_CR11","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1007\/BF01539706","volume":"18","author":"P. Brucker","year":"1996","unstructured":"Brucker, P., & Thiele, O. (1996). A branch and bound method for the general-shop problem with sequence-dependent setup times. Operations Research Spektrum, 18, 145\u2013161.","journal-title":"Operations Research Spektrum"},{"key":"283_CR12","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1007\/BF02085636","volume":"50","author":"P. Brucker","year":"1994","unstructured":"Brucker, P., Jurisch, P., & Kr\u00e4mer, A. (1994a). The job-shop problem and immediate selection. Annals of Operations Research, 50, 73\u2013114.","journal-title":"Annals of Operations Research"},{"key":"283_CR13","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1016\/0166-218X(94)90204-6","volume":"49","author":"P. Brucker","year":"1994","unstructured":"Brucker, P., Jurisch, P., & Sievers, B. (1994b). A fast branch and bound algorithm for the job-shop scheduling problem. Discrete Applied Mathematics, 49, 107\u2013127.","journal-title":"Discrete Applied Mathematics"},{"key":"283_CR14","unstructured":"Buscaylet, F., & Artigues, C. (2003). A fast tabu search method for the job-shop problem with sequence-dependent setup times. In Metaheuristic international conference MIC\u20192003."},{"issue":"12","key":"283_CR15","doi-asserted-by":"crossref","first-page":"3437","DOI":"10.1080\/002075498192148","volume":"36","author":"M. A. B. Candido","year":"1998","unstructured":"Candido, M. A. B., Khator, S. K., & Barcias, R. M. (1998). A genetic algorithm based procedure for more realistic job shop scheduling problems. International Journal of Production Research, 36(12), 3437\u20133457.","journal-title":"International Journal of Production Research"},{"key":"283_CR16","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1016\/S0377-2217(82)80007-6","volume":"11","author":"J. Carlier","year":"1982","unstructured":"Carlier, J. (1982). The one machine sequencing problem. European Journal of Operational Research, 11, 42\u201347.","journal-title":"European Journal of Operational Research"},{"key":"283_CR17","doi-asserted-by":"crossref","first-page":"164","DOI":"10.1287\/mnsc.35.2.164","volume":"35","author":"J. Carlier","year":"1989","unstructured":"Carlier, J., & Pinson, E. (1989). An algorithm for solving the job-shop problem. Management Science, 35, 164\u2013176.","journal-title":"Management Science"},{"key":"283_CR18","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1023\/A:1018918003761","volume":"70","author":"I.-C. Choi","year":"1997","unstructured":"Choi, I.-C., & Korkmaz, O. (1997). Job shop scheduling with separable sequence-dependent setups. Annals of Operations Research, 70, 155\u2013170.","journal-title":"Annals of Operations Research"},{"key":"283_CR19","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/S0360-8352(02)00002-5","volume":"42","author":"I.-N. Choi","year":"2002","unstructured":"Choi, I.-N., & Choi, D.-S. (2002). A local search algorithm for job-shop scheduling problems with alternative operations and sequence-dependent setups. Computers and Industrial Engineering, 42, 43\u201358.","journal-title":"Computers and Industrial Engineering"},{"key":"283_CR20","volume-title":"Theory of scheduling","author":"R. W. Conway","year":"1967","unstructured":"Conway, R. W., Maxwell, W. L., & Miller, L. W. (1967). Theory of scheduling. Reading: Addison\u2013Wesley."},{"issue":"1","key":"283_CR21","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1287\/ijoc.1030.0043","volume":"17","author":"S. Demassey","year":"2005","unstructured":"Demassey, S., Artigues, C., & Michelon, P. (2005). Constraint propagation-based cutting planes: an application to the resource-constrained project scheduling problem. INFORMS Journal on Computing, 17(1), 52\u201365.","journal-title":"INFORMS Journal on Computing"},{"issue":"3","key":"283_CR22","doi-asserted-by":"crossref","first-page":"216","DOI":"10.1002\/net.20033","volume":"44","author":"D. Feillet","year":"2004","unstructured":"Feillet, D., Dejax, P., Gendreau, M., & Gueguen, C. (2004). An exact algorithm for the elementary shortest path problem with resource constraints: Application to some vehicle routing problems. Networks, 44(3), 216\u2013229.","journal-title":"Networks"},{"key":"283_CR23","unstructured":"Focacci, F., Laborie, P., & Nuijten, W. (2000). Solving scheduling problems with setup times and alternative resources. In Fifth international conference on artificial intelligence planning and scheduling (pp. 92\u2013101)."},{"key":"283_CR24","doi-asserted-by":"crossref","first-page":"403","DOI":"10.1287\/ijoc.14.4.403.2827","volume":"Journal on Comp","author":"F. Focacci","year":"2002","unstructured":"Focacci, F., Lodi, A., & Milano, M. (2002). A hybrid exact algorithm for the tsptw. INFORMS, Journal on Computing, 14, 403\u2013417.","journal-title":"INFORMS, Journal on Computing, 14"},{"issue":"2","key":"283_CR25","doi-asserted-by":"crossref","first-page":"390","DOI":"10.1016\/S0377-2217(98)00113-1","volume":"113","author":"A. S. Jain","year":"1999","unstructured":"Jain, A. S., & Meeran, S. (1999). Deterministic job-shop scheduling: Past, present and future. European Journal of Operational Research, 113(2), 390\u2013434.","journal-title":"European Journal of Operational Research"},{"issue":"7","key":"283_CR26","doi-asserted-by":"crossref","first-page":"1503","DOI":"10.1080\/00207549408957019","volume":"32","author":"S. C. Kim","year":"1994","unstructured":"Kim, S. C., & Bobrowski, P. M. (1994). Impact of sequence-dependent setup time on job shop scheduling performance. International Journal of Production Research, 32(7), 1503\u20131520.","journal-title":"International Journal of Production Research"},{"key":"283_CR27","doi-asserted-by":"crossref","first-page":"320","DOI":"10.1016\/0377-2217(95)00357-6","volume":"90","author":"R. Kolisch","year":"1996","unstructured":"Kolisch, R. (1996). Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. European Journal of Operational Research, 90, 320\u2013333.","journal-title":"European Journal of Operational Research"},{"key":"283_CR28","unstructured":"Lawrence, S. (1984). Resource constrained project scheduling: an experimental investigation of heuristic scheduling techniques (supplement) (Technical report). Graduate School of Industrial Administration, Carnegie Mellon University."},{"key":"283_CR29","doi-asserted-by":"crossref","unstructured":"Martin, P., & Shmoys, D. B. (1996). A new approach to computing optimal schedules for the job-shop scheduling problem. In W. H. Cunningham, S. T. McCormick & M. Queyranne (Eds.), Proceedings of the 5th international conference on integer programming and combinatorial optimization IPCO\u201996 (pp. 389\u2013403). Vancouver, British Columbia, Canada.","DOI":"10.1007\/3-540-61310-2_29"},{"issue":"3","key":"283_CR30","doi-asserted-by":"crossref","first-page":"247","DOI":"10.1002\/jos.102","volume":"5","author":"S. J. Mason","year":"2002","unstructured":"Mason, S. J., Fowler, J. W., & Matthew Carlyle, W. (2002). A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops. Journal of Scheduling, 5(3), 247\u2013262.","journal-title":"Journal of Scheduling"},{"key":"283_CR31","unstructured":"Noivo, J. A., & Ramalhinho-Louren\u00e7o, H. (1998). Solving two production scheduling problems with sequence-dependent set-up times (Technical Report No. 138). Department of Economics and Business, Universitat Pompeu Fabra, Barcelona."},{"key":"283_CR32","doi-asserted-by":"crossref","first-page":"797","DOI":"10.1287\/mnsc.42.6.797","volume":"42","author":"E. Nowicki","year":"1996","unstructured":"Nowicki, E., & Smutnicki, C. (1996). A fast taboo search algorithm for the job shop problem. Management Science, 42, 797\u2013813.","journal-title":"Management Science"},{"key":"283_CR33","volume-title":"Time and resource constrained scheduling: a constraint satisfaction approach","author":"W. P. M. Nuijten","year":"1994","unstructured":"Nuijten, W. P. M. (1994). Time and resource constrained scheduling: a constraint satisfaction approach. Eindhoven University of Technology: Ph.D. thesis."},{"key":"283_CR34","doi-asserted-by":"crossref","first-page":"119","DOI":"10.1142\/S0960313192000157","volume":"2","author":"I. M. Ovacik","year":"1992","unstructured":"Ovacik, I. M., & Uzsoy, R. (1992). A shifting bottleneck algorithm for scheduling semiconductor testing operations. Journal of Electronics Manufacturing, 2, 119\u2013134.","journal-title":"Journal of Electronics Manufacturing"},{"key":"283_CR35","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/0278-6125(94)90023-X","volume":"13","author":"I. M. Ovacik","year":"1994","unstructured":"Ovacik, I. M., & Uzsoy, R. (1994a). Exploiting shop floor status information to schedule complex job shop. Journal of manufacturing systems, 13, 73\u201384.","journal-title":"Journal of manufacturing systems"},{"issue":"6","key":"283_CR36","doi-asserted-by":"crossref","first-page":"1243","DOI":"10.1080\/00207549408956998","volume":"32","author":"I. M. Ovacik","year":"1994","unstructured":"Ovacik, I. M., & Uzsoy, R. (1994b). Rolling horizon algorithms for a single machine dynamic scheduling problem with sequence-dependent setup times. International Journal of Production Research, 32(6), 1243\u20131263.","journal-title":"International Journal of Production Research"},{"key":"283_CR37","volume-title":"Le probl\u00e8me de job-shop: arbitrages et adjustments","author":"L. Peridy","year":"1996","unstructured":"Peridy, L. (1996). Le probl\u00e8me de job-shop: arbitrages et adjustments. Universit\u00e9 de Technologie de Compi\u00e8gne: Ph.D. thesis."},{"key":"283_CR38","unstructured":"Roy, B., & Sussman, B. (1964). Les probl\u00e8mes d\u2019ordonnancement avec contraintes disjonctives (Technical Report Note DS No. 9bis). SEMA, Paris."},{"key":"283_CR39","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1007\/BF02022044","volume":"4","author":"M. W. P. Savelsberg","year":"1985","unstructured":"Savelsberg, M. W. P. (1985). Local search in routing problems with time windows. Annals of Operations Research, 4, 285\u2013305.","journal-title":"Annals of Operations Research"},{"key":"283_CR40","unstructured":"Schutten, J. M. J. (1995). Practical job shop scheduling (Technical Report LPOM-95-12). Laboratory of Production and Operations Management, Department of Mechanical Engineering, University of Twente, The Netherlands."},{"issue":"6","key":"283_CR41","doi-asserted-by":"crossref","first-page":"416","DOI":"10.1016\/S0278-6125(00)87643-8","volume":"18","author":"X. Sun","year":"1999","unstructured":"Sun, X., & Noble, J. S. (1999). A modified shifting bottleneck approach to job shop scheduling with sequence dependent setups. Journal of Manufacturing Systems, 18(6), 416\u2013430.","journal-title":"Journal of Manufacturing Systems"},{"key":"283_CR42","unstructured":"Torres, P., & Lopez, P. (2000). Overview and possible extensions of shaving techniques for job-shop problems. In Proceedings of the workshop on integration of AI and OR techniques in constraint programming for combinatorial optimization problems, CPAIOR\u201900 (pp. 181\u2013186). Paderborn, Germany."},{"key":"283_CR43","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1287\/ijoc.8.3.302","volume":"8","author":"R. J. M. Vaessens","year":"1996","unstructured":"Vaessens, R. J. M., Aarts, E. H. L., & Lenstra, J. K. (1996). Job shop scheduling by local search. INFORMS Journal on Computing, 8, 302\u2013317.","journal-title":"INFORMS Journal on Computing"},{"key":"283_CR44","first-page":"312","volume-title":"Proceedings of the sixth international conference on artificial intelligence planning and scheduling (AIPS 2002)","author":"P. Vil\u00edm","year":"2002","unstructured":"Vil\u00edm, P., & Bart\u00e1k, R. (2002). Filtering algorithms for batch processing with sequence dependent setup times. In M. Ghallab, J. Hertzberg & P. Traverso (Eds.), Proceedings of the sixth international conference on artificial intelligence planning and scheduling (AIPS 2002) (pp. 312\u2013320). Menlo Park: AAAI Press."},{"issue":"4","key":"283_CR45","doi-asserted-by":"crossref","first-page":"B274","DOI":"10.1287\/mnsc.16.4.B274","volume":"16","author":"J. K. Wilbrecht","year":"1969","unstructured":"Wilbrecht, J. K., & Prescott, W. B. (1969). The influence of setup time on job shop performance. Management Science, 16(4), B274\u2013B280.","journal-title":"Management Science"},{"key":"283_CR46","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/0736-5845(89)90031-8","volume":"5","author":"C. Zhou","year":"1989","unstructured":"Zhou, C., & Egbelu, P. G. (1989). Scheduling in manufacturing shop with sequence-dependent setups. Robotics and Computer Integrated Manufacturing, 5, 73\u201381.","journal-title":"Robotics and Computer Integrated Manufacturing"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-007-0283-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-007-0283-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-007-0283-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T14:07:44Z","timestamp":1559138864000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-007-0283-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,12,1]]},"references-count":46,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2008,3]]}},"alternative-id":["283"],"URL":"https:\/\/doi.org\/10.1007\/s10479-007-0283-0","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,12,1]]}}}