{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,11]],"date-time":"2026-05-11T20:58:00Z","timestamp":1778533080246,"version":"3.51.4"},"reference-count":35,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2007,12,4]],"date-time":"2007-12-04T00:00:00Z","timestamp":1196726400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2008,3]]},"DOI":"10.1007\/s10479-007-0287-9","type":"journal-article","created":{"date-parts":[[2007,12,3]],"date-time":"2007-12-03T08:01:54Z","timestamp":1196668914000},"page":"275-292","source":"Crossref","is-referenced-by-count":49,"title":["Fuzzy job shop scheduling with lot-sizing"],"prefix":"10.1007","volume":"159","author":[{"given":"Sanja","family":"Petrovic","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Carole","family":"Fayad","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Dobrila","family":"Petrovic","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Edmund","family":"Burke","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Graham","family":"Kendall","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2007,12,4]]},"reference":[{"issue":"3","key":"287_CR1","doi-asserted-by":"crossref","first-page":"628","DOI":"10.1016\/0377-2217(95)00091-7","volume":"92","author":"G. I. Adamopoulos","year":"1996","unstructured":"Adamopoulos, G. I., & Pappis, C. P. (1996). Fuzzy-linguistic approach to a multi-criteria sequencing problem. European Journal of Operational Research, 92(3), 628\u2013636.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"287_CR2","doi-asserted-by":"crossref","first-page":"793","DOI":"10.1016\/j.cie.2004.05.010","volume":"46","author":"A. Agnetis","year":"2004","unstructured":"Agnetis, A., Alfieri, A., & Nicosia, G. (2004). A\u00a0heuristic approach to batching and scheduling a single machine to minimise setup costs. Computers & Industrial Engineering, 46(2), 793\u2013802.","journal-title":"Computers & Industrial Engineering"},{"key":"287_CR3","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0377-2217(95)00362-2","volume":"93","author":"J. Blazewicz","year":"1996","unstructured":"Blazewicz, J., Domschke, W., & Pesch, E. (1996). The job shop scheduling problem: Conventional and new solution techniques. European Journal of Operational Research, 93, 1\u201333.","journal-title":"European Journal of Operational Research"},{"key":"287_CR4","volume-title":"Deterministic and stochastic scheduling","year":"1982","unstructured":"Dempster, M. A. H., Lenstra, J. K., & Rinnooy Kan, A. H. G. (Eds.). (1982). Deterministic and stochastic scheduling. Dordrecht: Reidel."},{"key":"287_CR5","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/S0377-2217(97)00030-1","volume":"99","author":"A. Drexl","year":"1997","unstructured":"Drexl, A., & Kimms, A. (1997). Lot sizing and scheduling\u2014Survey and extensions. European Journal of Operational Research, 99, 221\u2013235.","journal-title":"European Journal of Operational Research"},{"key":"287_CR6","volume-title":"Fuzzy information engineering, a guided tour of applications","author":"H. Fargier","year":"1996","unstructured":"Fargier, H. (1996). Fuzzy scheduling: Principles and experiments. In D. Dubois, H. Prade, & R.\u00a0R. Yager (Eds.), Fuzzy information engineering, a guided tour of applications. New York: Wiley."},{"key":"287_CR7","series-title":"Lecture notes in artificial intelligence","doi-asserted-by":"crossref","first-page":"524","DOI":"10.1007\/11504894_71","volume-title":"Innovations in applied artificial intelligence","author":"C. Fayad","year":"2005","unstructured":"Fayad, C., & Petrovic, S. (2005). A genetic algorithm for the real world job-shop scheduling. In M. Ali & F. Esposito (Eds.), Lecture notes in artificial intelligence : Vol. 3533. Innovations in applied artificial intelligence (pp.\u00a0524\u2013533). New York: Springer."},{"key":"287_CR8","volume-title":"Genetic algorithms in search, optimisation, and machine learning","author":"D. Goldberg","year":"1989","unstructured":"Goldberg, D. (1989). Genetic algorithms in search, optimisation, and machine learning. Reading: Addison-Wesley."},{"issue":"1","key":"287_CR9","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0377-2217(94)90391-3","volume":"79","author":"S. Han","year":"1994","unstructured":"Han, S., Ishii, H., & Fuji, S. (1994). One machine scheduling problem with fuzzy due dates. European Journal of Operational Research, 79(1), 1\u201312.","journal-title":"European Journal of Operational Research"},{"key":"287_CR10","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1016\/0925-5273(94)90118-X","volume":"33","author":"H. Ishibuchi","year":"1994","unstructured":"Ishibuchi, H., Yamamoto, N., Misaki, S., & Tanaka, H. (1994). Local search algorithms for flow shop scheduling with fuzzy due-dates. International Journal of Production Economics, 33, 53\u201366.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"287_CR11","doi-asserted-by":"crossref","first-page":"284","DOI":"10.1016\/0377-2217(94)00162-6","volume":"87","author":"H. Ishii","year":"1995","unstructured":"Ishii, H., & Tada, M. (1995). Single machine scheduling problem with fuzzy precedence relation. European Journal of Operational Research, 87(2), 284\u2013288.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"287_CR12","first-page":"336","volume":"6","author":"H. Ishii","year":"1992","unstructured":"Ishii, H., Tada, M., & Masuda, T. (1992). Two scheduling problems with fuzzy due-dates. Fuzzy Sets and Systems, 6(3), 336\u2013347.","journal-title":"Fuzzy Sets and Systems"},{"key":"287_CR13","first-page":"291","volume-title":"Scheduling under fuzziness","author":"N. Karapapilidis","year":"2000","unstructured":"Karapapilidis, N., Pappis, C., & Adamopoulos, G. (2000). Fuzzy set approaches to lot sizing. In Scheduling under fuzziness (pp.\u00a0291\u2013304). Heidelberg: Physica."},{"key":"287_CR14","volume-title":"Fuzzy sets, uncertainty and information","author":"G. Klir","year":"1998","unstructured":"Klir, G., & Folger, T. (1998). Fuzzy sets, uncertainty and information. New Jersey: Prentice Hall."},{"issue":"1\u20132","key":"287_CR15","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/0925-5273(95)00091-7","volume":"44","author":"M. Kuroda","year":"1996","unstructured":"Kuroda, M., & Wang, Z. (1996). Fuzzy job shop scheduling. International Journal of Production Economics, 44(1\u20132), 45\u201351.","journal-title":"International Journal of Production Economics"},{"issue":"7","key":"287_CR16","doi-asserted-by":"crossref","first-page":"72","DOI":"10.1108\/EUM0000000001276","volume":"11","author":"Y. Y. Lee","year":"1991","unstructured":"Lee, Y. Y., Kramer, B. A., & Hwang, C. L. (1991). A comparative study of three lot-sizing methods for the case of fuzzy demand. International Journal of Operations and Production Management, 11(7), 72\u201380.","journal-title":"International Journal of Operations and Production Management"},{"key":"287_CR17","volume-title":"Handbook of scheduling: Algorithms, models, and performance analysis","year":"2004","unstructured":"Leung, J. (Ed.). (2004). Handbook of scheduling: Algorithms, models, and performance analysis. New York: Chapman & Hall\/CRC Press."},{"key":"287_CR18","unstructured":"Li, Y., Luh, P. B., & Guan, X. (1994). Fuzzy optimization-based scheduling of identical machines with possible breakdown. In Proceedings\u2014IEEE international conference on robotics and automation (pp.\u00a03447\u20133452). San Diego, USA, May 1994."},{"issue":"4","key":"287_CR19","doi-asserted-by":"crossref","first-page":"1125","DOI":"10.1080\/002075498193552","volume":"36","author":"J. Ouenniche","year":"1998","unstructured":"Ouenniche, J., & Boctor, F. (1998). Sequencing, lot sizing and scheduling of several products in job shops: The common cycle approach. International Journal of Production Research, 36(4), 1125\u20131140.","journal-title":"International Journal of Production Research"},{"key":"287_CR20","doi-asserted-by":"crossref","DOI":"10.7551\/mitpress\/3926.001.0001","volume-title":"An introduction to fuzzy sets\u2014analysis and design","author":"W. Pedrycz","year":"1998","unstructured":"Pedrycz, W., & Gowide, F. (1998). An introduction to fuzzy sets\u2014analysis and design. Cambridge: MIT Press."},{"key":"287_CR21","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1016\/0377-2217(91)90205-A","volume":"55","author":"D. Petrovic","year":"1991","unstructured":"Petrovic, D. (1991). Decision support for improving systems reliability by redundancy. European Journal of Operational Research, 55, 357\u2013367.","journal-title":"European Journal of Operational Research"},{"key":"287_CR22","volume-title":"Scheduling: Theory, algorithms, and systems","author":"M. Pinedo","year":"2002","unstructured":"Pinedo, M. (2002). Scheduling: Theory, algorithms, and systems (2nd edn.) New Jersey: Prentice Hall.","edition":"2"},{"key":"287_CR23","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"C. Potts","year":"2000","unstructured":"Potts, C., & Kovalyov, M. (2000). Scheduling with batching: A review. European Journal of Operational Research, 120, 228\u2013249.","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"287_CR24","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1057\/jors.1992.66","volume":"43","author":"C. N. Potts","year":"1995","unstructured":"Potts, C. N., & Van Wassenhove, L. N. (1995). Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity. Journal of Operational Research Society, 43(5), 395\u2013406.","journal-title":"Journal of Operational Research Society"},{"key":"287_CR25","first-page":"151","volume-title":"Modern heuristic techniques for combinatorial problems","author":"C. Reeves","year":"1995","unstructured":"Reeves, C. (1995a). Genetic algorithms. In V.\u00a0J. Rayward-Smith (Ed.), Modern heuristic techniques for combinatorial problems (pp.\u00a0151\u2013196). London: McGraw-Hill International."},{"issue":"1","key":"287_CR26","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1016\/0305-0548(93)E0014-K","volume":"22","author":"C. Reeves","year":"1995","unstructured":"Reeves, C. (1995b). A\u00a0genetic algorithm for flowshop sequencing. Computers and Operations Research, 22(1), 5\u201313.","journal-title":"Computers and Operations Research"},{"key":"287_CR27","volume-title":"Handbook of fuzzy computation","year":"1998","unstructured":"Ruspini, E. H., Bonissone, P., & Pedrycz, W. (Eds.). (1998). Handbook of fuzzy computation. Bristol: Institute of Physics Publishing (IOP)."},{"issue":"2","key":"287_CR28","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1016\/S0377-2217(99)00094-6","volume":"120","author":"M. Sakawa","year":"2000","unstructured":"Sakawa, M., & Kubota, R. (2000). Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms. European Journal of Operational Research, 120(2), 393\u2013407.","journal-title":"European Journal of Operational Research"},{"key":"287_CR29","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1016\/S0360-8352(02)00027-X","volume":"42","author":"R. Sarker","year":"2002","unstructured":"Sarker, R., & Newton, C. (2002). A\u00a0genetic algorithm for solving economic lot size scheduling problem. Computers & Industrial Engineering, 42, 189\u2013198.","journal-title":"Computers & Industrial Engineering"},{"key":"287_CR30","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1007\/0-387-28356-0_4","volume-title":"Search methodologies: Introductory tutorials in optimization and decision support techniques","author":"K. Sastry","year":"2005","unstructured":"Sastry, K., Goldberg, D., & Kendall, G. (2005). Genetic algorithms. In E.\u00a0K. Burke & G.\u00a0Kendall (Eds.), Search methodologies: Introductory tutorials in optimization and decision support techniques (pp.\u00a097\u2013125). New York: Springer."},{"key":"287_CR31","volume-title":"Scheduling under fuzziness","year":"2000","unstructured":"Slowinski, R., & Hapke, M. (Eds.). (2000). Scheduling under fuzziness. Heidelberg: Physica."},{"key":"287_CR32","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1016\/0360-8352(93)90265-Y","volume":"25","author":"Y. Tsujimura","year":"1993","unstructured":"Tsujimura, Y., Park, S., Change, I. S., & Gen, M. (1993). An efficient method for solving flow shop problem with fuzzy processing times. Computer and Industrial Engineering, 25, 239\u2013242.","journal-title":"Computer and Industrial Engineering"},{"key":"287_CR33","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","volume":"8","author":"L. A. Zadeh","year":"1965","unstructured":"Zadeh, L. A. (1965). Fuzzy sets. Information & Control, 8, 338\u2013353.","journal-title":"Information & Control"},{"key":"287_CR34","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1287\/mnsc.5.1.89","volume":"5","author":"H. M. Wagner","year":"1958","unstructured":"Wagner, H. M., & Whitin, T. M. (1958). Dynamic version of the economic lot size model. Management Science, 5, 89\u201396.","journal-title":"Management Science"},{"key":"287_CR35","first-page":"116","volume":"13","author":"R. H. Wilson","year":"1934","unstructured":"Wilson, R. H. (1934). A\u00a0scientific routine for stock control. Harvard Business Review, 13, 116\u2013128.","journal-title":"Harvard Business Review"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-007-0287-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-007-0287-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-007-0287-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T14:07:44Z","timestamp":1559138864000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-007-0287-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,12,4]]},"references-count":35,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2008,3]]}},"alternative-id":["287"],"URL":"https:\/\/doi.org\/10.1007\/s10479-007-0287-9","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,12,4]]}}}