{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,18]],"date-time":"2026-03-18T23:15:30Z","timestamp":1773875730591,"version":"3.50.1"},"reference-count":19,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2008,7,8]],"date-time":"2008-07-08T00:00:00Z","timestamp":1215475200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2009,4]]},"DOI":"10.1007\/s10479-008-0372-8","type":"journal-article","created":{"date-parts":[[2008,7,7]],"date-time":"2008-07-07T17:54:52Z","timestamp":1215453292000},"page":"5-21","source":"Crossref","is-referenced-by-count":25,"title":["A solution for cyclic scheduling of multi-hoists without\u00a0overlapping"],"prefix":"10.1007","volume":"168","author":[{"given":"Zhili","family":"Zhou","sequence":"first","affiliation":[]},{"given":"Ling","family":"Li","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2008,7,8]]},"reference":[{"key":"372_CR1","unstructured":"Anon (2004). CPLEX manual. Incline Village: CPLEX optimization. Inc."},{"key":"372_CR2","doi-asserted-by":"crossref","unstructured":"Baptiste, P., Legeard, B., & Varnier, C. C. (1992). Hoist scheduling problem: an approach based on constraints logic programming. In Proc. IEEE int. conf. robotics and automation. Nice, France.\u00a02, pp. 1139\u20131144.","DOI":"10.1109\/ROBOT.1992.220195"},{"key":"372_CR3","doi-asserted-by":"crossref","unstructured":"Che, A., & Chu, C. (2004). Single- track multi-hoist scheduling problems: a collision-free resolution based on a branch-and-bound approach. International Journal of Production Research, 42(12).","DOI":"10.1080\/00207540410001666288"},{"key":"372_CR4","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1109\/70.660860","volume":"14","author":"H. Chen","year":"1998","unstructured":"Chen, H., Chu, C., & Proth, J. M. (1998). Cyclic scheduling of a hoist with time window constraints. IEEE Transaction Robot. Automation, 14, 144\u2013152.","journal-title":"IEEE Transaction Robot. Automation"},{"key":"372_CR5","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1023\/A:1018980928352","volume":"69","author":"V. Kats","year":"1997","unstructured":"Kats, V., & Levner, E. (1997). Minimizing the number of robots to meet a given cyclic schedule. Annals of Operations Research, 69, 209\u2013226.","journal-title":"Annals of Operations Research"},{"key":"372_CR6","volume-title":"A proof: The cyclic hoist scheduling problem is NP-complete","author":"L. Lei","year":"1989","unstructured":"Lei, L., & Wang, T. J. (1989). A proof: The cyclic hoist scheduling problem is NP-complete. Working Paper 89-0016. Rutgers Univ., New Brunswick, NJ."},{"key":"372_CR7","doi-asserted-by":"crossref","first-page":"1629","DOI":"10.1287\/mnsc.37.12.1629","volume":"37","author":"L. Lei","year":"1991","unstructured":"Lei, L., & Wang, T. J. (1991). The minimum common-cycle algorithm for cyclic scheduling of two material handling hoists with time windows constraints. Management Science, 37, 1629\u20131639.","journal-title":"Management Science"},{"key":"372_CR8","doi-asserted-by":"crossref","first-page":"807","DOI":"10.1016\/0305-0548(93)90102-O","volume":"20","author":"L. Lei","year":"1993","unstructured":"Lei, L. (1993). Determining the optimal starting times in a cyclic schedule with a given route. Computers & Operations Research, 20, 807\u2013816.","journal-title":"Computers & Operations Research"},{"issue":"2","key":"372_CR9","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1080\/07408179408966593","volume":"26","author":"L. Lei","year":"1994","unstructured":"Lei, L., & Wang, T. J. (1994). Determining optimal cyclic hoist schedules in a single-hoist electroplating line. IEEE Transaction, 26(2), 25\u201333.","journal-title":"IEEE Transaction"},{"issue":"3","key":"372_CR10","doi-asserted-by":"crossref","first-page":"480","DOI":"10.1109\/TRA.2003.810240","volume":"9","author":"J. Leung","year":"2003","unstructured":"Leung, J., & Zhang, G. (2003). Optimal cyclic scheduling for printed circuit board production lines with multiple hoists and general processing sequence. IEEE Transactions on Robotics and Automation, 9(3), 480\u2013484.","journal-title":"IEEE Transactions on Robotics and Automation"},{"issue":"1","key":"372_CR11","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1080\/17517570601092143","volume":"1","author":"C. M\u00f8ller","year":"2007","unstructured":"M\u00f8ller, C. (2007). Process innovation laboratory: a new approach to business process innovation based on enterprise information systems. Enterprise Information Systems, 1(1), 113\u2013128.","journal-title":"Enterprise Information Systems"},{"key":"372_CR12","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1007\/BF00167800","volume":"8","author":"W. C. Ng","year":"1996","unstructured":"Ng, W. C. (1996). A branch and bound algorithm for hoist scheduling of a circuit board production line. International Journal of Flexible Manufacturing Systems, 8, 45\u201365.","journal-title":"International Journal of Flexible Manufacturing Systems"},{"issue":"1","key":"372_CR13","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1080\/17517570601088364","volume":"1","author":"D. L. Olson","year":"2007","unstructured":"Olson, D. L., & Zhao, F. (2007). CIOs\u2019 perspectives of critical success factors in ERP upgrade projects. Enterprise Information Systems, 1(1), 129\u2013138.","journal-title":"Enterprise Information Systems"},{"issue":"2","key":"372_CR14","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1080\/05695557608975070","volume":"8","author":"L. W. Phillips","year":"1976","unstructured":"Phillips, L. W., & Unger, P. S. (1976). Mathematical programming solution of a hoist scheduling program. AIIE Transaction, 8(2), 219\u2013225.","journal-title":"AIIE Transaction"},{"issue":"4","key":"372_CR15","first-page":"309","volume":"35","author":"C. Varnier","year":"1997","unstructured":"Varnier, C. (1997). Resolution of the cyclic multi-hoists scheduling problem with overlapping partitions. INFORMS, 35(4), 309\u2013324.","journal-title":"INFORMS"},{"issue":"2","key":"372_CR16","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1080\/07408178808966165","volume":"20","author":"G. W. Shapiro","year":"1988","unstructured":"Shapiro, G. W., & Nuttle, H. L. W. (1988). Hoist scheduling for a KB electroplating facility. IIE Transaction, 20(2), 157\u2013167.","journal-title":"IIE Transaction"},{"issue":"2","key":"372_CR17","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1080\/17517570701241079","volume":"1","author":"J. N. Warfield","year":"2007","unstructured":"Warfield, J. N. (2007). Systems science serves enterprise integration: a tutorial. Enterprise Information Systems, 1(2), 235\u2013254.","journal-title":"Enterprise Information Systems"},{"issue":"1","key":"372_CR18","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1080\/17517570712331393320","volume":"1","author":"L. Xu","year":"2007","unstructured":"Xu, L. (2007). Editorial. Enterprise Information Systems, 1(1), 1\u20132.","journal-title":"Enterprise Information Systems"},{"key":"372_CR19","doi-asserted-by":"crossref","first-page":"811","DOI":"10.1016\/S0305-0548(02)00043-6","volume":"30","author":"Z. Zhou","year":"2003","unstructured":"Zhou, Z., & Li, L. (2003). Single hoist cyclic scheduling with multi-tank: a material handling solution. Computers & Operations Research, 30, 811\u2013819.","journal-title":"Computers & Operations Research"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-008-0372-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-008-0372-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-008-0372-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T18:07:47Z","timestamp":1559153267000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-008-0372-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,7,8]]},"references-count":19,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2009,4]]}},"alternative-id":["372"],"URL":"https:\/\/doi.org\/10.1007\/s10479-008-0372-8","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,7,8]]}}}