{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,31]],"date-time":"2026-01-31T10:52:17Z","timestamp":1769856737266,"version":"3.49.0"},"reference-count":28,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2009,5,29]],"date-time":"2009-05-29T00:00:00Z","timestamp":1243555200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2009,11]]},"DOI":"10.1007\/s10479-009-0579-3","type":"journal-article","created":{"date-parts":[[2009,5,28]],"date-time":"2009-05-28T11:31:19Z","timestamp":1243510279000},"page":"259-276","source":"Crossref","is-referenced-by-count":13,"title":["Setting gates for activities in the stochastic project scheduling problem through the\u00a0cross entropy methodology"],"prefix":"10.1007","volume":"172","author":[{"given":"Illana","family":"Bendavid","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Boaz","family":"Golany","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2009,5,29]]},"reference":[{"key":"579_CR1","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1007\/s10479-005-5728-8","volume":"134","author":"G. Alon","year":"2005","unstructured":"Alon, G., Kroese, D. P., Raviv, T., & Rubinstein, R. Y. (2005). Application of the Cross-Entropy method to the buffer allocation problem in a simulation-based environment. Annals of Operations Research, 134, 137\u2013151.","journal-title":"Annals of Operations Research"},{"key":"579_CR2","first-page":"529","volume-title":"Proceedings of the 2004 winter simulation conference","author":"Z. Botev","year":"2004","unstructured":"Botev, Z., & Kroese, D. P. (2004). Global likelihood optimization via the cross-entropy method with an application to mixture models. In R. G. Ingalls, M. D. Rossetti, J. S. Smith, & B. A. Peters (Eds.), Proceedings of the 2004 winter simulation conference (pp. 529\u2013535). New York: IEEE Press."},{"issue":"1","key":"579_CR3","doi-asserted-by":"crossref","first-page":"126","DOI":"10.1287\/opre.45.1.126","volume":"45","author":"A. H. Buss","year":"1997","unstructured":"Buss, A. H., & Rosenblatt, M. J. (1997). Activity delay in stochastic project networks. Operations Research, 45(1), 126\u2013139.","journal-title":"Operations Research"},{"key":"579_CR4","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1007\/s10479-005-5730-1","volume":"134","author":"I. Cohen","year":"2005","unstructured":"Cohen, I., Golany, B., & Shtub, A. (2005). Managing stochastic, finite capacity, multi-project systems through the Cross-Entropy methodology. Annals of Operations Research, 134, 189\u2013199.","journal-title":"Annals of Operations Research"},{"key":"579_CR5","volume-title":"Project scheduling\u2014a research handbook","author":"E. L. Demeulemeester","year":"2002","unstructured":"Demeulemeester, E. L., & Herroelen, W. S. (2002). Project scheduling\u2014a research handbook. Dordrecht: Kluwer Academic."},{"key":"579_CR6","volume-title":"Dynamic programming: models and applications","author":"E. V. Denardo","year":"1982","unstructured":"Denardo, E. V. (1982). Dynamic programming: models and applications. New York: Prentice-Hall."},{"key":"579_CR7","volume-title":"Activity networks: project planning and control by network models","author":"S. E. Elmaghraby","year":"1977","unstructured":"Elmaghraby, S. E. (1977). Activity networks: project planning and control by network models. New York: Wiley."},{"key":"579_CR8","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1016\/S0925-5273(01)00111-6","volume":"74","author":"S. E. Elmaghraby","year":"2001","unstructured":"Elmaghraby, S. E. (2001). On the optimal release time of jobs with random processing times, with extensions to other criteria. International Journal of Production Economics, 74, 103\u2013113.","journal-title":"International Journal of Production Economics"},{"key":"579_CR9","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/S0925-5273(99)00054-7","volume":"64","author":"S. E. Elmaghraby","year":"2000","unstructured":"Elmaghraby, S. E., Ferreira, A. A., & Tavares, L. V. (2000). Optimal start times under stochastic activity durations. International Journal of Production Economics, 64, 153\u2013164.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"579_CR10","first-page":"10","volume":"13","author":"W. Fazar","year":"1959","unstructured":"Fazar, W. (1959). Program evaluation and review technique. American Statistician, 13(2), 10.","journal-title":"American Statistician"},{"key":"579_CR11","first-page":"771","volume":"31","author":"B. Golany","year":"1999","unstructured":"Golany, B., Dar-El, E. M., & Zeev, N. (1999). Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process. IIE Transactions, 31, 771\u2013781.","journal-title":"IIE Transactions"},{"key":"579_CR12","volume-title":"Critical chain","author":"E. M. Goldratt","year":"1997","unstructured":"Goldratt, E. M. (1997). Critical chain. New York: North River Press."},{"key":"579_CR13","volume-title":"Facilities design","author":"S. Heragu","year":"1997","unstructured":"Heragu, S. (1997). Facilities design. Boston: PWS Publishing Company."},{"key":"579_CR14","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/j.ejor.2004.04.002","volume":"165","author":"W. S. Herroelen","year":"2005","unstructured":"Herroelen, W. S., & Leus, R. (2005). Project scheduling under uncertainty: survey and research potentials. European Journal of Operational Research, 165, 289\u2013306.","journal-title":"European Journal of Operational Research"},{"key":"579_CR15","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1016\/S0377-2217(96)00112-9","volume":"100","author":"W. S. Herroelen","year":"1997","unstructured":"Herroelen, W. S., Van Dommelen, P., & Demeulemeester, E. L. (1997). Project network models with discounted cash flows: a guided tour through recent developments. European Journal of Operational Research, 100, 97\u2013121.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"579_CR16","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1016\/S0305-0548(97)00055-5","volume":"25","author":"W. S. Herroelen","year":"1998","unstructured":"Herroelen, W. S., De-Reyck, B., & Demeulemeester, E. L. (1998). Resource-constrained project scheduling: a survey of recent developments. Computers and Operations Research, 25(4), 279\u2013302.","journal-title":"Computers and Operations Research"},{"key":"579_CR17","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-1453-4","volume-title":"Mathematical programming and financial objectives for scheduling projects","author":"A. Kimms","year":"2001","unstructured":"Kimms, A. (2001). Mathematical programming and financial objectives for scheduling projects. Dordrecht: Kluwer Academic."},{"key":"579_CR18","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/S0305-0483(00)00046-3","volume":"29","author":"R. Kolish","year":"2001","unstructured":"Kolish, R., & Padman, R. (2001). An integrated survey of deterministic project scheduling. Omega, 29, 249\u2013272.","journal-title":"Omega"},{"issue":"10","key":"579_CR19","doi-asserted-by":"crossref","first-page":"1693","DOI":"10.1287\/mnsc.41.10.1693","volume":"41","author":"R. Kolish","year":"1995","unstructured":"Kolish, R., Sprecher, A., & Drexl, A. (1995). Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 41(10), 1693\u20131703.","journal-title":"Management Science"},{"key":"579_CR20","unstructured":"Krishnamoorthy, M. (1968). Critical path method: a review. Technical Report, Michigan Univ., Dept. of Industrial Engineering, Ann-Arbor, MI, USA."},{"key":"579_CR21","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1007\/s11009-006-9753-0","volume":"8","author":"D. P. Kroese","year":"2006","unstructured":"Kroese, D. P., Rubinstein, R. Y., & Porotsky, S. (2006). The cross-entropy method for continuous multi-extremal optimization. Methodology and Computing in Applied Probability, 8, 383\u2013407.","journal-title":"Methodology and Computing in Applied Probability"},{"key":"579_CR22","doi-asserted-by":"crossref","first-page":"646","DOI":"10.1287\/opre.7.5.646","volume":"7","author":"D. G. Malcom","year":"1959","unstructured":"Malcom, D. G., Roseboom, J. H., Clark, C. E., & Fazar, W. (1959). Apllication of a technique for research and development of program evaluation. Operations Research, 7, 646\u2013669.","journal-title":"Operations Research"},{"key":"579_CR23","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/S0263-7863(99)00019-8","volume":"18","author":"G. K. Rand","year":"2000","unstructured":"Rand, G. K. (2000). Critical chain: the theory of constraints applied to project management. International Journal of Project Management, 18, 173\u2013177.","journal-title":"International Journal of Project Management"},{"key":"579_CR24","volume-title":"The Cross-Entropy method\u2014a\u00a0unified approach to combinatorial optimization, Monte-Carlo simulation, and machine learning","author":"R. Y. Rubinstein","year":"2004","unstructured":"Rubinstein, R. Y., & Kroese, D. P. (2004). The Cross-Entropy method\u2014a\u00a0unified approach to combinatorial optimization, Monte-Carlo simulation, and machine learning. New York: Springer."},{"key":"579_CR25","volume-title":"Project management\u2014processes, methodologies, and economics","author":"A. Shtub","year":"2005","unstructured":"Shtub, A., Bard, J. F., & Globerson, S. (2005). Project management\u2014processes, methodologies, and economics. New York: Pearson Prentice Hall."},{"issue":"3","key":"579_CR26","doi-asserted-by":"crossref","first-page":"697","DOI":"10.1016\/j.ejor.2008.10.004","volume":"198","author":"M. J. Sobel","year":"2009","unstructured":"Sobel, M. J., Szmerekovsky, J. G., & Tilson, V. (2009). Scheduling projects with stochastic activity duration to maximize expected net present value. European Journal of Operational Research, 198(3), 697\u2013705.","journal-title":"European Journal of Operational Research"},{"key":"579_CR27","unstructured":"Trietsch, D. (2006a). Economically balanced criticalities for robust project scheduling and control. Working Paper, ISOM Department, University of Auckland, New Zealand."},{"key":"579_CR28","doi-asserted-by":"crossref","first-page":"627","DOI":"10.1080\/00207540500371881","volume":"44","author":"D. Trietsch","year":"2006","unstructured":"Trietsch, D. (2006b). Optimal feeding buffers for projects or batch supply chains by an exact generalization of the newsvendor result. International Journal of Production Research, 44, 627\u2013637.","journal-title":"International Journal of Production Research"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-009-0579-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-009-0579-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-009-0579-3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T18:07:55Z","timestamp":1559153275000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-009-0579-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,5,29]]},"references-count":28,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2009,11]]}},"alternative-id":["579"],"URL":"https:\/\/doi.org\/10.1007\/s10479-009-0579-3","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2009,5,29]]}}}