{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,30]],"date-time":"2026-03-30T08:52:01Z","timestamp":1774860721261,"version":"3.50.1"},"reference-count":22,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2010,1,29]],"date-time":"2010-01-29T00:00:00Z","timestamp":1264723200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2010,12]]},"DOI":"10.1007\/s10479-010-0686-1","type":"journal-article","created":{"date-parts":[[2010,1,28]],"date-time":"2010-01-28T01:05:36Z","timestamp":1264640736000},"page":"795-812","source":"Crossref","is-referenced-by-count":6,"title":["Applications of resource assignment and scheduling with\u00a0Petri Nets and heuristic search"],"prefix":"10.1007","volume":"181","author":[{"given":"Gonzalo","family":"Mej\u00eda","sequence":"first","affiliation":[]},{"given":"Carlos","family":"Montoya","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2010,1,29]]},"reference":[{"issue":"12","key":"686_CR1","doi-asserted-by":"crossref","first-page":"2733","DOI":"10.1080\/00207540210136496","volume":"40","author":"I. B. Abdallah","year":"2002","unstructured":"Abdallah, I. B., Elmaraghy, H. A., & Elmekkawy, T. Y. (2002). Deadlock-free scheduling in flexible manufacturing systems using Petri-Nets. International Journal of Production Research, 40(12), 2733\u20132756.","journal-title":"International Journal of Production Research"},{"key":"686_CR2","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","volume":"34","author":"J. Adams","year":"1988","unstructured":"Adams, J., Balas, E., & Zawack, D. (1988). The shifting bottleneck procedure for job shop scheduling. Management Science, 34, 391\u2013401.","journal-title":"Management Science"},{"issue":"2","key":"686_CR3","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1287\/ijoc.3.2.149","volume":"3","author":"D. Applegate","year":"1991","unstructured":"Applegate, D., & Cook, W. (1991). A computational study of the job-shop scheduling problem. ORSA Journal on Computing, 3(2), 149\u2013156.","journal-title":"ORSA Journal on Computing"},{"key":"686_CR4","doi-asserted-by":"crossref","first-page":"688","DOI":"10.1057\/palgrave.jors.2601359","volume":"53","author":"A. Bachman","year":"2002","unstructured":"Bachman, A., Cheng, T., & Janiak, A. (2002). Scheduling start time dependent jobs to minimize the total weighted completion time. Journal of the Operational Research Society, 53, 688\u2013693.","journal-title":"Journal of the Operational Research Society"},{"key":"686_CR5","unstructured":"Guti\u00e9rrez, E., & Mej\u00eda, G. (2009). Scheduling complex manufacturing systems using a genetic algorithm. In 20th international conference on production research, Shanghai, China, 2\u20136 August 2009. In CD-ROM."},{"issue":"6","key":"686_CR6","doi-asserted-by":"crossref","first-page":"955","DOI":"10.1016\/j.apm.2006.10.023","volume":"31","author":"Y. Kim","year":"2007","unstructured":"Kim, Y., Tatsuya, T., & Tatsuo, N. (2007). FMS scheduling based on timed Petri Net model and reactive graph search. Applied Mathematical Modelling, 31(6), 955\u2013970.","journal-title":"Applied Mathematical Modelling"},{"key":"686_CR7","unstructured":"Lawrence, S. (1984). Resource constraint scheduling: an experimental investigation of heuristic scheduling techniques. GSIA, Carnegie Mellon University."},{"issue":"2","key":"686_CR8","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1109\/70.282537","volume":"10","author":"D. Lee","year":"1994","unstructured":"Lee, D., & DiCesare, F. (1994). Scheduling flexible manufacturing systems using Petri Nets and heuristic search. IEEE Transactions on Robotics and Automation, 10(2), 123\u2013131.","journal-title":"IEEE Transactions on Robotics and Automation"},{"issue":"4","key":"686_CR9","doi-asserted-by":"crossref","first-page":"689","DOI":"10.1080\/00207540150504403","volume":"39","author":"C. Low","year":"2001","unstructured":"Low, C., & Wu, T.H. (2001). Mathematical modeling and heuristic approaches to operation scheduling problems in an FMS environment. International Journal of Production Research, 39(4), 689\u2013708.","journal-title":"International Journal of Production Research"},{"key":"686_CR10","series-title":"LNCS","first-page":"130","volume-title":"Pract. theo. autom. timetab. II","author":"A. Meisels","year":"1997","unstructured":"Meisels, A. & Lusternik, N. (1997). Experiments on networks of employee timetabling problems. In LNCS : Vol.\u00a01408. Pract. theo. autom. timetab. II, Toronto, Canada (pp. 130\u2013141). Berlin: Springer."},{"key":"686_CR11","unstructured":"Mej\u00eda, G. E., & Montoya, C. E. (2007). Resource assignment and scheduling using Petri Nets and heuristic search. In Proceedings of the ICPR 19 (International conference on production research), Valpara\u00edso, Chile."},{"key":"686_CR12","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1007\/s10479-007-0258-1","volume":"164","author":"G. Mej\u00eda","year":"2008","unstructured":"Mej\u00eda, G., & Montoya, C. (2008). A Petri Net algorithm for minimizing total tardiness in flexible manufacturing systems. Annals of Operations Research, 164, 63\u201378.","journal-title":"Annals of Operations Research"},{"issue":"22","key":"686_CR13","doi-asserted-by":"crossref","first-page":"6261","DOI":"10.1080\/00207540802225983","volume":"47","author":"G. Mej\u00eda","year":"2009","unstructured":"Mej\u00eda, G., & Montoya, C. (2009). Scheduling manufacturing systems with blocking: a Petri Net approach. International Journal of Production Research, 47(22), 6261\u20136277.","journal-title":"International Journal of Production Research"},{"issue":"2","key":"686_CR14","doi-asserted-by":"crossref","first-page":"79","DOI":"10.1016\/S0278-6125(05)80009-3","volume":"24","author":"G. Mej\u00eda","year":"2005","unstructured":"Mej\u00eda, G., & Odrey, N. (2005). An approach using Petri Nets and improved heuristic search for manufacturing system scheduling. Journal of Manufacturing Systems, 24(2), 79\u201392.","journal-title":"Journal of Manufacturing Systems"},{"issue":"4","key":"686_CR15","doi-asserted-by":"crossref","first-page":"541","DOI":"10.1109\/5.24143","volume":"77","author":"T. Murata","year":"1989","unstructured":"Murata, T. (1989). Petri Nets: properties, analysis and applications. Proceedings of the IEEE, 77(4), 541\u2013580.","journal-title":"Proceedings of the IEEE"},{"issue":"2","key":"686_CR16","doi-asserted-by":"crossref","first-page":"316","DOI":"10.1016\/j.ejor.2006.04.007","volume":"179","author":"B. Nhu","year":"2007","unstructured":"Nhu, B., Ho, J., Cing, T., & Edmund, M. (2007). An effective architecture for learning and evolving flexible job-shop schedules. European Journal of Operational Research, 179(2), 316\u2013333.","journal-title":"European Journal of Operational Research"},{"key":"686_CR17","volume-title":"Operations scheduling with applications in manufacturing and services","author":"M. Pinedo","year":"1999","unstructured":"Pinedo, M., & Chao, X. (1999). Operations scheduling with applications in manufacturing and services. New York: McGraw-Hill."},{"key":"686_CR18","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1016\/S0166-3615(01)00124-5","volume":"47","author":"A. Reyes-Moro","year":"2002","unstructured":"Reyes-Moro, A., Yu, H., Kelleher, G., & Lloyd, S. (2002). Integrating Petri Nets and hybrid heuristic search for the scheduling of FMS. Computers in Industry, 47, 123\u2013138.","journal-title":"Computers in Industry"},{"issue":"6","key":"686_CR19","doi-asserted-by":"crossref","first-page":"841","DOI":"10.1109\/21.23085","volume":"18","author":"F. Rodammer","year":"1988","unstructured":"Rodammer, F., & Whit, K. (1988). A recent survey of production scheduling. IEEE Transactions on Systems, Man, and Cybernetics, 18(6), 841\u2013851.","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics"},{"issue":"3","key":"686_CR20","doi-asserted-by":"crossref","first-page":"384","DOI":"10.1109\/66.705373","volume":"11","author":"H. Xiong","year":"1998","unstructured":"Xiong, H., & Zhou, M. (1998). Scheduling of semi-conductor test facility via Petri Nets and hybrid heuristic search. IEEE Transactions on Semiconductor Manufacturing, 11(3), 384\u2013393.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"686_CR21","doi-asserted-by":"crossref","first-page":"527","DOI":"10.1016\/S0360-8352(02)00212-7","volume":"44","author":"H. Yu","year":"2003","unstructured":"Yu, H., Reyes, A., Cang, K., & Lloyd, S. (2003). Combined Petri Net modelling and AI based heuristic hybrid search for flexible manufacturing systems\u2014part 1, Petri Net modelling and heuristic search. Computers and Industrial Engineering, 44, 527\u2013543.","journal-title":"Computers and Industrial Engineering"},{"issue":"2","key":"686_CR22","doi-asserted-by":"crossref","first-page":"398","DOI":"10.1016\/j.ejor.2004.07.051","volume":"170","author":"X. Zhang","year":"2006","unstructured":"Zhang, X., & Bard, J.F. (2006). A multi-period machine assignment problem. European Journal of Operational Research, 170(2), 398\u2013415.","journal-title":"European Journal of Operational Research"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-010-0686-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-010-0686-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-010-0686-1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T18:07:59Z","timestamp":1559153279000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-010-0686-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,1,29]]},"references-count":22,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2010,12]]}},"alternative-id":["686"],"URL":"https:\/\/doi.org\/10.1007\/s10479-010-0686-1","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010,1,29]]}}}