{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,28]],"date-time":"2026-04-28T16:46:33Z","timestamp":1777394793477,"version":"3.51.4"},"reference-count":30,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2011,5,17]],"date-time":"2011-05-17T00:00:00Z","timestamp":1305590400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2011,6]]},"DOI":"10.1007\/s10479-011-0885-4","type":"journal-article","created":{"date-parts":[[2011,5,16]],"date-time":"2011-05-16T04:44:51Z","timestamp":1305521091000},"page":"295-316","source":"Crossref","is-referenced-by-count":81,"title":["Workforce-constrained maintenance scheduling for military aircraft fleet: a case study"],"prefix":"10.1007","volume":"186","author":[{"given":"Nima","family":"Safaei","sequence":"first","affiliation":[]},{"given":"Dragan","family":"Banjevic","sequence":"additional","affiliation":[]},{"given":"Andrew K. S.","family":"Jardine","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2011,5,17]]},"reference":[{"issue":"4","key":"885_CR1","doi-asserted-by":"crossref","first-page":"833","DOI":"10.1111\/j.1540-5915.2000.tb00945.x","volume":"31","author":"S. Ahire","year":"2000","unstructured":"Ahire, S., Greenwood, G., Gupta, A., & Terwilliger, M. (2000). Workforce-constrained preventive maintenance scheduling using evolution strategies. Decision Sciences Journal, 31(4), 833\u2013859.","journal-title":"Decision Sciences Journal"},{"key":"885_CR2","unstructured":"Beabout, B. A. Statistical process control: an application in aircraft maintenance management. Department of Operational Sciences, Air Force Institute of Technology, Master thesis March 2003."},{"issue":"2","key":"885_CR3","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1002\/atr.5670260204","volume":"26","author":"M. Bir\u00f3","year":"1992","unstructured":"Bir\u00f3, M., Simon, I., & T\u00e1nczos, C. (1992). Aircraft and maintenance scheduling support, mathematical insights and a proposed interactive system. Journal of Advanced Transportation, 26(2), 121\u2013130.","journal-title":"Journal of Advanced Transportation"},{"issue":"3","key":"885_CR4","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/inte.7.3.1","volume":"7","author":"N. J. Boere","year":"1977","unstructured":"Boere, N. J. (1977). Air Canada saves with aircraft maintenance scheduling. Interfaces, 7(3), 1\u201313.","journal-title":"Interfaces"},{"key":"885_CR5","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1023\/A:1018945415148","volume":"69","author":"L. W. Clarke","year":"1997","unstructured":"Clarke, L. W., Johnson, E. L., Nemhauser, G. L., & Zhu, Z. (1997). The aircraft rotation problem. Annals of Operations Research, 69, 33\u201346.","journal-title":"Annals of Operations Research"},{"issue":"3","key":"885_CR6","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1287\/opre.51.3.387.14759","volume":"51","author":"A. M. Cohn","year":"2003","unstructured":"Cohn, A. M., & Barnhart, C. (2003). Improving crew scheduling by incorporating key maintenance routing decisions. Operation Research, 51(3), 387\u2013396.","journal-title":"Operation Research"},{"issue":"4","key":"885_CR7","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1287\/inte.24.6.47","volume":"24","author":"M. C. Dijkstra","year":"1994","unstructured":"Dijkstra, M. C., Kroon, L. G., Salomon, M., Van Nunen, J., & Van Wassenhove, L. N. (1994). Planning the size and organisation of KLM\u2019s aircraft maintenance personnel. Interfaces, 24(4), 47\u201358.","journal-title":"Interfaces"},{"issue":"4","key":"885_CR8","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/S0969-6997(00)00011-9","volume":"6","author":"W. Moudani El","year":"2000","unstructured":"El Moudani, W., & Mora-Camino, F. (2000). A dynamic approach for aircraft assignment and maintenance scheduling by airlines. Journal of Air Transport Management, 6(4), 233\u2013237.","journal-title":"Journal of Air Transport Management"},{"issue":"4","key":"885_CR9","doi-asserted-by":"crossref","first-page":"827","DOI":"10.1287\/mnsc.43.6.827","volume":"43","author":"M. Gopalakrishnan","year":"1997","unstructured":"Gopalakrishnan, M., Ahire, S. L., & Miller, D. M. (1997). Maximizing the effectiveness of a preventive maintenance system: an adaptive modelling approach. Management Science, 43(4), 827\u2013840.","journal-title":"Management Science"},{"key":"885_CR10","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1023\/A:1018988203220","volume":"76","author":"R. Gopalan","year":"1998","unstructured":"Gopalan, R., & Talluri, K. L. (1998). Mathematical models in airline schedule planning: a survey. Annals of Operational Research, 76, 155\u2013185.","journal-title":"Annals of Operational Research"},{"key":"885_CR11","doi-asserted-by":"crossref","first-page":"1026","DOI":"10.1057\/palgrave.jors.2600612","volume":"49","author":"A. Higgins","year":"1998","unstructured":"Higgins, A. (1998). Scheduling of railway track maintenance activities and crews. Journal of the Operational Research Society, 49, 1026\u20131033.","journal-title":"Journal of the Operational Research Society"},{"issue":"5","key":"885_CR12","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1016\/S0167-6377(00)00061-4","volume":"27","author":"H. Hoogeveen","year":"2000","unstructured":"Hoogeveen, H., Potts, C. N., & Woeginger, G. J. (2000). On-line scheduling on a single machine: maximizing the number of early jobs. Operations Research Letters, 27(5), 193\u2013197.","journal-title":"Operations Research Letters"},{"key":"885_CR13","doi-asserted-by":"crossref","first-page":"782","DOI":"10.1007\/978-3-540-31880-4_54","volume":"3410","author":"M. P. Kleeman","year":"2005","unstructured":"Kleeman, M. P., & Lamont, G. B. (2005). Solving the aircraft engine maintenance scheduling problem using a multi-objective evolutionary algorithm. Lecture Notes in Computer Science (Evolutionary Multi-Criterion Optimization), 3410, 782\u2013796.","journal-title":"Lecture Notes in Computer Science (Evolutionary Multi-Criterion Optimization)"},{"issue":"2","key":"885_CR14","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1002\/atr.5670430205","volume":"43","author":"G. Kozanidis","year":"2009","unstructured":"Kozanidis, G. (2009). A multi-objective model for maximizing fleet availability under the presence of flight and maintenance requirements. Journal of Advanced Transportation, 43(2), 155\u2013182.","journal-title":"Journal of Advanced Transportation"},{"key":"885_CR15","first-page":"397","volume-title":"The Handbook of airline economics","author":"M. Lam","year":"1995","unstructured":"Lam, M. (1995). An introduction to airline maintenance. In The Handbook of airline economics (1st ed.) (pp. 397\u2013406). New York: McGraw-Hill.","edition":"1"},{"issue":"5","key":"885_CR16","doi-asserted-by":"crossref","first-page":"493","DOI":"10.1287\/mnsc.11.5.493","volume":"11","author":"J. McCall","year":"1965","unstructured":"McCall, J. (1965). Maintenance policies for stochastically failing equipment: a survey. Management Science, 11(5), 493\u2013524.","journal-title":"Management Science"},{"issue":"3","key":"885_CR17","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1108\/13552510210439829","volume":"8","author":"E.A.M. Mjema","year":"2002","unstructured":"Mjema, E.A.M. (2002). An analysis of personnel capacity requirement in the maintenance department by using a simulation method. Journal of Quality in Maintenance Engineering, 8(3), 253\u2013273.","journal-title":"Journal of Quality in Maintenance Engineering"},{"key":"885_CR18","doi-asserted-by":"crossref","first-page":"1969","DOI":"10.1016\/j.ejor.2005.12.015","volume":"177","author":"G. Quan","year":"2007","unstructured":"Quan, G., Greenwood, G. W., Liu, D., & Hu, S. (2007). Searching for multi-objective preventive maintenance schedules: combining preferences with evolutionary algorithms. European Journal of Operational Research, 177, 1969\u20131984.","journal-title":"European Journal of Operational Research"},{"issue":"13","key":"885_CR19","doi-asserted-by":"crossref","first-page":"3539","DOI":"10.1080\/00207540701824225","volume":"47","author":"R. Quintana","year":"2009","unstructured":"Quintana, R., Leung, M.T., Villalobos, J.R., Graul, M. (2009). Corrective maintenance through dynamic work allocation and pre-emption: case study and application. International Journal of Production Research, 47(13), 3539\u20133557.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"885_CR20","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1007\/BF00934541","volume":"39","author":"S. M. Roberts","year":"1983","unstructured":"Roberts, S. M., & Escudero, L. F. (1983). Scheduling of plant maintenance personnel. Journal of Optimization Theory and Applications, 39(3), 323\u2013343.","journal-title":"Journal of Optimization Theory and Applications"},{"key":"885_CR21","first-page":"27","volume-title":"Global optimization: focus on simulated annealing","author":"N. Safaei","year":"2008","unstructured":"Safaei, N., Banjevic, D., & Jardine, A. K. S. (2008). Multi-objective simulated annealing for a maintenance workforce scheduling problem: a case study. In C. M. Tan (Ed.), Global optimization: focus on simulated annealing (pp. 27\u201348). Berlin: Springer."},{"key":"885_CR22","doi-asserted-by":"crossref","first-page":"1005","DOI":"10.1057\/jors.2010.51","volume":"62","author":"N. Safaei","year":"2011","unstructured":"Safaei, N., Banjevic, D., & Jardine, A. K. S. (2011). Workforce-constrained maintenance scheduling: a case study. Journal of Operational Research Society, 62, 1005\u20131018.","journal-title":"Journal of Operational Research Society"},{"key":"885_CR23","volume-title":"Proceedings of IEEE symposium on computational intelligence in scheduling (CI-Sched)","author":"A. Shenneld","year":"2007","unstructured":"Shenneld, A., Fleming, P., Allan, J., & Kadirkamanathan, V. (2007). Optimisation of maintenance scheduling strategies on the grid. In Proceedings of IEEE symposium on computational intelligence in scheduling (CI-Sched), Honolulu, HI, April 2007."},{"issue":"1","key":"885_CR24","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/S0965-8564(02)00004-6","volume":"37","author":"C. Sriram","year":"2003","unstructured":"Sriram, C., & Haghani, A. (2003). An optimization model for aircraft maintenance scheduling and re-assignment. Transportation Research Part A: Policy and Practice, 37(1), 29\u201348.","journal-title":"Transportation Research Part A: Policy and Practice"},{"issue":"3","key":"885_CR25","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1142\/S0218539307002611","volume":"14","author":"A. K. Verma","year":"2007","unstructured":"Verma, A. K., & Ramesh, P. G. (2007). Multi-objective initial preventive maintenance scheduling for large engineering plants. International Journal of Reliability, Quality and Safety Engineering, 14(3), 241\u2013250.","journal-title":"International Journal of Reliability, Quality and Safety Engineering"},{"issue":"2","key":"885_CR26","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1287\/mnsc.13.2.B52","volume":"13","author":"R. C. Vergin","year":"1966","unstructured":"Vergin, R. C. (1966). Scheduling maintenance and determining crew size for stochastically failing equipment. Management Science, 13(2), 52\u201365.","journal-title":"Management Science"},{"issue":"2","key":"885_CR27","doi-asserted-by":"crossref","first-page":"316","DOI":"10.1287\/mnsc.10.2.316","volume":"10","author":"H. M. Wagner","year":"1964","unstructured":"Wagner, H. M., Giglio, R. J., & Glaser, R. G. (1964). Preventive maintenance scheduling by mathematical programming. Management Science, 10(2), 316\u2013334.","journal-title":"Management Science"},{"issue":"5","key":"885_CR28","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1016\/j.tre.2005.02.002","volume":"42","author":"S. Yan","year":"2006","unstructured":"Yan, S., Chen, S.-C., & Chen, C.-H. (2006). Air cargo fleet routing and timetable setting with multiple on-time demands. Transportation Research Part E: Logistics and Transportation Review, 42(5), 409\u2013430.","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"issue":"1","key":"885_CR29","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1016\/j.omega.2005.03.002","volume":"35","author":"S. Yan","year":"2007","unstructured":"Yan, S., Tanga, C.-H., & Leea, M.-C. (2007). A flight scheduling model for Taiwan airlines under market competitions. Omega, 35(1), 61\u201374.","journal-title":"Omega"},{"key":"885_CR30","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/S0969-6997(03)00013-9","volume":"9","author":"T.-H. Yanga","year":"2003","unstructured":"Yanga, T.-H., Yanb, S., & Chen, H.-H. (2003). An airline maintenance manpower planning model with flexible strategies. Journal of Air Transport Management, 9, 233\u2013239.","journal-title":"Journal of Air Transport Management"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-011-0885-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-011-0885-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-011-0885-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T14:08:06Z","timestamp":1559138886000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-011-0885-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,5,17]]},"references-count":30,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2011,6]]}},"alternative-id":["885"],"URL":"https:\/\/doi.org\/10.1007\/s10479-011-0885-4","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2011,5,17]]}}}