{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,4,5]],"date-time":"2022-04-05T17:35:40Z","timestamp":1649180140593},"reference-count":19,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2011,10,4]],"date-time":"2011-10-04T00:00:00Z","timestamp":1317686400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2011,11]]},"DOI":"10.1007\/s10479-011-0996-y","type":"journal-article","created":{"date-parts":[[2011,10,3]],"date-time":"2011-10-03T09:58:00Z","timestamp":1317635880000},"page":"219-249","source":"Crossref","is-referenced-by-count":1,"title":["A sensitivity analysis to assess the completion time deviation for multi-purpose machines facing demand uncertainty"],"prefix":"10.1007","volume":"191","author":[{"given":"Andr\u00e9","family":"Rossi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Alexis","family":"Aubry","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mireille","family":"Jacomino","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2011,10,4]]},"reference":[{"issue":"1","key":"996_CR1","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1109\/66.909654","volume":"14","author":"E. Ak\u00e7ali","year":"2001","unstructured":"Ak\u00e7ali, E., Nemoto, K., & Uzsoy, R. (2001). Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Transaction on Semiconductor Manufacturing, 14(1), 48\u201356.","journal-title":"IEEE Transaction on Semiconductor Manufacturing"},{"issue":"3","key":"996_CR2","doi-asserted-by":"crossref","first-page":"1115","DOI":"10.1016\/j.ejor.2006.05.050","volume":"187","author":"A. Aubry","year":"2008","unstructured":"Aubry, A., Rossi, A., & Jacomino, M. (2008a). Minimizing setup costs for parallel multi-purpose machines under load-balancing constraint. European Journal of Operational Research, 187(3), 1115\u20131125.","journal-title":"European Journal of Operational Research"},{"key":"996_CR3","volume-title":"International federation of automatic control","author":"A. Aubry","year":"2008","unstructured":"Aubry, A., Rossi, A., & Jacomino, M. (2008b). Sensitivity analysis for the configuration of a multi-purpose machines workshop. In International federation of automatic control, Seoul, South Korea. Available at http:\/\/sites.google.com\/site\/aubryalexis\/ ."},{"key":"996_CR4","first-page":"1464","volume-title":"Preprints of the 13th IFAC symposium on information control problems in manufacturing","author":"A. Aubry","year":"2009","unstructured":"Aubry, A., Rossi, A., & Jacomino, M. (2009). A generic off-line approach for dealing with uncertainty in optimisation. In Preprints of the 13th IFAC symposium on information control problems in manufacturing, Moscow, Russia, 3\u20135\u00a0June (pp. 1464\u20131469)."},{"key":"996_CR5","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1023\/A:1018950911030","volume":"70","author":"P. Brucker","year":"1997","unstructured":"Brucker, P., Jurisch, B., & Kramer, A. (1997). Complexity of scheduling problems with multi-purpose machines. Annals of Operational Research, 70, 57\u201373.","journal-title":"Annals of Operational Research"},{"key":"996_CR6","doi-asserted-by":"crossref","DOI":"10.1002\/9780470611432","volume-title":"Flexibility and robustness in scheduling","author":"J.-C. Billaut","year":"2008","unstructured":"Billaut, J.-C., Moukrim, A., & Sanlaville, E. (2008). Flexibility and robustness in scheduling. London: ISTE Ltd, Wiley."},{"key":"996_CR7","volume-title":"Flexibility and robustness in scheduling","author":"M.-L. Espinouse","year":"2008","unstructured":"Espinouse, M.-L., Jacomino, M., & Rossi, A. (2008). The robustness of multi-purpose machines workshop configuration. In Flexibility and robustness in scheduling. London: ISTE Ltd, Wiley."},{"key":"996_CR8","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R. Graham","year":"1979","unstructured":"Graham, R., Lawler, E., Lenstra, J., & Rinnooy Kan, A. (1979). Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5, 287\u2013326.","journal-title":"Annals of Discrete Mathematics"},{"key":"996_CR9","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4757-2620-6","volume-title":"Robust discrete optimization and its applications","author":"P. Kouvelis","year":"1997","unstructured":"Kouvelis, P., & Yu, G. (1997). Robust discrete optimization and its applications. Dordrecht: Kluwer Academic."},{"key":"996_CR10","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/0377-2217(92)90032-5","volume":"63","author":"P. Kouvelis","year":"1992","unstructured":"Kouvelis, P., Kurawarwala, A. A., & Guti\u00e9rrez, G. J. (1992). Algorithms for robust single and multiple period layout planning for manufacturing systems. European Journal of Operational Research, 63, 287\u2013303.","journal-title":"European Journal of Operational Research"},{"key":"996_CR11","doi-asserted-by":"crossref","first-page":"612","DOI":"10.1145\/322092.322101","volume":"25","author":"E. Lawler","year":"1978","unstructured":"Lawler, E., & Labetoulle, J. (1978). On preemptive scheduling of unrelated parallel processors by linear programming. Journal of the Association for Computing Machinery, 25, 612\u2013619.","journal-title":"Journal of the Association for Computing Machinery"},{"key":"996_CR12","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1016\/j.ijpe.2008.09.003","volume":"116","author":"J. Leung","year":"2008","unstructured":"Leung, J., & Li, C.-L. (2008). Scheduling with processing set restrictions: a survey. International Journal of Production Economics, 116, 251\u2013262.","journal-title":"International Journal of Production Economics"},{"issue":"5\u20136","key":"996_CR13","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/S0020-0190(99)00108-8","volume":"71","author":"L. Nourine","year":"1999","unstructured":"Nourine, L., & Raynaud, O. (1999). A fast algorithm for building lattices. Information Processing Letters, 71(5\u20136), 199\u2013204.","journal-title":"Information Processing Letters"},{"key":"996_CR14","doi-asserted-by":"crossref","first-page":"606","DOI":"10.1016\/S0377-2217(00)00281-2","volume":"134","author":"B. Penz","year":"2001","unstructured":"Penz, B., Rapine, C., & Trystram, D. (2001). Sensitivity analysis of scheduling algorithms. European Journal of Operational Research, 134, 606\u2013615.","journal-title":"European Journal of Operational Research"},{"key":"996_CR15","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1007\/BF01580724","volume":"40","author":"J. Renegar","year":"1988","unstructured":"Renegar, J. (1988). A polynomial-time algorithm, based on Newton\u2019s method, for linear programming. Mathematical Programming, 40, 59\u201393.","journal-title":"Mathematical Programming"},{"key":"996_CR16","unstructured":"Rossi, A. (2003). Ordonnancement en milieu incertain, mise en \u0153uvre d\u2019une d\u00e9marche robuste. Ph.D. thesis, Institut National Polytechnique de Grenoble, France."},{"issue":"7","key":"996_CR17","doi-asserted-by":"crossref","first-page":"547","DOI":"10.1080\/07408170500216480","volume":"38","author":"L. V. Snyder","year":"2006","unstructured":"Snyder, L. V. (2006). Facility location under uncertainty: a review. IIE Transactions, 38(7), 547\u2013564.","journal-title":"IIE Transactions"},{"key":"996_CR18","doi-asserted-by":"crossref","DOI":"10.1137\/1.9781611971453","volume-title":"Primal-dual interior-point methods","author":"S. Wright","year":"1997","unstructured":"Wright, S. (1997). Primal-dual interior-point methods. Philadelphia: Society for Industrial and Applied Mathematics."},{"issue":"1","key":"996_CR19","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1109\/TSM.2003.822730","volume":"17","author":"H. J. Yoon","year":"2004","unstructured":"Yoon, H. J., & Lee, D. Y. (2004). Deadlock-free scheduling of photolithography equipment in semiconductor fabrication. IEEE Transaction on Semiconductor Manufacturing, 17(1), 42\u201354.","journal-title":"IEEE Transaction on Semiconductor Manufacturing"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-011-0996-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-011-0996-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-011-0996-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T14:08:09Z","timestamp":1559138889000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-011-0996-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,10,4]]},"references-count":19,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2011,11]]}},"alternative-id":["996"],"URL":"https:\/\/doi.org\/10.1007\/s10479-011-0996-y","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2011,10,4]]}}}