{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,2]],"date-time":"2026-07-02T23:27:23Z","timestamp":1783034843503,"version":"3.54.6"},"reference-count":43,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2012,5,16]],"date-time":"2012-05-16T00:00:00Z","timestamp":1337126400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2014,2]]},"DOI":"10.1007\/s10479-012-1155-9","type":"journal-article","created":{"date-parts":[[2012,5,15]],"date-time":"2012-05-15T09:51:52Z","timestamp":1337075512000},"page":"203-220","source":"Crossref","is-referenced-by-count":17,"title":["Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective"],"prefix":"10.1007","volume":"213","author":[{"given":"Zhengwen","family":"He","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Nengmin","family":"Wang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Pengxiang","family":"Li","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2012,5,16]]},"reference":[{"key":"1155_CR1","volume-title":"Handbook on scheduling: from theory to applications","author":"J. B\u0142a\u017cewicz","year":"2007","unstructured":"B\u0142a\u017cewicz, J., Ecker, K., Pesch, E., Schmidt, G., & W\u0119glarz, J. (2007). Handbook on scheduling: from theory to applications. Berlin: Springer."},{"issue":"8","key":"1155_CR2","doi-asserted-by":"crossref","first-page":"2335","DOI":"10.1080\/00207549608905028","volume":"34","author":"F. F. Boctor","year":"1996","unstructured":"Boctor, F. F. (1996). Resource-constrained project scheduling by simulated annealing. International Journal of Production Research, 34(8), 2335\u20132351.","journal-title":"International Journal of Production Research"},{"issue":"2","key":"1155_CR3","doi-asserted-by":"crossref","first-page":"268","DOI":"10.1016\/S0377-2217(02)00761-0","volume":"149","author":"K. Bouleimen","year":"2003","unstructured":"Bouleimen, K., & Lecocq, H. (2003). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research, 149(2), 268\u2013281.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"1155_CR4","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P. Brucker","year":"1999","unstructured":"Brucker, P., Drexl, A., M\u00f6hring, R., Neumann, K., & Pesch, E. (1999). Resource-constrained project scheduling: notation, classification, models and methods. European Journal of Operational Research, 112(1), 3\u201341.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"1155_CR5","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1007\/BF00940812","volume":"45","author":"V. Cerny","year":"1985","unstructured":"Cerny, V. (1985). Thermodynamical approach to the traveling salesman problem: an efficient simulation algorithm. Journal of Optimization Theory and Applications, 45(1), 41\u201351.","journal-title":"Journal of Optimization Theory and Applications"},{"issue":"7","key":"1155_CR6","doi-asserted-by":"crossref","first-page":"736","DOI":"10.1057\/palgrave.jors.2600416","volume":"48","author":"J. H. Cho","year":"1997","unstructured":"Cho, J. H., & Kim, Y. D. (1997). A simulated annealing algorithm for resource constrained project scheduling problems. Journal of the Operational Research Society, 48(7), 736\u2013744.","journal-title":"Journal of the Operational Research Society"},{"issue":"3\u20134","key":"1155_CR7","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1080\/01966324.1988.10737242","volume":"8","author":"N. E. Collins","year":"1988","unstructured":"Collins, N. E., Eglese, R. W., & Golden, B. L. (1988). Simulated annealing\u2014an annotated bibliography. American Journal of Mathematical and Management Sciences, 8(3\u20134), 209\u2013307.","journal-title":"American Journal of Mathematical and Management Sciences"},{"issue":"9","key":"1155_CR8","doi-asserted-by":"crossref","first-page":"906","DOI":"10.1057\/palgrave.jors.2600440","volume":"48","author":"N. Dayanand","year":"1997","unstructured":"Dayanand, N., & Padman, R. (1997). On modeling progress payments in project networks. Journal of the Operational Research Society, 48(9), 906\u2013918.","journal-title":"Journal of the Operational Research Society"},{"issue":"1","key":"1155_CR9","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1023\/A:1010910316909","volume":"102","author":"N. Dayanand","year":"2001","unstructured":"Dayanand, N., & Padman, R. (2001a). A two stage search heuristic for scheduling payments in projects. Annals of Operations Research, 102(1), 197\u2013220.","journal-title":"Annals of Operations Research"},{"issue":"12","key":"1155_CR10","doi-asserted-by":"crossref","first-page":"1654","DOI":"10.1287\/mnsc.47.12.1654.10242","volume":"47","author":"N. Dayanand","year":"2001","unstructured":"Dayanand, N., & Padman, R. (2001b). Project contracts and payments schedules: the client\u2019s problem. Management Science, 47(12), 1654\u20131667.","journal-title":"Management Science"},{"key":"1155_CR11","volume-title":"Project scheduling\u2014a research handbook","author":"E. Demeulemeester","year":"2002","unstructured":"Demeulemeester, E., & Herroelen, W. (2002). Project scheduling\u2014a research handbook. Boston: Kluwer Academic."},{"issue":"2","key":"1155_CR12","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1016\/0377-2217(94)00187-H","volume":"81","author":"P. De","year":"1995","unstructured":"De, P., Dunne, E. J., Ghosh, J. B., & Wells, C. E. (1995). The discrete time-cost tradeoff problem revisited. European Journal of Operational Research, 81(2), 225\u2013238.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"1155_CR13","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1287\/opre.45.2.302","volume":"45","author":"P. De","year":"1997","unstructured":"De, P., Dunne, E. J., Ghosh, J. B., & Wells, C. E. (1997). Complexity of the discrete time-cost tradeoff problem for project networks. Operations Research, 45(2), 302\u2013306.","journal-title":"Operations Research"},{"key":"1155_CR14","volume-title":"Resource-constrained project scheduling: models, algorithms, extensions and applications","author":"L.-E. Drezet","year":"2008","unstructured":"Drezet, L.-E. (2008). RCPSP with financial costs. In C. Artigues, S. Demassey, & E. N\u00e9ron (Eds.), Resource-constrained project scheduling: models, algorithms, extensions and applications London: ISTE-Wiley."},{"issue":"3","key":"1155_CR15","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1016\/0377-2217(90)90001-R","volume":"46","author":"R. W. Eglese","year":"1990","unstructured":"Eglese, R. W. (1990). Simulated annealing: a tool for operational research. European Journal of Operational Research, 46(3), 271\u2013281.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"1155_CR16","doi-asserted-by":"crossref","first-page":"90","DOI":"10.1016\/0377-2217(95)00382-7","volume":"96","author":"R. Etgar","year":"1997","unstructured":"Etgar, R., Shtub, A., & LeBlanc, L. J. (1997). Scheduling projects to maximize net present value\u2014the case of time-dependent, contingent cash flows. European Journal of Operational Research, 96(1), 90\u201396.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"1155_CR17","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1016\/S0377-2217(97)00336-6","volume":"107","author":"M. Hapke","year":"1998","unstructured":"Hapke, M., Jaszkiewicz, A., & S\u0142owi\u0144ski, R. (1998). Interactive analysis of multiple-criteria project scheduling problems. European Journal of Operational Research, 107(2), 315\u2013324.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"1155_CR18","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S. Hartmann","year":"2010","unstructured":"Hartmann, S., & Briskorn, D. (2010). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207(1), 1\u201314.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"1155_CR19","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1016\/S0377-2217(96)00112-9","volume":"100","author":"W. S. Herroelen","year":"1997","unstructured":"Herroelen, W. S., Dommelen, P., & Demeulemeester, E. L. (1997). Project network models with discounted cash flows: a guided tour through recent developments. European Journal of Operational Research, 100(1), 97\u2013121.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"1155_CR20","doi-asserted-by":"crossref","first-page":"1191","DOI":"10.1016\/j.ejor.2006.07.053","volume":"189","author":"Z. He","year":"2008","unstructured":"He, Z., & Xu, Y. (2008). Multi-mode project payment scheduling problems with bonus-penalty structure. European Journal of Operational Research, 189(3), 1191\u20131207.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"1155_CR21","doi-asserted-by":"crossref","first-page":"688","DOI":"10.1016\/j.ejor.2008.10.005","volume":"198","author":"Z. He","year":"2009","unstructured":"He, Z., Wang, N., Jia, T., & Xu, Y. (2009). Simulated annealing and tabu search for multi-mode project payment scheduling. European Journal of Operational Research, 198(3), 688\u2013696.","journal-title":"European Journal of Operational Research"},{"issue":"11","key":"1155_CR22","doi-asserted-by":"crossref","first-page":"80","DOI":"10.1108\/01443579310046454","volume":"13","author":"O. Icmeli","year":"1993","unstructured":"Icmeli, O., Erenguc, S. S., & Zappe, C. J. (1993). Project scheduling problem: a survey. Journal of Operations and Productions Management, 13(11), 80\u201391.","journal-title":"Journal of Operations and Productions Management"},{"issue":"1","key":"1155_CR23","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1023\/A:1010954031930","volume":"102","author":"J. Jozefowska","year":"2001","unstructured":"Jozefowska, J., Mika, M., Rozycki, R., Waligora, G., & Weglarz, J. (2001). Simulated annealing for multi-mode resource-constrained project scheduling. Annals of Operations Research, 102(1), 137\u2013155.","journal-title":"Annals of Operations Research"},{"issue":"2","key":"1155_CR24","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1002\/nav.20331","volume":"56","author":"N. Kavlak","year":"2009","unstructured":"Kavlak, N., Ulusoy, G., \u015eerifo\u011flu, F. S., & Birbil, \u015e. \u0130. (2009). Client-contractor bargaining on net present value in project scheduling with limited resources. Naval Research Logistics, 56(2), 93\u2013112.","journal-title":"Naval Research Logistics"},{"issue":"4598","key":"1155_CR25","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S. Kirkpatrick","year":"1983","unstructured":"Kirkpatrick, S., Gelatt, C. D., & Vecchi, M. P. (1983). Optimization by simulated annealing. Science, 220(4598), 671\u2013680.","journal-title":"Science"},{"key":"1155_CR26","volume-title":"Project scheduling: recent models, algorithms, and applications","author":"R. Kolisch","year":"1999","unstructured":"Kolisch, R., & Hartmann, S. (1999). Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis. In J. W\u0119glarz (Ed.), Project scheduling: recent models, algorithms, and applications Boston: Kluwer Academic."},{"issue":"3","key":"1155_CR27","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/S0305-0483(00)00046-3","volume":"29","author":"R. Kolisch","year":"2001","unstructured":"Kolisch, R., & Padman, R. (2001). An integrated survey of deterministic project scheduling. Omega, 29(3), 249\u2013272.","journal-title":"Omega"},{"issue":"1","key":"1155_CR28","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1016\/S0377-2217(96)00170-1","volume":"96","author":"R. Kolisch","year":"1996","unstructured":"Kolisch, R., & Sprecher, A. (1996). PSPLIB\u2014a project scheduling problem library. European Journal of Operational Research, 96(1), 205\u2013216.","journal-title":"European Journal of Operational Research"},{"issue":"10","key":"1155_CR29","doi-asserted-by":"crossref","first-page":"1693","DOI":"10.1287\/mnsc.41.10.1693","volume":"41","author":"R. Kolisch","year":"1995","unstructured":"Kolisch, R., Sprecher, A., & Drexl, A. (1995). Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 41(10), 1693\u20131703.","journal-title":"Management Science"},{"issue":"1","key":"1155_CR30","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1016\/0305-0483(94)90006-X","volume":"22","author":"C. Koulamas","year":"1994","unstructured":"Koulamas, C., Antony, S. R., & Jean, R. (1994). A survey of simulated annealing applications to operations research problems. Omega, 22(1), 44\u201356.","journal-title":"Omega"},{"issue":"6","key":"1155_CR31","doi-asserted-by":"crossref","first-page":"1087","DOI":"10.1063\/1.1699114","volume":"21","author":"N. Metropolis","year":"1953","unstructured":"Metropolis, N., Rosenbluth, A., Rosenbluth, M., Teller, A., & Teller, E. (1953). Equation of state calculations by fast computing machines. Journal of Chemical Physics, 21(6), 1087\u20131092.","journal-title":"Journal of Chemical Physics"},{"issue":"3","key":"1155_CR32","doi-asserted-by":"crossref","first-page":"639","DOI":"10.1016\/j.ejor.2003.10.053","volume":"164","author":"M. Mika","year":"2005","unstructured":"Mika, M., Walig\u00f3ra, G., & W\u0119glarz, J. (2005). Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models. European Journal of Operational Research, 164(3), 639\u2013668.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"1155_CR33","doi-asserted-by":"crossref","first-page":"1238","DOI":"10.1016\/j.ejor.2006.06.069","volume":"187","author":"M. Mika","year":"2008","unstructured":"Mika, M., Walig\u00f3ra, G., & W\u0119glarz, J. (2008). Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times. European Journal of Operational Research, 187(3), 1238\u20131250.","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"1155_CR34","doi-asserted-by":"crossref","first-page":"574","DOI":"10.1080\/07408179508936773","volume":"27","author":"L. \u00d6zdamar","year":"1995","unstructured":"\u00d6zdamar, L., & Ulusoy, G. (1995). A survey on the resource-constrained project scheduling problem. IIE Transactions, 27(5), 574\u2013586.","journal-title":"IIE Transactions"},{"issue":"5","key":"1155_CR35","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1287\/mnsc.16.5.357","volume":"16","author":"A. H. Russell","year":"1970","unstructured":"Russell, A. H. (1970). Cash flows in networks. Management Science, 16(5), 357\u2013373.","journal-title":"Management Science"},{"issue":"1","key":"1155_CR36","doi-asserted-by":"crossref","first-page":"124","DOI":"10.1016\/0377-2217(94)00158-8","volume":"88","author":"A. Shtub","year":"1996","unstructured":"Shtub, A., LeBlanc, L. J., & Cai, Z. (1996). Scheduling programs with repetitive projects: a comparison of a simulated annealing, a genetic and a pair-wise swap algorithm. European Journal of Operational Research, 88(1), 124\u2013138.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"1155_CR37","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1007\/BF01545587","volume":"19","author":"A. Sprecher","year":"1997","unstructured":"Sprecher, A., Hartmann, S., & Drexl, A. (1997). An exact algorithm for project scheduling with multiple modes. OR-Spektrum, 19(3), 195\u2013203.","journal-title":"OR-Spektrum"},{"issue":"4","key":"1155_CR38","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1287\/mnsc.1040.0319","volume":"51","author":"J. G. Szmerekovsky","year":"2005","unstructured":"Szmerekovsky, J. G. (2005). The impact of contractor behavior on the client\u2019s payment-scheduling problem. Management Science, 51(4), 629\u2013640.","journal-title":"Management Science"},{"issue":"2","key":"1155_CR39","doi-asserted-by":"crossref","first-page":"262","DOI":"10.1016\/S0377-2217(99)00499-3","volume":"127","author":"G. Ulusoy","year":"2000","unstructured":"Ulusoy, G., & Cebelli, S. (2000). An equitable approach to the payment scheduling problem in project management. European Journal of Operational Research, 127(2), 262\u2013278.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"1155_CR40","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1016\/S0377-2217(99)00163-0","volume":"120","author":"A. Viana","year":"2000","unstructured":"Viana, A., & Sousa, J. P. (2000). Using metaheuristics in multiobjective resource constrained project scheduling. European Journal of Operational Research, 120(2), 359\u2013374.","journal-title":"European Journal of Operational Research"},{"issue":"7","key":"1155_CR41","doi-asserted-by":"crossref","first-page":"2141","DOI":"10.1016\/j.cor.2006.09.022","volume":"35","author":"G. Walig\u00f3ra","year":"2008","unstructured":"Walig\u00f3ra, G. (2008). Discrete-continuous project scheduling with discounted cash flows\u2014a tabu search approach. Computers & Operations Research, 35(7), 2141\u20132153.","journal-title":"Computers & Operations Research"},{"issue":"3","key":"1155_CR42","doi-asserted-by":"crossref","first-page":"849","DOI":"10.1016\/j.ejor.2007.11.009","volume":"193","author":"G. Walig\u00f3ra","year":"2009","unstructured":"Walig\u00f3ra, G. (2009). Tabu search for discrete-continuous scheduling problems with heuristic continuous resource allocation. European Journal of Operational Research, 193(3), 849\u2013856.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"1155_CR43","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/j.ejor.2010.03.037","volume":"208","author":"J. W\u0119glarz","year":"2011","unstructured":"W\u0119glarz, J., J\u00f3zefowska, J., Mika, M., & Walig\u00f3ra, G. (2011). Project scheduling with finite or infinite number of activity processing modes\u2014a survey. European Journal of Operational Research, 208(3), 177\u2013205.","journal-title":"European Journal of Operational Research"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-012-1155-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-012-1155-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-012-1155-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T14:09:35Z","timestamp":1559138975000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-012-1155-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,5,16]]},"references-count":43,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2014,2]]}},"alternative-id":["1155"],"URL":"https:\/\/doi.org\/10.1007\/s10479-012-1155-9","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,5,16]]}}}