{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,28]],"date-time":"2024-08-28T19:09:07Z","timestamp":1724872147425},"reference-count":34,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2012,9,6]],"date-time":"2012-09-06T00:00:00Z","timestamp":1346889600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2015,8]]},"DOI":"10.1007\/s10479-012-1201-7","type":"journal-article","created":{"date-parts":[[2012,9,5]],"date-time":"2012-09-05T07:00:46Z","timestamp":1346828446000},"page":"79-104","source":"Crossref","is-referenced-by-count":1,"title":["Continuous material flow systems: analysis of marine ports handling bulk materials"],"prefix":"10.1007","volume":"231","author":[{"given":"\u00dcnsal","family":"\u00d6zdo\u011fru","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tayfur","family":"Altiok","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2012,9,6]]},"reference":[{"key":"1201_CR1","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1023\/A:1018915605231","volume":"93","author":"T. Altiok","year":"2000","unstructured":"Altiok, T. (2000). Tandem queues in bulk port operations. Annals of Operations Research, 93, 1\u201314.","journal-title":"Annals of Operations Research"},{"issue":"3","key":"1201_CR2","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/0278-6125(94)90006-X","volume":"13","author":"R. Alvarez-Vargas","year":"1994","unstructured":"Alvarez-Vargas, R., Dallery, Y., & David, R. (1994). A study of the continuous flow model of production lines with unreliable finite buffers. Journal of Manufacturing Systems, 13(3), 221\u2013234.","journal-title":"Journal of Manufacturing Systems"},{"key":"1201_CR3","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1023\/A:1018996428429","volume":"93","author":"H. Bihan Le","year":"2000","unstructured":"Le Bihan, H., & Dallery, Y. (2000). A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers. Annals of Operations Research, 93, 265\u2013297.","journal-title":"Annals of Operations Research"},{"key":"1201_CR4","unstructured":"Burman, M. H. (1995). New results in flow lines. PhD thesis, Massachusetts Institute of Technology."},{"issue":"2","key":"1201_CR5","doi-asserted-by":"crossref","first-page":"150","DOI":"10.1080\/07408178708975381","volume":"19","author":"Y. F. Choong","year":"1987","unstructured":"Choong, Y. F., & Gerswin, S. B. (1987). A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times. IIE Transactions, 19(2), 150\u2013159.","journal-title":"IIE Transactions"},{"key":"1201_CR6","author":"M. Colledani","year":"2011","unstructured":"Colledani, M., & Gershwin, S. B. (2011). A decomposition method for approximate evaluation of continuous flow multi-stage lines with general Markovian machines. Annals of Operations Research. doi: 10.1007\/s10479-011-0961-9 . Online first\u2122.","journal-title":"Annals of Operations Research"},{"issue":"3","key":"1201_CR7","doi-asserted-by":"crossref","first-page":"280","DOI":"10.1080\/07408178808966181","volume":"20","author":"Y. Dallery","year":"1988","unstructured":"Dallery, Y., David, R., & Xie, X. (1988). An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers. IIE Transactions, 20(3), 280\u2013283.","journal-title":"IIE Transactions"},{"issue":"9","key":"1201_CR8","doi-asserted-by":"crossref","first-page":"943","DOI":"10.1109\/9.35807","volume":"34","author":"Y. Dallery","year":"1989","unstructured":"Dallery, Y., David, R., & Xie, X. (1989). Approximate analysis of transfer lines with unreliable machines and finite buffers. IEEE Transactions on Automatic Control, 34(9), 943\u2013953.","journal-title":"IEEE Transactions on Automatic Control"},{"key":"1201_CR9","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1287\/opre.35.2.291","volume":"35","author":"S. B. Gershwin","year":"1987","unstructured":"Gershwin, S. B. (1987). An efficient decomposition algorithm for the approximate evaluation of tandem queues with finite storage space and blocking. Operations Research, 35, 291\u2013305.","journal-title":"Operations Research"},{"key":"1201_CR10","volume-title":"Manufacturing systems engineering","author":"S. B. Gershwin","year":"1994","unstructured":"Gershwin, S. B. (1994). Manufacturing systems engineering. New York: Prentice Hall"},{"issue":"1","key":"1201_CR11","doi-asserted-by":"crossref","first-page":"150","DOI":"10.1080\/05695558108974530","volume":"13","author":"S. B. Gershwin","year":"1981","unstructured":"Gershwin, S. B., & Berman, O. (1981). Analysis of transfer lines consisting of two-unreliable machines with random processing times and finite buffers. AIIE Transactions, 13(1), 150\u2013159.","journal-title":"AIIE Transactions"},{"key":"1201_CR12","unstructured":"Gershwin, S. B., & Schick, I. C. (1980). Continuous model of an unreliable two-machine material flow system with a finite interstage buffer (Report LIDS-R-1039). MIT Laboratory for Information and Decision Systems."},{"key":"1201_CR13","unstructured":"Glassey, C., & Hong, Y. (1986). The analysis of behavior of an unreliable two-stage automatic transfer line with inter-stage buffer storage (Technical report). University of Berkeley, Berkeley, CA, ORC 86-5."},{"issue":"3","key":"1201_CR14","doi-asserted-by":"crossref","first-page":"519","DOI":"10.1080\/00207549308956742","volume":"31","author":"C. R. Glassey","year":"1993","unstructured":"Glassey, C. R., & Hong, Y. (1993). Analysis of behavior of an unreliable n-stage transfer line with (n\u22121) inter-stage storage buffers. International Journal of Production Research, 31(3), 519\u2013530.","journal-title":"International Journal of Production Research"},{"key":"1201_CR15","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1023\/B:ANOR.0000011188.11019.33","volume":"125","author":"S. Helber","year":"2004","unstructured":"Helber, S., & Jusi\u0107, H. (2004). A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material. Annals of Operations Research, 125, 117\u2013139.","journal-title":"Annals of Operations Research"},{"key":"1201_CR16","doi-asserted-by":"crossref","first-page":"223","DOI":"10.1023\/A:1027324618360","volume":"45","author":"D. Jagerman","year":"2003","unstructured":"Jagerman, D., & Altiok, T. (2003). Vessel arrival process and queueing in marine ports handling bulk materials. Queueing Systems, 45, 223\u2013243.","journal-title":"Queueing Systems"},{"issue":"2\u20133","key":"1201_CR17","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1007\/s00291-005-0202-1","volume":"27","author":"J. Kim","year":"2005","unstructured":"Kim, J., & Gershwin, S. B. (2005). Integrated quality and quantity modeling of a production line. OR Spektrum, 27(2\u20133), 287\u2013314.","journal-title":"OR Spektrum"},{"key":"1201_CR18","doi-asserted-by":"crossref","first-page":"284","DOI":"10.1080\/07408170701558607","volume":"40","author":"J. Kim","year":"2008","unstructured":"Kim, J., & Gershwin, S. B. (2008). Analysis of long flow lines with quality and operational failures. IIE Transactions, 40, 284\u2013296.","journal-title":"IIE Transactions"},{"key":"1201_CR19","doi-asserted-by":"crossref","first-page":"615","DOI":"10.1080\/00207548708919865","volume":"25","author":"M. Koster De","year":"1987","unstructured":"De Koster, M. (1987). Estimation of line efficiency by aggregation. International Journal of Production Research, 25, 615\u2013626.","journal-title":"International Journal of Production Research"},{"key":"1201_CR20","doi-asserted-by":"crossref","first-page":"247","DOI":"10.1016\/S0166-5316(02)00098-6","volume":"51","author":"R. Levantesi","year":"2003","unstructured":"Levantesi, R., Matta, A., & Tolio, T. (2003). Performance evaluation of continuous production lines with machines having different processing times and multiple failure modes. Performance Evaluation, 51, 247\u2013268.","journal-title":"Performance Evaluation"},{"key":"1201_CR21","doi-asserted-by":"crossref","first-page":"646","DOI":"10.2307\/1427040","volume":"20","author":"D. Mitra","year":"1988","unstructured":"Mitra, D. (1988). Stochastic theory of a fluid model of producers and consumers coupled by a buffer. Advances in Applied Probability, 20, 646\u2013676.","journal-title":"Advances in Applied Probability"},{"issue":"4","key":"1201_CR22","doi-asserted-by":"crossref","first-page":"439","DOI":"10.1080\/05695557508975029","volume":"7","author":"R. A. Murphy","year":"1975","unstructured":"Murphy, R. A. (1975). The effect of surge on system availability. AIIE Transactions, 7(4), 439\u2013443.","journal-title":"AIIE Transactions"},{"key":"1201_CR23","unstructured":"\u00d6zdo\u011fru, U. (2000). Performance analysis of continuous material flow systems. PhD dissertation, RUTCOR, Rutgers University."},{"key":"1201_CR24","unstructured":"\u00d6zdo\u011fru, U., & Altiok, T. (1999). A comparative review of fluid-flow systems with storage in between (Technical report 101-99). ISE-Rutgers University."},{"key":"1201_CR25","unstructured":"\u00d6zdo\u011fru, U., & Altiok, T. (2000). A two-valve flow system with random material arrival process (Technical report 36-00). RUTCOR, Rutgers University."},{"key":"1201_CR26","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1007\/978-1-4615-1019-2_11","volume-title":"Analysis and modeling of manufacturing systems","author":"U. \u00d6zdo\u011fru","year":"2003","unstructured":"\u00d6zdo\u011fru, U., & Altiok, T. (2003). Analysis of two-valve fluid-flow systems with general repair times. In Analysis and modeling of manufacturing systems (special volume, pp. 255\u2013288). Boston: Kluwer Academic."},{"key":"1201_CR27","unstructured":"Semery, A. (1987). Modelisation des integracion du modele de dubo\u00ecs ar forestier a l\u2019heuristique de gershwin, pour les lignes a temps de cycle differents (Rapport de recherche, AS\/619-87)."},{"key":"1201_CR28","doi-asserted-by":"crossref","first-page":"429","DOI":"10.1137\/1107040","volume":"7","author":"B. A. Sevast\u2019Yanov","year":"1962","unstructured":"Sevast\u2019Yanov, B. A. (1962). Influence of storage bin capacity on the average standstill time of a production line. Theory of Probability and Its Applications, 7, 429\u2013438.","journal-title":"Theory of Probability and Its Applications"},{"issue":"8\u20139","key":"1201_CR29","doi-asserted-by":"crossref","first-page":"1011","DOI":"10.1016\/S0895-7177(00)00296-X","volume":"33","author":"B. Tan","year":"2001","unstructured":"Tan, B. (2001). A three station continuous materials flow merge system with unreliable stations and a shared buffer. Mathematical and Computer Modelling, 33(8\u20139), 1011\u20131026.","journal-title":"Mathematical and Computer Modelling"},{"issue":"2","key":"1201_CR30","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1016\/j.ijpe.2008.05.022","volume":"120","author":"B. Tan","year":"2009","unstructured":"Tan, B., & Gershwin, S. B. (2009). Analysis of a general Markovian two-stage continuous flow production system with a finite buffer. International Journal of Production Economics, 120(2), 327\u2013339.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"1201_CR31","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1007\/s10479-009-0612-6","volume":"182","author":"B. Tan","year":"2011","unstructured":"Tan, B., & Gershwin, S. B. (2011). Modelling and analysis of Markovian continuous flow systems with a finite buffer. Annals of Operations Research, 182(1), 5\u201330. Advances in manufacturing systems.","journal-title":"Annals of Operations Research"},{"key":"1201_CR32","volume-title":"International conference on robotics and automation","author":"C. Terracol","year":"1987","unstructured":"Terracol, C., & David, R. (1987). An aggregation method for performance evaluation of transfer lines with unreliable machines and finite buffers. In International conference on robotics and automation."},{"issue":"1","key":"1201_CR33","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1080\/05695557908974399","volume":"11","author":"J. Wijngaard","year":"1979","unstructured":"Wijngaard, J. (1979). The effect of an inter-stage buffer storage on the output of two able production units in series with different production rates. AIIE Transactions, 11(1), 42\u201346.","journal-title":"AIIE Transactions"},{"key":"1201_CR34","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/0377-2217(86)90326-7","volume":"27","author":"S. Yeralan","year":"1986","unstructured":"Yeralan, S., Franck, W., & Quasem, M. A. (1986). A continuous materials flow production line model with station breakdown. European Journal of Operational Research, 27, 289\u2013300.","journal-title":"European Journal of Operational Research"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-012-1201-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-012-1201-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-012-1201-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T18:09:37Z","timestamp":1559153377000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-012-1201-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,9,6]]},"references-count":34,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2015,8]]}},"alternative-id":["1201"],"URL":"https:\/\/doi.org\/10.1007\/s10479-012-1201-7","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,9,6]]}}}