{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,29]],"date-time":"2026-05-29T22:58:47Z","timestamp":1780095527405,"version":"3.54.0"},"reference-count":36,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2012,11,8]],"date-time":"2012-11-08T00:00:00Z","timestamp":1352332800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2016,6]]},"DOI":"10.1007\/s10479-012-1240-0","type":"journal-article","created":{"date-parts":[[2012,11,7]],"date-time":"2012-11-07T15:26:18Z","timestamp":1352301978000},"page":"225-247","source":"Crossref","is-referenced-by-count":28,"title":["Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projects"],"prefix":"10.1007","volume":"241","author":[{"given":"Xin","family":"Xu","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Yao","family":"Zhao","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ching-Yu","family":"Chen","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2012,11,8]]},"reference":[{"key":"1240_CR1","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1016\/0272-6963(80)90013-3","volume":"1","author":"N. J. Aquilano","year":"1980","unstructured":"Aquilano, N. J., & Smith, D. E. (1980). A formal set of algorithms for project scheduling with critical path method-material requirements planning. Journal of Operations Management, 1, 57\u201367.","journal-title":"Journal of Operations Management"},{"key":"1240_CR2","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1287\/opre.38.1.64","volume":"38","author":"S. Axsater","year":"1990","unstructured":"Axsater, S. (1990). Simple solution procedures for a class of two-echelon inventory problems. Operations Research, 38, 64\u201369.","journal-title":"Operations Research"},{"key":"1240_CR3","volume-title":"Inventory control","author":"S. Axsater","year":"2006","unstructured":"Axsater, S. (2006). Inventory control (2nd ed.). New York: Springer.","edition":"2"},{"key":"1240_CR4","doi-asserted-by":"crossref","first-page":"442","DOI":"10.1287\/inte.1040.0108","volume":"34","author":"K. Brown","year":"2004","unstructured":"Brown, K., Schmitt, T. G., Schonberger, R. J., & Dennis, S. (2004). Quadrant homes applies lean concepts in a project environment. Interfaces, 34, 442\u2013450.","journal-title":"Interfaces"},{"key":"1240_CR5","doi-asserted-by":"crossref","first-page":"1005","DOI":"10.1023\/A:1010994519405","volume":"33","author":"B. Dodin","year":"2001","unstructured":"Dodin, B., & Elimam, A. A. (2001). Integrated project scheduling and material planning with variable activity duration and rewards. IIE Transactions, 33, 1005\u20131018.","journal-title":"IIE Transactions"},{"key":"1240_CR6","first-page":"222","volume-title":"Proceedings IGLC-18","author":"J. A. Elfving","year":"2010","unstructured":"Elfving, J. A., Ballard, G., & Talvitie, U. (2010). Standardizing logistics at the corporate level towards lean logistics in construction. In Proceedings IGLC-18, July 2010, Technion, Haifa, Israel (pp. 222\u2013231)."},{"key":"1240_CR7","doi-asserted-by":"crossref","first-page":"68","DOI":"10.1287\/msom.2.1.68.23267","volume":"2","author":"S. C. Graves","year":"2000","unstructured":"Graves, S. C., & Willems, S. P. (2000). Optimizing strategic safety stock placement in supply chains. Manufacturing & Service Operations Management, 2, 68\u201383.","journal-title":"Manufacturing & Service Operations Management"},{"key":"1240_CR8","series-title":"Handbooks in operations research and management science","volume-title":"Supply chain management: design, coordination and operation","author":"S. C. Graves","year":"2003","unstructured":"Graves, S. C., & Willems, S. P. (2003). Supply chain design: safety stock placement and supply chain configuration. In A. G. de Kok & S. C. Graves (Eds.), Handbooks in operations research and management science: Vol. 11. Supply chain management: design, coordination and operation. Amsterdam: North-Holland."},{"key":"1240_CR9","doi-asserted-by":"crossref","first-page":"1165","DOI":"10.1287\/mnsc.1050.0367","volume":"51","author":"S. C. Graves","year":"2005","unstructured":"Graves, S. C., & Willems, S. P. (2005). Optimizing the supply chain configuration for new products. Management Science, 51, 1165\u20131180.","journal-title":"Management Science"},{"key":"1240_CR10","volume-title":"Analysis of inventory systems","author":"G. Hadley","year":"1963","unstructured":"Hadley, G., & Whitin, T. M. (1963). Analysis of inventory systems. Englewood Cliffs: Prentice-Hall."},{"key":"1240_CR11","doi-asserted-by":"crossref","first-page":"1599","DOI":"10.1287\/mnsc.41.10.1599","volume":"41","author":"R. Hariharan","year":"1995","unstructured":"Hariharan, R., & Zipkin, P. (1995). Customer-order information, leadtimes, and inventories. Management Science, 41, 1599\u20131607.","journal-title":"Management Science"},{"key":"1240_CR12","doi-asserted-by":"crossref","first-page":"646","DOI":"10.1016\/S0377-2217(97)00152-5","volume":"109","author":"W. H. Hausman","year":"1998","unstructured":"Hausman, W. H., Lee, H. L., & Zhang, A. X. (1998). Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies. European Journal of Operational Research, 109, 646\u2013659.","journal-title":"European Journal of Operational Research"},{"key":"1240_CR13","doi-asserted-by":"crossref","DOI":"10.1007\/978-0-387-33768-5","volume-title":"Perspectives in modern project scheduling","author":"J. Jozefowska","year":"2006","unstructured":"Jozefowska, J., & Weglarz, J. (2006). Perspectives in modern project scheduling (1st ed.). Berlin: Springer.","edition":"1"},{"key":"1240_CR14","unstructured":"Kerwin, K. (2005). BW 50: A new blueprint at Pulte Homes. BusinessWeek, October 3rd, 2005."},{"key":"1240_CR15","volume-title":"Production and operations analysis","author":"S. Nahmias","year":"2004","unstructured":"Nahmias, S. (2004). Production and operations analysis (5th ed.). Boston: McGraw-Hill\/Irwin.","edition":"5"},{"key":"1240_CR16","volume-title":"Proceedings IGLC-10","author":"W. J. O\u2019Brien","year":"2002","unstructured":"O\u2019Brien, W. J., London, K., & Vrijhoef, R. (2002). Construction supply chain modeling: a research review and interdisciplinary research agenda. In Proceedings IGLC-10, 1\u201319 August 2002, Gramado, Brazil."},{"key":"1240_CR17","doi-asserted-by":"crossref","first-page":"574","DOI":"10.1080\/07408179508936773","volume":"27","author":"L. Ozdamar","year":"1995","unstructured":"Ozdamar, L., & Ulusoy, G. (1995). A survey on the resource-constrained project scheduling problem. IIE Transactions, 27, 574\u2013586.","journal-title":"IIE Transactions"},{"key":"1240_CR18","volume-title":"Planning and scheduling in manufacturing and services","author":"M. Pinedo","year":"2005","unstructured":"Pinedo, M. (2005). Planning and scheduling in manufacturing and services. New York: Springer."},{"key":"1240_CR19","doi-asserted-by":"crossref","DOI":"10.1515\/9781503619883","volume-title":"Foundations of stochastic inventory theory","author":"E. L. Porteus","year":"2002","unstructured":"Porteus, E. L. (2002). Foundations of stochastic inventory theory. California: Stanford University Press."},{"key":"1240_CR20","volume-title":"Discrete event systems: sensitivity analysis and stochastic optimization by the score function method","author":"R. Y. Rubinstein","year":"1993","unstructured":"Rubinstein, R. Y., & Shapiro, A. (1993). Discrete event systems: sensitivity analysis and stochastic optimization by the score function method. New York: Wiley."},{"key":"1240_CR21","doi-asserted-by":"crossref","first-page":"1102","DOI":"10.1002\/nav.20043","volume":"51","author":"T. G. Schmitt","year":"2004","unstructured":"Schmitt, T. G., & Faaland, B. (2004). Scheduling recurrent construction. Naval Research Logistics, 51, 1102\u20131128.","journal-title":"Naval Research Logistics"},{"key":"1240_CR22","volume-title":"Construction resource management","author":"M. Shah","year":"2009","unstructured":"Shah, M., & Zhao, Y. (2009). Construction resource management. Newark: ICM Inc. Rutgers Business School Case Study."},{"key":"1240_CR23","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1155\/2012\/126254","volume":"2012","author":"D. Simchi-Levi","year":"2011","unstructured":"Simchi-Levi, D., & Zhao, Y. (2011). Performance evaluation of stochastic multi-echelon inventory systems: a survey. Advances in Operations Research, 2012, 1\u201334.","journal-title":"Advances in Operations Research"},{"key":"1240_CR24","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1016\/0272-6963(84)90022-6","volume":"4","author":"D. E. Smith-Danials","year":"1984","unstructured":"Smith-Danials, D. E., & Aquilano, N. J. (1984). Constrained resource project scheduling subject to material constraints. Journal of Operations Management, 4, 369\u2013388.","journal-title":"Journal of Operations Management"},{"key":"1240_CR25","doi-asserted-by":"crossref","first-page":"122","DOI":"10.1080\/07408178708975378","volume":"19","author":"D. E. Smith-Daniels","year":"1987","unstructured":"Smith-Daniels, D. E., & Smith-Daniels, V. L. (1987). Optimal project scheduling with materials ordering. IIE Transactions, 19, 122\u2013129.","journal-title":"IIE Transactions"},{"key":"1240_CR26","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1023\/A:1007785312398","volume":"18","author":"C. T. Somerville","year":"1999","unstructured":"Somerville, C. T. (1999). Residential construction costs and the supply of new housing: endogeneity and bias in construction cost indexes. Journal of Real Estate Finance and Economics, 18, 43\u201362.","journal-title":"Journal of Real Estate Finance and Economics"},{"key":"1240_CR27","unstructured":"Tommelein, I. D., Walsh, K. D., & Hershauer, J. C. (2003). Improving capital projects supply chain performance (Research Report No. 172-11). Construction Industry Institute, Austin, TX."},{"key":"1240_CR28","volume-title":"Construction supply chain management handbook","author":"I. D. Tommelein","year":"2009","unstructured":"Tommelein, I. D., Ballard, G., & Kaminsky, P. (2009). Supply chain management for lean project delivery. In W. J. O\u2019Brien, C. T. Formoso, R. Vrijhoef, & K. A. London (Eds.), Construction supply chain management handbook. New York: CRC Press\/Taylor & Francis. Chap. 6."},{"key":"1240_CR29","first-page":"170","volume-title":"Proceedings IGLC-15","author":"K. Vaidyanathan","year":"2007","unstructured":"Vaidyanathan, K., & Howell, G. (2007). Construction supply chain maturity model\u2014conceptual framework. In Proceedings IGLC-15, July 2007, Michigan, USA (pp. 170\u2013180)."},{"key":"1240_CR30","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1016\/S0969-7012(00)00013-7","volume":"6","author":"R. Vrijhoef","year":"2000","unstructured":"Vrijhoef, R., & Koskela, L. (2000). Roles of supply chain management in construction. European Journal of Purchasing and Supply Chain Management, 6, 169\u2013178.","journal-title":"European Journal of Purchasing and Supply Chain Management"},{"issue":"6","key":"1240_CR31","doi-asserted-by":"crossref","first-page":"818","DOI":"10.1061\/(ASCE)0733-9364(2004)130:6(818)","volume":"130","author":"K. D. Walsh","year":"2004","unstructured":"Walsh, K. D., Hershauer, J. C., Tommelein, I. D., & Walsh, T. A. (2004). Strategic positioning of inventory to match demand in a capital projects supply chain. Journal of Construction Engineering and Management, 130(6), 818\u2013826.","journal-title":"Journal of Construction Engineering and Management"},{"key":"1240_CR32","unstructured":"Xu, X., & Zhao, Y. (2010). Some economic facts of the prefabricated housing (Industry Report). Rutgers Business School, Newark."},{"key":"1240_CR33","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1016\/S0263-7863(01)00021-7","volume":"20","author":"K. T. Yeo","year":"2002","unstructured":"Yeo, K. T., & Ning, J. H. (2002). Integrating supply chain and critical chain concepts in engineering-procure-construct (EPC) projects. International Journal of Project Management, 20, 253\u2013262.","journal-title":"International Journal of Project Management"},{"key":"1240_CR34","doi-asserted-by":"crossref","first-page":"706","DOI":"10.1287\/opre.1060.0302","volume":"54","author":"Y. Zhao","year":"2006","unstructured":"Zhao, Y., & Simchi-Levi, D. (2006). Performance analysis and evaluation of assemble-to-order systems with stochastic sequential lead-times. Operations Research, 54, 706\u2013724.","journal-title":"Operations Research"},{"key":"1240_CR35","doi-asserted-by":"crossref","first-page":"397","DOI":"10.1002\/1520-6750(199106)38:3<397::AID-NAV3220380309>3.0.CO;2-3","volume":"38","author":"P. Zipkin","year":"1991","unstructured":"Zipkin, P. (1991). Evaluation of base-stock policies in multiechelon inventory systems with compound-Poisson demands. Naval Research Logistics, 38, 397\u2013412.","journal-title":"Naval Research Logistics"},{"key":"1240_CR36","volume-title":"Foundations of inventory management","author":"P. Zipkin","year":"2000","unstructured":"Zipkin, P. (2000). Foundations of inventory management. Boston: McGraw Hill."}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-012-1240-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-012-1240-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-012-1240-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,31]],"date-time":"2022-01-31T00:12:55Z","timestamp":1643587975000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-012-1240-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,11,8]]},"references-count":36,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2016,6]]}},"alternative-id":["1240"],"URL":"https:\/\/doi.org\/10.1007\/s10479-012-1240-0","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,11,8]]}}}