{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,3]],"date-time":"2026-06-03T21:02:38Z","timestamp":1780520558287,"version":"3.54.1"},"reference-count":34,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2013,1,4]],"date-time":"2013-01-04T00:00:00Z","timestamp":1357257600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2014,2]]},"DOI":"10.1007\/s10479-012-1277-0","type":"journal-article","created":{"date-parts":[[2013,1,3]],"date-time":"2013-01-03T12:09:09Z","timestamp":1357214949000},"page":"271-291","source":"Crossref","is-referenced-by-count":26,"title":["Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment"],"prefix":"10.1007","volume":"213","author":[{"given":"Wendi","family":"Tian","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Erik","family":"Demeulemeester","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2013,1,4]]},"reference":[{"issue":"1","key":"1277_CR1","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P. Brucker","year":"1999","unstructured":"Brucker, P., Drexl, A., M\u00f6hring, R., Neumann, K., & Pesch, E. (1999). Resource-constrained project scheduling: notation, classification, models, and methods. European Journal of Operational Research, 112(1), 3\u201341.","journal-title":"European Journal of Operational Research"},{"key":"1277_CR2","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1287\/opre.45.2.302","volume":"45","author":"P. De","year":"1997","unstructured":"De, P., Dunne, E. J., Gosh, J. B., & Wells, C. E. (1997). Complexity of the discrete time\/cost problem for project networks. Operations Research, 45, 302\u2013306.","journal-title":"Operations Research"},{"key":"1277_CR3","unstructured":"De Reyck, B. (1998). Scheduling projects with generalized precedence relations: exact and heuristic procedures. Ph.D. thesis, Department of Applied Economics, KU Leuven, Leuven, Belgium."},{"key":"1277_CR4","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1002\/(SICI)1520-6750(199809)45:6<553::AID-NAV2>3.0.CO;2-1","volume":"45","author":"B. Reyck De","year":"1998","unstructured":"De Reyck, B., Demeulemeester, E., & Herroelen, W. (1998). Local search methods for the discrete time\/resource trade-off problem in project networks. Naval Research Logistics Quarterly, 45, 553\u2013578.","journal-title":"Naval Research Logistics Quarterly"},{"issue":"12","key":"1277_CR5","doi-asserted-by":"crossref","first-page":"1803","DOI":"10.1287\/mnsc.38.12.1803","volume":"38","author":"E. Demeulemeester","year":"1992","unstructured":"Demeulemeester, E., & Herroelen, W. (1992). A branch-and-bound procedure for the multiple resource constrained project scheduling problem. Management Science, 38(12), 1803\u20131818.","journal-title":"Management Science"},{"key":"1277_CR6","first-page":"473","volume-title":"Project scheduling: a research handbook","author":"E. Demeulemeester","year":"2002","unstructured":"Demeulemeester, E., & Herroelen, W. (2002). Project scheduling: a research handbook (pp. 473\u2013530). Dordrecht: Kluwer Academic."},{"key":"1277_CR7","first-page":"1059","volume":"32","author":"E. Demeulemeester","year":"2000","unstructured":"Demeulemeester, E., De Reyck, B., & Herroelen, W. (2000). The discrete time\/resource trade-off problem in project networks: a branch and bound approach. IIE Transactions, 32, 1059\u20131069.","journal-title":"IIE Transactions"},{"issue":"2","key":"1277_CR8","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1016\/j.ejor.2004.04.003","volume":"165","author":"S. E. Elmaghraby","year":"2005","unstructured":"Elmaghraby, S. E. (2005). On the fallacy of averages in project risk management. European Journal of Operational Research, 165(2), 307\u2013313.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"1277_CR9","doi-asserted-by":"crossref","first-page":"568","DOI":"10.1016\/j.ejor.2009.09.019","volume":"203","author":"C. U. F\u00fcndeling","year":"2010","unstructured":"F\u00fcndeling, C. U., & Trautmann, N. (2010). A priority-rule method for project scheduling with work-content constraints. European Journal of Operational Research, 203(3), 568\u2013574.","journal-title":"European Journal of Operational Research"},{"key":"1277_CR10","volume-title":"Critical chain","author":"E. M. Goldratt","year":"1997","unstructured":"Goldratt, E. M. (1997). Critical chain. New York: North River Press."},{"issue":"8","key":"1277_CR11","doi-asserted-by":"crossref","first-page":"990","DOI":"10.1287\/mnsc.37.8.990","volume":"37","author":"G. J. Gutierrez","year":"1991","unstructured":"Gutierrez, G. J. & Kouvelis, P. (1991). Parkinson\u2019s law and its implications for project management. Management Science, 37(8), 990\u20131001.","journal-title":"Management Science"},{"issue":"1","key":"1277_CR12","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S. Hartmann","year":"2010","unstructured":"Hartmann, S., & Briskorn, D. (2010). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207(1), 1\u201314.","journal-title":"European Journal of Operational Research"},{"key":"1277_CR13","doi-asserted-by":"crossref","first-page":"559","DOI":"10.1016\/S0272-6963(01)00054-7","volume":"19","author":"W. Herroelen","year":"2001","unstructured":"Herroelen, W., & Leus, R. (2001). On the merits and pitfalls of critical chain scheduling. Journal of Operations Management, 19, 559\u2013577.","journal-title":"Journal of Operations Management"},{"issue":"8","key":"1277_CR14","doi-asserted-by":"crossref","first-page":"1599","DOI":"10.1080\/00207540310001638055","volume":"42","author":"W. Herroelen","year":"2004","unstructured":"Herroelen, W., & Leus, R. (2004a). Robust and reactive project scheduling: a review and classification of procedures. International Journal of Production Research, 42(8), 1599\u20131620.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"1277_CR15","doi-asserted-by":"crossref","first-page":"550","DOI":"10.1016\/S0377-2217(03)00130-9","volume":"156","author":"W. Herroelen","year":"2004","unstructured":"Herroelen, W., & Leus, R. (2004b). The construction of stable project baseline schedules. European Journal of Operational Research, 156(3), 550\u2013565.","journal-title":"European Journal of Operational Research"},{"key":"1277_CR16","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/978-1-4615-5533-9_1","volume-title":"Project scheduling: recent models, algorithm, and applications","author":"W. Herroelen","year":"1999","unstructured":"Herroelen, W., Demeulemeester, E., & De Reyck, B. (1999). A classification scheme for project scheduling. In J. Weglarz (Ed.), Project scheduling: recent models, algorithm, and applications (pp. 1\u201326). Dordrecht: Kluwer."},{"issue":"3","key":"1277_CR17","first-page":"221","volume":"128","author":"W. Herroelen","year":"2000","unstructured":"Herroelen, W., Demeulemeester, E., & De Reyck, B. (2000). On the paper \u201cResource-constrained project scheduling: notation, classification, models, and methods\u201d by Brucker et al. European Journal of Operational Research, 128(3), 221\u2013230.","journal-title":"European Journal of Operational Research"},{"key":"1277_CR18","volume-title":"Integrating critical chain and the PMBOK\u00ae guide","author":"G. I. Kendall","year":"2001","unstructured":"Kendall, G. I., Pitagorsky, G., & Hulett, D. (2001). Integrating critical chain and the PMBOK \u00ae guide. New York: International Institute for Learning. http:\/\/logmgt.nkmu.edu.tw\/news\/articles\/criticalChain-PMBOK.pdf"},{"issue":"1","key":"1277_CR19","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1016\/S0377-2217(96)00170-1","volume":"96","author":"R. Kolisch","year":"1996","unstructured":"Kolisch, R., & Sprecher, A. (1996). PSPLIB\u2014a project scheduling problem library. European Journal of Operational Research, 96(1), 205\u2013216.","journal-title":"European Journal of Operational Research"},{"issue":"10","key":"1277_CR20","doi-asserted-by":"crossref","first-page":"1693","DOI":"10.1287\/mnsc.41.10.1693","volume":"41","author":"R. Kolisch","year":"1995","unstructured":"Kolisch, R., Sprecher, A., & Drexl, A. (1995). Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 41(10), 1693\u20131703.","journal-title":"Management Science"},{"issue":"2","key":"1277_CR21","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1177\/875697289903000207","volume":"30","author":"L. P. Leach","year":"1999","unstructured":"Leach, L. P. (1999). Critical chain project management improves project performance. Project Management Journal, 30(2), 39\u201351.","journal-title":"Project Management Journal"},{"key":"1277_CR22","volume-title":"Critical chain project management","author":"L. P. Leach","year":"2000","unstructured":"Leach, L. P. (2000). Critical chain project management. Norwood: Artech House."},{"key":"1277_CR23","doi-asserted-by":"crossref","first-page":"688","DOI":"10.1016\/j.ijproman.2007.09.012","volume":"26","author":"L. Long","year":"2008","unstructured":"Long, L., & Ohsato, A. (2008). Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. International Journal of Project Management, 26, 688\u2013698.","journal-title":"International Journal of Project Management"},{"key":"1277_CR24","doi-asserted-by":"crossref","DOI":"10.1201\/b18205","volume-title":"Project management in the fast lane: applying the theory of constraints","author":"R. C. Newbold","year":"1998","unstructured":"Newbold, R. C. (1998). Project management in the fast lane: applying the theory of constraints. Boca Raton: St. Lucie Press."},{"key":"1277_CR25","volume-title":"Parkinson\u2019s law","author":"C. N. Parkinson","year":"1957","unstructured":"Parkinson, C. N. (1957). Parkinson\u2019s law. Cambridge: The Riverside Press."},{"issue":"2","key":"1277_CR26","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1016\/j.amc.2007.02.109","volume":"191","author":"M. Ranjbar","year":"2007","unstructured":"Ranjbar, M., & Kianfar, F. (2007). Solving the discrete time\/resource trade-off problem with genetic algorithms. Applied Mathematics and Computation, 191(2), 451\u2013456.","journal-title":"Applied Mathematics and Computation"},{"issue":"1","key":"1277_CR27","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/j.ejor.2007.10.042","volume":"193","author":"M. Ranjbar","year":"2009","unstructured":"Ranjbar, M., De Reyck, B., & Kianfar, F. (2009). A hybrid scatter search for the discrete time\/resource trade-off problem in project scheduling. European Journal of Operational Research, 193(1), 35\u201348.","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"1277_CR28","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1287\/inte.11.5.66","volume":"11","author":"R. J. Schonberger","year":"1981","unstructured":"Schonberger, R. J. (1981). Why projects are \u201calways\u201d late: a rationale based on manual simulation of a PERT\/CPM network. Interfaces, 11(5), 66\u201370.","journal-title":"Interfaces"},{"issue":"2","key":"1277_CR29","doi-asserted-by":"crossref","first-page":"401","DOI":"10.1016\/j.ejor.2004.10.019","volume":"172","author":"O. I. Tukel","year":"2006","unstructured":"Tukel, O. I., Rom, W. O., & Eksioglu, S. D. (2006). An investigation of buffer sizing techniques in critical chain scheduling. European Journal of Operational Research, 172(2), 401\u2013416.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"1277_CR30","first-page":"27","volume":"41","author":"M. Umble","year":"2000","unstructured":"Umble, M., & Umble, E. (2000). Manage your projects for success: an application of the theory of constraints. Production & Inventory Management Journal, 41(2), 27.","journal-title":"Production & Inventory Management Journal"},{"key":"1277_CR31","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1016\/j.ijpe.2004.08.004","volume":"97","author":"S. Vonder Van\u00a0de","year":"2005","unstructured":"Van\u00a0de Vonder, S., Demeulemeester, E., Herroelen, W., & Leus, R. (2005). The use of buffers in project management: the trade-off between stability and makespan. International Journal of Production Economics, 97, 227\u2013240.","journal-title":"International Journal of Production Economics"},{"key":"1277_CR32","doi-asserted-by":"crossref","first-page":"723","DOI":"10.1016\/j.ejor.2006.10.061","volume":"189","author":"S. Vonder Van\u00a0de","year":"2008","unstructured":"Van\u00a0de Vonder, S., Demeulemeester, E., & Herroelen, W. (2008). Proactive heuristic procedures for robust project scheduling: an experimental analysis. European Journal of Operational Research, 189, 723\u2013733.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"1277_CR33","doi-asserted-by":"crossref","first-page":"140","DOI":"10.1016\/j.cie.2007.07.001","volume":"54","author":"M. Vanhoucke","year":"2008","unstructured":"Vanhoucke, M., & Debels, D. (2008). The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects. Computers & Industrial Engineering, 54(1), 140\u2013154.","journal-title":"Computers & Industrial Engineering"},{"issue":"2","key":"1277_CR34","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1016\/j.ejor.2009.03.034","volume":"201","author":"V. Peteghem Van","year":"2010","unstructured":"Van Peteghem, V., & Vanhoucke, M. (2010). A genetic algorithm for the preemptive and non-preemptive multi-mode resource constrained project scheduling problem. European Journal of Operational Research, 201(2), 409\u2013418.","journal-title":"European Journal of Operational Research"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-012-1277-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-012-1277-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-012-1277-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,7]],"date-time":"2019-07-07T21:39:10Z","timestamp":1562535550000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-012-1277-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,1,4]]},"references-count":34,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2014,2]]}},"alternative-id":["1277"],"URL":"https:\/\/doi.org\/10.1007\/s10479-012-1277-0","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,1,4]]}}}