{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,1]],"date-time":"2026-02-01T13:18:53Z","timestamp":1769951933149,"version":"3.49.0"},"reference-count":24,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2013,2,12]],"date-time":"2013-02-12T00:00:00Z","timestamp":1360627200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2013,10]]},"DOI":"10.1007\/s10479-013-1323-6","type":"journal-article","created":{"date-parts":[[2013,2,11]],"date-time":"2013-02-11T02:56:57Z","timestamp":1360551417000},"page":"179-205","source":"Crossref","is-referenced-by-count":10,"title":["The stochastic economic lot sizing problem for non-stop multi-grade production with sequence-restricted setup changeovers"],"prefix":"10.1007","volume":"209","author":[{"given":"George","family":"Liberopoulos","sequence":"first","affiliation":[]},{"given":"Dimitrios G.","family":"Pandelis","sequence":"additional","affiliation":[]},{"given":"Olympia","family":"Hatzikonstantinou","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2013,2,12]]},"reference":[{"key":"1323_CR1","unstructured":"Bruin, J., & van der Wal, J. (2010a). A cyclic production scheme for multi-item production systems with backlog; Part 1 (Report 2010-018). EURANDOM, Department of Mathematics and Computer Science, Eindhoven University of Technology, The Netherlands."},{"key":"1323_CR2","unstructured":"Bruin, J., & van der Wal, J. (2010b). A dynamic control strategy for multi-item production systems with backlog; Part 2 (Report 2010-018). EURANDOM, Department of Mathematics and Computer Science, Eindhoven University of Technology, The Netherlands."},{"key":"1323_CR3","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1016\/j.jom.2004.08.009","volume":"24","author":"D. L. Cooke","year":"2006","unstructured":"Cooke, D. L., & Rohleder, T. R. (2006). Inventory evaluation and product slate management in large-scale continuous process industries. Journal of Operations Management, 24, 235\u2013249.","journal-title":"Journal of Operations Management"},{"issue":"4","key":"1323_CR4","doi-asserted-by":"crossref","first-page":"419","DOI":"10.1111\/j.1937-5956.1997.tb00484.x","volume":"6","author":"M. Elhafsi","year":"1997","unstructured":"Elhafsi, M., & Bai, S. X. (1997). Optimal and near-optimal control of a two-part-type stochastic manufacturing system with dynamic setups. Production and Operations Management, 6(4), 419\u2013438.","journal-title":"Production and Operations Management"},{"issue":"6","key":"1323_CR5","doi-asserted-by":"crossref","first-page":"587","DOI":"10.1287\/mnsc.24.6.587","volume":"24","author":"S. E. Elmaghraby","year":"1978","unstructured":"Elmaghraby, S. E. (1978). The economic lot scheduling problem (ELSP): review and extensions. Management Science, 24(6), 587\u2013598.","journal-title":"Management Science"},{"issue":"3","key":"1323_CR6","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1080\/00207549408956954","volume":"32","author":"A. Gascon","year":"1994","unstructured":"Gascon, A., Leachman, R. C., & Lefrancois, P. (1994). Multi-item, single-machine scheduling problem with stochastic demands: a comparison of heuristics. International Journal of Production Research, 32(3), 583\u2013596.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"1323_CR7","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1080\/05695558008974511","volume":"12","author":"S. C. Graves","year":"1980","unstructured":"Graves, S. C. (1980). The multi-product production cycling problem. AIIE Transactions, 12(3), 233\u2013240.","journal-title":"AIIE Transactions"},{"key":"1323_CR8","unstructured":"Hatzikonstantinou, O. (2009). Production scheduling optimization in a PET resin chemical industry. Ph.D. Dissertation, Department of Mechanical Engineering, University of Thessaly, Greece."},{"issue":"5","key":"1323_CR9","doi-asserted-by":"crossref","first-page":"940","DOI":"10.1287\/opre.42.5.940","volume":"42","author":"M. Herzberg","year":"1994","unstructured":"Herzberg, M., & Yechiali, U. (1994). Accelerating procedures of the value iteration algorithm for discounted Markov decision processes, based on a one-step look-ahead analysis. Operations Research Letters, 42(5), 940\u2013946.","journal-title":"Operations Research Letters"},{"issue":"3","key":"1323_CR10","doi-asserted-by":"crossref","first-page":"523","DOI":"10.1287\/opre.1060.0297","volume":"54","author":"S. M. Karalli","year":"2006","unstructured":"Karalli, S. M., & Flowers, A. D. (2006). The multiple-family ELSP with safety stocks. Operations Research, 54(3), 523\u2013531.","journal-title":"Operations Research"},{"key":"1323_CR11","unstructured":"Kalantzis, G. (2012). Accelerating the value iteration algorithm on the stochastic economic lot scheduling problem for continuous multi-grade production. M.Sc. Thesis in Econometrics and Management Science with Specialization in Operational Research and Quantitative Logistics, Erasmus University, The Netherlands."},{"issue":"2","key":"1323_CR12","doi-asserted-by":"crossref","first-page":"360","DOI":"10.1016\/0377-2217(94)90271-2","volume":"73","author":"U. S. Karmarkar","year":"1994","unstructured":"Karmarkar, U. S., & Yoo, J. (1994). The stochastic dynamic product cycling problem. European Journal of Operational Research, 73(2), 360\u2013373.","journal-title":"European Journal of Operational Research"},{"issue":"8","key":"1323_CR13","doi-asserted-by":"crossref","first-page":"2109","DOI":"10.1080\/002075497194769","volume":"35","author":"G. Liberopoulos","year":"1997","unstructured":"Liberopoulos, G., & Caramanis, M. (1997). Numerical investigation of optimal policies for production flow control and set-up scheduling: lessons from two-part-type failure prone FMSs. International Journal of Production Research, 35(8), 2109\u20132133.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"1323_CR14","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1016\/j.compchemeng.2009.05.017","volume":"34","author":"G. Liberopoulos","year":"2009","unstructured":"Liberopoulos, G., Kozanidis, G., & Hatzikonstantinou, O. (2009). Production scheduling of a multi-grade PET resin plant. Computers & Chemical Engineering, 34(3), 387\u2013400.","journal-title":"Computers & Chemical Engineering"},{"key":"1323_CR15","author":"N. L\u00f6hndorf","year":"2012","unstructured":"L\u00f6hndorf, N., & Minner, S. (2012). Simulation optimization for the stochastic economic lot scheduling problem. IIE Transactions. doi: 10.1080\/0740817X.2012.662310 .","journal-title":"IIE Transactions"},{"key":"1323_CR16","unstructured":"L\u00f6hndorf, N., Riel, M., & Minner, S. (2012). Simulation optimization for the stochastic economic lot scheduling problem with sequence-dependent setup times. Optimization Online. http:\/\/www.optimization-online.org\/DB_HTML\/2012\/10\/3661.html ."},{"issue":"2","key":"1323_CR17","doi-asserted-by":"crossref","first-page":"350","DOI":"10.1109\/9.341809","volume":"40","author":"J. Qiu","year":"1995","unstructured":"Qiu, J., & Loulou, R. (1995). Multiproduct production\/inventory control under random demands. IEEE Transactions on Automatic Control, 40(2), 350\u2013356.","journal-title":"IEEE Transactions on Automatic Control"},{"key":"1323_CR18","series-title":"Lecture notes in economics and mathematical systems","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-51649-8","volume-title":"Deterministic lotsizing models for production planning","author":"M. Salomon","year":"1991","unstructured":"Salomon, M. (1991). Lecture notes in economics and mathematical systems. Deterministic lotsizing models for production planning. Berlin: Springer."},{"issue":"2","key":"1323_CR19","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1007\/BF01805561","volume":"1","author":"A. Sharifnia","year":"1991","unstructured":"Sharifnia, A., Caramanis, M., & Gershwin, S. B. (1991). Dynamic setup scheduling and flow control in manufacturing systems. Discrete Event Dynamic Systems, 1(2), 149\u2013175.","journal-title":"Discrete Event Dynamic Systems"},{"issue":"5","key":"1323_CR20","first-page":"349","volume":"29","author":"C. R. Sox","year":"1997","unstructured":"Sox, C. R., & Muckstadt, J. A. (1997). Optimization-based planning for the stochastic lot-sizing problem. IIE Transactions, 29(5), 349\u2013357.","journal-title":"IIE Transactions"},{"issue":"3","key":"1323_CR21","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1016\/S0925-5273(98)00247-3","volume":"62","author":"C. R. Sox","year":"1999","unstructured":"Sox, C. R., Jackson, P. L., Bowman, A., & Muckstadt, J. A. (1999). A review of the stochastic lot scheduling problem. International Journal of Production Economics, 62(3), 181\u2013200.","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"1323_CR22","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1016\/j.jprocont.2005.06.009","volume":"16","author":"R. L. Tousain","year":"2006","unstructured":"Tousain, R. L., & Bosgra, O. H. (2006). Market-oriented scheduling and economic optimization of continuous multi-grade chemical processes. Journal of Process Control, 16(3), 291\u2013301.","journal-title":"Journal of Process Control"},{"issue":"1","key":"1323_CR23","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1080\/03155986.1978.11731688","volume":"16","author":"R. C. Vergin","year":"1978","unstructured":"Vergin, R. C., & Lee, T. N. (1978). Scheduling rules for the multiple product single-machine system with stochastic demand. INFOR. Information Systems and Operational Research, 16(1), 64\u201373.","journal-title":"INFOR. Information Systems and Operational Research"},{"issue":"1","key":"1323_CR24","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2010.06.011","volume":"210","author":"E. M. M. Winands","year":"2011","unstructured":"Winands, E. M. M., Adan, I. J. B. F., & van Houtum, G. J. (2011). The stochastic economic lot scheduling problem: a survey. European Journal of Operational Research, 210(1), 1\u20139.","journal-title":"European Journal of Operational Research"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-013-1323-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-013-1323-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-013-1323-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T14:09:41Z","timestamp":1559138981000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-013-1323-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,2,12]]},"references-count":24,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2013,10]]}},"alternative-id":["1323"],"URL":"https:\/\/doi.org\/10.1007\/s10479-013-1323-6","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,2,12]]}}}