{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,18]],"date-time":"2026-01-18T11:05:56Z","timestamp":1768734356606,"version":"3.49.0"},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2014,1,15]],"date-time":"2014-01-15T00:00:00Z","timestamp":1389744000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2014,6]]},"DOI":"10.1007\/s10479-014-1531-8","type":"journal-article","created":{"date-parts":[[2014,1,14]],"date-time":"2014-01-14T11:15:23Z","timestamp":1389698123000},"page":"263-279","source":"Crossref","is-referenced-by-count":16,"title":["Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence"],"prefix":"10.1007","volume":"217","author":[{"given":"F. J.","family":"Hwang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M. Y.","family":"Kovalyov","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"B. M. T.","family":"Lin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2014,1,15]]},"reference":[{"issue":"1","key":"1531_CR1","doi-asserted-by":"crossref","first-page":"32","DOI":"10.1080\/07408178808966147","volume":"20","author":"K. R. Baker","year":"1988","unstructured":"Baker, K. R. (1988). Scheduling the production of components at a common facility. IIE Transactions, 20(1), 32\u201335.","journal-title":"IIE Transactions"},{"key":"1531_CR2","volume-title":"Handbook on scheduling: from theory to applications","author":"J. B\u0142a\u017cewicz","year":"2007","unstructured":"B\u0142a\u017cewicz, J., Ecker, K. H., Pesch, E., Schmidt, G., & W\u0119glarz, J. (2007). Handbook on scheduling: from theory to applications. Berlin: Springer."},{"issue":"2","key":"1531_CR3","first-page":"135","volume":"31","author":"T. C. E. Cheng","year":"1999","unstructured":"Cheng, T. C. E., & Wang, G. (1999). Scheduling the fabrication and assembly of components in a two-machine flowshop. IIE Transactions, 31(2), 135\u2013143.","journal-title":"IIE Transactions"},{"issue":"2","key":"1531_CR4","doi-asserted-by":"crossref","first-page":"128","DOI":"10.1002\/(SICI)1520-6750(200003)47:2<128::AID-NAV4>3.0.CO;2-#","volume":"47","author":"T. C. E. Cheng","year":"2000","unstructured":"Cheng, T. C. E., Lin, B. M. T., & Toker, A. (2000). Makespan minimization in the two-machine flowshop batch scheduling problem. Naval Research Logistics, 47(2), 128\u2013144.","journal-title":"Naval Research Logistics"},{"issue":"0","key":"1531_CR5","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1023\/A:1018959420252","volume":"92","author":"A. E. Gerodimos","year":"1999","unstructured":"Gerodimos, A. E., Glass, C. A., Potts, C. N., & Tautenhahn, T. (1999). Scheduling multi-operation jobs on a single machine. Annals of Operations Research, 92(0), 87\u2013105.","journal-title":"Annals of Operations Research"},{"issue":"2","key":"1531_CR6","doi-asserted-by":"crossref","first-page":"250","DOI":"10.1016\/S0377-2217(99)00154-X","volume":"120","author":"A. E. Gerodimos","year":"2000","unstructured":"Gerodimos, A. E., Glass, C. A., & Potts, C. N. (2000). Scheduling the production of two-component jobs on a single machine. European Journal of Operational Research, 120(2), 250\u2013259.","journal-title":"European Journal of Operational Research"},{"key":"1531_CR7","author":"\u00d6. Haz\u0131r","year":"2012","unstructured":"Haz\u0131r, \u00d6., & Kedad-Sidhoum, S. (2012). Batch sizing and just-in-time scheduling with common due date. Annals of Operations Research. doi: 10.1007\/s10479-012-1289-9 .","journal-title":"Annals of Operations Research"},{"key":"1531_CR8","unstructured":"Herrmann, J. W., & Lee, C. Y. (1992). Three-machine look-ahead scheduling problems (Research Report No.\u00a092-93). Department of Industrial Engineering, University of Florida, FL."},{"issue":"6","key":"1531_CR9","doi-asserted-by":"crossref","first-page":"839","DOI":"10.1057\/jors.2011.90","volume":"63","author":"F. J. Hwang","year":"2012","unstructured":"Hwang, F. J., & Lin, B. M. T. (2012). Two-stage assembly-type flowshop batching problem subject to a fixed job sequence. Journal of the Operational Research Society, 63(6), 839\u2013845.","journal-title":"Journal of the Operational Research Society"},{"issue":"1","key":"1531_CR10","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/j.disopt.2011.11.001","volume":"9","author":"F. J. Hwang","year":"2012","unstructured":"Hwang, F. J., Kovalyov, M. Y., & Lin, B. M. T. (2012). Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence. Discrete Optimization, 9(1), 29\u201339.","journal-title":"Discrete Optimization"},{"issue":"1","key":"1531_CR11","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"S. M. Johnson","year":"1954","unstructured":"Johnson, S. M. (1954). Optimal two and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1(1), 61\u201368.","journal-title":"Naval Research Logistics Quarterly"},{"issue":"1","key":"1531_CR12","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1287\/opre.48.1.99.12447","volume":"48","author":"J. J. Kanet","year":"2000","unstructured":"Kanet, J. J., & Sridharan, V. (2000). Scheduling with inserted idle time: problem taxonomy and literature review. Operations Research, 48(1), 99\u2013110.","journal-title":"Operations Research"},{"issue":"3","key":"1531_CR13","doi-asserted-by":"crossref","first-page":"620","DOI":"10.1016\/S0377-2217(03)00250-9","volume":"157","author":"M. Y. Kovalyov","year":"2004","unstructured":"Kovalyov, M. Y., Potts, C. N., & Strusevich, V. A. (2004). Batching decisions for assembly production systems. European Journal of Operational Research, 157(3), 620\u2013642.","journal-title":"European Journal of Operational Research"},{"issue":"11","key":"1531_CR14","first-page":"1015","volume":"34","author":"B. M. T. Lin","year":"2002","unstructured":"Lin, B. M. T., & Cheng, T. C. E. (2002). Fabrication and assembly scheduling in a two-machine flowshop. IIE Transactions, 34(11), 1015\u20131020.","journal-title":"IIE Transactions"},{"issue":"1\u20134","key":"1531_CR15","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1007\/s10479-004-5029-7","volume":"133","author":"B. M. T. Lin","year":"2005","unstructured":"Lin, B. M. T., & Cheng, T. C. E. (2005). Two-machine flowshop batching and scheduling. Annals of Operations Research, 133(1\u20134), 149\u2013161.","journal-title":"Annals of Operations Research"},{"issue":"1","key":"1531_CR16","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1002\/nav.20437","volume":"58","author":"B. M. T. Lin","year":"2011","unstructured":"Lin, B. M. T., & Cheng, T. C. E. (2011). Scheduling with centralized and decentralized batching policies in concurrent open shops. Naval Research Logistics, 58(1), 17\u201327.","journal-title":"Naval Research Logistics"},{"issue":"5","key":"1531_CR17","doi-asserted-by":"crossref","first-page":"208","DOI":"10.1016\/j.ipl.2010.11.021","volume":"111","author":"B. M. T. Lin","year":"2011","unstructured":"Lin, B. M. T., & Hwang, F. J. (2011). Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type. Information Processing Letters, 111(5), 208\u2013212.","journal-title":"Information Processing Letters"},{"issue":"9\u201310","key":"1531_CR18","doi-asserted-by":"crossref","first-page":"990","DOI":"10.1007\/s00170-005-2585-1","volume":"29","author":"M. Mathirajan","year":"2006","unstructured":"Mathirajan, M., & Sivakumar, A. I. (2006). A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor. The International Journal of Advanced Manufacturing Technology, 29(9\u201310), 990\u20131001.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"6","key":"1531_CR19","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1007\/s10951-007-0041-9","volume":"10","author":"C. T. Ng","year":"2007","unstructured":"Ng, C. T., & Kovalyov, M. Y. (2007). Batching and scheduling in a multi-machine flow shop. Journal of Scheduling, 10(6), 353\u2013364.","journal-title":"Journal of Scheduling"},{"key":"1531_CR20","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4614-2361-4","volume-title":"Scheduling: theory, algorithms, and systems","author":"M. L. Pinedo","year":"2012","unstructured":"Pinedo, M. L. (2012). Scheduling: theory, algorithms, and systems. Berlin: Springer."},{"issue":"2","key":"1531_CR21","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"C. N. Potts","year":"2000","unstructured":"Potts, C. N., & Kovalyov, M. Y. (2000). Scheduling with batching: a review. European Journal of Operational Research, 120(2), 228\u2013249.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"1531_CR22","doi-asserted-by":"crossref","first-page":"S41","DOI":"10.1057\/jors.2009.2","volume":"60","author":"C. N. Potts","year":"2009","unstructured":"Potts, C. N., & Strusevich, V. A. (2009). Fifty years of scheduling: a survey of milestones. Journal of the Operational Research Society, 60(1), S41\u2013S68.","journal-title":"Journal of the Operational Research Society"},{"issue":"7","key":"1531_CR23","doi-asserted-by":"crossref","first-page":"705","DOI":"10.1002\/(SICI)1520-6750(199810)45:7<705::AID-NAV4>3.0.CO;2-F","volume":"45","author":"Y. M. Shafransky","year":"1998","unstructured":"Shafransky, Y. M., & Strusevich, V. A. (1998). The open shop scheduling problem with a given sequence of jobs on one machine. Naval Research Logistics, 45(7), 705\u2013731.","journal-title":"Naval Research Logistics"},{"issue":"1","key":"1531_CR24","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1016\/j.ejor.2004.01.025","volume":"165","author":"F. Sourd","year":"2005","unstructured":"Sourd, F. (2005). Optimal timing of a sequence of tasks with general completion costs. European Journal of Operational Research, 165(1), 82\u201396.","journal-title":"European Journal of Operational Research"},{"issue":"8","key":"1531_CR25","doi-asserted-by":"crossref","first-page":"773","DOI":"10.1057\/jors.1993.136","volume":"44","author":"C. S. Sung","year":"1993","unstructured":"Sung, C. S., & Park, C. K. (1993). Scheduling of products with common and product-dependent components manufactured at a single facility. Journal of the Operational Research Society, 44(8), 773\u2013784.","journal-title":"Journal of the Operational Research Society"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-014-1531-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-014-1531-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-014-1531-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T14:09:47Z","timestamp":1559138987000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-014-1531-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,1,15]]},"references-count":25,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2014,6]]}},"alternative-id":["1531"],"URL":"https:\/\/doi.org\/10.1007\/s10479-014-1531-8","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,1,15]]}}}