{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,5]],"date-time":"2025-10-05T12:35:45Z","timestamp":1759667745154},"reference-count":17,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2014,9,16]],"date-time":"2014-09-16T00:00:00Z","timestamp":1410825600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2015,3]]},"DOI":"10.1007\/s10479-014-1718-z","type":"journal-article","created":{"date-parts":[[2014,9,15]],"date-time":"2014-09-15T04:03:27Z","timestamp":1410753807000},"page":"551-563","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":9,"title":["A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount"],"prefix":"10.1007","volume":"226","author":[{"given":"Parvaneh","family":"Samouei","sequence":"first","affiliation":[]},{"given":"Amir Saman","family":"Kheirkhah","sequence":"additional","affiliation":[]},{"given":"Parviz","family":"Fattahi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,9,16]]},"reference":[{"key":"1718_CR1","volume-title":"Network flows: Theory, algorithms and applications","author":"RK Ahuja","year":"1993","unstructured":"Ahuja, R. K., Magnanti, T. L., & Orlin, J. B. (1993). Network flows: Theory, algorithms and applications. Englewood Cliffs: Prentice-Hall Inc."},{"key":"1718_CR2","doi-asserted-by":"crossref","first-page":"584","DOI":"10.1016\/S0377-2217(96)00322-0","volume":"99","author":"P Alfredsson","year":"1997","unstructured":"Alfredsson, P. (1997). Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities. European Journal of Operational Research, 99, 584\u2013595.","journal-title":"European Journal of Operational Research"},{"key":"1718_CR3","doi-asserted-by":"crossref","first-page":"480","DOI":"10.1016\/S0377-2217(96)00279-2","volume":"97","author":"A D\u00edaz","year":"1997","unstructured":"D\u00edaz, A., & Fu, M. C. (1997). Models for multi-echelon repairable item inventory systems with limited repair capacity. European Journal of Operational Research, 97, 480\u2013492.","journal-title":"European Journal of Operational Research"},{"key":"1718_CR4","doi-asserted-by":"crossref","first-page":"118","DOI":"10.1016\/0377-2217(86)90017-2","volume":"24","author":"JPK Felderhof","year":"1986","unstructured":"Felderhof, J. P. K., & Konstantis, G. (1986). A three echelon spare parts provisioning model. European Journal of Operational Research, 24, 118\u2013122.","journal-title":"European Journal of Operational Research"},{"key":"1718_CR5","volume-title":"Flows in networks","author":"LR Ford","year":"1962","unstructured":"Ford, L. R., & Fulkerson, D. R. (1962). Flows in networks. Princeton, NJ: Princeton University Press."},{"issue":"2","key":"1718_CR6","first-page":"21","volume":"25","author":"JM Fordyce","year":"1984","unstructured":"Fordyce, J. M., & Webster, F. M. (1984). The Wagner Whitin algorithm made simple. Production and Inventory Management, 25(2), 21\u201327.","journal-title":"Production and Inventory Management"},{"issue":"10","key":"1718_CR7","doi-asserted-by":"crossref","first-page":"1247","DOI":"10.1287\/mnsc.31.10.1247","volume":"31","author":"SC Graves","year":"1985","unstructured":"Graves, S. C. (1985). A multi-echelon inventory model for a repairable item with one-for-one replenishment. Management Science, 31(10), 1247\u20131256.","journal-title":"Management Science"},{"key":"1718_CR8","doi-asserted-by":"crossref","first-page":"340","DOI":"10.1016\/0377-2217(92)90123-Q","volume":"62","author":"A Gupta","year":"1992","unstructured":"Gupta, A., & Albright, S. C. (1992). Steady-state approximations for a multi-echelon multi-indentured repairable-item inventory system. European Journal of Operational Research, 62, 340\u2013353.","journal-title":"European Journal of Operational Research"},{"key":"1718_CR9","doi-asserted-by":"crossref","unstructured":"Jiangsheng, S., Sujian, L., Fanggeng, Z., & Yanmei, L. (2007). Research on the multi-echelon inventory model of weapon equipment repairable valuable spare parts. In Automation and logistics, 2007 IEEE international conference, pp. 662\u2013665.","DOI":"10.1109\/ICAL.2007.4338646"},{"key":"1718_CR10","doi-asserted-by":"crossref","first-page":"397","DOI":"10.1016\/S0925-5273(02)00284-0","volume":"81\u201382","author":"M Kalchschmidt","year":"2003","unstructured":"Kalchschmidt, M., Zotteri, G., & Verganti, R. (2003). Inventory management in a multi-echelon spare parts supply chain. International Journal of Production Economics, 81\u201382, 397\u2013413.","journal-title":"International Journal of Production Economics"},{"key":"1718_CR11","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/j.ejor.2004.06.022","volume":"170","author":"HC Lau","year":"2006","unstructured":"Lau, H. C., Song, H., See, C. T., & Cheng, S. Y. (2006). Evaluation of time-varying availability in multi-echelon spare parts systems with passivation. European Journal of Operational Research, 170, 91\u2013105.","journal-title":"European Journal of Operational Research"},{"key":"1718_CR12","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/j.ijpe.2011.03.004","volume":"132","author":"E Levner","year":"2011","unstructured":"Levner, E., Perlman, Y., Cheng, T. C. E., & Levner, I. (2011). A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand. International Journal of Production Economics, 132, 43\u201351.","journal-title":"International Journal of Production Economics"},{"key":"1718_CR13","unstructured":"Liu, J. (2003). Algorithms for minimum-cost flows. Computer Science Department, The University of Western Ontario."},{"key":"1718_CR14","doi-asserted-by":"crossref","first-page":"440","DOI":"10.4236\/jssm.2010.34050","volume":"3","author":"Y Perlman","year":"2010","unstructured":"Perlman, Y., & Levner, I. (2010). Modeling multi-echelon multi-supplier repairable inventory systems with backorders. Journal of Service Science and Management, 3, 440\u2013448.","journal-title":"Journal of Service Science and Management"},{"key":"1718_CR15","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1016\/S0925-5273(02)00155-X","volume":"79","author":"A Sleptchenko","year":"2002","unstructured":"Sleptchenko, A., Heijden, M. C., & Harten, A. (2002). Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems. International Journal of Production Economics, 79, 209\u2013230.","journal-title":"International Journal of Production Economics"},{"key":"1718_CR16","doi-asserted-by":"crossref","first-page":"733","DOI":"10.1016\/j.ejor.2004.02.002","volume":"163","author":"A Sleptchenko","year":"2005","unstructured":"Sleptchenko, A., Heijden, M. C., & Harten, A. (2005). Using repair priorities to reduce stock investment in spare part networks. European Journal of Operational Research, 163, 733\u2013750.","journal-title":"European Journal of Operational Research"},{"key":"1718_CR17","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1287\/mnsc.5.1.89","volume":"5","author":"H Wagner","year":"1958","unstructured":"Wagner, H., & Whitin, T. M. (1958). Dynamic version of the economic lot size model. Management Science, 5, 89\u201396.","journal-title":"Management Science"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-014-1718-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-014-1718-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-014-1718-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T14:09:53Z","timestamp":1559138993000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-014-1718-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,9,16]]},"references-count":17,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2015,3]]}},"alternative-id":["1718"],"URL":"https:\/\/doi.org\/10.1007\/s10479-014-1718-z","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,9,16]]}}}