{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,11]],"date-time":"2024-08-11T11:08:44Z","timestamp":1723374524144},"reference-count":31,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2015,5,1]],"date-time":"2015-05-01T00:00:00Z","timestamp":1430438400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2017,4]]},"DOI":"10.1007\/s10479-015-1882-9","type":"journal-article","created":{"date-parts":[[2015,4,30]],"date-time":"2015-04-30T20:27:28Z","timestamp":1430425648000},"page":"367-382","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Value analysis planning with goal programming"],"prefix":"10.1007","volume":"251","author":[{"given":"Marc J.","family":"Schniederjans","sequence":"first","affiliation":[]},{"given":"Dara","family":"Schniederjans","sequence":"additional","affiliation":[]},{"given":"Qing","family":"Cao","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,5,1]]},"reference":[{"key":"1882_CR1","doi-asserted-by":"crossref","DOI":"10.1201\/b16501","volume-title":"Design for manufacturability: How to use concurrent engineering to rapidly develop low-cost, high-quality products for lean production","author":"DM Anderson","year":"2014","unstructured":"Anderson, D. M. (2014). Design for manufacturability: How to use concurrent engineering to rapidly develop low-cost, high-quality products for lean production. Boca Raton, FL: CRC Press."},{"issue":"6","key":"1882_CR2","doi-asserted-by":"crossref","first-page":"619","DOI":"10.1080\/09544820802459243","volume":"21","author":"G Avigad","year":"2010","unstructured":"Avigad, G., & Moshaiov, A. (2010). Set-based concept selection in multi-objective problems involving delayed decisions. Journal of Engineering Design, 21(6), 619\u2013646.","journal-title":"Journal of Engineering Design"},{"key":"1882_CR3","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1007\/s10479-006-0149-x","volume":"150","author":"A Azaron","year":"2007","unstructured":"Azaron, A., Katagiri, H., & Sakawa, M. (2007). Time-cost trade-off via optimal control theory in Markov PERT networks. Annals of Operations Research, 150, 47\u201364.","journal-title":"Annals of Operations Research"},{"issue":"11","key":"1882_CR4","doi-asserted-by":"crossref","first-page":"1201","DOI":"10.1057\/palgrave.jors.2601159","volume":"52","author":"S Dowlatshahi","year":"2001","unstructured":"Dowlatshahi, S. (2001). Product life cycle analysis: A goal programming approach. Journal of the Operational Research Society, 52(11), 1201\u20131214.","journal-title":"Journal of the Operational Research Society"},{"issue":"41","key":"1882_CR5","first-page":"45","volume":"41","author":"B Doyle","year":"2013","unstructured":"Doyle, B. (2013). Value engineering expertise a key factor in DVG\u2019s solid financial standing. Caribbean Business, 41(41), 45.","journal-title":"Caribbean Business"},{"issue":"10","key":"1882_CR6","doi-asserted-by":"crossref","first-page":"3014","DOI":"10.1080\/00207543.2013.860249","volume":"52","author":"MG Filho","year":"2014","unstructured":"Filho, M. G., & Uzsoy, R. (2014). Assessing the impact of alternative continuous improvement programmes in a flow shop using system dynamics. International Journal of Production Research, 52(10), 3014\u20133031.","journal-title":"International Journal of Production Research"},{"issue":"3\/4","key":"1882_CR7","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1016\/j.jom.2004.09.005","volume":"23","author":"CH Fine","year":"2005","unstructured":"Fine, C. H., Golany, B., & Naseraldin, H. (2005). Modeling tradeoffs in three-dimensional concurrent engineering: A goal programming approach. Journal of Operations Management, 23(3\/4), 389\u2013403.","journal-title":"Journal of Operations Management"},{"issue":"4","key":"1882_CR8","doi-asserted-by":"crossref","first-page":"547","DOI":"10.1111\/j.1475-3995.2012.00842.x","volume":"19","author":"M Gagnon","year":"2012","unstructured":"Gagnon, M., Gilles, A., & Aouni, B. (2012). Resource-constrained project scheduling through the goal programming model: Integration of the manager\u2019s preferences. International Transactions in Operational Research, 19(4), 547\u2013565.","journal-title":"International Transactions in Operational Research"},{"issue":"3\/4","key":"1882_CR9","doi-asserted-by":"crossref","first-page":"325","DOI":"10.1016\/S0360-8352(97)00103-4","volume":"33","author":"M Gupta","year":"1997","unstructured":"Gupta, M., & Isaacs, J. (1997). Value analysis of disposal strategies for automobiles. Computers and Industrial Engineering, 33(3\/4), 325\u2013329.","journal-title":"Computers and Industrial Engineering"},{"key":"1882_CR10","volume-title":"Linear programming in single- and multiple-objective systems","author":"J Ignizio","year":"1982","unstructured":"Ignizio, J. (1982). Linear programming in single- and multiple-objective systems. Englewood Cliffs, NJ: Prentice Hall."},{"key":"1882_CR11","volume-title":"Value analysis tear-down","author":"J Kaufman","year":"2004","unstructured":"Kaufman, J. (2004). Value analysis tear-down. New York: Industrial Press."},{"issue":"3","key":"1882_CR12","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1109\/TEM.2008.922627","volume":"55","author":"TJ Kull","year":"2008","unstructured":"Kull, T. J., & Talluri, S. (2008). A supply risk reduction model using integrated multicriteria decision making. IEEE Transactions on Engineering Management, 55(3), 409\u2013419.","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"3","key":"1882_CR13","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1080\/09544820600907732","volume":"18","author":"S Kumar","year":"2007","unstructured":"Kumar, S., & Krob, W. (2007). Phase reviews versus fast product development: A business case. Journal of Engineering Design, 18(3), 279\u2013291.","journal-title":"Journal of Engineering Design"},{"issue":"4","key":"1882_CR14","first-page":"47","volume":"56","author":"O Ladipo","year":"2014","unstructured":"Ladipo, O., Bolyard, C., & Mintz, M. (2014). Earned value analysis and CPM schedule review in construction. Cost Engineering, 56(4), 47\u201356.","journal-title":"Cost Engineering"},{"issue":"21","key":"1882_CR15","doi-asserted-by":"crossref","first-page":"4495","DOI":"10.1080\/00207540410001720403","volume":"42","author":"A Lamghabbar","year":"2004","unstructured":"Lamghabbar, A., Yacout, S., & Ouali, M. S. (2004). Concurrent optimization of the design and manufacturing stages of product development. International Journal of Production Research, 42(21), 4495\u20134512.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"1882_CR16","doi-asserted-by":"crossref","first-page":"367","DOI":"10.1016\/0360-8352(91)90008-T","volume":"20","author":"B Lee","year":"1991","unstructured":"Lee, B., Chung, N.-K., & Tcha, D.-W. (1991). A parallel algorithm and duality for a fuzzy multi-objective linear fractional programming program. Computer and Industrial Engineering, 20(3), 367\u2013372.","journal-title":"Computer and Industrial Engineering"},{"key":"1882_CR17","volume-title":"Goal programming for decision analysis","author":"SL Lee","year":"1972","unstructured":"Lee, S. L. (1972). Goal programming for decision analysis. Philadelphia, PA: Auerbach."},{"key":"1882_CR18","volume-title":"Micro management scienc","author":"SL Lee","year":"1990","unstructured":"Lee, S. L., & Shim, J. P. (1990). Micro management scienc (2nd ed.). Boston, MA: Allyn and Bacon.","edition":"2"},{"issue":"1","key":"1882_CR19","doi-asserted-by":"crossref","first-page":"116","DOI":"10.1109\/TSMCA.2007.909502","volume":"38","author":"C Meirina","year":"2008","unstructured":"Meirina, C., Levchuk, Y., Levchuk, G., & Pattipati, K. (2008). A Markov decision problem approach to goal attainment. IEEE Transactions on Systems, Man and Cybernetics, 38(1), 116\u2013132.","journal-title":"IEEE Transactions on Systems, Man and Cybernetics"},{"issue":"3","key":"1882_CR20","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1002\/isaf.203","volume":"10","author":"S Nanda","year":"2001","unstructured":"Nanda, S., & Pendharkar, P. (2001). Linear models for minimizing misclassification costs in bankruptcy prediction. International Journal of Intelligent Systems in Accounting, Finance and Management, 10(3), 155\u2013168.","journal-title":"International Journal of Intelligent Systems in Accounting, Finance and Management"},{"key":"1882_CR21","volume-title":"Lean production for competitive advantage","author":"J Nicholas","year":"2011","unstructured":"Nicholas, J. (2011). Lean production for competitive advantage. New York, NY: Taylor and Frances Group."},{"issue":"4","key":"1882_CR22","doi-asserted-by":"crossref","first-page":"534","DOI":"10.1109\/TEM.2006.883705","volume":"53","author":"B Pollack-Johnson","year":"2006","unstructured":"Pollack-Johnson, B., & Liberatore, M. J. (2006). Incorporating quality considerations into project time\/cost tradeoff analysis and decision making. IEEE Transactions on Engineering Management, 53(4), 534\u2013542.","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"6","key":"1882_CR23","doi-asserted-by":"crossref","first-page":"79","DOI":"10.1108\/01443579310039065","volume":"13","author":"IM Premachandra","year":"1993","unstructured":"Premachandra, I. M. (1993). A goal programming model for activity crashing in project networks. International Journal of Operations and Production Management, 13(6), 79\u201385.","journal-title":"International Journal of Operations and Production Management"},{"issue":"5","key":"1882_CR24","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1080\/09511921003643152","volume":"23","author":"TT Pullan","year":"2010","unstructured":"Pullan, T. T., Bhasi, M., & Madhu, G. (2010). Application of concurrent engineering in manufacturing industry. International Journal of Computer Integrated Manufacturing, 23(5), 425\u2013440.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"23","key":"1882_CR25","doi-asserted-by":"crossref","first-page":"6939","DOI":"10.1080\/00207540903352686","volume":"48","author":"P Romano","year":"2010","unstructured":"Romano, P., Formentini, M., Bandera, C., & Tomasella, M. (2010). Value analysis as a decision support tool in cruise ship design. International Journal of Production Research, 48(23), 6939\u20136958.","journal-title":"International Journal of Production Research"},{"issue":"2","key":"1882_CR26","doi-asserted-by":"crossref","first-page":"202","DOI":"10.1109\/17.509985","volume":"43","author":"MJ Schniederjans","year":"1996","unstructured":"Schniederjans, M. J., & Hong, S. (1996). Multiobjective concurrent engineering: A goal programming approach. IEEE Transactions on Engineering Management, 43(2), 202\u2013209.","journal-title":"IEEE Transactions on Engineering Management"},{"key":"1882_CR27","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-2229-4","volume-title":"Goal programming: Methodology and applications","author":"MJ Schniederjans","year":"1995","unstructured":"Schniederjans, M. J. (1995). Goal programming: Methodology and applications. Boston, MA: Kluwer Academic."},{"key":"1882_CR28","doi-asserted-by":"crossref","DOI":"10.4324\/9781315889986","volume-title":"Relationship management and the management of projects","author":"H Smyth","year":"2014","unstructured":"Smyth, H. (2014). Relationship management and the management of projects. New York: Routledge."},{"issue":"2","key":"1882_CR29","first-page":"139","volume":"24","author":"I Stancu-Minasian","year":"1988","unstructured":"Stancu-Minasian, I., & Tigan, S. (1988). A stochastic approach to some linear fractional goal programming problems. Kybernetika, 24(2), 139\u2013149.","journal-title":"Kybernetika"},{"issue":"4","key":"1882_CR30","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1080\/14783361003606480","volume":"21","author":"H Sun","year":"2010","unstructured":"Sun, H., & Zhao, Y. (2010). The empirical relationship between quality management and the speed of new product development. Total Quality Management and Business Excellence, 21(4), 351\u2013361.","journal-title":"Total Quality Management and Business Excellence"},{"issue":"9","key":"1882_CR31","doi-asserted-by":"crossref","first-page":"1440","DOI":"10.1111\/j.1539-6924.2010.01432.x","volume":"30","author":"D Wu","year":"2010","unstructured":"Wu, D., Kefan, X., Gang, C., & Ping, G. (2010). A risk analysis model in concurrent engineering product development. Risk Analysis: An International Journal, 30(9), 1440\u20131453.","journal-title":"Risk Analysis: An International Journal"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-015-1882-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-015-1882-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-015-1882-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-015-1882-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,9,1]],"date-time":"2020-09-01T17:12:51Z","timestamp":1598980371000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-015-1882-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,5,1]]},"references-count":31,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2017,4]]}},"alternative-id":["1882"],"URL":"https:\/\/doi.org\/10.1007\/s10479-015-1882-9","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,5,1]]}}}