{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,10]],"date-time":"2026-01-10T02:48:19Z","timestamp":1768013299786,"version":"3.49.0"},"reference-count":51,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2015,10,7]],"date-time":"2015-10-07T00:00:00Z","timestamp":1444176000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2017,4]]},"DOI":"10.1007\/s10479-015-2007-1","type":"journal-article","created":{"date-parts":[[2015,10,7]],"date-time":"2015-10-07T14:14:42Z","timestamp":1444227282000},"page":"351-365","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":10,"title":["Supply chain management through the stochastic goal programming model"],"prefix":"10.1007","volume":"251","author":[{"given":"Alireza","family":"Azimian","sequence":"first","affiliation":[]},{"given":"Belaid","family":"Aouni","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,10,7]]},"reference":[{"issue":"3","key":"2007_CR1","doi-asserted-by":"crossref","first-page":"1427","DOI":"10.1016\/j.ejor.2005.11.049","volume":"181","author":"O Ak\u00f6z","year":"2007","unstructured":"Ak\u00f6z, O., & Petrovic, D. (2007). A fuzzy goal programming method with imprecise goal hierarchy. European Journal of Operational Research, 181(3), 1427\u20131433.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"2007_CR2","doi-asserted-by":"crossref","first-page":"38","DOI":"10.1016\/S0377-2217(00)00294-0","volume":"133","author":"B Aouni","year":"2001","unstructured":"Aouni, B., & Kettani, O. (2001). Goal programming model: A glorious history and promising future. European Journal of Operational Research, 133(2), 38\u201346.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"2007_CR3","doi-asserted-by":"crossref","first-page":"610","DOI":"10.1016\/j.ejor.2003.10.035","volume":"162","author":"B Aouni","year":"2005","unstructured":"Aouni, B., Abdelaziz, F. B., & Martel, J. M. (2005). Decision-maker\u2019s preferences modeling in the stochastic goal programming. European Journal of Operational Research, 162(3), 610\u2013618.","journal-title":"European Journal of Operational Research"},{"issue":"5\u20138","key":"2007_CR4","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1007\/s00170-009-2150-4","volume":"46","author":"A Azadeh","year":"2010","unstructured":"Azadeh, A., Ghaderi, S. F., Dehghanbaghi, M., & Dabbaghi, A. (2010). Integration of simulation, design of experiment and goal programming for minimization of make span and tardiness. The International Journal of Advanced Manufacturing Technology, 46(5\u20138), 431\u2013444.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"2007_CR5","doi-asserted-by":"crossref","unstructured":"Azaron, A., Furmans, K., & Modarres, M. (2010). Multi-objective stochastic programming approaches for supply chain management. In New developments in multiple objective and goal programming, (pp. 1\u201314). Berlin: Springer.","DOI":"10.1007\/978-3-642-10354-4_1"},{"issue":"2","key":"2007_CR6","doi-asserted-by":"crossref","first-page":"352","DOI":"10.1016\/S0377-2217(00)00303-9","volume":"133","author":"F Ben Abdelaziz","year":"2001","unstructured":"Ben Abdelaziz, F., & Sameh, M. (2001). Application of goal programming in a multi-objective reservoir operation model in Tunisia. European Journal of Operational Research, 133(2), 352\u2013361.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"2007_CR7","doi-asserted-by":"crossref","first-page":"382","DOI":"10.1016\/j.ejor.2007.09.039","volume":"192","author":"UK Bhattacharya","year":"2009","unstructured":"Bhattacharya, U. K. (2009). A chance constraints goal programming model for the advertising planning problem. European Journal of Operational Research, 192(2), 382\u2013395.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"2007_CR8","doi-asserted-by":"crossref","first-page":"1123","DOI":"10.1016\/j.ejor.2008.04.034","volume":"196","author":"M Bravo","year":"2009","unstructured":"Bravo, M., & Gonzalez, I. (2009). Applying stochastic goal programming: A case study on water use planning. European Journal of Operational Research, 196(3), 1123\u20131129.","journal-title":"European Journal of Operational Research"},{"key":"2007_CR9","doi-asserted-by":"crossref","first-page":"134","DOI":"10.1080\/01621459.1962.10482155","volume":"57","author":"A Charnes","year":"1952","unstructured":"Charnes, A., & Cooper, W. W. (1952). Chance conctraints and normal deviates. Journal of American Statistics Association, 57, 134\u2013148.","journal-title":"Journal of American Statistics Association"},{"key":"2007_CR10","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1287\/mnsc.6.1.73","volume":"6","author":"A Charnes","year":"1959","unstructured":"Charnes, A., & Cooper, W. W. (1959). Chance-constrained programming. Management Sciences, 6, 73\u201378.","journal-title":"Management Sciences"},{"key":"2007_CR11","doi-asserted-by":"crossref","first-page":"18","DOI":"10.1287\/opre.11.1.18","volume":"11","author":"A Charnes","year":"1963","unstructured":"Charnes, A., & Cooper, W. W. (1963). Deterministic equivalents for optimizing and satisfying under chance constraints. Operations Research, 11, 18\u201339.","journal-title":"Operations Research"},{"key":"2007_CR12","doi-asserted-by":"crossref","first-page":"138","DOI":"10.1287\/mnsc.1.2.138","volume":"1","author":"A Charnes","year":"1955","unstructured":"Charnes, A., Cooper, W. W., & Ferguson, R. (1955). Optimal estimation of executive compensation by linear programming. Management Sciences, 1, 138\u2013351.","journal-title":"Management Sciences"},{"key":"2007_CR13","doi-asserted-by":"crossref","first-page":"1084","DOI":"10.1016\/j.ejor.2007.04.025","volume":"186","author":"MS Cherif","year":"2008","unstructured":"Cherif, M. S., Chabchoub, H., & Aouni, B. (2008). Quality control system design through the goal programming model and the satisfaction functions. European Journal of Operational Research, 186, 1084\u20131098.","journal-title":"European Journal of Operational Research"},{"key":"2007_CR14","unstructured":"Chopra, S., & Meindl, P. (2001). Supply chain management: Strategy, planning and operation. ISBN 0-13-026465-2, pp. 1\u20137."},{"issue":"3","key":"2007_CR15","doi-asserted-by":"crossref","first-page":"576","DOI":"10.1287\/opre.16.3.576","volume":"16","author":"B Contini","year":"1968","unstructured":"Contini, B. (1968). A stochastic approach to goal programming. Operations Research, 16(3), 576\u2013586.","journal-title":"Operations Research"},{"issue":"3\u20134","key":"2007_CR16","doi-asserted-by":"crossref","first-page":"319","DOI":"10.1016\/j.jom.2004.10.001","volume":"23","author":"C Forza","year":"2005","unstructured":"Forza, C., Salvador, F., & Rungtusanatham, M. (2005). Coordinating product design, process design, and supply chain design decisions: Part B. Coordinating approaches, tradeoffs, and future research directions. Journal of Operations Management, 23(3\u20134), 319\u2013324.","journal-title":"Journal of Operations Management"},{"issue":"1","key":"2007_CR17","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1007\/s12063-008-0007-x","volume":"1","author":"W Ho","year":"2008","unstructured":"Ho, W., Lee, C. K. M., & Ho, G. T. S. (2008). Optimization of the facility location-allocation problem in a customer-driven supply chain. Operations Management Research, 1(1), 69\u201379.","journal-title":"Operations Management Research"},{"issue":"8","key":"2007_CR18","doi-asserted-by":"crossref","first-page":"9053","DOI":"10.1016\/j.eswa.2010.09.024","volume":"38","author":"SJ Hung","year":"2011","unstructured":"Hung, S. J. (2011). Activity-based divergent supply chain planning for competitive advantage in the risky global environment: A DEMATEL-ANP fuzzy goal programming approach. Expert Systems with Applications, 38(8), 9053\u20139062.","journal-title":"Expert Systems with Applications"},{"key":"2007_CR19","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1111\/j.1540-5915.1982.tb00152.x","volume":"13","author":"JP Ignizio","year":"1982","unstructured":"Ignizio, J. P. (1982). On the (re)discovery of fuzzy goal programming. Decision Sciences, 13, 331\u2013336.","journal-title":"Decision Sciences"},{"issue":"4","key":"2007_CR20","doi-asserted-by":"crossref","first-page":"547","DOI":"10.1007\/s10100-010-0144-9","volume":"19","author":"F Jolai","year":"2011","unstructured":"Jolai, F., Razmi, J., & Rostami, N. K. M. (2011). A fuzzy goal programming and meta heuristic algorithms for solving integrated production: Distribution planning problem. Central European Journal of Operations Research, 19(4), 547\u2013569.","journal-title":"Central European Journal of Operations Research"},{"issue":"5","key":"2007_CR21","doi-asserted-by":"crossref","first-page":"5833","DOI":"10.1016\/j.eswa.2010.11.039","volume":"38","author":"H Jung","year":"2011","unstructured":"Jung, H. (2011). A fuzzy AHP\u2013GP approach for integrated production-planning considering manufacturing partners. Expert Systems with Applications, 38(5), 5833\u20135840.","journal-title":"Expert Systems with Applications"},{"issue":"4","key":"2007_CR22","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1007\/s11135-009-9223-1","volume":"44","author":"CY Ku","year":"2010","unstructured":"Ku, C. Y., Chang, C. T., & Ho, H. P. (2010). Global supplier selection using fuzzy analytic hierarchy process and fuzzy goal programming. Quality and Quantity, 44(4), 623\u2013640.","journal-title":"Quality and Quantity"},{"issue":"1","key":"2007_CR23","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1016\/j.cie.2003.09.010","volume":"46","author":"M Kumar","year":"2004","unstructured":"Kumar, M., Vrat, P., & Shankar, R. (2004). A fuzzy goal programming approach for vendor selection in supply chain. Computers & Industrial Engineering, 46(1), 69\u201385.","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"2007_CR24","doi-asserted-by":"crossref","first-page":"6318","DOI":"10.1016\/j.eswa.2008.08.044","volume":"36","author":"AH Lee","year":"2009","unstructured":"Lee, A. H., Kang, H. Y., & Chang, C. T. (2009). Fuzzy multiple goal programming applied to TFT-LCD supplier selection by downstream manufacturers. Expert Systems with Applications, 36(3), 6318\u20136325.","journal-title":"Expert Systems with Applications"},{"issue":"3","key":"2007_CR25","doi-asserted-by":"crossref","first-page":"531","DOI":"10.1016\/j.cie.2007.05.010","volume":"53","author":"SCH Leung","year":"2007","unstructured":"Leung, S. C. H., & Ng, Wan-lung. (2007). A goal programming model for production planning of perishable products with postponement. Computers & Industrial Engineering, 53(3), 531\u2013541.","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"2007_CR26","doi-asserted-by":"crossref","first-page":"1053","DOI":"10.1016\/j.cie.2008.09.017","volume":"56","author":"SCH Leung","year":"2009","unstructured":"Leung, S. C. H., & Chan, S. S. W. (2009). A goal programming model for aggregate production planning with resource utilization constraint. Computers & Industrial Engineering, 56(3), 1053\u20131064.","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"2007_CR27","doi-asserted-by":"crossref","first-page":"508","DOI":"10.1016\/j.ejor.2005.06.009","volume":"175","author":"L Li","year":"2006","unstructured":"Li, L., Fonseca, D. J., & Chen, Der-San. (2006). Earliness-tardiness production planning for just-in-time manufacturing: A unifying approach by goal programming. European Journal of Operational Research, 175(1), 508\u2013515.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"2007_CR28","doi-asserted-by":"crossref","first-page":"1407","DOI":"10.1016\/j.cie.2009.07.010","volume":"57","author":"TF Liang","year":"2009","unstructured":"Liang, T. F. (2009). Fuzzy multi-objective project management decisions using two-phase fuzzy goal programming approach. Computers & Industrial Engineering, 57(4), 1407\u20131416.","journal-title":"Computers & Industrial Engineering"},{"issue":"9","key":"2007_CR29","doi-asserted-by":"crossref","first-page":"10803","DOI":"10.1016\/j.eswa.2011.02.031","volume":"38","author":"CN Liao","year":"2011","unstructured":"Liao, C. N., & Kao, H. P. (2011). An integrated fuzzy TOPSIS and MCGP approach to supplier selection in supply chain management. Expert Systems with Applications, 38(9), 10803\u201310811.","journal-title":"Expert Systems with Applications"},{"issue":"7","key":"2007_CR30","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/0895-7177(96)00125-2","volume":"24","author":"B Liu","year":"1996","unstructured":"Liu, B. (1996). Dependent-chance goal programming and its genetic algorithm based approach. Mathematical and Computer Modeling, 24(7), 43\u201352.","journal-title":"Mathematical and Computer Modeling"},{"issue":"2","key":"2007_CR31","doi-asserted-by":"crossref","first-page":"430","DOI":"10.1016\/j.ejor.2011.04.001","volume":"213","author":"MM Lotfi","year":"2011","unstructured":"Lotfi, M. M., & Torabi, S. A. (2011). A fuzzy goal programming approach for mid-term assortment planning in supermarkets. European Journal of Operational Research, 213(2), 430\u2013441.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"2007_CR32","doi-asserted-by":"crossref","first-page":"1121","DOI":"10.1057\/jors.1990.179","volume":"41","author":"JM Martel","year":"1990","unstructured":"Martel, J. M., & Aouni, B. (1990). Incorporating the decision-maker\u2019s preferences in the goal programming model. Journal of Operational Research Society, 41(1), 1121\u20131132.","journal-title":"Journal of Operational Research Society"},{"key":"2007_CR33","volume-title":"Incorporating the decision-maker\u2019s preferences in the goal programming model with fuzzy goals values, a new formulation lecture notes in economics and mathematical systems","author":"JM Martel","year":"1996","unstructured":"Martel, J. M., & Aouni, B. (1996). Incorporating the decision-maker\u2019s preferences in the goal programming model with fuzzy goals values, a new formulation lecture notes in economics and mathematical systems. Berlin: Springer."},{"key":"2007_CR34","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1023\/A:1008206226608","volume":"12","author":"JM Martel","year":"1998","unstructured":"Martel, J. M., & Aouni, B. (1998). Diverse imprecise goal programming model formulations. Journal of Global Optimization, 12, 127\u2013138.","journal-title":"Journal of Global Optimization"},{"issue":"1","key":"2007_CR35","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1111\/j.1475-3995.1996.tb00036.x","volume":"3","author":"H Min","year":"1996","unstructured":"Min, H., & Melachrinoudis, E. (1996). Dynamic location and entry mode selection of multinational manufacturing facilities under uncertainty: A chance-constrained goal programming approach. International Transactions in Operational Research, 3(1), 65\u201376.","journal-title":"International Transactions in Operational Research"},{"key":"2007_CR36","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1016\/j.ejor.2009.09.008","volume":"204","author":"J Mula","year":"2009","unstructured":"Mula, J., Peidro, D., Diaz-Madronero, M., & Vicens, E. (2009). Mathematical programming models for supply chain production and transport planning. European Journal of Operational Research, 204, 377\u2013390.","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"2007_CR37","doi-asserted-by":"crossref","first-page":"1955","DOI":"10.1016\/j.cor.2008.06.009","volume":"36","author":"U \u00d6zcan","year":"2009","unstructured":"\u00d6zcan, U., & Toklu, B. (2009). Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models. Computers & Operations Research, 36(6), 1955\u20131965.","journal-title":"Computers & Operations Research"},{"key":"2007_CR38","unstructured":"Rostami NKi, M., Razmi, J., & Jolai, F. (2010). Designing a genetic algorithm to solve an integrated model in supply chain management using fuzzy goal programming approach. Balanced Automation Systems for Future Manufacturing Networks, 168\u2013176."},{"key":"2007_CR39","doi-asserted-by":"crossref","first-page":"581","DOI":"10.1016\/S0305-0483(99)00080-8","volume":"28","author":"EH Sabri","year":"2000","unstructured":"Sabri, E. H., & Beamon, B. M. (2000). A multi-objective approach to simultaneous strategic and operational planning in supply chain design. Omega, 28, 581\u2013598.","journal-title":"Omega"},{"key":"2007_CR40","doi-asserted-by":"crossref","first-page":"96","DOI":"10.1016\/j.ejor.2004.01.046","volume":"167","author":"T Santoso","year":"2005","unstructured":"Santoso, T., Ahmed, S., Goetschalckx, M., & Shapiro, A. (2005). A stochastic programming approach for supply chain network design under uncertainty. European Journal of Operational research, 167, 96\u2013115.","journal-title":"European Journal of Operational research"},{"issue":"3\u20134","key":"2007_CR41","doi-asserted-by":"crossref","first-page":"401","DOI":"10.1007\/s00170-006-0842-6","volume":"36","author":"H Selim","year":"2008","unstructured":"Selim, H., & Ozkarahan, I. (2008). A supply chain distribution network design model: An interactive fuzzy goal programming-based solution approach. The International Journal of Advanced Manufacturing Technology, 36(3\u20134), 401\u2013418.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"3","key":"2007_CR42","doi-asserted-by":"crossref","first-page":"396","DOI":"10.1016\/j.tre.2006.11.001","volume":"44","author":"H Selim","year":"2008","unstructured":"Selim, H., Araz, C., & Ozkarahan, I. (2008). Collaborative production-distribution planning in supply chain: A fuzzy goal programming approach. Transportation Research Part E: Logistics and Transportation Review, 44(3), 396\u2013419.","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"issue":"2","key":"2007_CR43","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1016\/0038-0121(88)90021-3","volume":"22","author":"SB Sinha","year":"1988","unstructured":"Sinha, S. B., Rao, K. A., & Mangaraj, B. K. (1988). Fuzzy goal programming in multi-criteria decision systems: A case study in agriculture planning. Socio-Economic Planning Sciences, 22(2), 93\u2013101.","journal-title":"Socio-Economic Planning Sciences"},{"issue":"8","key":"2007_CR44","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1108\/EUM0000000000329","volume":"8","author":"GC Stevens","year":"1989","unstructured":"Stevens, G. C. (1989). Integrating the supply chains. International Journal of Physical Distribution and Materials Management, 8(8), 3\u20138.","journal-title":"International Journal of Physical Distribution and Materials Management"},{"key":"2007_CR45","volume-title":"Distributional assumptions for parametric forecasting of intermittent demand, in service parts management","author":"AA Syntetos","year":"2011","unstructured":"Syntetos, A. A., Babai, M. Z., Lengu, D., & Altay, N. (2011). Distributional assumptions for parametric forecasting of intermittent demand, in service parts management. London: Springer."},{"issue":"2","key":"2007_CR46","doi-asserted-by":"crossref","first-page":"136","DOI":"10.1016\/0019-8501(79)90053-1","volume":"8","author":"BW Taylor","year":"1979","unstructured":"Taylor, B. W., & Anderson, P. F. (1979). Goal programming approach to marketing\/ production planning. Industrial Marketing Management, 8(2), 136\u2013144.","journal-title":"Industrial Marketing Management"},{"issue":"1\u20132","key":"2007_CR47","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1007\/s00170-003-1791-y","volume":"25","author":"G Wang","year":"2005","unstructured":"Wang, G., Huang, S. H., & Dismukes, J. P. (2005). Manufacturing supply chain design and evaluation. The International Journal of Advanced Manufacturing Technology, 25(1\u20132), 93\u2013100.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"3","key":"2007_CR48","doi-asserted-by":"crossref","first-page":"599","DOI":"10.1007\/s10845-010-0398-z","volume":"23","author":"JT Wong","year":"2012","unstructured":"Wong, J. T. (2012). DSS for 3PL provider selection in global supply chain: Combining the multi-objective optimization model with experts\u2019 opinions. Journal of Intelligent Manufacturing, 23(3), 599\u2013614.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"12","key":"2007_CR49","doi-asserted-by":"crossref","first-page":"2668","DOI":"10.1016\/j.apm.2006.10.011","volume":"31","author":"L Yang","year":"2007","unstructured":"Yang, L., & Feng, Y. (2007). A bicriteria solid transportation problem with fixed charge under stochastic environment. Applied Mathematical Modeling, 31(12), 2668\u20132683.","journal-title":"Applied Mathematical Modeling"},{"issue":"5\u20138","key":"2007_CR50","doi-asserted-by":"crossref","first-page":"809","DOI":"10.1007\/s00170-011-3212-y","volume":"56","author":"MHF Zarandi","year":"2011","unstructured":"Zarandi, M. H. F., Sisakht, A. H., & Davari, S. (2011). Design of a closed-loop supply chain (CLSC) model using an interactive fuzzy goal programming. The International Journal of Advanced Manufacturing Technology, 56(5\u20138), 809\u2013821.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"4","key":"2007_CR51","doi-asserted-by":"crossref","first-page":"341","DOI":"10.1007\/s11741-001-0053-1","volume":"5","author":"SY Zhou","year":"2001","unstructured":"Zhou, S. Y., & Chen, R. Q. (2001). A decision model for selecting participants in supply chain. Journal of Shanghai University (English Edition), 5(4), 341\u2013344.","journal-title":"Journal of Shanghai University (English Edition)"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-015-2007-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-015-2007-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-015-2007-1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-015-2007-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T18:10:03Z","timestamp":1559153403000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-015-2007-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,10,7]]},"references-count":51,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2017,4]]}},"alternative-id":["2007"],"URL":"https:\/\/doi.org\/10.1007\/s10479-015-2007-1","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,10,7]]}}}