{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,11]],"date-time":"2025-11-11T13:15:28Z","timestamp":1762866928897,"version":"3.37.3"},"reference-count":29,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2016,8,31]],"date-time":"2016-08-31T00:00:00Z","timestamp":1472601600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2017,11]]},"DOI":"10.1007\/s10479-016-2301-6","type":"journal-article","created":{"date-parts":[[2016,9,2]],"date-time":"2016-09-02T13:38:28Z","timestamp":1472823508000},"page":"415-435","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["An MILP model for planning of batch plants operating in a campaign-mode"],"prefix":"10.1007","volume":"258","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-1975-983X","authenticated-orcid":false,"given":"Yanina","family":"Fumero","sequence":"first","affiliation":[]},{"given":"Gabriela","family":"Corsano","sequence":"additional","affiliation":[]},{"given":"Jorge M.","family":"Montagna","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,8,31]]},"reference":[{"key":"2301_CR1","doi-asserted-by":"crossref","first-page":"913","DOI":"10.1016\/j.compchemeng.2003.09.004","volume":"28","author":"G Berning","year":"2004","unstructured":"Berning, G., Brandenburg, M., Gursoy, K., Kussi, J. S., Mehta, V., & Tolle, F. J. (2004). Integrating collaborative planning and supply chain optimization for the chemical process industry I. Methodology. Computers & Chemical Engineering, 28, 913\u2013927.","journal-title":"Computers & Chemical Engineering"},{"key":"2301_CR2","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1007\/s10479-013-1415-3","volume":"211","author":"B Bilgen","year":"2013","unstructured":"Bilgen, B., & \u00c7elebi, Y. (2013). Integrated production scheduling and distribution planning in dairy supply chain by hybrid modeling. Annals of Operations Research, 211, 55\u201382.","journal-title":"Annals of Operations Research"},{"issue":"1\u20132","key":"2301_CR3","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1016\/0098-1354(89)89014-3","volume":"13","author":"DB Birewar","year":"1989","unstructured":"Birewar, D. B., & Grossmann, I. E. (1989). Incorporating scheduling in the optimal design of multiproduct batch plants. Computers and Chemical Engineering, 13(1\u20132), 141\u2013161.","journal-title":"Computers and Chemical Engineering"},{"key":"2301_CR4","volume-title":"GAMS, a user\u2019s guide","author":"A Brooke","year":"2012","unstructured":"Brooke, A., Kendrick, D., Meeraus, A., & Raman, R. (2012). GAMS, a user\u2019s guide. Washington, DC: GAMS Development Corporation."},{"key":"2301_CR5","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1016\/j.compchemeng.2014.02.023","volume":"72","author":"Y Chu","year":"2015","unstructured":"Chu, Y., You, F., Wassick, J. M., & Agarwal, A. (2015). Integrated planning and scheduling under production uncertainties: Bi-level model formulation and hybrid solution method. Computers and Chemical Engineering, 72, 255\u2013272.","journal-title":"Computers and Chemical Engineering"},{"key":"2301_CR6","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1007\/s10479-011-1031-z","volume":"210","author":"E Coban","year":"2013","unstructured":"Coban, E., & Hooker, J. (2013). Single-facility scheduling by logic-based Benders decomposition. Annals of Operations Research, 210, 245\u2013272.","journal-title":"Annals of Operations Research"},{"key":"2301_CR7","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1021\/ie050778z","volume":"45","author":"M Erdirik-Dogan","year":"2006","unstructured":"Erdirik-Dogan, M., & Grossmann, I. E. (2006). A decomposition method for the simultaneous planning and scheduling of single-stage continuous muliproduct plants. Industrial and Engineering Chemistry Research, 45, 299\u2013315.","journal-title":"Industrial and Engineering Chemistry Research"},{"key":"2301_CR8","doi-asserted-by":"crossref","first-page":"2664","DOI":"10.1016\/j.compchemeng.2007.07.010","volume":"32","author":"M Erdirik-Dogan","year":"2008","unstructured":"Erdirik-Dogan, M., & Grossmann, I. E. (2008). Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines. Computers and Chemical Engineering, 32, 2664\u20132683.","journal-title":"Computers and Chemical Engineering"},{"key":"2301_CR9","doi-asserted-by":"crossref","first-page":"6146","DOI":"10.1021\/ie1008376","volume":"50","author":"Y Fumero","year":"2011","unstructured":"Fumero, Y., Corsano, G., & Montagna, J. M. (2011). Detailed design of multiproduct batch plants considering production scheduling. Industrial and Engineering Chemistry Research, 50, 6146\u20136160.","journal-title":"Industrial and Engineering Chemistry Research"},{"key":"2301_CR10","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1007\/s10479-011-0954-8","volume":"199","author":"Y Fumero","year":"2012","unstructured":"Fumero, Y., Corsano, G., & Montagna, J. M. (2012a). Planning and scheduling of multistage multiproduct batch plants operating under production campaigns. Annals of Operations Research, 199, 249\u2013268.","journal-title":"Annals of Operations Research"},{"key":"2301_CR11","doi-asserted-by":"crossref","first-page":"3988","DOI":"10.1021\/ie201757t","volume":"51","author":"Y Fumero","year":"2012","unstructured":"Fumero, Y., Corsano, G., & Montagna, J. M. (2012b). Scheduling of multistage multiproduct batch plants operating in a campaign-mode. Industrial and Engineering Chemistry Research, 51, 3988\u20134001.","journal-title":"Industrial and Engineering Chemistry Research"},{"issue":"44","key":"2301_CR12","doi-asserted-by":"crossref","first-page":"17059","DOI":"10.1021\/ie500454x","volume":"53","author":"Y Fumero","year":"2014","unstructured":"Fumero, Y., Corsano, G., & Montagna, J. M. (2014). Simultaneous batching and scheduling of batch plants that operate in a campaign-mode, considering nonidentical parallel units and sequence-dependent changeovers. Industrial and Engineering Chemistry Research, 53(44), 17059\u201317074.","journal-title":"Industrial and Engineering Chemistry Research"},{"key":"2301_CR13","doi-asserted-by":"crossref","first-page":"455","DOI":"10.1287\/mnsc.22.4.455","volume":"22","author":"F Glover","year":"1975","unstructured":"Glover, F. (1975). Improved linear integer programming formulations of nonlinear integer problems. Management Science, 22, 455\u2013460.","journal-title":"Management Science"},{"key":"2301_CR14","first-page":"150","volume":"98","author":"IE Grossmann","year":"2002","unstructured":"Grossmann, I. E., Van den Heever, S. A., & Harjunkoski, I. (2002). Discrete optimization methods and their role in the integration of planning and scheduling. AIChE Symposium Series, 98, 150\u2013168.","journal-title":"AIChE Symposium Series"},{"key":"2301_CR15","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1007\/s00291-002-0101-7","volume":"24","author":"J Kallrath","year":"2002","unstructured":"Kallrath, J. (2002). Planning and scheduling in the process industry. OR Spectrum, 24, 219\u2013250.","journal-title":"OR Spectrum"},{"key":"2301_CR16","doi-asserted-by":"crossref","first-page":"3585","DOI":"10.1016\/j.ces.2009.04.047","volume":"64","author":"Z Li","year":"2009","unstructured":"Li, Z., & Ierapetritou, M. G. (2009). Integrated production planning and scheduling using a decomposition framework. Chemical Engineering Science, 64, 3585\u2013359.","journal-title":"Chemical Engineering Science"},{"key":"2301_CR17","doi-asserted-by":"crossref","first-page":"407","DOI":"10.1007\/s10287-009-0096-5","volume":"7","author":"S Liu","year":"2010","unstructured":"Liu, S., Pinto, J. M., & Papageorgiou, L. G. (2010). MILP-based approaches for medium-term planning of single-stage continuous multiproduct plants with parallel units. Computational Management Science, 7, 407\u2013435.","journal-title":"Computational Management Science"},{"key":"2301_CR18","doi-asserted-by":"crossref","first-page":"1919","DOI":"10.1016\/j.compchemeng.2009.06.007","volume":"33","author":"CT Maravelias","year":"2009","unstructured":"Maravelias, C. T., & Sung, C. (2009). Integration of production planning and scheduling: Overview, challenges and opportunities. Computers and Chemical Engineering, 33, 1919\u20131930.","journal-title":"Computers and Chemical Engineering"},{"key":"2301_CR19","doi-asserted-by":"crossref","first-page":"6482","DOI":"10.1021\/ie100054h","volume":"49","author":"PA Marchetti","year":"2010","unstructured":"Marchetti, P. A., M\u00e9ndez, C. A., & Cerd\u00e1, J. (2010). Mixed-integer linear programming monolithic formulations for lot-sizing and scheduling of single-stage batch facilities. Industrial and Engineering Chemistry Research, 49, 6482\u20136498.","journal-title":"Industrial and Engineering Chemistry Research"},{"key":"2301_CR20","doi-asserted-by":"crossref","first-page":"5762","DOI":"10.1021\/ie202275y","volume":"51","author":"PA Marchetti","year":"2012","unstructured":"Marchetti, P. A., M\u00e9ndez, C. A., & Cerd\u00e1, J. (2012). Simultaneous lot sizing and scheduling of multistage batch processes handling multiple orders per product. Industrial and Engineering Chemistry Research, 51, 5762\u20135780.","journal-title":"Industrial and Engineering Chemistry Research"},{"key":"2301_CR21","doi-asserted-by":"crossref","first-page":"1106","DOI":"10.1016\/j.compchemeng.2007.06.012","volume":"32","author":"P Prasad","year":"2008","unstructured":"Prasad, P., & Maravelias, C. T. (2008). Batch selection, assignment and sequencing in multi-stage multi-product processes. Computers and Chemical Engineering, 32, 1106\u20131119.","journal-title":"Computers and Chemical Engineering"},{"issue":"4","key":"2301_CR22","first-page":"285","volume":"30","author":"GV Reklaitis","year":"2000","unstructured":"Reklaitis, G. V. (2000). Overview of planning and scheduling technologies. Latin American Applied Research, 30(4), 285\u2013293.","journal-title":"Latin American Applied Research"},{"key":"2301_CR23","first-page":"75","volume-title":"Proceedings of the third international conference of the foundations of computer-aided process operations","author":"N Shah","year":"1998","unstructured":"Shah, N. (1998). Single and multisite planning and scheduling: Current status and future challenge. In J. F. Pekny & G. E. Blau (Eds.), Proceedings of the third international conference of the foundations of computer-aided process operations (pp. 75\u201390). Utah: Snowbird."},{"key":"2301_CR24","doi-asserted-by":"crossref","first-page":"2082","DOI":"10.1016\/j.cor.2008.07.006","volume":"36","author":"XY Shao","year":"2009","unstructured":"Shao, X. Y., Li, X. Y., Gao, L., & Zhang, C. Y. (2009). Integration of process planning and scheduling\u2014a modified genetic algorithm-based approach. Computers & Operations Research, 36, 2082\u20132096.","journal-title":"Computers & Operations Research"},{"key":"2301_CR25","doi-asserted-by":"crossref","first-page":"6050","DOI":"10.1021\/ie801386m","volume":"48","author":"A Sundaramoorthy","year":"2009","unstructured":"Sundaramoorthy, A., Maravelias, C. T., & Prasad, P. (2009). Scheduling of multistage batch processes under utility constraints. Industrial and Engineering Chemistry Research, 48, 6050\u20136058.","journal-title":"Industrial and Engineering Chemistry Research"},{"key":"2301_CR26","doi-asserted-by":"crossref","first-page":"1546","DOI":"10.1021\/ie070944y","volume":"47","author":"A Sundaramoorthy","year":"2008","unstructured":"Sundaramoorthy, A., & Maravelias, C. T. (2008a). Simultaneous batching and scheduling in multistage multiproduct processes. Industrial and Engineering Chemistry Research, 47, 1546\u20131555.","journal-title":"Industrial and Engineering Chemistry Research"},{"key":"2301_CR27","doi-asserted-by":"crossref","first-page":"6648","DOI":"10.1021\/ie701737a","volume":"47","author":"A Sundaramoorthy","year":"2008","unstructured":"Sundaramoorthy, A., & Maravelias, C. T. (2008b). Modeling of storage in batching and scheduling of multistage processes. Industrial and Engineering Chemistry Research, 47, 6648\u20136660.","journal-title":"Industrial and Engineering Chemistry Research"},{"key":"2301_CR28","doi-asserted-by":"crossref","first-page":"1315","DOI":"10.1021\/ie00005a012","volume":"31","author":"VT Voudouris","year":"1992","unstructured":"Voudouris, V. T., & Grossmann, I. E. (1992). Mixed-integer linear programming reformulations for batch process design with discrete equipment sizes. Industrial and Engineering Chemistry Research, 31, 1315\u20131325.","journal-title":"Industrial and Engineering Chemistry Research"},{"issue":"1","key":"2301_CR29","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1109\/TASE.2006.872107","volume":"4","author":"HS Yan","year":"2007","unstructured":"Yan, H. S., & Zhang, X. D. (2007). A case study on integrated production planning and scheduling in a three stage manufacturing system. IEEE Transactions on Automation Science and Engineering, 4(1), 86\u201392.","journal-title":"IEEE Transactions on Automation Science and Engineering"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-016-2301-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-016-2301-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-016-2301-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-016-2301-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,11,16]],"date-time":"2017-11-16T12:39:37Z","timestamp":1510835977000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-016-2301-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,8,31]]},"references-count":29,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2017,11]]}},"alternative-id":["2301"],"URL":"https:\/\/doi.org\/10.1007\/s10479-016-2301-6","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"type":"print","value":"0254-5330"},{"type":"electronic","value":"1572-9338"}],"subject":[],"published":{"date-parts":[[2016,8,31]]}}}