{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,8]],"date-time":"2025-09-08T06:41:54Z","timestamp":1757313714885},"reference-count":24,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2016,9,29]],"date-time":"2016-09-29T00:00:00Z","timestamp":1475107200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2017,11]]},"DOI":"10.1007\/s10479-016-2315-0","type":"journal-article","created":{"date-parts":[[2016,9,29]],"date-time":"2016-09-29T16:11:14Z","timestamp":1475165474000},"page":"437-452","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":12,"title":["Fuzzy-probabilistic PERT"],"prefix":"10.1007","volume":"258","author":[{"given":"Barbara","family":"G\u0142adysz","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,9,29]]},"reference":[{"key":"2315_CR1","doi-asserted-by":"crossref","first-page":"704","DOI":"10.1016\/S0377-2217(03)00269-8","volume":"157","author":"YH Abdelkader","year":"2004","unstructured":"Abdelkader, Y. H. (2004). Evaluating project completion times when activity times are Weibull distribution. European Journal of Operational Research, 157, 704\u2013715.","journal-title":"European Journal of Operational Research"},{"key":"2315_CR2","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1007\/s10479-010-0781-3","volume":"181","author":"YH Abdelkader","year":"2010","unstructured":"Abdelkader, Y. H. (2010). Adjustment of the moments of the project completion times when activity times are exponentially distributed. Annals of Operations Research, 181, 503\u2013514.","journal-title":"Annals of Operations Research"},{"key":"2315_CR3","doi-asserted-by":"crossref","first-page":"2448","DOI":"10.1016\/j.ins.2007.01.035","volume":"177","author":"CT Chen","year":"2007","unstructured":"Chen, C. T., & Huang, S. F. (2007). Applying fuzzy method for measuring criticality in project network. Information Sciences, 177, 2448\u20132458.","journal-title":"Information Sciences"},{"key":"2315_CR4","doi-asserted-by":"crossref","first-page":"1289","DOI":"10.1016\/j.apm.2007.04.009","volume":"32","author":"SP Chen","year":"2008","unstructured":"Chen, S. P., & Hsueh, Y. J. (2008). A simple approach to fuzzy critical path analysis in project networks. Applied Mathematical Modelling, 32, 1289\u20131927.","journal-title":"Applied Mathematical Modelling"},{"key":"2315_CR5","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/0165-0114(88)90098-X","volume":"25","author":"S Chanas","year":"1988","unstructured":"Chanas, S., & Nowakowski, M. (1988). Single value simulation of fuzzy variable. Fuzzy Sets and Systems, 25, 43\u201357.","journal-title":"Fuzzy Sets and Systems"},{"issue":"5","key":"2315_CR6","doi-asserted-by":"crossref","first-page":"04014071","DOI":"10.1061\/(ASCE)ME.1943-5479.0000296","volume":"31","author":"KA Chrysafis","year":"2015","unstructured":"Chrysafis, K. A., & Papadopoulos, B. K. (2015). Possibilistic moments for the task duration in fuzzy PERT. Journal of Management in Engineering, 31(5), 04014071.","journal-title":"Journal of Management in Engineering"},{"issue":"2","key":"2315_CR7","doi-asserted-by":"crossref","first-page":"577","DOI":"10.3233\/IFS-120751","volume":"26","author":"KA Chrysafis","year":"2014","unstructured":"Chrysafis, K. A., & Papadopoulos, B. K. (2014). Approaching activity duration in PERT by means of fuzzy sets theory and statistics. Journal of Intelligent and Fuzzy Systems, 26(2), 577\u2013587.","journal-title":"Journal of Intelligent and Fuzzy Systems"},{"issue":"4","key":"2315_CR8","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1007\/s13042-012-0093-9","volume":"4","author":"KA Chrysafis","year":"2013","unstructured":"Chrysafis, K. A., Panagiotakopoulos, D., & Papadopoulos, B. K. (2013). Hybrid (fuzzy-stochastic) Modelling in Construction Operations Management. International Journal of Machine Learning & Cybernetics, 4(4), 339\u2013346.","journal-title":"International Journal of Machine Learning & Cybernetics"},{"key":"2315_CR9","unstructured":"Dubois, D., Fortin, J., & Zieli\u0144ski, P. (2010). Interval PERT and its fuzzy extension. In C. Kahraman & M. Yavuz (Eds.), Production engineering and management under fuzziness. Studies in fuzziness and soft computing (Vol. 252, pp. 171\u2013199). Berlin: Springer."},{"key":"2315_CR10","doi-asserted-by":"crossref","unstructured":"Dubois, D., & Prade, H. (1988). Possibility theory: An approach to computerized processing of uncertainty: Plenum Press.","DOI":"10.1007\/978-1-4684-5287-7"},{"key":"2315_CR11","doi-asserted-by":"crossref","first-page":"1360","DOI":"10.1287\/mnsc.33.10.1360","volume":"33","author":"C Gallagher","year":"1987","unstructured":"Gallagher, C. (1987). A note on PERT assumptions. Management Science, 33, 1360\u20131360.","journal-title":"Management Science"},{"key":"2315_CR12","doi-asserted-by":"publisher","unstructured":"Gan, L., & Xu, J. (2015). Control risk for multimode resource-constrained project scheduling problem under hybrid uncertainty. Journal of Management in Engineering, 31(3), 1\u201316. doi: 10.1061\/(ASCE)ME.1943-5479.0000243 .","DOI":"10.1061\/(ASCE)ME.1943-5479.0000243"},{"key":"2315_CR13","doi-asserted-by":"crossref","first-page":"515","DOI":"10.1007\/s10479-010-0783-1","volume":"181","author":"CBG Garcia","year":"2010","unstructured":"Garcia, C. B. G., Perez, J. G., & Rambaud, S. C. (2010). Proposal of new distribution in PERT methodology. Annals of Operations Research, 181, 515\u2013538.","journal-title":"Annals of Operations Research"},{"key":"2315_CR14","unstructured":"G\u0142adysz, B. (2014) Mixtures of fuzzy variables in the analysis of a project\u2019s duration a robust approach. Proceedings of XIII Conference Polish Operational and Systems Research Society: Advances and Experiences, Warsaw, 24-26.09.2014, IBS, Warsaw, 1--7"},{"key":"2315_CR15","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1057\/jors.1989.57","volume":"40","author":"DI Golenko","year":"1989","unstructured":"Golenko, D. I. (1989). A new approach to the activity-time distribution in PERT. Journal of Operational Research Society, 40, 389\u2013393.","journal-title":"Journal of Operational Research Society"},{"key":"2315_CR16","doi-asserted-by":"crossref","first-page":"912","DOI":"10.1287\/opre.10.6.912","volume":"10","author":"F Grubbs","year":"1962","unstructured":"Grubbs, F. (1962). Attempts to validate PERT statistics or picking on PERT. Operations Research, 10, 912\u2013915.","journal-title":"Operations Research"},{"key":"2315_CR17","doi-asserted-by":"crossref","first-page":"450","DOI":"10.1016\/j.ejor.2007.04.032","volume":"210","author":"E Hahn","year":"2008","unstructured":"Hahn, E. (2008). Mixture densities for project management activity times: A robust approach to PERT. European Journal of Operational Research, 210, 450\u2013459.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"2315_CR18","doi-asserted-by":"crossref","first-page":"448","DOI":"10.1016\/j.ejor.2010.08.014","volume":"210","author":"J Herreras-Velasco","year":"2011","unstructured":"Herreras-Velasco, J., Herreras-Pleguezuelo, R., & Dorp, J. (2011). Revisiting the PERT mean and variance. European Journal of Operational Research, 210(2), 448\u2013454.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"2315_CR19","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1016\/S0305-0483(97)00002-9","volume":"25","author":"J Kamburowski","year":"1997","unstructured":"Kamburowski, J. (1997). New validation of PERT times. Omega The International Journal of Management Science, 25(3), 323\u2013328.","journal-title":"Omega The International Journal of Management Science"},{"issue":"1","key":"2315_CR20","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1016\/0377-2217(93)90261-K","volume":"71","author":"J Magott","year":"1993","unstructured":"Magott, J., & Skudlarski, K. (1993). Estimating the mean completion time of PERT networks with exponentially distributed duration of activities. European Journal of Operational Research, 71(1), 70\u201379.","journal-title":"European Journal of Operational Research"},{"key":"2315_CR21","doi-asserted-by":"crossref","first-page":"646","DOI":"10.1287\/opre.7.5.646","volume":"7","author":"D Malcolm","year":"1959","unstructured":"Malcolm, D., Rosenboom, J., Clark, C., & Fazar, W. (1959). Application of a technique for research and development program evaluation. Operations Research, 7, 646\u2013669.","journal-title":"Operations Research"},{"key":"2315_CR22","doi-asserted-by":"crossref","first-page":"347","DOI":"10.5267\/j.msl.2011.22.003","volume":"1","author":"N Pour","year":"2011","unstructured":"Pour, N., Kheranmand, M., Fallah, M., & Zeynali, S. (2011). A new method for critical path method with fuzzy processing time. Management Sciences Letters, 1, 347\u2013354.","journal-title":"Management Sciences Letters"},{"issue":"20","key":"2315_CR23","first-page":"953","volume":"5","author":"N Shankar","year":"2010","unstructured":"Shankar, N., Sireesha, V., & Rao, B. (2010). An analytical method for finding critical path in a fuzzy project network. International Journal of Contemporary Mathematical Sciences, 5(20), 953\u2013962.","journal-title":"International Journal of Contemporary Mathematical Sciences"},{"key":"2315_CR24","doi-asserted-by":"crossref","first-page":"421","DOI":"10.1016\/0022-247X(68)90078-4","volume":"23","author":"L Zadeh","year":"1968","unstructured":"Zadeh, L. (1968). Probability measures of fuzzy events. Journal of Mathematical Analysis and Applications, 23, 421\u2013427.","journal-title":"Journal of Mathematical Analysis and Applications"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-016-2315-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-016-2315-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-016-2315-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,9,26]],"date-time":"2020-09-26T09:28:08Z","timestamp":1601112488000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-016-2315-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,9,29]]},"references-count":24,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2017,11]]}},"alternative-id":["2315"],"URL":"https:\/\/doi.org\/10.1007\/s10479-016-2315-0","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,9,29]]}}}