{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,25]],"date-time":"2024-08-25T02:30:15Z","timestamp":1724553015544},"reference-count":14,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2016,9,30]],"date-time":"2016-09-30T00:00:00Z","timestamp":1475193600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2018,8]]},"DOI":"10.1007\/s10479-016-2324-z","type":"journal-article","created":{"date-parts":[[2016,9,30]],"date-time":"2016-09-30T10:54:17Z","timestamp":1475232857000},"page":"47-63","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["Multiobjective bi-level programming for shared inventory with emergency and backorders"],"prefix":"10.1007","volume":"267","author":[{"given":"Fouad","family":"Ben Abdelaziz","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sameh","family":"Mejri","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,9,30]]},"reference":[{"issue":"3\/4","key":"2324_CR1","doi-asserted-by":"crossref","first-page":"341","DOI":"10.1504\/IJMASSC.2008.017147","volume":"2","author":"N Baozhuang","year":"2008","unstructured":"Baozhuang, N., Shouping, G., Zhang, Z., & Li, X. (2008). An optimal inventory model based on postponement strategy: A bilevel programming approach. International Journal of Mass Customization, 2(3\/4), 341\u2013357.","journal-title":"International Journal of Mass Customization"},{"issue":"8\/9","key":"2324_CR2","doi-asserted-by":"crossref","first-page":"684","DOI":"10.1080\/09537287.2012.666857","volume":"24","author":"F Ben Abdelaziz","year":"2013","unstructured":"Ben Abdelaziz, F., & Mejri, S. (2013). Decentralized bilevel model for shared inventory management. Production Planning and Control, 24(8\/9), 684\u2013701.","journal-title":"Production Planning and Control"},{"issue":"1","key":"2324_CR3","doi-asserted-by":"crossref","first-page":"310","DOI":"10.1016\/j.cie.2008.12.002","volume":"57","author":"Lu Cheng","year":"2009","unstructured":"Cheng, Lu, Wan, Zhongping, & Wang, Guangmin. (2009). Bilevel newsvendor models considering retailer with CVaR objective. Computers & Industrial Engineering, 57(1), 310\u2013318.","journal-title":"Computers & Industrial Engineering"},{"key":"2324_CR4","volume-title":"Foundations of bilevel programming","author":"S Dempe","year":"2002","unstructured":"Dempe, S. (2002). Foundations of bilevel programming. Amsterdam: Kluwer."},{"key":"2324_CR5","doi-asserted-by":"crossref","first-page":"1219","DOI":"10.1016\/S0098-1354(03)00048-6","volume":"27","author":"A Gupta","year":"2003","unstructured":"Gupta, A., & Maranas, D. C. (2003). Managing demand uncertainty in supply chain planning. Computers and Chemical Engineering, 27, 1219\u20131227.","journal-title":"Computers and Chemical Engineering"},{"key":"2324_CR6","volume-title":"Analysis of inventory systems","author":"G Hadley","year":"1963","unstructured":"Hadley, G., & Whitin, T. M. (1963). Analysis of inventory systems. Englewood Cliffs, NJ: Prentice Hall."},{"issue":"3","key":"2324_CR7","doi-asserted-by":"crossref","first-page":"728","DOI":"10.1016\/j.ejor.2007.12.032","volume":"194","author":"E Kutanoglu","year":"2009","unstructured":"Kutanoglu, E., & Mahajan, M. (2009). An inventory sharing and allocation method for a multi-location service parts logistics network with time-based service levels. European Journal of Operational Research, 194(3), 728\u2013742.","journal-title":"European Journal of Operational Research"},{"key":"2324_CR8","doi-asserted-by":"crossref","unstructured":"Lu, J., Han, J., Hu, Y., & Zang, G. (2016). Multilevel decesion-making a survey. Information Sciences, 346\u2013347, 463\u2013487.","DOI":"10.1016\/j.ins.2016.01.084"},{"key":"2324_CR9","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1016\/S0096-3003(03)00628-3","volume":"153","author":"MA Osman","year":"2004","unstructured":"Osman, M. A., Abo-Sinna, M. A., Amer, A. H., & Emam, O. E. (2004). A multi-level non-linear multi-objective decision-making under fuzziness. Applied Mathematics and Computation, 153, 239\u2013252.","journal-title":"Applied Mathematics and Computation"},{"key":"2324_CR10","doi-asserted-by":"crossref","first-page":"786","DOI":"10.1016\/j.amc.2006.10.032","volume":"188","author":"Roghanian","year":"2007","unstructured":"Roghanian, Sadjadi, S. J., & Areanezha, M. B. (2007). A probabilistic bi-level linear multi _ objective program to supply chain planning. Applied Mathematics and Computation, 188, 786\u2013800.","journal-title":"Applied Mathematics and Computation"},{"issue":"6\/7","key":"2324_CR11","first-page":"1121","volume":"28","author":"Jun-hyung Ryu","year":"2004","unstructured":"Ryu, Jun-hyung, & Pistikopoulos, Efstratios N. (2004). A bilevel programming framework for enterprise-wide supply chain planning problems under uncertainty. Computers and Chemical Engineering, 28(6\/7), 1121\u20131129.","journal-title":"Computers and Chemical Engineering"},{"key":"2324_CR12","doi-asserted-by":"crossref","first-page":"193","DOI":"10.5267\/j.uscm.2013.09.003","volume":"1","author":"M Taran","year":"2013","unstructured":"Taran, M., & Roghanian, E. (2013). A fuzzy multi-objective multi-follower linear Bi-level programming problem to supply chain optimization. Unceratin Supply Chain Management, 1, 193\u2013206.","journal-title":"Unceratin Supply Chain Management"},{"key":"2324_CR13","unstructured":"Xu, Q., Dai, X., & Shuai Shao, S. (2008). Stochastic dynamic Bi-level model of procurement for nickel raw material in supply chain. In Service operations and logistics, and informatics, IEEE\/SOLI2008, 12\u201315 October 2008. Beijing (pp. 1592\u20131595). Beijing: IEEE."},{"key":"2324_CR14","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1080\/07408170304356","volume":"35","author":"GP Zhang","year":"2003","unstructured":"Zhang, G. P., Patuwo, B. E., & Chu, C. W. (2003). A hybrid inventory system with a time limit on backorders. IIE Transactions, 35, 679\u2013689.","journal-title":"IIE Transactions"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-016-2324-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-016-2324-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-016-2324-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,14]],"date-time":"2019-09-14T04:40:54Z","timestamp":1568436054000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-016-2324-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,9,30]]},"references-count":14,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2018,8]]}},"alternative-id":["2324"],"URL":"https:\/\/doi.org\/10.1007\/s10479-016-2324-z","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,9,30]]}}}