{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,18]],"date-time":"2026-03-18T05:26:42Z","timestamp":1773811602551,"version":"3.50.1"},"reference-count":81,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2017,6,23]],"date-time":"2017-06-23T00:00:00Z","timestamp":1498176000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2018,2]]},"DOI":"10.1007\/s10479-017-2563-7","type":"journal-article","created":{"date-parts":[[2017,6,23]],"date-time":"2017-06-23T14:57:16Z","timestamp":1498229836000},"page":"303-337","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":36,"title":["A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering"],"prefix":"10.1007","volume":"261","author":[{"given":"Ata Allah","family":"Taleizadeh","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,6,23]]},"reference":[{"issue":"4","key":"2563_CR1","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1080\/095372897235190","volume":"8","author":"NE Abboud","year":"1997","unstructured":"Abboud, N. E. (1997). A simple approximation of the EMQ model with Poisson machine failures. Production Planning and Control, 8(4), 385\u2013397.","journal-title":"Production Planning and Control"},{"key":"2563_CR2","doi-asserted-by":"crossref","unstructured":"Aryanezhad, M. B., Noorollahi, E., Karimi-Nasab, M., & Ghoreyshi, S. M. (2010). Batch sizing with random yield and imperfect inspection and process compressibility. In 40th International conference on computers and industrial engineering: Soft computing techniques for advanced manufacturing and service systems, CIE40 2010, Art. No. 5668221.","DOI":"10.1109\/ICCIE.2010.5668221"},{"key":"2563_CR3","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1287\/opre.42.1.111","volume":"42","author":"M Berg","year":"1994","unstructured":"Berg, M., Posner, M. J. M., & Zhao, H. (1994). Production\u2013inventory systems with unreliable machines. Operations Research, 42, 111\u2013118.","journal-title":"Operations Research"},{"key":"2563_CR4","doi-asserted-by":"crossref","first-page":"532","DOI":"10.1287\/opre.36.4.532","volume":"36","author":"T Bielecki","year":"1988","unstructured":"Bielecki, T., & Kumar, P. R. (1988). Optimality of zero-inventory policies for unreliable production facility. Operations Research, 36, 532\u2013541.","journal-title":"Operations Research"},{"key":"2563_CR5","unstructured":"Bijari, M., Barzoki, M. R., & Jahanbazi, M. (2007). Effects of imperfect products and rework on lot sizing with work in process inventory. In IIE annual conference and Expo 2007\u2014Industrial engineering\u2019s critical role in a flat world\u2014conference proceedings, pp 919-925."},{"key":"2563_CR6","doi-asserted-by":"crossref","first-page":"758","DOI":"10.1016\/j.cie.2007.07.017","volume":"55","author":"LE C\u00e1rdenas-Barr\u00f3n","year":"2008","unstructured":"C\u00e1rdenas-Barr\u00f3n, L. E. (2008). Optimal manufacturing batch size with rework in a single-stage production system\u2014A simple derivation. Computers and Industrial Engineering Journal, 55, 758\u2013765.","journal-title":"Computers and Industrial Engineering Journal"},{"key":"2563_CR7","doi-asserted-by":"crossref","first-page":"1105","DOI":"10.1016\/j.cie.2009.04.020","volume":"57","author":"LE C\u00e1rdenas-Barr\u00f3n","year":"2009","unstructured":"C\u00e1rdenas-Barr\u00f3n, L. E. (2009). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Computers and Industrial Engineering Journal, 57, 1105\u20131113.","journal-title":"Computers and Industrial Engineering Journal"},{"key":"2563_CR8","first-page":"75","volume":"25","author":"S Chakrabarty","year":"1988","unstructured":"Chakrabarty, S., & Rao, N. V. (1988). EBQ for a multi stage production system considering rework. Opsearch, 25, 75\u201388.","journal-title":"Opsearch"},{"key":"2563_CR9","doi-asserted-by":"crossref","first-page":"588","DOI":"10.1080\/09537280310001626179","volume":"14","author":"WM Chan","year":"2003","unstructured":"Chan, W. M., Ibrahim, R. N., & Lochert, P. B. (2003). A new EPQ model: Integrating lower pricing, rework and reject situations. Production Planning and Control, 14, 588\u2013595.","journal-title":"Production Planning and Control"},{"issue":"13","key":"2563_CR10","first-page":"2030","volume":"5","author":"KK Chen","year":"2010","unstructured":"Chen, K. K., Chiu, Y. S. P., & Hwang, M. H. (2010a). Integrating a cost reduction delivery policy into an imperfect production system with repairable items. International Journal of the Physical Sciences, 5(13), 2030\u20132037.","journal-title":"International Journal of the Physical Sciences"},{"key":"2563_CR11","first-page":"223","volume":"4","author":"KK Chen","year":"2010","unstructured":"Chen, K. K., Chiu, Y. S. P., & Ting, C. K. (2010b). Producer\u2019s replenishment policy for an EPQ model with rework and machine failure taking place in backorder reloading time. WSEAS Transactions on Information Science and Applications, 4, 223\u2013233.","journal-title":"WSEAS Transactions on Information Science and Applications"},{"key":"2563_CR12","first-page":"463","volume":"4","author":"FT Cheng","year":"2010","unstructured":"Cheng, F. T., Chang, H. H., & Chiu, S. W. (2010c). Economic production quantity model with backordering. Rework and machine failure taking place in stock piling time. WSEAS Transactions on Information Science and Applications, 4, 463\u2013473.","journal-title":"WSEAS Transactions on Information Science and Applications"},{"key":"2563_CR13","doi-asserted-by":"crossref","first-page":"427","DOI":"10.1080\/03052150310001597783","volume":"35","author":"YP Chiu","year":"2003","unstructured":"Chiu, Y. P. (2003). Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization, 35, 427\u2013437.","journal-title":"Engineering Optimization"},{"key":"2563_CR14","doi-asserted-by":"crossref","first-page":"899","DOI":"10.1016\/j.cor.2009.03.016","volume":"37","author":"SW Chiu","year":"2007","unstructured":"Chiu, S. W. (2007a). Robust planning in optimization for production system subject to random machine breakdown and failure in rework. Computers and Operations Research, 37, 899\u2013908.","journal-title":"Computers and Operations Research"},{"key":"2563_CR15","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1002\/asmb.664","volume":"23","author":"SW Chiu","year":"2007","unstructured":"Chiu, S. W. (2007b). Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Applied Stochastic Models in Business and Industry., 23, 165\u2013178.","journal-title":"Applied Stochastic Models in Business and Industry."},{"key":"2563_CR16","doi-asserted-by":"crossref","first-page":"610","DOI":"10.1016\/j.ejor.2007.04.049","volume":"188","author":"SW Chiu","year":"2008","unstructured":"Chiu, S. W. (2008). Production lot size problem with failure in repair and backlogging derived without derivatives. European Journal of Operational Research, 188, 610\u2013615.","journal-title":"European Journal of Operational Research"},{"key":"2563_CR17","doi-asserted-by":"crossref","first-page":"919","DOI":"10.1016\/j.camwa.2009.10.001","volume":"59","author":"YSP Chiu","year":"2010","unstructured":"Chiu, Y. S. P., Chen, K. K., Cheng, F. T., & Wu, M. F. (2010a). Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown. Computers and Mathematics with Applications, 59, 919\u2013932.","journal-title":"Computers and Mathematics with Applications"},{"key":"2563_CR18","doi-asserted-by":"crossref","first-page":"364","DOI":"10.3390\/mca15030364","volume":"15","author":"SW Chiu","year":"2010","unstructured":"Chiu, S. W., Cheng, C. B., Wu, M. F., & Yang, J. C. (2010b). An algebraic for determining the optimal lot size for EPQ model with rework process. Mathematical and Computational Applications, 15, 364\u2013370.","journal-title":"Mathematical and Computational Applications"},{"key":"2563_CR19","doi-asserted-by":"crossref","first-page":"1291","DOI":"10.1016\/j.eswa.2011.08.005","volume":"39","author":"YSP Chiu","year":"2012","unstructured":"Chiu, Y. S. P., Chen, K. K., & Ting, C. K. (2012). Replenishment run time problem with machine breakdown and failure in rework. Expert Systems with Applications, 39, 1291\u20131297.","journal-title":"Expert Systems with Applications"},{"key":"2563_CR20","first-page":"499","volume":"65","author":"SW Chiu","year":"2006","unstructured":"Chiu, S. W., & Chiu, Y. S. P. (2006). Mathematical modeling for production system with backlogging and failure in repair. Journal of Scientific and Industrial Research, 65, 499\u2013506.","journal-title":"Journal of Scientific and Industrial Research"},{"key":"2563_CR21","first-page":"225","volume":"8","author":"SW Chiu","year":"2003","unstructured":"Chiu, S. W., Chiu, Y. P., & Wu, B. P. (2003). An economic production quantity model with the steady production rate of scrap items. The Journal of Chaoyang University of Technology, 8, 225\u2013235.","journal-title":"The Journal of Chaoyang University of Technology"},{"key":"2563_CR22","doi-asserted-by":"crossref","first-page":"317","DOI":"10.3390\/mca16020317","volume":"16","author":"SW Chiu","year":"2011","unstructured":"Chiu, S. W., Gong, D. C., Chiu, C. L., & Chung, C. L. (2011a). Joint determination of the production lot size and number of shipments for EPQ model with rework. Mathematical and Computational Applications, 16, 317\u2013328.","journal-title":"Mathematical and Computational Applications"},{"key":"2563_CR23","doi-asserted-by":"crossref","first-page":"375","DOI":"10.1007\/BF03167589","volume":"21","author":"SW Chiu","year":"2004","unstructured":"Chiu, S. W., Gong, D. C., & Wee, H. M. (2004). Effects of random defective rate and imperfect rework process on economic production quantity model. Japan Journal of Industrial and Applied Mathematics, 21, 375\u2013389.","journal-title":"Japan Journal of Industrial and Applied Mathematics"},{"key":"2563_CR24","doi-asserted-by":"crossref","first-page":"576","DOI":"10.1016\/j.cie.2010.12.015","volume":"60","author":"YSP Chiu","year":"2011","unstructured":"Chiu, Y. S. P., Lin, H. D., & Chang, H. H. (2011b). Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown. Computers and Industrial Engineering, 60, 576\u2013584.","journal-title":"Computers and Industrial Engineering"},{"key":"2563_CR25","doi-asserted-by":"crossref","first-page":"664","DOI":"10.1016\/j.ejor.2006.05.005","volume":"180","author":"SW Chiu","year":"2007","unstructured":"Chiu, S. W., Wang, S. L., & Chiu, S. Y. P. (2007). Determining the optimal run time for the EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operations Research, 180, 664\u2013676.","journal-title":"European Journal of Operations Research"},{"issue":"7","key":"2563_CR26","first-page":"183","volume":"4","author":"SW Chiu","year":"2008","unstructured":"Chiu, S. W., Yang, J. C., & Kuo, S. Y. C. (2008). Manufacturing Lot-sizing with backordering, scrap, and random breakdown occurring in inventory-stacking period. WSEAS Transactions in Mathematics, 4(7), 183\u2013194.","journal-title":"WSEAS Transactions in Mathematics"},{"key":"2563_CR27","doi-asserted-by":"crossref","first-page":"139","DOI":"10.1016\/S0360-8352(96)00207-0","volume":"32","author":"KJ Chung","year":"1997","unstructured":"Chung, K. J. (1997). Bounds for production lot sizing with machine breakdowns. Computers and Industrial Engineering, 32, 139\u2013144.","journal-title":"Computers and Industrial Engineering"},{"key":"2563_CR28","doi-asserted-by":"crossref","first-page":"1499","DOI":"10.1016\/S0305-0548(02)00079-5","volume":"30","author":"KJ Chung","year":"2003","unstructured":"Chung, K. J. (2003). Approximations to production lot sizing with machine breakdowns. Computers and Operations Research, 30, 1499\u20131507.","journal-title":"Computers and Operations Research"},{"key":"2563_CR29","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1016\/j.ejor.2004.11.024","volume":"173","author":"M Freimer","year":"2006","unstructured":"Freimer, M., Thomas, D., & Tyworth, J. (2006). The value of setup cost reduction and process improvement for the economic production quantity model with defects. European Journal of Operational Research, 173, 241\u2013251.","journal-title":"European Journal of Operational Research"},{"key":"2563_CR30","first-page":"33","volume":"34","author":"SK Goyal","year":"2005","unstructured":"Goyal, S. K., & C\u00e1rdenas-Barr\u00f3n, L. E. (2005). Economic production quantity with imperfect production system. Industrial Engineering Journal, 34, 33\u201336.","journal-title":"Industrial Engineering Journal"},{"key":"2563_CR31","unstructured":"Haji, B., Haji, R., & Ghayoor, Z. (2007). Economic batch quantity with setup time for immediate and delayed rework. In IIE annual conference and Expo 2007\u2013industrial engineering\u2019s critical role in a flat world\u2014conference proceedings (pp. 1666\u20131671)."},{"key":"2563_CR32","doi-asserted-by":"crossref","unstructured":"Haji, B., Haji, A., & Haji, R. (2009a). Optimal batch production with minimum rework cycles and constraint on accumulated defective units. In 2009 IEEE\/INFORMS international conference on service operations, logistics and informatics, SOLI 2009, Art. no. 5204011 (pp. 633\u2013638).","DOI":"10.1109\/SOLI.2009.5204011"},{"key":"2563_CR33","doi-asserted-by":"crossref","unstructured":"Haji, B., Haji, R. and Haji, A. (2009b). Optimal batch production with rework and non-zero setup cost for rework. In International conference on computers and industrial engineering, Paris, France (pp. 857\u2013862).","DOI":"10.1109\/ICCIE.2009.5223505"},{"key":"2563_CR34","first-page":"243","volume":"3","author":"A Haji","year":"2010","unstructured":"Haji, A., & Haji, B. (2010). Optimal batch production for a single machine system with accumulated defectives and random rate of rework. Journal of Industrial and Systems Engineering, 3, 243\u2013256.","journal-title":"Journal of Industrial and Systems Engineering"},{"key":"2563_CR35","first-page":"236","volume":"2","author":"B Haji","year":"2008","unstructured":"Haji, B., Haji, A., & Rahmati, Tavakol A. (2008a). Scheduling accumulated rework in a normal cycle: Optimal batch production with minimum rework cycles. Journal of Industrial and Systems Engineering, 2, 236\u2013249.","journal-title":"Journal of Industrial and Systems Engineering"},{"key":"2563_CR36","doi-asserted-by":"crossref","first-page":"230","DOI":"10.1007\/s11518-008-5077-7","volume":"17","author":"R Haji","year":"2008","unstructured":"Haji, R., Haji, A., Sajadifar, M., & Zolfaghari, S. (2008b). Lot sizing with non-zero setup times for rework. Journal of Systems Science and Systems Engineering, 17, 230\u2013240.","journal-title":"Journal of Systems Science and Systems Engineering"},{"key":"2563_CR37","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1504\/IJPD.2010.029993","volume":"10","author":"A Haji","year":"2010","unstructured":"Haji, A., Sikari, S. S., & Shamsi, R. (2010). The effect of inspection errors on the optimal batch size in reworkable production systems with scraps. International Journal of Product Development, 10, 201\u2013216.","journal-title":"International Journal of Product Development"},{"key":"2563_CR38","doi-asserted-by":"crossref","first-page":"584","DOI":"10.1080\/095372801750397707","volume":"12","author":"PA Hayek","year":"2001","unstructured":"Hayek, P. A., & Salameh, M. K. (2001). Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, 12, 584\u2013590.","journal-title":"Production Planning and Control"},{"key":"2563_CR39","doi-asserted-by":"crossref","first-page":"10","DOI":"10.1016\/j.apm.2006.03.034","volume":"31","author":"KL Hou","year":"2007","unstructured":"Hou, K. L. (2007). An EPQ model with setup cost and process quality as functions of capital expenditure. Applied Mathematical Modelling, 31, 10\u201317.","journal-title":"Applied Mathematical Modelling"},{"key":"2563_CR40","doi-asserted-by":"publisher","unstructured":"Huang, Y. F. (2006). The effect of service constraint on EPQ model with random deffective rate. Mathematical Problems in Engineering. doi: 10.1155\/MPE\/2006\/79028 .","DOI":"10.1155\/MPE\/2006\/79028"},{"key":"2563_CR41","doi-asserted-by":"crossref","first-page":"26","DOI":"10.1016\/j.ijpe.2008.08.007","volume":"118","author":"MY Jaber","year":"2009","unstructured":"Jaber, M. Y., Bonney, M., & Moualek, I. (2009). An economic order quantity model for an imperfect production process with entropy cost. International Journal of Production Economics, 118, 26\u201333.","journal-title":"International Journal of Production Economics"},{"key":"2563_CR42","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1016\/j.ijpe.2008.05.007","volume":"115","author":"MY Jaber","year":"2008","unstructured":"Jaber, M. Y., Goyal, S. K., & Imran, M. (2008). Economic production quantity model for items with imperfect quality subject to learning effects. International Journal of Production Economics, 115, 143\u2013150.","journal-title":"International Journal of Production Economics"},{"key":"2563_CR43","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1016\/j.cie.2004.03.001","volume":"47","author":"AMM Jamal","year":"2004","unstructured":"Jamal, A. M. M., Sarker, B. R., & Mondal, S. (2004). Optimal manufacturing batch size with rework process at a single-stage production system. Computers and Industrial Engineering, 47, 77\u201389.","journal-title":"Computers and Industrial Engineering"},{"key":"2563_CR44","doi-asserted-by":"crossref","first-page":"586","DOI":"10.1080\/095372897234920","volume":"8","author":"HL Lee","year":"1997","unstructured":"Lee, H. L., Chandra, M. J., & Deleveaux, V. J. (1997). Optimal batch size and investment in multistage production systems with scrap. Production Planning and Control, 8, 586\u2013596.","journal-title":"Production Planning and Control"},{"key":"2563_CR45","doi-asserted-by":"crossref","first-page":"1125","DOI":"10.1287\/mnsc.33.9.1125","volume":"33","author":"HL Lee","year":"1987","unstructured":"Lee, H. L., & Rosenblatt, M. (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Management Sciences, 33, 1125\u20131136.","journal-title":"Management Sciences"},{"key":"2563_CR46","doi-asserted-by":"crossref","first-page":"348","DOI":"10.1016\/j.ejor.2008.01.004","volume":"195","author":"GL Liao","year":"2009","unstructured":"Liao, G. L., Chen, Y. H., & Sheu, S. H. (2009). Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance. European Journal of Operational Research, 195, 348\u2013357.","journal-title":"European Journal of Operational Research"},{"key":"2563_CR47","doi-asserted-by":"crossref","first-page":"118","DOI":"10.1016\/j.ijpe.2010.12.004","volume":"130","author":"GL Liao","year":"2011","unstructured":"Liao, G. L., & Sheu, S. H. (2011). Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance. International Journal of Production Economics, 130, 118\u2013124.","journal-title":"International Journal of Production Economics"},{"key":"2563_CR48","doi-asserted-by":"crossref","first-page":"80","DOI":"10.1016\/j.mcm.2011.12.023","volume":"56","author":"E Noorollahi","year":"2012","unstructured":"Noorollahi, E., Karimi-Nasab, M., & Aryanezhad, M. B. (2012). An economic production quantity model with random yield subject to process compressibility. Mathematical and Computer Modeling, 56, 80\u201396.","journal-title":"Mathematical and Computer Modeling"},{"key":"2563_CR49","doi-asserted-by":"crossref","first-page":"305","DOI":"10.1504\/EJIE.2009.025050","volume":"3","author":"M Parveen","year":"2009","unstructured":"Parveen, M., & Rao, T. V. V. L. N. (2009). Optimal batch sizing, quality improvement and rework for an imperfect production system with inspection and restoration. European Journal of Industrial Engineering, 3, 305\u2013335.","journal-title":"European Journal of Industrial Engineering"},{"issue":"5\u20138","key":"2563_CR50","doi-asserted-by":"crossref","first-page":"827","DOI":"10.1007\/s00170-009-2432-x","volume":"49","author":"SHR Pasandideh","year":"2010","unstructured":"Pasandideh, S. H. R., Niaki, S. T. A., & Mirhosseini, S. S. (2010). A parameter-tuned genetic algorithm to solve multi-product economic production quantity model with defective items, rework, and constrained space. International Journal of advanced Manufacturing Technology, 49(5\u20138), 827\u2013837.","journal-title":"International Journal of advanced Manufacturing Technology"},{"key":"2563_CR51","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1016\/j.ejor.2009.01.041","volume":"200","author":"SS Sana","year":"2010","unstructured":"Sana, S. S. (2010a). A production\u2013inventory model in an imperfect production process. European Journal of Operational Research, 200, 451\u2013464.","journal-title":"European Journal of Operational Research"},{"key":"2563_CR52","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1016\/j.ejor.2009.02.027","volume":"201","author":"SS Sana","year":"2010","unstructured":"Sana, S. S. (2010b). An economic production lot size model in an imperfect production system. European Journal of Operational Research, 201, 158\u2013170.","journal-title":"European Journal of Operational Research"},{"key":"2563_CR53","doi-asserted-by":"crossref","first-page":"635","DOI":"10.1080\/00207720903144495","volume":"41","author":"SS Sana","year":"2010","unstructured":"Sana, S. S., & Chaudhuri, K. S. (2010). An EMQ model in an imperfect production process. International Journal of Systems Science, 41, 635\u2013646.","journal-title":"International Journal of Systems Science"},{"key":"2563_CR54","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1504\/IJMOR.2010.033441","volume":"2","author":"B Sarkar","year":"2010","unstructured":"Sarkar, B., Sana, S. S., & Chaudhuri, K. S. (2010). Optimal reliability, production lot size and safety stock in an imperfect production system. International Journal of Mathematics in Operational Research, 2, 467\u2013490.","journal-title":"International Journal of Mathematics in Operational Research"},{"key":"2563_CR55","first-page":"13543","volume":"38","author":"B Sarkar","year":"2011","unstructured":"Sarkar, B., Sana, S. S., & Chaudhuri, K. (2011). An imperfect production process for time varying demand with inflation and time value of money\u2014An EMQ model. Expert Systems with Applications, 38, 13543\u201313548.","journal-title":"Expert Systems with Applications"},{"key":"2563_CR56","doi-asserted-by":"crossref","first-page":"915","DOI":"10.1016\/j.ejor.2006.12.005","volume":"184","author":"BR Sarker","year":"2008","unstructured":"Sarker, B. R., Jamal, A. A. M., & Mondal, S. (2008). Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research, 184, 915\u2013929.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"2563_CR57","doi-asserted-by":"crossref","first-page":"593","DOI":"10.1007\/s10479-012-1130-5","volume":"208","author":"J Shi","year":"2013","unstructured":"Shi, J., Katehakis, M. N., & Melamed, B. (2013). Martingale methods for pricing inventory penalties under continuous replenishment and compound renewal demands. Annals of Operations Research, 208(1), 593\u2013612.","journal-title":"Annals of Operations Research"},{"issue":"5","key":"2563_CR58","doi-asserted-by":"crossref","first-page":"1048","DOI":"10.1287\/opre.2014.1299","volume":"6","author":"J Shi","year":"2014","unstructured":"Shi, J., Katehakis, M. N., Melamed, B., & Xia, Y. (2014). Optimal continuous replenishment for inventory systems with compound Poisson demands and lost-sales. Operations Research, 6(5), 1048\u20131063.","journal-title":"Operations Research"},{"key":"2563_CR59","doi-asserted-by":"crossref","first-page":"1007","DOI":"10.1016\/j.camwa.2011.09.050","volume":"63","author":"J Taheri-Tolgari","year":"2012","unstructured":"Taheri-Tolgari, J., Mirzazadeh, A., & Jolai, F. (2012). An inventory model for imperfect items under inflationary conditions with considering inspection errors. Computers and Mathematics with Applications, 63, 1007\u20131019.","journal-title":"Computers and Mathematics with Applications"},{"key":"2563_CR60","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1016\/j.ijpe.2014.01.023","volume":"155","author":"AA Taleizadeh","year":"2014","unstructured":"Taleizadeh, A. A. (2014). An economic order quantity model with partial backordering and advance payments for an evaporating item. International Journal of Production Economic, 155, 185\u2013193.","journal-title":"International Journal of Production Economic"},{"issue":"5\u20136","key":"2563_CR61","doi-asserted-by":"crossref","first-page":"1273","DOI":"10.1016\/j.mcm.2011.03.038","volume":"54","author":"AA Taleizadeh","year":"2011","unstructured":"Taleizadeh, A. A., Barzinpour, F., & Wee, H. M. (2011a). Meta-heuristic algorithms to solve the fuzzy single period problem. Mathematical and Computer Modeling, 54(5\u20136), 1273\u20131285.","journal-title":"Mathematical and Computer Modeling"},{"key":"2563_CR62","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1016\/j.ijpe.2013.11.023","volume":"150","author":"AA Taleizadeh","year":"2012","unstructured":"Taleizadeh, A. A., Cardenas-Barron, L. E., & Mohamamdi, B. (2012a). Multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process. International Journal of Production Economic, 150, 9\u201327.","journal-title":"International Journal of Production Economic"},{"issue":"23","key":"2563_CR63","doi-asserted-by":"crossref","first-page":"4263","DOI":"10.3923\/jas.2008.4263.4273","volume":"8","author":"AA Taleizadeh","year":"2009","unstructured":"Taleizadeh, A. A., Moghadasi, H., Niaki, S. T. A., & Eftekhari, A. K. (2009). An EOQ-joint replenishment policy to supply expensive imported raw materials with payment in advance. Journal of Applied Science, 8(23), 4263\u20134273.","journal-title":"Journal of Applied Science"},{"key":"2563_CR64","first-page":"58","volume":"17","author":"AA Taleizadeh","year":"2010","unstructured":"Taleizadeh, A. A., Najafi, A. A., & Niaki, S. T. A. (2010a). Economic production quantity model with scraped items and limited production capacity. Scientia Iranica, 17, 58\u201369.","journal-title":"Scientia Iranica"},{"key":"2563_CR65","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1016\/j.apm.2013.05.065","volume":"38","author":"AA Taleizadeh","year":"2014","unstructured":"Taleizadeh, A. A., & Nematollahi, M. R. (2014). An inventory control problem for deteriorating items with backordering and financial engineering considerations. Applied Mathematical Modeling, 38, 93\u2013109.","journal-title":"Applied Mathematical Modeling"},{"issue":"7","key":"2563_CR66","doi-asserted-by":"crossref","first-page":"1228","DOI":"10.3923\/jas.2008.1228.1234","volume":"8","author":"AA Taleizadeh","year":"2008","unstructured":"Taleizadeh, A. A., Niaki, S. T., & Aryanezhad, M. B. (2008). Multi-product multi-constraint inventory control systems with stochastic replenishment and discount under fuzzy purchasing price and holding costs. American Journal of Applied Science, 8(7), 1228\u20131234.","journal-title":"American Journal of Applied Science"},{"issue":"10","key":"2563_CR67","doi-asserted-by":"crossref","first-page":"1187","DOI":"10.1080\/00207720903171761","volume":"41","author":"AA Taleizadeh","year":"2010","unstructured":"Taleizadeh, A. A., Niaki, S. T. A., & Aryanezhad, M. B. (2010b). Replenish-up-to multi chance-constraint inventory control system with stochastic period lengths and total discount under fuzzy purchasing price and holding costs. International Journal of System Sciences, 41(10), 1187\u20131200.","journal-title":"International Journal of System Sciences"},{"issue":"1\u20134","key":"2563_CR68","doi-asserted-by":"crossref","first-page":"311","DOI":"10.1007\/s00170-010-2604-8","volume":"51","author":"AA Taleizadeh","year":"2010","unstructured":"Taleizadeh, A. A., Niaki, S. T. A., Aryanezhad, M. B., & Fallah-Tafti, A. (2010c). A genetic algorithm to optimize multi-product multi-constraint inventory control systems with stochastic replenishments and discount. International Journal of Advanced Manufacturing Technology, 51(1\u20134), 311\u2013323.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"2563_CR69","doi-asserted-by":"crossref","first-page":"1834","DOI":"10.1016\/j.cam.2009.09.021","volume":"233","author":"AA Taleizadeh","year":"2010","unstructured":"Taleizadeh, A. A., Niaki, S. T. A., & Najafi, A. A. (2010d). Multi-product single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. Journal of Computational and Applied Mathematics, 233, 1834\u20131849.","journal-title":"Journal of Computational and Applied Mathematics"},{"issue":"3","key":"2563_CR70","doi-asserted-by":"crossref","first-page":"516","DOI":"10.1016\/j.ejor.2013.02.014","volume":"28","author":"AA Taleizadeh","year":"2013","unstructured":"Taleizadeh, A. A., & Pentico, D. W. (2013). An economic order quantity model with known price increase and partial backordering. European Journal of Operational Research, 28(3), 516\u2013525.","journal-title":"European Journal of Operational Research"},{"key":"2563_CR71","doi-asserted-by":"crossref","first-page":"172","DOI":"10.1016\/j.ijpe.2014.01.012","volume":"155","author":"AA Taleizadeh","year":"2014","unstructured":"Taleizadeh, A. A., & Pentico, D. W. (2014). An economic order quantity model with partial backordering and all-units discount. International Journal of Production Economic, 155, 172\u2013184.","journal-title":"International Journal of Production Economic"},{"issue":"3","key":"2563_CR72","doi-asserted-by":"crossref","first-page":"571","DOI":"10.1016\/j.ejor.2012.03.032","volume":"221","author":"AA Taleizadeh","year":"2012","unstructured":"Taleizadeh, A. A., Pentico, D. W., Aryanezhad, M. B., & Ghoreyshi, M. (2012b). An economic order quantity model with partial backordering and a special sale price. European Journal of Operational Research, 221(3), 571\u2013583.","journal-title":"European Journal of Operational Research"},{"issue":"3\u20134","key":"2563_CR73","doi-asserted-by":"crossref","first-page":"311","DOI":"10.1016\/j.mcm.2012.07.002","volume":"57","author":"AA Taleizadeh","year":"2013","unstructured":"Taleizadeh, A. A., Pentico, D. W., Jabalameli, M. S., & Aryanezhad, M. B. (2013a). An economic order quantity model with multiple partial prepayments and partial backordering. Mathematical and Computer Modeling, 57(3\u20134), 311\u2013323.","journal-title":"Mathematical and Computer Modeling"},{"key":"2563_CR74","doi-asserted-by":"crossref","first-page":"388","DOI":"10.1504\/EJIE.2011.042738","volume":"5","author":"AA Taleizadeh","year":"2010","unstructured":"Taleizadeh, A. A., Sadjadi, S. J., & Niaki, S. T. A. (2010e). Multi-product EPQ model with single machine, backordering and Immediate rework process. European journal of Industrial Engineering, 5, 388\u2013411.","journal-title":"European journal of Industrial Engineering"},{"issue":"5","key":"2563_CR75","doi-asserted-by":"crossref","first-page":"2765","DOI":"10.1016\/j.apm.2012.06.006","volume":"37","author":"AA Taleizadeh","year":"2013","unstructured":"Taleizadeh, A. A., Wee, H. M., & Jalali-Naini, S. G. R. (2013b). Economic production quantity model with repair failure and limited capacity. Applied Mathematical Modeling, 37(5), 2765\u20132774.","journal-title":"Applied Mathematical Modeling"},{"key":"2563_CR76","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/j.cie.2010.02.015","volume":"59","author":"AA Taleizadeh","year":"2010","unstructured":"Taleizadeh, A. A., Wee, H. M., & Sadjadi, S. J. (2010f). Multi-product production quantity model with repair failure and partial backordering. Computers and Industrial Engineering, 59, 45\u201354.","journal-title":"Computers and Industrial Engineering"},{"key":"2563_CR77","doi-asserted-by":"crossref","first-page":"213","DOI":"10.5267\/j.ijiec.2011.01.002","volume":"2","author":"AA Taleizadeh","year":"2011","unstructured":"Taleizadeh, A. A., Widyadana, G. A., Wee, H. M., & Biabani, J. (2011b). Multi products single machine economic production quantity model with multiple batch size. International Journal of Industrial Engineering Computations, 2, 213\u2013224.","journal-title":"International Journal of Industrial Engineering Computations"},{"key":"2563_CR78","doi-asserted-by":"crossref","first-page":"329","DOI":"10.3390\/mca16020329","volume":"16","author":"CK Ting","year":"2011","unstructured":"Ting, C. K., Chiu, Y. S. P., & Chan, C. C. H. (2011). Optimal lot sizing with scrap and random breakdown occurring in backorder replenishment period. Mathematical and Computational Applications, 16, 329\u2013339.","journal-title":"Mathematical and Computational Applications"},{"issue":"5","key":"2563_CR79","doi-asserted-by":"crossref","first-page":"1343","DOI":"10.1080\/00207540701570182","volume":"47","author":"HM Wee","year":"2009","unstructured":"Wee, H. M., & Chung, C. J. (2009). Optimizing replenishment policy for an integrated production inventory deteriorating model considering green component-value design and remanufacturing. International Journal of Production Research, 47(5), 1343\u20131368.","journal-title":"International Journal of Production Research"},{"key":"2563_CR80","doi-asserted-by":"crossref","first-page":"7","DOI":"10.1016\/j.omega.2005.01.019","volume":"35","author":"HM Wee","year":"2007","unstructured":"Wee, H. M., Yu, Jonas, & Chen, M. C. (2007). Optimal inventory model for items with imperfect quality and shortage backordering. Omega, 35, 7\u201311.","journal-title":"Omega"},{"key":"2563_CR81","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1016\/j.ijpe.2009.05.008","volume":"121","author":"SH Yoo","year":"2009","unstructured":"Yoo, S. H., Kim, D. S., & Park, M. S. (2009). Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return. International Journal of Production Economics, 121, 255\u2013265.","journal-title":"International Journal of Production Economics"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-017-2563-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-017-2563-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-017-2563-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,7,30]],"date-time":"2022-07-30T00:28:29Z","timestamp":1659140909000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-017-2563-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,6,23]]},"references-count":81,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2018,2]]}},"alternative-id":["2563"],"URL":"https:\/\/doi.org\/10.1007\/s10479-017-2563-7","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,6,23]]}}}