{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,3]],"date-time":"2026-10-03T16:22:16Z","timestamp":1791044536411,"version":"4.1.0"},"reference-count":60,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2018,11,19]],"date-time":"2018-11-19T00:00:00Z","timestamp":1542585600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2018,11,19]],"date-time":"2018-11-19T00:00:00Z","timestamp":1542585600000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100003725","name":"National Research Foundation of Korea","doi-asserted-by":"publisher","award":["2016R1D1A1B03930952"],"award-info":[{"award-number":["2016R1D1A1B03930952"]}],"id":[{"id":"10.13039\/501100003725","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100003621","name":"Ministry of Science, ICT and Future Planning","doi-asserted-by":"publisher","award":["B0364-15-1008"],"award-info":[{"award-number":["B0364-15-1008"]}],"id":[{"id":"10.13039\/501100003621","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2021,3]]},"DOI":"10.1007\/s10479-018-3098-2","type":"journal-article","created":{"date-parts":[[2018,11,19]],"date-time":"2018-11-19T12:47:18Z","timestamp":1542631638000},"page":"339-359","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":14,"title":["Cyclic robot scheduling for 3D printer-based flexible assembly systems"],"prefix":"10.1007","volume":"298","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-7190-3264","authenticated-orcid":false,"given":"Hyun-Jung","family":"Kim","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-7693-8896","authenticated-orcid":false,"given":"Jun-Ho","family":"Lee","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2018,11,19]]},"reference":[{"issue":"1","key":"3098_CR1","doi-asserted-by":"crossref","first-page":"80","DOI":"10.1016\/j.ejor.2006.09.011","volume":"182","author":"FS Al-Anzi","year":"2007","unstructured":"Al-Anzi, F. S., & Allahverdi, A. (2007). A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times. European Journal of Operational Research, 182(1), 80\u201394.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"3098_CR2","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1016\/j.cie.2004.09.002","volume":"7","author":"H Allaoui","year":"2004","unstructured":"Allaoui, H., & Artiba, A. (2004). Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints. Computers and Industrial Engineering, 7(4), 431\u2013450.","journal-title":"Computers and Industrial Engineering"},{"issue":"13","key":"3098_CR3","doi-asserted-by":"crossref","first-page":"2480","DOI":"10.1016\/j.dam.2008.03.021","volume":"156","author":"N Brauner","year":"2008","unstructured":"Brauner, N. (2008). Identical part production in cyclic robotic cells: Concepts, overview and open questions. Discrete Applied Mathematics, 156(13), 2480\u20132492.","journal-title":"Discrete Applied Mathematics"},{"issue":"1","key":"3098_CR4","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/j.ijpe.2011.07.008","volume":"135","author":"A Che","year":"2013","unstructured":"Che, A., Chabrol, M., Gourgand, M., & Wang, Y. (2013). Scheduling multiple robots in a no-wait re-entrant robotic flowshop. International Journal of Production Economics, 135(1), 199\u2013208.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"3098_CR5","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1016\/S0377-2217(02)00175-3","volume":"145","author":"A Che","year":"2003","unstructured":"Che, A., Chengbin, C., & Levner, E. (2003). A polynomial algorithm for 2-degree cyclic robot scheduling. European Journal of Operational Research, 145(1), 31\u201344.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"3098_CR6","doi-asserted-by":"crossref","first-page":"445","DOI":"10.1007\/s00291-006-0040-9","volume":"29","author":"A Che","year":"2007","unstructured":"Che, A., & Chu, C. (2007). Cyclic hoist scheduling in large real-life electroplating lines. OR Spectrum, 29(3), 445\u2013470.","journal-title":"OR Spectrum"},{"issue":"19","key":"3098_CR7","doi-asserted-by":"crossref","first-page":"5679","DOI":"10.1080\/00207543.2010.503200","volume":"49","author":"A Che","year":"2011","unstructured":"Che, A., Zhou, Z., Chu, C., & Chen, H. (2011). Multi-degree cyclic hoist scheduling with time window constraints. International Journal of Production Research, 49(19), 5679\u20135693.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"3098_CR8","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1023\/A:1018995317468","volume":"96","author":"Y Crama","year":"2000","unstructured":"Crama, Y., Kats, V., Klundert, J., & Levner, E. (2000). Cyclic scheduling in robotic flowshops. Annals of Operations Research, 96(1), 97\u2013124.","journal-title":"Annals of Operations Research"},{"key":"3098_CR9","unstructured":"Crama, Y., & Klundert, J. (1997). Robotic flowshop scheduling is strongly NP-complete. In: Ten Years LNMB. Amsterdam: CWI Tract."},{"issue":"5","key":"3098_CR10","doi-asserted-by":"crossref","first-page":"418","DOI":"10.1016\/j.rcim.2013.04.001","volume":"29","author":"M Dai","year":"2013","unstructured":"Dai, M., Tang, D., Giret, A., Saildo, M. A., & Li, W. D. (2013). Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm. Robotics and Computer-Integrated Manufacturing, 29(5), 418\u2013429.","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"key":"3098_CR11","doi-asserted-by":"crossref","first-page":"184","DOI":"10.1016\/j.cor.2015.10.006","volume":"67","author":"A El Amraoui","year":"2016","unstructured":"El Amraoui, A., & Elhafsi, M. (2016). An efficient new heuristic for the hoist scheduling problem. Computers and Operations Research, 67, 184\u2013192.","journal-title":"Computers and Operations Research"},{"key":"3098_CR12","unstructured":"El Amraoui, A., Manier, M.A., & El Moudni, A. (2008). A mixed linear program for a multi-part cyclic hoist scheduling problem. International Journal of Sciences and Techniques of Automatic Control and Computer Engineering (Special Issue), 612\u2013623."},{"issue":"10","key":"3098_CR13","doi-asserted-by":"crossref","first-page":"2543","DOI":"10.1016\/j.cor.2013.01.024","volume":"40","author":"A Elmi","year":"2013","unstructured":"Elmi, A., & Topaloglu, S. (2013). A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots. Computers and Operations Research, 40(10), 2543\u20132555.","journal-title":"Computers and Operations Research"},{"issue":"12","key":"3098_CR14","doi-asserted-by":"crossref","first-page":"1144","DOI":"10.1080\/0951192X.2013.874576","volume":"27","author":"A Elmi","year":"2014","unstructured":"Elmi, A., & Topaloglu, S. (2014). Scheduling multiple parts in hybrid flow shop robotic cells served by a single robot. International Journal of Computer Integrated Manufacturing, 27(12), 1144\u20131159.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"6","key":"3098_CR15","doi-asserted-by":"crossref","first-page":"1083","DOI":"10.1016\/j.future.2004.03.014","volume":"20","author":"O Engin","year":"2004","unstructured":"Engin, O., & D\u00f6yen, A. (2004). A new approach to solve hybrid flow shop scheduling problems by artificial immune system. Future Generation Computer Systems, 20(6), 1083\u20131095.","journal-title":"Future Generation Computer Systems"},{"issue":"5","key":"3098_CR16","doi-asserted-by":"crossref","first-page":"787","DOI":"10.1007\/s00170-012-4217-x","volume":"65","author":"P Fattahi","year":"2013","unstructured":"Fattahi, P., Hosseini, S. M. H., & Jolai, F. (2013). A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem. The International Journal of Advanced Manufacturing Technology, 65(5), 787\u2013802.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"2","key":"3098_CR17","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1016\/j.ejor.2003.09.013","volume":"162","author":"HN Geismar","year":"2005","unstructured":"Geismar, H. N., Dawande, M., & Sriskandarajah, C. (2005). Approximation algorithms for k-unit cyclic solutions in robotic cells. European Journal of Operational Research, 162(2), 291\u2013309.","journal-title":"European Journal of Operational Research"},{"issue":"2\u20133","key":"3098_CR18","doi-asserted-by":"crossref","first-page":"167","DOI":"10.1016\/0166-218X(94)00102-J","volume":"57","author":"C Hanen","year":"1995","unstructured":"Hanen, C., & Munier, A. (1995). A study of the cyclic scheduling problem on parallel processors. Discrete Applied Mathematics, 57(2\u20133), 167\u2013192.","journal-title":"Discrete Applied Mathematics"},{"issue":"3","key":"3098_CR19","doi-asserted-by":"crossref","first-page":"547","DOI":"10.1016\/S0377-2217(96)00312-8","volume":"103","author":"AMA Hariri","year":"1997","unstructured":"Hariri, A. M. A., & Potts, C. N. (1997). A branch and bound algorithm for the two-stage assembly scheduling problem. European Journal of Operational Research, 103(3), 547\u2013556.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"3098_CR20","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1016\/j.ejor.2004.05.017","volume":"168","author":"JG Kyparisis","year":"2006","unstructured":"Kyparisis, J. G., & Koulamas, C. (2006). Flexible flow shop scheduling with uniform parallel machines. European Journal of Operational Research, 168(3), 985\u2013997.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"3098_CR21","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1137\/0204007","volume":"4","author":"DB Johnson","year":"1975","unstructured":"Johnson, D. B. (1975). Finding all the elementary circuits of a directed graph. SIAM Journal on Computing, 4(1), 77\u201384.","journal-title":"SIAM Journal on Computing"},{"issue":"3","key":"3098_CR22","doi-asserted-by":"crossref","first-page":"354","DOI":"10.1007\/s00170-007-0977-0","volume":"37","author":"J Jungwattanakit","year":"2008","unstructured":"Jungwattanakit, J., Reodecha, M., Chaovalitwongse, P., & Werner, F. (2008). Algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria. The International Journal of Advanced Manufacturing Technology, 37(3), 354\u2013370.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"2","key":"3098_CR23","doi-asserted-by":"crossref","first-page":"358","DOI":"10.1016\/j.cor.2007.10.004","volume":"36","author":"J Jungwattanakit","year":"2009","unstructured":"Jungwattanakit, J., Reodecha, M., Chaovalitwongse, P., & Werner, F. (2009). A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria. Computers and Operations Research, 36(2), 358\u2013378.","journal-title":"Computers and Operations Research"},{"issue":"1","key":"3098_CR24","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1016\/j.ejor.2010.10.002","volume":"209","author":"V Kats","year":"2011","unstructured":"Kats, V., & Levner, E. (2011). A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times. European Journal of Operational Research, 209(1), 51\u201356.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"3098_CR25","doi-asserted-by":"crossref","first-page":"420","DOI":"10.1109\/TSM.2012.2199329","volume":"25","author":"DK Kim","year":"2012","unstructured":"Kim, D. K., Jung, Y. J., Jung, C., & Lee, T. E. (2012). Cyclic scheduling of cluster tools with nonidentical chamber access times between parallel chambers. IEEE Transactions on Semiconductor Manufacturing, 25(3), 420\u2013431.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"11","key":"3098_CR26","doi-asserted-by":"crossref","first-page":"3092","DOI":"10.1080\/00207543.2016.1243819","volume":"55","author":"DK Kim","year":"2017","unstructured":"Kim, D. K., Kim, H. J., & Lee, T. E. (2017). Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module. International Journal of Production Research, 55(11), 3092\u20133109.","journal-title":"International Journal of Production Research"},{"key":"3098_CR27","doi-asserted-by":"crossref","unstructured":"Kim, H. J., & Lee, J. H. (2017). Robot task sequencing for a flexible assembly system with 3D printers. In Proceedings of the 2017 international conference on control, decision, and information technologies, Bercelona, Spain.","DOI":"10.1109\/CoDIT.2017.8102557"},{"issue":"1","key":"3098_CR28","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1109\/TASE.2012.2220355","volume":"10","author":"HJ Kim","year":"2013","unstructured":"Kim, H. J., Lee, J. H., Jung, C., & Lee, T. E. (2013). Scheduling cluster tools with ready time constraints for consecutive small lots. IEEE Transactions on Automation Science and Engineering, 10(1), 145\u2013159.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"2","key":"3098_CR29","doi-asserted-by":"crossref","first-page":"690","DOI":"10.1109\/TASE.2013.2293552","volume":"12","author":"HJ Kim","year":"2015","unstructured":"Kim, H. J., Lee, J. H., & Lee, T. E. (2015). Noncyclic scheduling of cluster tools with a branch and bound algorithm. IEEE Transactions on Automation Science and Engineering, 12(2), 690\u2013700.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"3","key":"3098_CR30","doi-asserted-by":"crossref","first-page":"521","DOI":"10.1109\/TSM.2003.815203","volume":"16","author":"JH Kim","year":"2003","unstructured":"Kim, J. H., Lee, T. E., Lee, H. Y., & Park, D. B. (2003). Scheduling analysis of time-constrained dual-armed cluster tools. IEEE Transactions on Semiconductor Manufacturing, 16(3), 521\u2013534.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"2","key":"3098_CR31","doi-asserted-by":"crossref","first-page":"226","DOI":"10.1109\/TSM.2006.873402","volume":"19","author":"HY Lee","year":"2006","unstructured":"Lee, H. Y., & Lee, T. E. (2006). Scheduling single-armed cluster tools with reentrant wafer flows. IEEE Transactions on Semiconductor Manufacturing, 19(2), 226\u2013240.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"3","key":"3098_CR32","first-page":"127","volume":"29","author":"JH Lee","year":"2016","unstructured":"Lee, J. H., & Kim, H. J. (2016). Makespan analysis of lot switching period in cluster tools. IEEE Transactions on Semiconductor Manufacturing, 29(3), 127\u2013136.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"4","key":"3098_CR33","doi-asserted-by":"crossref","first-page":"1622","DOI":"10.1109\/TASE.2017.2690443","volume":"14","author":"JH Lee","year":"2017","unstructured":"Lee, J. H., & Kim, H. J. (2017). Completion time analysis of wafer lots in single-armed cluster tools with parallel processing modules. IEEE Transactions on Automation Science and Engineering, 14(4), 1622\u20131633.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"2","key":"3098_CR34","doi-asserted-by":"crossref","first-page":"525","DOI":"10.1109\/TASE.2013.2296855","volume":"11","author":"JH Lee","year":"2014","unstructured":"Lee, J. H., Kim, H. J., & Lee, T. E. (2014). Scheduling cluster tools for concurrent processing of two wafer types. IEEE Transactions on Automation Science and Engineering, 11(2), 525\u2013536.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"12","key":"3098_CR35","first-page":"3671","volume":"51","author":"JH Lee","year":"2015","unstructured":"Lee, J. H., Kim, H. J., & Lee, T. E. (2015). Scheduling cluster tools for concurrent processing of two wafer types with PM sharing. International Journal of Production Research, 51(12), 3671\u20133687.","journal-title":"International Journal of Production Research"},{"key":"3098_CR36","doi-asserted-by":"crossref","unstructured":"Lee, T. E. (2008). A review of scheduling theory and methods for semiconductor manufacturing cluster tools. In Proceedings of the 2008 Winter Simulation Conference (pp. 2127\u20132135). Austin, TX, USA.","DOI":"10.1109\/WSC.2008.4736310"},{"key":"3098_CR37","unstructured":"Lee, T. E., Lee, H. Y., & Sreenivas, R. S. (2006). Token delays and generalized workload balancing for event graphs with application to cluster tool operation. In Proceedings of the 2006 IEEE conference on automation science and engineering (pp. 93\u201399). Shanghai, China."},{"issue":"1","key":"3098_CR38","doi-asserted-by":"crossref","first-page":"72","DOI":"10.1287\/opre.45.1.72","volume":"45","author":"TE Lee","year":"1997","unstructured":"Lee, T. E., & Posner, M. E. (1997). Performance measures and schedules in periodic job shops. Operations Research, 45(1), 72\u201391.","journal-title":"Operations Research"},{"issue":"2","key":"3098_CR39","doi-asserted-by":"crossref","first-page":"352","DOI":"10.1016\/j.cie.2010.03.013","volume":"59","author":"E Levner","year":"2010","unstructured":"Levner, E., Kats, V., Pablo, D. A. L., & Cheng, T. C. E. (2010). Complexity of cyclic scheduling problems: A state-of-the-art survey. Computers and Industrial Engineering, 59(2), 352\u2013361.","journal-title":"Computers and Industrial Engineering"},{"issue":"5","key":"3098_CR40","doi-asserted-by":"crossref","first-page":"704","DOI":"10.1080\/0305215X.2013.795560","volume":"46","author":"X Li","year":"2014","unstructured":"Li, X., & Fung, R. Y. K. (2014). A mixed integer linear programming solution for single hoist multi-degree cyclic scheduling with reentrance. Engineering Optimization, 46(5), 704\u2013723.","journal-title":"Engineering Optimization"},{"issue":"1","key":"3098_CR41","doi-asserted-by":"crossref","first-page":"90","DOI":"10.1137\/0205007","volume":"5","author":"P Mateti","year":"1976","unstructured":"Mateti, P., & Deo, N. (1976). On algorithms for enumerating all circuits of a graph. SIAM Journal on Computing, 5(1), 90\u201399.","journal-title":"SIAM Journal on Computing"},{"issue":"4","key":"3098_CR42","doi-asserted-by":"crossref","first-page":"541","DOI":"10.1109\/5.24143","volume":"77","author":"T Murata","year":"1989","unstructured":"Murata, T. (1989). Petri nets: Properties, analysis and applications. Proceedings of the IEEE, 77(4), 541\u2013580.","journal-title":"Proceedings of the IEEE"},{"issue":"1","key":"3098_CR43","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1109\/TASE.2013.2292572","volume":"12","author":"T Nishi","year":"2015","unstructured":"Nishi, T., & Matsumoto, I. (2015). Petri net decomposition approach to deadlock-free and non-cyclic scheduling of dual-armed cluster tools. IEEE Transactions on Automation Science and Engineering, 12(1), 281\u2013294.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"2","key":"3098_CR44","doi-asserted-by":"crossref","first-page":"160","DOI":"10.1109\/TSM.2015.2390644","volume":"28","author":"CR Pan","year":"2015","unstructured":"Pan, C. R., Qiao, Y., Zhou, M. C., & Wu, Nq. (2015). Scheduling and analysis of start-up transient processes of dual-arm cluster tools with wafer revisiting. IEEE Transactions on Semiconductor Manufacturing, 28(2), 160\u2013170.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"3098_CR45","doi-asserted-by":"publisher","unstructured":"Pan, C. R., Zhou, M. C., Qiao, Y., & Wu, N. Q.: Scheduling cluster tools in semiconductor manufacturing: Recent advances and challenges. IEEE Transactions on Automation Science and Engineering. https:\/\/doi.org\/10.1109\/TASE.2016.2642997.","DOI":"10.1109\/TASE.2016.2642997"},{"issue":"2","key":"3098_CR46","doi-asserted-by":"crossref","first-page":"346","DOI":"10.1287\/opre.43.2.346","volume":"43","author":"CN Potts","year":"1995","unstructured":"Potts, C. N., Sevast\u2019janov, S. V., Strusevich, V. A., Wassenhove, L. N. V., & Zwaneveld, C. M. (1995). The two-stage assembly scheduling problem: Complexity and approximation. Operations Research, 43(2), 346\u2013355.","journal-title":"Operations Research"},{"issue":"10","key":"3098_CR47","doi-asserted-by":"crossref","first-page":"286","DOI":"10.1109\/TII.2013.2272702","volume":"1","author":"Y Qiao","year":"2014","unstructured":"Qiao, Y., Wu, N. Q., & Zhou, M. C. (2014). Scheduling of dual-arm cluster tools with wafer revisiting and residency time constraints. IEEE Transactions on Industrial Informatics, 1(10), 286\u2013300.","journal-title":"IEEE Transactions on Industrial Informatics"},{"issue":"3","key":"3098_CR48","doi-asserted-by":"crossref","first-page":"472","DOI":"10.1109\/TSMC.2014.2347928","volume":"45","author":"Y Qiao","year":"2015","unstructured":"Qiao, Y., Wu, N. Q., & Zhou, M. C. (2015). Schedulability and scheduling analysis of dual-arm cluster tools with wafer revisiting and residency time constraints based on a novel schedule. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 45(3), 472\u2013484.","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics: Systems"},{"issue":"4","key":"3098_CR49","doi-asserted-by":"crossref","first-page":"1243","DOI":"10.1109\/TCST.2016.2598762","volume":"25","author":"Y Qiao","year":"2017","unstructured":"Qiao, Y., Zhou, M. C., Wu, N. Q., & Zhu, Q. H. (2017). Scheduling and control of startup process for single-arm cluster tools with residency time constraints. IEEE Transactions on Control Systems Technology, 25(4), 1243\u20131256.","journal-title":"IEEE Transactions on Control Systems Technology"},{"issue":"1","key":"3098_CR50","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.09.024","volume":"205","author":"R Ruiz","year":"2010","unstructured":"Ruiz, R., & V\u00e1zquez-Rodr\u00edguez, J. A. (2010). The hybrid flow shop scheduling problem. European Journal of Operational Research, 205(1), 1\u201318.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"3098_CR51","doi-asserted-by":"crossref","first-page":"1038","DOI":"10.1016\/j.ijpe.2007.12.007","volume":"113","author":"CS Sung","year":"2008","unstructured":"Sung, C. S., & Kim, H. A. (2008). A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times. International Journal of Production Economics, 113(2), 1038\u20131048.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"3098_CR52","doi-asserted-by":"crossref","first-page":"78","DOI":"10.1111\/j.1468-0394.2005.00297.x","volume":"22","author":"H Wang","year":"2005","unstructured":"Wang, H. (2005). Flexible flow shop scheduling: Optimum, heuristics and artificial intelligence solutions. Expert Systems, 22(2), 78\u201385.","journal-title":"Expert Systems"},{"issue":"2","key":"3098_CR53","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/0167-6377(94)90064-7","volume":"16","author":"ED Wikum","year":"1994","unstructured":"Wikum, E. D., Llewellyn, D. C., & Nemhauser, G. L. (1994). One-machine generalized precedence constrained scheduling problem. Operations Research Letters, 16(2), 87\u201399.","journal-title":"Operations Research Letters"},{"issue":"2","key":"3098_CR54","doi-asserted-by":"crossref","first-page":"224","DOI":"10.1109\/TSM.2008.2000425","volume":"21","author":"NQ Wu","year":"2008","unstructured":"Wu, N. Q., Chu, C., Chu, F., & Zhou, M. C. (2008). A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints. IEEE Transactions on Semiconductor Manufacturing, 21(2), 224\u2013237.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"1","key":"3098_CR55","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1109\/TASE.2010.2046736","volume":"8","author":"NQ Wu","year":"2011","unstructured":"Wu, N. Q., Chu, F., Chu, C., & Zhou, M. C. (2011). Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes. IEEE Transactions on Automation Science and Engineering, 8(1), 42\u201355.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"1","key":"3098_CR56","doi-asserted-by":"crossref","first-page":"196","DOI":"10.1109\/TSMCA.2012.2187890","volume":"43","author":"NQ Wu","year":"2013","unstructured":"Wu, N. Q., Chu, F., Chu, C., & Zhou, M. C. (2013). Petri net modeling and cycle time analysis of dual-arm cluster tools with wafer revisiting. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 43(1), 196\u2013207.","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics: Systems"},{"issue":"3","key":"3098_CR57","doi-asserted-by":"crossref","first-page":"421","DOI":"10.1007\/s00291-006-0046-3","volume":"29","author":"N Wu","year":"2007","unstructured":"Wu, N., & Zhou, M. (2007). Real-time deadlock-free scheduling for semiconductor track systems based on colored timed Petri nets. OR Spectrum, 29(3), 421\u2013443.","journal-title":"OR Spectrum"},{"issue":"2","key":"3098_CR58","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1109\/TASE.2008.2008633","volume":"7","author":"NQ Wu","year":"2010","unstructured":"Wu, N. Q., & Zhou, M. C. (2010). A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis. IEEE Transactions on Automation Science and Engineering, 7(2), 303\u2013315.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"2","key":"3098_CR59","doi-asserted-by":"crossref","first-page":"446","DOI":"10.1109\/TASE.2011.2178023","volume":"9","author":"NQ Wu","year":"2012","unstructured":"Wu, N. Q., & Zhou, M. C. (2012a). Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets. IEEE Transactions on Automation Science and Engineering, 9(2), 446\u2013454.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"1","key":"3098_CR60","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1109\/TASE.2011.2160452","volume":"9","author":"NQ Wu","year":"2012","unstructured":"Wu, N. Q., & Zhou, M. C. (2012b). Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation. IEEE Transactions on Automation Science and Engineering, 9(1), 203\u2013209.","journal-title":"IEEE Transactions on Automation Science and Engineering"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-018-3098-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-018-3098-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-018-3098-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,2,13]],"date-time":"2021-02-13T20:43:03Z","timestamp":1613248983000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-018-3098-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,11,19]]},"references-count":60,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2021,3]]}},"alternative-id":["3098"],"URL":"https:\/\/doi.org\/10.1007\/s10479-018-3098-2","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,11,19]]},"assertion":[{"value":"19 November 2018","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}