{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T07:33:41Z","timestamp":1740123221500,"version":"3.37.3"},"reference-count":24,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2019,10,16]],"date-time":"2019-10-16T00:00:00Z","timestamp":1571184000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2019,10,16]],"date-time":"2019-10-16T00:00:00Z","timestamp":1571184000000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2020,4]]},"DOI":"10.1007\/s10479-019-03423-8","type":"journal-article","created":{"date-parts":[[2019,10,16]],"date-time":"2019-10-16T18:57:52Z","timestamp":1571252272000},"page":"379-401","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["Innovative maintenance problem in a two-stage production-inventory system with imperfect processes"],"prefix":"10.1007","volume":"287","author":[{"given":"Rung-Hung","family":"Su","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5618-9904","authenticated-orcid":false,"given":"Ming-Wei","family":"Weng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yung-Fu","family":"Huang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,10,16]]},"reference":[{"key":"3423_CR1","doi-asserted-by":"publisher","first-page":"257","DOI":"10.1016\/S0925-5273(01)00168-2","volume":"76","author":"M Ben-Daya","year":"2002","unstructured":"Ben-Daya, M. (2002). The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. International Journal of Production Economics,76, 257\u2013264.","journal-title":"International Journal of Production Economics"},{"key":"3423_CR2","doi-asserted-by":"publisher","first-page":"285","DOI":"10.1016\/j.cie.2012.02.011","volume":"63","author":"HJ Chang","year":"2012","unstructured":"Chang, H. J., Su, R. H., Yang, C. T., & Weng, M. W. (2012). An economic manufacturing quantity model for a two-stage assembly system with imperfect processes and variable production rate. Computers & Industrial Engineering,63, 285\u2013293.","journal-title":"Computers & Industrial Engineering"},{"issue":"2","key":"3423_CR3","doi-asserted-by":"publisher","first-page":"445","DOI":"10.1007\/s10479-017-2511-6","volume":"271","author":"N Cheikhrouhou","year":"2018","unstructured":"Cheikhrouhou, N., Sarkar, B., Ganguly, B., Malik, A. I., Batista, R., & Lee, Y. H. (2018). Optimization of sample size and order size in an inventory model with quality inspection and return of defective items. Annals of Operations Research,271(2), 445\u2013467.","journal-title":"Annals of Operations Research"},{"issue":"5","key":"3423_CR4","doi-asserted-by":"publisher","first-page":"295","DOI":"10.1080\/00207720600566602","volume":"37","author":"YC Chen","year":"2006","unstructured":"Chen, Y. C. (2006). Optimal inspection and economical production quantity strategy for an imperfect production process. International Journal of Systems Science,37(5), 295\u2013302.","journal-title":"International Journal of Systems Science"},{"key":"3423_CR5","doi-asserted-by":"publisher","first-page":"302","DOI":"10.1016\/j.ijpe.2013.07.024","volume":"155","author":"SC Chen","year":"2014","unstructured":"Chen, S. C., Teng, J. T., & Skouri, K. (2014). Economic production quantity models for deteriorating items with up-stream full trade credit and down-stream partial trade credit. International Journal of Production Economics,155, 302\u2013309.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"3423_CR6","doi-asserted-by":"publisher","first-page":"301","DOI":"10.1016\/j.ijpe.2006.09.008","volume":"107","author":"MA Darwish","year":"2007","unstructured":"Darwish, M. A., & Ben-Daya, M. (2007). Effect of inspection errors and preventive maintenance on a two-stage production inventory system. International Journal of Production Economics,107(1), 301\u2013313.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"3423_CR7","doi-asserted-by":"publisher","first-page":"816","DOI":"10.1016\/j.ijpe.2007.07.004","volume":"112","author":"HH Lee","year":"2008","unstructured":"Lee, H. H. (2008). The investment model in preventive maintenance in multi-level production systems. International Journal of Production Economics,112(2), 816\u2013828.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"3423_CR8","doi-asserted-by":"publisher","first-page":"348","DOI":"10.1016\/j.ejor.2008.01.004","volume":"195","author":"GL Liao","year":"2009","unstructured":"Liao, G. L., Chen, Y. H., & Sheu, S. H. (2009). Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance. European Journal of Operational Research,195(2), 348\u2013357.","journal-title":"European Journal of Operational Research"},{"key":"3423_CR9","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-017-2650-9","author":"AH Nobil","year":"2017","unstructured":"Nobil, A. H., Sedigh, A. H. A., & C\u00e1rdenas-Barr\u00f3n, L. E. (2017). A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints. Annals of Operations Research. \nhttps:\/\/doi.org\/10.1007\/s10479-017-2650-9\n\n.","journal-title":"Annals of Operations Research"},{"key":"3423_CR10","doi-asserted-by":"publisher","first-page":"533","DOI":"10.1007\/s10100-010-0143-x","volume":"19","author":"WL Pearn","year":"2011","unstructured":"Pearn, W. L., Su, R. H., Weng, M. W., & Hsu, C. H. (2011). Optimal production run time for two-stage production system with imperfect processes and allowable shortages. Central European Journal of Operations Research,19, 533\u2013545.","journal-title":"Central European Journal of Operations Research"},{"key":"3423_CR11","doi-asserted-by":"publisher","first-page":"915","DOI":"10.1016\/j.ejor.2006.12.005","volume":"184","author":"BR Sarker","year":"2008","unstructured":"Sarker, B. R., Jamal, A. M. M., & Mondal, S. (2008). Optimal batch sizing in a multistage production system with rework consideration. European Journal of Operations Research,184, 915\u2013929.","journal-title":"European Journal of Operations Research"},{"key":"3423_CR12","first-page":"1410","volume":"101","author":"EW Taft","year":"1918","unstructured":"Taft, E. W. (1918). The most economical production lot. Iron Age,101, 1410\u20131412.","journal-title":"Iron Age"},{"key":"3423_CR13","doi-asserted-by":"publisher","first-page":"303","DOI":"10.1007\/s10479-017-2563-7","volume":"261","author":"AA Taleizadeh","year":"2018","unstructured":"Taleizadeh, A. A. (2018). A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering. Annals of Operations Research,261, 303\u2013337.","journal-title":"Annals of Operations Research"},{"key":"3423_CR14","doi-asserted-by":"publisher","first-page":"143","DOI":"10.1007\/s11750-015-0377-9","volume":"24","author":"AA Taleizadeh","year":"2016","unstructured":"Taleizadeh, A. A., Kalantari, S. S., & C\u00e1rdenas-Barr\u00f3n, L. E. (2016). Pricing and lot sizing for an EPQ inventory model with rework and multiple shipments. TOP,24, 143\u2013155.","journal-title":"TOP"},{"issue":"8","key":"3423_CR15","doi-asserted-by":"publisher","first-page":"1834","DOI":"10.1016\/j.cam.2009.09.021","volume":"233","author":"AA Taleizadeh","year":"2010","unstructured":"Taleizadeh, A. A., Niaki, S. T. A., & Najafi, A. A. (2010a). Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. Journal of Computational and Applied Mathematics,233(8), 1834\u20131849.","journal-title":"Journal of Computational and Applied Mathematics"},{"issue":"4","key":"3423_CR16","doi-asserted-by":"publisher","first-page":"388","DOI":"10.1504\/EJIE.2011.042738","volume":"5","author":"AA Taleizadeh","year":"2011","unstructured":"Taleizadeh, A. A., Sadjadi, S. J., & Niaki, S. T. A. (2011). Multi-product single-machine EPQ model with immediate rework process and back-ordering. European Journal of Industrial Engineering,5(4), 388\u2013411.","journal-title":"European Journal of Industrial Engineering"},{"issue":"5","key":"3423_CR17","doi-asserted-by":"publisher","first-page":"2765","DOI":"10.1016\/j.apm.2012.06.006","volume":"37","author":"AA Taleizadeh","year":"2013","unstructured":"Taleizadeh, A. A., Wee, H. M., & Jalali-Naini, S. G. (2013). Economic production quantity model with repair failure and limited capacity. Applied Mathematical Modeling,37(5), 2765\u20132774.","journal-title":"Applied Mathematical Modeling"},{"issue":"1","key":"3423_CR18","doi-asserted-by":"publisher","first-page":"45","DOI":"10.1016\/j.cie.2010.02.015","volume":"59","author":"AA Taleizadeh","year":"2010","unstructured":"Taleizadeh, A. A., Weeb, H. M., & Sadjadi, S. J. (2010b). Multi-product production quantity model with repair failure and partial back-ordering. Computers & Industrial Engineering,59(1), 45\u201354.","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"3423_CR19","doi-asserted-by":"publisher","first-page":"232","DOI":"10.1108\/JM2-06-2018-0086","volume":"14","author":"AA Taleizadeh","year":"2018","unstructured":"Taleizadeh, A. A., Yadegari, M., & Sana, S. S. (2018). Production models of multiple products using a single machine under quality screening and reworking policies. Journal of Modelling in Management, 14(1), 232\u2013259.","journal-title":"Journal of Modelling in Management"},{"key":"3423_CR20","doi-asserted-by":"publisher","first-page":"218","DOI":"10.1016\/j.ijpe.2013.10.012","volume":"155","author":"JT Teng","year":"2014","unstructured":"Teng, J. T., Lou, K. R., & Wang, L. (2014). Optimal trade credit and lot size policies in economic production quantity models with learning curve production costs. International Journal of Production Economics,155, 218\u2013323.","journal-title":"International Journal of Production Economics"},{"key":"3423_CR21","doi-asserted-by":"publisher","first-page":"305","DOI":"10.1023\/A:1018910109348","volume":"91","author":"H Wang","year":"1999","unstructured":"Wang, H., & Pham, H. (1999). Some maintenance models and availability with imperfect maintenance in production systems. Annals of Operations Research,91, 305\u2013318.","journal-title":"Annals of Operations Research"},{"issue":"11","key":"3423_CR22","doi-asserted-by":"publisher","first-page":"2940","DOI":"10.1080\/00207543.2011.578159","volume":"50","author":"HM Wee","year":"2011","unstructured":"Wee, H. M., & Widyadana, G. A. (2011). Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time. International Journal of Production Economics,50(11), 2940\u20132952.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"3423_CR23","doi-asserted-by":"publisher","first-page":"53","DOI":"10.4156\/ijei.vol3.issue2.7","volume":"3","author":"MW Weng","year":"2012","unstructured":"Weng, M. W., & Su, R. H. (2012). Determining the optimal production lot size for two-stage production system with allowable shortage, imperfect processes and rework. International Journal of Engineering and Industries,3(2), 53\u201364.","journal-title":"International Journal of Engineering and Industries"},{"key":"3423_CR24","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-018-3069-7","author":"N Yassine","year":"2018","unstructured":"Yassine, N. (2018). A sustainable economic production model: Effects of quality and emissions tax from transportation. Annals of Operations Research. \nhttps:\/\/doi.org\/10.1007\/s10479-018-3069-7\n\n.","journal-title":"Annals of Operations Research"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-019-03423-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-019-03423-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-019-03423-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,10,14]],"date-time":"2020-10-14T23:40:14Z","timestamp":1602718814000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-019-03423-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,10,16]]},"references-count":24,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2020,4]]}},"alternative-id":["3423"],"URL":"https:\/\/doi.org\/10.1007\/s10479-019-03423-8","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"type":"print","value":"0254-5330"},{"type":"electronic","value":"1572-9338"}],"subject":[],"published":{"date-parts":[[2019,10,16]]},"assertion":[{"value":"16 October 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"This paper complies with the provisions of ethical responsibilities of authors.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethical statements"}}]}}