{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,4]],"date-time":"2026-08-04T02:45:47Z","timestamp":1785811547016,"version":"3.56.0"},"reference-count":75,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2020,2,7]],"date-time":"2020-02-07T00:00:00Z","timestamp":1581033600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2020,2,7]],"date-time":"2020-02-07T00:00:00Z","timestamp":1581033600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"name":"NTNU Norwegian University of Science and Technology"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2022,1]]},"abstract":"<jats:title>Abstract<\/jats:title><jats:p>Manufacturing flexibility improves a firm\u2019s ability to react in timely manner to customer demands and to increase production system productivity without incurring excessive costs and expending an excessive amount of resources. The emerging technologies in the Industry 4.0 era, such as cloud operations or industrial Artificial Intelligence, allow for new flexible production systems. We develop and test an analytical model for a throughput analysis and use it to reveal the conditions under which the autonomous mobile robots (AMR)-based flexible production networks are more advantageous as compared to the traditional production lines. Using a circular loop among workstations and inter-operational buffers, our model allows congestion to be avoided by utilizing multiple crosses and analyzing both the flow and the load\/unload phases. The sensitivity analysis shows that the cost of the AMRs and the number of shifts are the key factors in improving flexibility and productivity. The outcomes of this research promote a deeper understanding of the role of AMRs in Industry 4.0-based production networks and can be utilized by production planners to determine optimal configurations and the associated performance impact of the AMR-based production networks in as compared to the traditionally balanced lines. This study supports the decision-makers in how the AMR in production systems in process industry can improve manufacturing performance in terms of productivity, flexibility, and costs.\u00a0<\/jats:p>","DOI":"10.1007\/s10479-020-03526-7","type":"journal-article","created":{"date-parts":[[2020,2,7]],"date-time":"2020-02-07T11:04:05Z","timestamp":1581073445000},"page":"125-143","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":347,"title":["Increasing flexibility and productivity in Industry 4.0 production networks with autonomous mobile robots and smart intralogistics"],"prefix":"10.1007","volume":"308","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-8915-509X","authenticated-orcid":false,"given":"Giuseppe","family":"Fragapane","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-4932-9627","authenticated-orcid":false,"given":"Dmitry","family":"Ivanov","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6857-8392","authenticated-orcid":false,"given":"Mirco","family":"Peron","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9541-3515","authenticated-orcid":false,"given":"Fabio","family":"Sgarbossa","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3741-9000","authenticated-orcid":false,"given":"Jan Ola","family":"Strandhagen","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2020,2,7]]},"reference":[{"issue":"2","key":"3526_CR1","doi-asserted-by":"publisher","first-page":"15","DOI":"10.1080\/10429247.2006.11431690","volume":"18","author":"FA Abdulmalek","year":"2006","unstructured":"Abdulmalek, F. A., Rajgopal, J., & Needy, K. L. (2006). A classification scheme for the process industry to guidethe implementation of lean. Engineering Management Journal, 18(2), 15\u201325. https:\/\/doi.org\/10.1080\/10429247.2006.11431690.","journal-title":"Engineering Management Journal"},{"key":"3526_CR2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1451664","author":"G Ahn","year":"2018","unstructured":"Ahn, G., Park, Y. J., & Hur, S. (2018). Performance computation methods for composition of tasks with multiple patterns in cloud manufacturing. International Journal of Production Research,. https:\/\/doi.org\/10.1080\/00207543.2018.1451664.","journal-title":"International Journal of Production Research"},{"key":"3526_CR3","doi-asserted-by":"publisher","unstructured":"Andriansyah, R. (2011). Order-picking workstations for automated warehouses. Ph.D. thesis, Technische Universiteit Eindhoven. https:\/\/doi.org\/10.6100\/IR715619.","DOI":"10.6100\/IR715619"},{"key":"3526_CR4","doi-asserted-by":"publisher","unstructured":"Angerer, S., Strassmair, C., Staehr, M., Roettenbacher, M., & Robertson, NM. (2012). Give me a hand\u2014The potential of mobile assistive robots in automotive logistics and assembly applications. In 2012 IEEE international conference on technologies for practical robot applications (TePRA) (pp. 111\u2013127). https:\/\/doi.org\/10.1109\/TePRA.2012.6215663.","DOI":"10.1109\/TePRA.2012.6215663"},{"key":"3526_CR5","doi-asserted-by":"publisher","DOI":"10.1080\/095372800232225","author":"R Arifin","year":"2000","unstructured":"Arifin, R., & Egbelu, P. J. (2000). Determination of vehicle requirements in automated guided vehicle systems: A statistical approach. Production Planning & Control,. https:\/\/doi.org\/10.1080\/095372800232225.","journal-title":"Production Planning & Control"},{"issue":"1","key":"3526_CR6","first-page":"37","volume":"8","author":"M Brettel","year":"2014","unstructured":"Brettel, M., Friederichsen, N., Keller, M., & Rosenberg, M. (2014). How virtualization, decentralization and network building change the manufacturing landscape: An Industry 4.0 Perspective. International Journal of Mechanical, Industrial Science Engineering, 8(1), 37\u201344.","journal-title":"International Journal of Mechanical, Industrial Science Engineering"},{"issue":"11","key":"3526_CR7","doi-asserted-by":"publisher","first-page":"1476","DOI":"10.1016\/J.IFACOL.2018.08.295","volume":"51","author":"M Calzavara","year":"2018","unstructured":"Calzavara, M., Persona, A., & Sgarbossa, F. (2018). Modelling of rail guided vehicles serving an automated parts-to-picker system. IFAC-PapersOnLine, 51(11), 1476\u201381. https:\/\/doi.org\/10.1016\/J.IFACOL.2018.08.295.","journal-title":"IFAC-PapersOnLine"},{"key":"3526_CR8","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1016\/j.ijinfomgt.2019.03.004","volume":"49","author":"IM Cavalcantea","year":"2019","unstructured":"Cavalcantea, I. M., Frazzon, E. M., Forcellinia, F. A., & Ivanov, D. (2019). A supervised machine learning approach to data-driven simulation of resilient supplier selection in digital manufacturing. International Journal of Information Management, 49, 86\u201397.","journal-title":"International Journal of Information Management"},{"issue":"6","key":"3526_CR9","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1108\/01443579610119117","volume":"16","author":"SS Chakravorty","year":"1996","unstructured":"Chakravorty, S. S., & Atwater, J. B. (1996). A comparative study of line design approaches for serial production systems. International Journal of Operations & Production Management, 16(6), 91\u2013108. https:\/\/doi.org\/10.1108\/01443579610119117.","journal-title":"International Journal of Operations & Production Management"},{"issue":"2","key":"3526_CR10","first-page":"3222","volume":"19","author":"M Chen","year":"2012","unstructured":"Chen, M., Mao, S., & Liu, Y. (2012). Fleet sizing of automated guided vehicles: A linear programming approach based on closed queuing networks. International Journal of Production Research, 19(2), 3222\u20133257. (Mobile networks applications).","journal-title":"International Journal of Production Research"},{"issue":"12","key":"3526_CR11","doi-asserted-by":"crossref","first-page":"3222","DOI":"10.1080\/00207543.2011.562560","volume":"50","author":"FF Choobineh","year":"2012","unstructured":"Choobineh, F. F., Asef-Vaziri, A., & Huang, X. (2012). Fleet sizing of automated guided vehicles: A linear programming approach based on closed queuing networks. International Journal of Production Research, 50(12), 3222\u20133235.","journal-title":"International Journal of Production Research"},{"issue":"6","key":"3526_CR12","doi-asserted-by":"publisher","first-page":"1271","DOI":"10.1007\/s10845-013-0729-y","volume":"25","author":"QV Dang","year":"2014","unstructured":"Dang, Q. V., Nielsen, I., Steger-Jensen, K., & Madsen, O. (2014). Scheduling a single mobile robot for part-feeding tasks of production lines. Journal of Intelligent Manufacturing, 25(6), 1271\u201387. https:\/\/doi.org\/10.1007\/s10845-013-0729-y.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"18","key":"3526_CR13","doi-asserted-by":"crossref","first-page":"4153","DOI":"10.1080\/00207540110072281","volume":"39","author":"A Das","year":"2001","unstructured":"Das, A. (2001). Towards theory building in manufacturing flexibility. International Journal of Production Research, 39(18), 4153\u20134177.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"3526_CR14","doi-asserted-by":"publisher","first-page":"171","DOI":"10.1080\/00207546508919974","volume":"4","author":"LE Davis","year":"1965","unstructured":"Davis, L. E. (1965). Pacing effects on manned assembly lines. International Journal of Production Research, 4(3), 171\u201384. https:\/\/doi.org\/10.1080\/00207546508919974.","journal-title":"International Journal of Production Research"},{"issue":"1\u20132","key":"3526_CR15","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1007\/s10479-018-2772-8","volume":"270","author":"ABL De Sousa Jabbour","year":"2018","unstructured":"De Sousa Jabbour, A. B. L., Jabbour, C. J. C., Godinho Filho, M., & Roubaud, D. (2018). Industry 4.0 and the circular economy: A proposed research agenda and original roadmap for sustainable operations. Annals of Operations Research, 270(1\u20132), 273\u2013286. https:\/\/doi.org\/10.1007\/s10479-018-2772-8.","journal-title":"Annals of Operations Research"},{"issue":"6","key":"3526_CR16","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1016\/s0272-6963(00)00039-5","volume":"18","author":"DR Dennis","year":"2000","unstructured":"Dennis, D. R., & Meredith, J. R. (2000). An analysis of process industry production and inventory management systems. Journal of Operations Management, 18(6), 39\u201344. https:\/\/doi.org\/10.1016\/s0272-6963(00)00039-5.","journal-title":"Journal of Operations Management"},{"issue":"2","key":"3526_CR17","doi-asserted-by":"crossref","first-page":"823","DOI":"10.1007\/s12555-017-0055-9","volume":"16","author":"LA Dias","year":"2018","unstructured":"Dias, L. A., Silva, R. W. D. O., Emanuel, P. C. D. S., Filho, A. F., & Bento, R. T. (2018). Application of the fuzzy logic for the development of automnomous robot with obstacles deviation. International Journal of Control, Automation and Systems, 16(2), 823\u2013833.","journal-title":"International Journal of Control, Automation and Systems"},{"issue":"3","key":"3526_CR18","doi-asserted-by":"crossref","first-page":"732","DOI":"10.1016\/j.ejor.2004.07.025","volume":"168","author":"A Dolgui","year":"2006","unstructured":"Dolgui, A., Guschinsky, N., & Levin, G. (2006). A special case of transfer lines balancing by graph approach. European Journal of Operational Research, 168(3), 732\u2013746.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"3526_CR19","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1080\/00207543.2018.1442948","volume":"57","author":"A Dolgui","year":"2019","unstructured":"Dolgui, A., Ivanov, D., Sethi, S. P., & Sokolov, B. (2019). Scheduling in production, supply chain and Industry 4.0 systems by optimal control. International Journal of Production Research, 57(2), 411\u2013432.","journal-title":"International Journal of Production Research"},{"key":"3526_CR20","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-84996-017-5","volume-title":"Supply chains engineering: Useful methods and techniques","author":"A Dolgui","year":"2010","unstructured":"Dolgui, A., & Proth, J. M. (2010). Supply chains engineering: Useful methods and techniques. New York: Springer."},{"issue":"2","key":"3526_CR21","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1007\/s40171-014-0058-9","volume":"15","author":"R Dubey","year":"2014","unstructured":"Dubey, R., & Ali, S. S. (2014). Identification of flexible manufacturing system dimensions and their interrelationship using total interpretive structural modelling and fuzzy MICMAC analysis. Global Journal of Flexible Systems Management, 15(2), 131\u2013143.","journal-title":"Global Journal of Flexible Systems Management"},{"issue":"1","key":"3526_CR22","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1108\/IJOPM-04-2016-0173","volume":"38","author":"R Dubey","year":"2018","unstructured":"Dubey, R., Altay, N., Gunasekaran, A., Blome, C., Papadopoulos, T., & Childe, S. J. (2018). Supply chain agility, adaptability and alignment: Empirical evidence from the Indian auto components industry. International Journal of Operations & Production Management, 38(1), 129\u2013148.","journal-title":"International Journal of Operations & Production Management"},{"key":"3526_CR23","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2019.1582820","author":"R Dubey","year":"2019","unstructured":"Dubey, R., Gunasekaran, A., Childe, S. J., Wamba, S. F., Roubaud, D., & Foropon, C. (2019). Empirical investigation of data analytics capability and organizational flexibility as complements to supply chain resilience. International Journal of Production Research,. https:\/\/doi.org\/10.1080\/00207543.2019.1582820.","journal-title":"International Journal of Production Research"},{"key":"3526_CR24","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1016\/J.IJPE.2014.06.008","volume":"157","author":"A Ferrara","year":"2014","unstructured":"Ferrara, A., Gebennini, E., & Grassi, A. (2014). Fleet sizing of laser guided vehicles and pallet shuttles in automated warehouses. International Journal of Production Economics, 157, 7\u201314. https:\/\/doi.org\/10.1016\/J.IJPE.2014.06.008.","journal-title":"International Journal of Production Economics"},{"key":"3526_CR25","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1016\/j.ijpe.2019.01.004","volume":"210","author":"AG Frank","year":"2019","unstructured":"Frank, A. G., Dalenogare, L. S., & Ayala, N. F. (2019). Industry 4.0 technologies: Implementation patterns in manufacturing companies. International Journal of Production Economics, 210, 15\u201326.","journal-title":"International Journal of Production Economics"},{"key":"3526_CR26","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1115\/1.1688372","volume":"126","author":"T Freiheit","year":"2004","unstructured":"Freiheit, T., Shpitalni, M., & Hu, S. J. (2004). Productivity of paced parallel-serial manufacturing lines with and without crossover. Journal of Manufacturing Science and Engineering, 126, 361\u2013367.","journal-title":"Journal of Manufacturing Science and Engineering"},{"issue":"1","key":"3526_CR27","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1007\/s10462-012-9365-8","volume":"43","author":"J Fuentes-Pacheco","year":"2015","unstructured":"Fuentes-Pacheco, J., Ruiz-Ascencio, J., & Rendn-Mancha, J. M. (2015). Visual simultaneous localization and mapping: A survey. Artificial Intelligence Review, 43(1), 55\u201381.","journal-title":"Artificial Intelligence Review"},{"key":"3526_CR28","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1023\/A:1018936219150","volume":"76","author":"T Ganesharajah","year":"1998","unstructured":"Ganesharajah, T., Hall, N. G., & Sriskandarajah, C. (1998). Design and operational issues in AGV-served manufacturing systems. Annals of Operations Research, 76, 109\u2013154.","journal-title":"Annals of Operations Research"},{"issue":"10","key":"3526_CR29","doi-asserted-by":"crossref","first-page":"3359","DOI":"10.1080\/00207543.2018.1457813","volume":"56","author":"D Ivanov","year":"2018","unstructured":"Ivanov, D., Das, A., & Choi, T. M. (2018a). New flexibility drivers in manufacturing, service, and supply chain systems. International Journal of Production Research, 56(10), 3359\u20133368.","journal-title":"International Journal of Production Research"},{"issue":"15\u201316","key":"3526_CR30","doi-asserted-by":"crossref","first-page":"5119","DOI":"10.1080\/00207543.2018.1521025","volume":"57","author":"D Ivanov","year":"2019","unstructured":"Ivanov, D., & Dolgui, A. (2019). Low-Certainty-Need (LCN) Supply Chains: A new perspective in managing disruption risks and resilience. International Journal of Production Research, 57(15\u201316), 5119\u20135136.","journal-title":"International Journal of Production Research"},{"key":"3526_CR31","doi-asserted-by":"crossref","unstructured":"Ivanov, D., & Dolgui, A. (2020). A digital supply chain twin for managing the disruptions risks and resilience in the era of Industry 4.0. Production Planning and Control(forthcoming).","DOI":"10.1080\/09537287.2020.1768450"},{"issue":"3","key":"3526_CR32","doi-asserted-by":"crossref","first-page":"829","DOI":"10.1080\/00207543.2018.1488086","volume":"57","author":"D Ivanov","year":"2019","unstructured":"Ivanov, D., Dolgui, A., & Sokolov, B. (2019). The impact of digital technology and Industry 4.0 on the ripple effect and supply chain risk analytics. International Journal of Production Research, 57(3), 829\u2013846.","journal-title":"International Journal of Production Research"},{"key":"3526_CR33","doi-asserted-by":"crossref","first-page":"134","DOI":"10.1016\/j.arcontrol.2018.10.014","volume":"46","author":"D Ivanov","year":"2018","unstructured":"Ivanov, D., Sethi, S., Dolgui, A., & Sokolov, B. (2018b). A survey on the control theory applications to operational systems, supply chain management and Industry 4.0. Annual Reviews in Control, 46, 134\u2013147.","journal-title":"Annual Reviews in Control"},{"issue":"2","key":"3526_CR34","doi-asserted-by":"crossref","first-page":"386","DOI":"10.1080\/00207543.2014.999958","volume":"54","author":"D Ivanov","year":"2016","unstructured":"Ivanov, D., Sokolov, B., Dolgui, A., Werner, F., & Ivanova, M. (2016). A dynamic model and an algorithm for short-term supply chain scheduling in the smart factory Industry 4.0. International Journal of Production Research, 54(2), 386\u2013402.","journal-title":"International Journal of Production Research"},{"key":"3526_CR35","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-319-94313-8","volume-title":"Global supply chain and operations management: A decision-oriented introduction into the creation of value","author":"D Ivanov","year":"2019","unstructured":"Ivanov, D., Tsipoulanidis, A., & Schnberger, J. (2019b). Global supply chain and operations management: A decision-oriented introduction into the creation of value (2nd ed.). Cham: Springer. (Digital Supply Chain).","edition":"2"},{"issue":"19","key":"3526_CR36","doi-asserted-by":"crossref","first-page":"5946","DOI":"10.1080\/00207543.2013.824627","volume":"51","author":"A Jain","year":"2013","unstructured":"Jain, A., Jain, P. K., Chan, F. T. S., & Singh, S. (2013). A review on manufacturing flexibility. International Journal of Production Research, 51(19), 5946\u20135970.","journal-title":"International Journal of Production Research"},{"key":"3526_CR37","doi-asserted-by":"publisher","first-page":"780","DOI":"10.3182\/20090603-3-RU-2001.0090","volume":"42","author":"V Kats","year":"2009","unstructured":"Kats, V., & Levner, E. (2009). A parametric algorithm for 2-cyclic robotic scheduling with interval processing times. IFAC Proceedings Volumes, 42, 780\u201385. https:\/\/doi.org\/10.3182\/20090603-3-RU-2001.0090.","journal-title":"IFAC Proceedings Volumes"},{"issue":"2","key":"3526_CR38","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1007\/s11465-018-0483-0","volume":"13","author":"Y Koren","year":"2018","unstructured":"Koren, Y., Gu, X., & Guo, W. (2018). Reconfigurable manufacturing systems: Principles, design, and future trends. Frontiers of Mechanical Engineering, 13(2), 121\u2013157.","journal-title":"Frontiers of Mechanical Engineering"},{"issue":"1\u20132","key":"3526_CR39","doi-asserted-by":"crossref","first-page":"508","DOI":"10.1080\/00207543.2017.1351644","volume":"56","author":"A Kusiak","year":"2018","unstructured":"Kusiak, A. (2018). Smart manufacturing. International Journal of Production Research, 56(1\u20132), 508\u2013517.","journal-title":"International Journal of Production Research"},{"key":"3526_CR40","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1016\/j.mfglet.2018.09.002","volume":"18","author":"J Lee","year":"2018","unstructured":"Lee, J., Davari, H., Singh, J., & Pandhare, V. (2018). Industrial Artificial Intelligence for industry 4.0-based manufacturing systems. Manufacturing Letters, 18, 20\u201323.","journal-title":"Manufacturing Letters"},{"key":"3526_CR41","doi-asserted-by":"crossref","DOI":"10.1007\/978-0-387-75579-3","volume-title":"Production systems engineering","author":"J Li","year":"2009","unstructured":"Li, J., & Meerkov, S. M. (2009). Production systems engineering. New York: Springer."},{"key":"3526_CR42","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-019-03433-6","author":"B Lin","year":"2019","unstructured":"Lin, B., Wu, W., & Song, M. (2019). Industry 4.0: Driving factors and impacts on firm\u2019s performance: An empirical study on China\u2019s manufacturing industry. Annals of Operations Research,. https:\/\/doi.org\/10.1007\/s10479-019-03433-6.","journal-title":"Annals of Operations Research"},{"issue":"15\u201316","key":"3526_CR43","first-page":"4854","volume":"57","author":"Y Liu","year":"2018","unstructured":"Liu, Y., Wang, L., Wang, X. V., Xu, L., & Zhang, L. (2018). Scheduling in cloud manufacturing: State-of-the-art and research challenges. International Journal of Production Research, 57(15\u201316), 4854\u20134879.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"3526_CR44","doi-asserted-by":"crossref","first-page":"50","DOI":"10.1504\/EJIE.2008.016329","volume":"2","author":"A Lusa","year":"2008","unstructured":"Lusa, A. (2008). A survey of the literature on the multiple or parallel assembly line balancing problem. European Journal of Industrial Engineering, 2(1), 50\u201372.","journal-title":"European Journal of Industrial Engineering"},{"issue":"6","key":"3526_CR45","doi-asserted-by":"publisher","first-page":"475","DOI":"10.1080\/09537287.2011.633576","volume":"24","author":"A Lyons","year":"2013","unstructured":"Lyons, A., Vidamour, K., Jain, R., & Sutherland, M. (2013). Developing an understanding of lean thinking in process industries. Production Planning & Control, 24(6), 475\u201394. https:\/\/doi.org\/10.1080\/09537287.2011.633576.","journal-title":"Production Planning & Control"},{"issue":"2","key":"3526_CR46","doi-asserted-by":"crossref","first-page":"621","DOI":"10.1016\/j.cirp.2016.06.005","volume":"65","author":"L Monostori","year":"2016","unstructured":"Monostori, L., Kadar, B., Bauernhansl, T., Kondoh, S., Kumara, S., Reinhart, G., et al. (2016). Cyber-physical systems in manufacturing. Cirp Annals, 65(2), 621\u2013662.","journal-title":"Cirp Annals"},{"issue":"1","key":"3526_CR47","doi-asserted-by":"publisher","first-page":"83","DOI":"10.1007\/s11740-017-0784-x","volume":"12","author":"S Mosallaeipour","year":"2018","unstructured":"Mosallaeipour, S., Nejad, M. G., Shavarani, S. M., & Nazerian, R. (2018). Mobile robot scheduling for cycle time optimization in flow-shop cells, a case study. Production Engineering, 12(1), 83\u201394. https:\/\/doi.org\/10.1007\/s11740-017-0784-x.","journal-title":"Production Engineering"},{"issue":"5","key":"3526_CR48","doi-asserted-by":"publisher","first-page":"1171","DOI":"10.1007\/s10845-015-1072-2","volume":"28","author":"I Nielsen","year":"2017","unstructured":"Nielsen, I., Dang, Q. V., Bocewicz, G., & Banaszak, Z. (2017). A methodology for implementation of mobile robot in adaptive manufacturing environments. Journal of Intelligent Manufacturing, 28(5), 1171\u201388. https:\/\/doi.org\/10.1007\/s10845-015-1072-2.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"3526_CR49","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1016\/J.IJPE.2017.03.006","volume":"188","author":"S Noroozi","year":"2017","unstructured":"Noroozi, S., & Wikner, J. (2017). Sales and operations planning in the process industry: A literature review. International Journal of Production Economics, 188, 139\u201355. https:\/\/doi.org\/10.1016\/J.IJPE.2017.03.006.","journal-title":"International Journal of Production Economics"},{"key":"3526_CR50","volume-title":"Toyota production system: Beyond large-scale production","author":"T Ono","year":"1988","unstructured":"Ono, T. (1988). Toyota production system: Beyond large-scale production. Boca Raton: Productivity Press."},{"issue":"4","key":"3526_CR51","doi-asserted-by":"crossref","first-page":"344","DOI":"10.1504\/IJISM.2010.035642","volume":"5","author":"PK Palaniappan","year":"2010","unstructured":"Palaniappan, P. K., & Jawahar, N. (2010). Integration of procurement and production scheduling in flexible flow-line assembly. International Journal of Integrated Supply Management, 5(4), 344\u2013364.","journal-title":"International Journal of Integrated Supply Management"},{"key":"3526_CR52","doi-asserted-by":"crossref","first-page":"200","DOI":"10.1016\/j.arcontrol.2019.02.002","volume":"47","author":"H Panetto","year":"2019","unstructured":"Panetto, H., Iung, B., Ivanov, D., Weichhart, G., & Wang, X. (2019). Challenges for the cyber-physical manufacturing enterprises of the future. Annual Reviews in Control, 47, 200\u2013213.","journal-title":"Annual Reviews in Control"},{"issue":"6","key":"3526_CR53","doi-asserted-by":"crossref","first-page":"691","DOI":"10.1016\/j.dt.2018.06.004","volume":"14","author":"BK Patle","year":"2018","unstructured":"Patle, B. K., Pandey, A., Jagadeesh, A., & Parhi, D. R. (2018). Path planning in uncertain environment by using firefly algorithm. Defence Technology, 14(6), 691\u2013701.","journal-title":"Defence Technology"},{"key":"3526_CR54","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/j.procir.2016.08.005","volume":"52","author":"J Qin","year":"2016","unstructured":"Qin, J., Liu, Y., & Grosvenor, R. (2016). A categorical framework of manufacturing for industry 4.0 and beyond. Procedia CIRP, 52, 173\u2013181.","journal-title":"Procedia CIRP"},{"issue":"2","key":"3526_CR55","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1016\/S1367-5788(02)00027-5","volume":"26","author":"B Rekiek","year":"2002","unstructured":"Rekiek, B., Dolgui, A., Delchambre, A., & Bratcu, A. (2002). State of art of assembly lines design optimization. Annual Reviews in Control, 26(2), 163\u2013174.","journal-title":"Annual Reviews in Control"},{"key":"3526_CR56","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1016\/J.PROCIR.2016.05.067","volume":"54","author":"M Scholz","year":"2016","unstructured":"Scholz, M., Kreitlein, S., Lehmann, C., Bhner, J., Franke, J., & Steinhilper, R. (2016). Integrating intralogistics into resource efficiency oriented learning factories. Procedia CIRP, 54, 239\u2013283. https:\/\/doi.org\/10.1016\/J.PROCIR.2016.05.067.","journal-title":"Procedia CIRP"},{"issue":"3\u20134","key":"3526_CR57","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1007\/BF01324886","volume":"4","author":"SP Sethi","year":"1992","unstructured":"Sethi, S. P., Sriskandarajah, C., Sorger, G., Blazewicz, J., & Kubiak, W. (1992). Sequencing of parts and robot moves in a robotic cell. International Journal of Flexible Manufacturing Systems, 4(3\u20134), 331\u201358.","journal-title":"International Journal of Flexible Manufacturing Systems"},{"key":"3526_CR58","doi-asserted-by":"crossref","first-page":"905","DOI":"10.1016\/j.cie.2018.12.026","volume":"128","author":"N Shukla","year":"2019","unstructured":"Shukla, N., Tiwari, G. M., & Beydoun, G. (2019). Next generation smart manufacturing and service systems using big data analytics. Computers & Industrial Engineering, 128, 905\u2013910.","journal-title":"Computers & Industrial Engineering"},{"issue":"14","key":"3526_CR59","doi-asserted-by":"crossref","first-page":"3165","DOI":"10.1080\/00207540600844043","volume":"45","author":"RK Singh","year":"2007","unstructured":"Singh, R. K., Khilwani, N., & Tiwari, M. K. (2007). Justification for the selection of a reconfigurable manufacturing system: A fuzzy analytical hierarchy based approach. International Journal of Production Research, 45(14), 3165\u20133190.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"3526_CR60","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/s10479-013-1418-0","volume":"231","author":"JM Smith","year":"2015","unstructured":"Smith, J. M. (2015). Optimal workload allocation in closed queueing networks with state dependent queues. Annals of Operations Research, 231(1), 157\u2013183.","journal-title":"Annals of Operations Research"},{"key":"3526_CR61","volume-title":"Manufacturing facilities: Location, planning, and design","author":"DR Sule","year":"2009","unstructured":"Sule, D. R. (2009). Manufacturing facilities: Location, planning, and design. Boca Raton: CRC Press."},{"issue":"1","key":"3526_CR62","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1007\/s10479-015-2034-y","volume":"240","author":"EG Talbi","year":"2016","unstructured":"Talbi, E. G. (2016). Combining metaheuristics with mathematical programming, constraint programming and machine learning. Annals of Operations Research, 240(1), 171\u2013215.","journal-title":"Annals of Operations Research"},{"key":"3526_CR63","doi-asserted-by":"publisher","first-page":"12","DOI":"10.1016\/J.PROCIR.2016.07.041","volume":"52","author":"L Thames","year":"2016","unstructured":"Thames, L., & Schaefer, D. (2016). Software-defined cloud manufacturing for Industry 4.0. Procedia CIRP, 52, 12\u201317. https:\/\/doi.org\/10.1016\/J.PROCIR.2016.07.041.","journal-title":"Procedia CIRP"},{"key":"3526_CR64","volume-title":"Facilities planning","author":"JA Tompkins","year":"2010","unstructured":"Tompkins, J. A. (2010). Facilities planning. New York: Wiley."},{"issue":"6\u20138","key":"3526_CR65","doi-asserted-by":"crossref","first-page":"887","DOI":"10.1108\/IJOPM-01-2019-0025","volume":"39","author":"SF Wamba","year":"2019","unstructured":"Wamba, S. F., & Akter, S. (2019). Understanding supply chain analytics capabilities and agility for data-rich environments. International Journal of Operations & Production Management, 39(6\u20138), 887\u2013912.","journal-title":"International Journal of Operations & Production Management"},{"key":"3526_CR66","doi-asserted-by":"crossref","first-page":"234","DOI":"10.1016\/j.ijpe.2014.12.031","volume":"165","author":"SF Wamba","year":"2015","unstructured":"Wamba, S. F., Akter, S., Edwards, A., Chopin, G., & Gnanzou, D. (2015). How big data can make big impact: Findings from a systematic review and a longitudinal case study. International Journal of Production Economics, 165, 234\u2013246.","journal-title":"International Journal of Production Economics"},{"issue":"1\u20132","key":"3526_CR67","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s10479-018-3024-7","volume":"270","author":"SF Wamba","year":"2018","unstructured":"Wamba, S. F., Gunasekaran, A., Dubey, R., & Ngai, E. W. (2018). Big data analytics in operations and supply chain management. Annals of Operations Research, 270(1\u20132), 1\u20134. https:\/\/doi.org\/10.1007\/s10479-018-3024-7.","journal-title":"Annals of Operations Research"},{"issue":"1","key":"3526_CR68","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1108\/IJOPM-07-2016-0414","volume":"37","author":"SF Wamba","year":"2017","unstructured":"Wamba, S. F., Ngai, E. W. T., Riggins, F., & Akter, S. (2017). Transforming operations and production management using big data and business analytics: Future research directions. International Journal of Operations & Production Management, 37(1), 2\u20139.","journal-title":"International Journal of Operations & Production Management"},{"issue":"7","key":"3526_CR69","doi-asserted-by":"crossref","first-page":"1133","DOI":"10.1243\/09544054JEM1690","volume":"224","author":"J Wan","year":"2010","unstructured":"Wan, J., Li, D., He-Hua, Y., & Zhang, P. (2010). Fuzzy feedback scheduling algorithm based on central processing unit utilization for a software-based computer numerical control system. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 224(7), 1133\u20131176.","journal-title":"Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture"},{"key":"3526_CR70","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1016\/j.comnet.2015.12.017","volume":"101","author":"S Wang","year":"2016","unstructured":"Wang, S., Wan, J., Zhang, D., Li, D., & Zhang, C. (2016). Towards smart factory for industry 4.0: A self-organized multi-agent system with big data based feedback and coordination. Computer Networks, 101, 158\u201368.","journal-title":"Computer Networks"},{"issue":"1","key":"3526_CR71","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1016\/j.rcim.2011.07.002","volume":"28","author":"X Xu","year":"2012","unstructured":"Xu, X. (2012). From cloud computing to cloud manufacturing. Robotics Computer-Integrated Manufacturing, 28(1), 75\u201386.","journal-title":"Robotics Computer-Integrated Manufacturing"},{"issue":"8","key":"3526_CR72","doi-asserted-by":"crossref","first-page":"2941","DOI":"10.1080\/00207543.2018.1444806","volume":"56","author":"L Xu","year":"2018","unstructured":"Xu, L., Xu, E. L., & Li, L. (2018). Industry 4.0: State of the art and future trends. International Journal of Production Research, 56(8), 2941\u201362.","journal-title":"International Journal of Production Research"},{"issue":"1\u20132","key":"3526_CR73","doi-asserted-by":"crossref","first-page":"848","DOI":"10.1080\/00207543.2017.1403664","volume":"56","author":"Y Yin","year":"2018","unstructured":"Yin, Y., Stecke, K. E., & Li, D. (2018). The evolution of production systems from Industry 2.0 through Industry 4.0. International Journal of Production Research, 56(1\u20132), 848\u2013861.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"3526_CR74","doi-asserted-by":"publisher","first-page":"965","DOI":"10.1108\/IJQRM-11-2016-0202","volume":"35","author":"I Zennaro","year":"2018","unstructured":"Zennaro, I., Battini, D., Sgarbossa, F., Persona, A., & Marchi, R. D. (2018). Micro downtime: Data collection, analysis and impact on OEE in bottling lines the San Benedetto case study. International Journal of Quality & Reliability Management, 35(4), 965\u201395. https:\/\/doi.org\/10.1108\/IJQRM-11-2016-0202.","journal-title":"International Journal of Quality & Reliability Management"},{"issue":"2\u20133","key":"3526_CR75","doi-asserted-by":"crossref","first-page":"214","DOI":"10.1504\/IJIR.2017.088743","volume":"4","author":"L Zschorn","year":"2017","unstructured":"Zschorn, L., M\u00fcller, S., & Ivanov, D. (2017). Capacity planning on key work stations in a hybrid MTO-ETO production system: A case-study on Siemens AG. International Journal of Inventory Research, 4(2\u20133), 214\u2013232.","journal-title":"International Journal of Inventory Research"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-020-03526-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-020-03526-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-020-03526-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,3]],"date-time":"2022-01-03T14:13:53Z","timestamp":1641219233000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-020-03526-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,2,7]]},"references-count":75,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2022,1]]}},"alternative-id":["3526"],"URL":"https:\/\/doi.org\/10.1007\/s10479-020-03526-7","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,2,7]]},"assertion":[{"value":"7 February 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}