{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,23]],"date-time":"2026-01-23T17:07:02Z","timestamp":1769188022050,"version":"3.49.0"},"reference-count":54,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2020,2,18]],"date-time":"2020-02-18T00:00:00Z","timestamp":1581984000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,2,18]],"date-time":"2020-02-18T00:00:00Z","timestamp":1581984000000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2020,5]]},"DOI":"10.1007\/s10479-020-03538-3","type":"journal-article","created":{"date-parts":[[2020,2,18]],"date-time":"2020-02-18T08:04:27Z","timestamp":1582013067000},"page":"331-361","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["Modeling and heuristics for production time crashing in supply chain network design"],"prefix":"10.1007","volume":"288","author":[{"given":"Yi","family":"Liao","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0003-0698-0022","authenticated-orcid":false,"given":"Ali","family":"Diabat","sequence":"additional","affiliation":[]},{"given":"Chaher","family":"Alzaman","sequence":"additional","affiliation":[]},{"given":"Yiqiang","family":"Zhang","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2020,2,18]]},"reference":[{"key":"3538_CR1","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1016\/j.ijpe.2018.06.004","volume":"203","author":"C Alzaman","year":"2018","unstructured":"Alzaman, C., Zhang, Z. H., & Diabat, A. (2018). Supply chain network design with direct and indirect production costs: Hybrid gradient and local search based heuristics. International Journal of Production Economics,203, 203\u2013215.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"3538_CR2","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1287\/inte.25.1.69","volume":"25","author":"BC Arntzen","year":"1995","unstructured":"Arntzen, B. C., Brown, G. G., Harrison, T. P., & Trafton, L. L. (1995). Global supply chain management at digital equipment corporation. Interfaces,25(1), 69\u201393.","journal-title":"Interfaces"},{"key":"3538_CR3","doi-asserted-by":"crossref","first-page":"694","DOI":"10.1016\/j.jclepro.2015.09.038","volume":"147","author":"R Babazadeh","year":"2017","unstructured":"Babazadeh, R., Razmi, J., Rabbani, M., & Pishvaee, M. S. (2017). An integrated data envelopment analysis\u2013mathematical programming approach to strategic biodiesel supply chain network design problem. Journal of Cleaner Production,147, 694\u2013707.","journal-title":"Journal of Cleaner Production"},{"key":"3538_CR4","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.tre.2017.06.012","volume":"105","author":"H Badria","year":"2017","unstructured":"Badria, H., Ghomia, S. F., & Hejazib, T. H. (2017). A two-stage stochastic programming approach for value-based closed-loop supply chain network design. Transportation Research Part E,105, 1\u201317.","journal-title":"Transportation Research Part E"},{"key":"3538_CR5","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1016\/S0925-5273(98)00079-6","volume":"55","author":"BM Beamon","year":"1998","unstructured":"Beamon, B. M. (1998). Supply chain design and analysis: Models and methods. International Journal of Production Economics,55, 281\u2013294.","journal-title":"International Journal of Production Economics"},{"key":"3538_CR6","first-page":"1991","volume-title":"Time-based competition: The next battle ground in American manufacturing","author":"JD Blackburn","year":"1991","unstructured":"Blackburn, J. D. (1991). Time-based competition: The next battle ground in American manufacturing (p. 1991). Homewood: Business One Irwin."},{"issue":"3","key":"3538_CR7","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/S0925-5273(02)00260-8","volume":"80","author":"A Cakravastia","year":"2002","unstructured":"Cakravastia, A., Toha, I. S., & Nakamura, N. (2002). A two-stage model for the design of supply chain networks. International Journal of Production Economics,80(3), 231\u2013248.","journal-title":"International Journal of Production Economics"},{"key":"3538_CR8","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/j.jclepro.2015.02.063","volume":"110","author":"S Coskun","year":"2016","unstructured":"Coskun, S., Ozgur, L., Polat, O., & Gungor, A. (2016). A model proposal for green supply chain network design based on consumer segmentation. Journal of Cleaner Production,110, 149\u2013157.","journal-title":"Journal of Cleaner Production"},{"issue":"7","key":"3538_CR9","doi-asserted-by":"crossref","first-page":"1577","DOI":"10.1007\/s11590-015-0950-z","volume":"10","author":"A Diabat","year":"2016","unstructured":"Diabat, A. (2016). A capacitated facility location and inventory management problem with single sourcing. Optimization Letters,10(7), 1577\u20131592.","journal-title":"Optimization Letters"},{"key":"3538_CR10","doi-asserted-by":"crossref","first-page":"330","DOI":"10.1016\/j.ijpe.2014.12.004","volume":"164","author":"A Diabat","year":"2015","unstructured":"Diabat, A., & Al-Salem, M. (2015). An integrated supply chain problem with environmental considerations. International Journal of Production Economics,164, 330\u2013338.","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"3538_CR11","doi-asserted-by":"crossref","first-page":"526","DOI":"10.1016\/j.ejor.2013.02.026","volume":"228","author":"M Diaby","year":"2013","unstructured":"Diaby, M., Cruz, J. M., & Nsakanda, A. L. (2013). Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction. European Journal of Operational Research,228(3), 526\u2013535.","journal-title":"European Journal of Operational Research"},{"key":"3538_CR12","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1016\/j.compchemeng.2014.07.020","volume":"72","author":"V Dua","year":"2015","unstructured":"Dua, V. (2015). Mixed integer polynomial programming. Computers & Chemical Engineering,72, 387\u2013394.","journal-title":"Computers & Chemical Engineering"},{"issue":"2","key":"3538_CR13","doi-asserted-by":"crossref","first-page":"429","DOI":"10.1007\/s10479-013-1513-2","volume":"244","author":"M Esmaeilikia","year":"2016","unstructured":"Esmaeilikia, M., Fahimnia, B., Sarkis, J., Govindan, K., Kumar, A., & Mo, J. (2016). A tactical supply chain planning model with multiple flexibility options: An empirical evaluation. Annals of Operations Research,244(2), 429\u2013454.","journal-title":"Annals of Operations Research"},{"key":"3538_CR14","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/j.omega.2015.01.014","volume":"54","author":"B Fahimnia","year":"2015","unstructured":"Fahimnia, B., Sarkis, J., & Eshragh, A. (2015). A tradeoff model for green supply chain planning: A leanness-versus-greenness analysis. Omega,54, 173\u2013190.","journal-title":"Omega"},{"issue":"5","key":"3538_CR15","doi-asserted-by":"crossref","first-page":"822","DOI":"10.1287\/mnsc.20.5.822","volume":"29","author":"AM Geoffrion","year":"1974","unstructured":"Geoffrion, A. M., & Graves, G. (1974). Multi-commodity distribution system design by Benders decomposition. Management Science,29(5), 822\u2013844.","journal-title":"Management Science"},{"key":"3538_CR16","doi-asserted-by":"crossref","first-page":"680","DOI":"10.1016\/j.ijpe.2015.09.033","volume":"183","author":"K Govindan","year":"2017","unstructured":"Govindan, K., & Fattahi, M. (2017). Investigating risk and robustness measures for supply chain network design under demand uncertainty: A case study of glass supply chain. International Journal of Production Economics,183, 680\u2013699.","journal-title":"International Journal of Production Economics"},{"key":"3538_CR17","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1016\/j.ijpe.2013.12.028","volume":"152","author":"K Govindan","year":"2014","unstructured":"Govindan, K., Jafarian, A., Khodaverdi, R., & Devika, K. (2014). Two-echelon multiple-vehicle location\u2013routing problem with time windows for optimization of sustainable supply chain network of perishable food. International Journal of Production Economics,152, 9\u201328.","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"3538_CR18","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1023\/A:1021039126272","volume":"3","author":"IE Grossmann","year":"2002","unstructured":"Grossmann, I. E. (2002). Review of nonlinear mixed-integer and disjunctive programming techniques. Optimization and engineering,3(3), 227\u2013252.","journal-title":"Optimization and engineering"},{"issue":"9","key":"3538_CR19","doi-asserted-by":"crossref","first-page":"2760","DOI":"10.1080\/00207543.2012.738942","volume":"51","author":"R Hammami","year":"2013","unstructured":"Hammami, R., & Frein, Y. (2013). An optimisation model for the design of global multi-echelon supply chains under lead time constraints. International Journal of Production Research,51(9), 2760\u20132775.","journal-title":"International Journal of Production Research"},{"issue":"5","key":"3538_CR20","doi-asserted-by":"crossref","first-page":"1596","DOI":"10.1080\/00207543.2014.965349","volume":"53","author":"A Hasani","year":"2015","unstructured":"Hasani, A., Zegordi, S. H., & Nikbakhsh, E. (2015). Robust closed-loop global supply chain network design under uncertainty: The case of the medical device industry. International Journal of Production Research,53(5), 1596\u20131624.","journal-title":"International Journal of Production Research"},{"key":"3538_CR21","unstructured":"Hillier, F. S., & Lieberman, G. J. (1995). Introduction to mathematical programming. McGraw-Hill."},{"key":"3538_CR22","volume-title":"Adaptation in natural and artificial systems","author":"JH Holland","year":"1975","unstructured":"Holland, J. H. (1975). Adaptation in natural and artificial systems. Ann Arbor: University of Michigan Press."},{"issue":"2","key":"3538_CR23","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1016\/j.ijpe.2005.02.012","volume":"102","author":"MA Hoque","year":"2006","unstructured":"Hoque, M. A., & Goyal, S. K. (2006). A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer. International Journal of Production Economics,102(2), 217\u2013225.","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"3538_CR24","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1016\/S0377-2217(02)00153-4","volume":"144","author":"V Jayaraman","year":"2003","unstructured":"Jayaraman, V., & Ross, A. (2003). A simulated annealing methodology to distribution network design and management. European Journal of Operational Research,144(3), 629\u2013645.","journal-title":"European Journal of Operational Research"},{"key":"3538_CR25","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1016\/j.tre.2015.10.006","volume":"84","author":"M Jian","year":"2015","unstructured":"Jian, M., Fang, X., Jin, L. Q., & Rajapov, A. (2015). The impact of lead time compression on demand forecasting risk and production cost: A newsvendor model. Transportation Research Part E: Logistics and Transportation Review,84, 61\u201372.","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"key":"3538_CR26","doi-asserted-by":"crossref","unstructured":"Katayama, K., & Narihisa, H. (2001). On fundamental design of parthenogenetic algorithm for the binary quadratic programming problem. In Proceedings of the 2001 Congress on evolutionary computation (Vol. 1, pp. 356\u2013363). IEEE.","DOI":"10.1109\/CEC.2001.934412"},{"key":"3538_CR58","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1016\/S0377-2217(00)00242-3","volume":"134","author":"K Kattayama","year":"2001","unstructured":"Kattayama, K., & Narihisa, H. (2001). Performance of simulated annealing-based heuristic for the unconstrained binary quadratic programming problem. European Journal of Operational Research, 134, 103\u2013119.","journal-title":"European Journal of Operational Research"},{"key":"3538_CR27","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1016\/j.cor.2015.07.005","volume":"65","author":"O Kaya","year":"2016","unstructured":"Kaya, O., & Urek, B. (2016). A mixed integer nonlinear programming model and heuristic solutions for location, inventory and pricing decisions in a closed loop supply chain. Computers & Operations Research,65, 93\u2013103.","journal-title":"Computers & Operations Research"},{"issue":"1","key":"3538_CR28","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1016\/j.ejor.2015.08.028","volume":"249","author":"E Keyvanshokooh","year":"2016","unstructured":"Keyvanshokooh, E., Ryan, S. M., & Kabir, E. (2016). Hybrid robust and stochastic optimization for closed-loop supply chain network design using accelerated Benders decomposition. European Journal of Operational Research,249(1), 76\u201392.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"3538_CR30","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1137\/S003614450242889","volume":"45","author":"TG Kolda","year":"2003","unstructured":"Kolda, T. G., Lewis, R. M., & Torczon, V. (2003). Optimization by direct search: New perspectives on some classical and modern methods. SIAM Review,45(3), 385\u2013482.","journal-title":"SIAM Review"},{"issue":"4","key":"3538_CR31","doi-asserted-by":"crossref","first-page":"1026","DOI":"10.1287\/mnsc.2015.2380","volume":"63","author":"MK Lim","year":"2016","unstructured":"Lim, M. K., Mak, H. Y., & Shen, Z. J. M. (2016). Agility and proximity considerations in supply chain design. Management Science,63(4), 1026\u20131041.","journal-title":"Management Science"},{"issue":"24","key":"3538_CR32","doi-asserted-by":"crossref","first-page":"6311","DOI":"10.1021\/acs.iecr.5b00349","volume":"54","author":"P Longinidis","year":"2015","unstructured":"Longinidis, P., Georgiadis, M. C., & Kozanidis, G. (2015). Integrating operational hedging of exchange rate risk in the optimal design of global supply chain networks. Industrial and Engineering Chemistry Research,54(24), 6311\u20136325.","journal-title":"Industrial and Engineering Chemistry Research"},{"issue":"1","key":"3538_CR34","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1504\/IJOR.2016.073252","volume":"25","author":"SK Mangla","year":"2016","unstructured":"Mangla, S. K., Kumar, P., & Barua, M. K. (2016). An integrated methodology of FTA and fuzzy AHP for risk assessment in green supply chain. International Journal of Operational Research,25(1), 77\u201399.","journal-title":"International Journal of Operational Research"},{"key":"3538_CR35","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1016\/j.ijpe.2015.04.016","volume":"166","author":"JMC Marti","year":"2015","unstructured":"Marti, J. M. C., Tancrez, J. S., & Seifert, R. W. (2015). Carbon footprint and responsiveness trade-offs in supply chain network design. International Journal of Production Economics,166, 129\u2013142.","journal-title":"International Journal of Production Economics"},{"key":"3538_CR36","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1023\/A:1017912624016","volume":"8","author":"P Merz","year":"2002","unstructured":"Merz, P., & Freisleben, B. (2002). Greedy and local search heuristics for unconstrained binary quadratic programming. Journal of Heuristics,8, 197\u2013213.","journal-title":"Journal of Heuristics"},{"key":"3538_CR37","volume-title":"Genetic algorithms\u2009+\u2009data structures\u2009=\u2009evolution programs","author":"Z Michalewicz","year":"1996","unstructured":"Michalewicz, Z. (1996). Genetic algorithms\u2009+\u2009data structures\u2009=\u2009evolution programs. New York: Springer."},{"issue":"1","key":"3538_CR38","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1080\/00207543.2016.1198504","volume":"55","author":"KJ Mizgier","year":"2017","unstructured":"Mizgier, K. J. (2017). Global sensitivity analysis and aggregation of risk in multi-product supply chain networks. International Journal of Production Research,55(1), 130\u2013144.","journal-title":"International Journal of Production Research"},{"key":"3538_CR57","unstructured":"Mohri, M., Rostamizadeh, A., & Talwalkar, A. (2018). Foundations of machine learning. MIT Press."},{"issue":"6","key":"3538_CR41","doi-asserted-by":"crossref","first-page":"969","DOI":"10.1016\/j.omega.2012.12.004","volume":"41","author":"F Pan","year":"2013","unstructured":"Pan, F., & Nagi, R. (2013). Multi-echelon supply chain network design in agile manufacturing. Omega,41(6), 969\u2013983.","journal-title":"Omega"},{"issue":"1","key":"3538_CR42","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1007\/s10479-013-1420-6","volume":"227","author":"K Petridis","year":"2015","unstructured":"Petridis, K. (2015). Optimal design of multi-echelon supply chain networks under normally distributed demand. Annals of Operations Research,227(1), 63\u201391.","journal-title":"Annals of Operations Research"},{"key":"3538_CR43","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/j.cie.2017.04.012","volume":"108","author":"T Pham","year":"2017","unstructured":"Pham, T., & Yenradee, P. (2017). Optimal supply chain network design with process network and BOM under uncertainties: A case study in toothbrush industry. Computers & Industrial Engineering,108, 177\u2013191.","journal-title":"Computers & Industrial Engineering"},{"issue":"20","key":"3538_CR44","doi-asserted-by":"crossref","first-page":"2668","DOI":"10.1016\/j.fss.2010.04.010","volume":"161","author":"MS Pishvaee","year":"2010","unstructured":"Pishvaee, M. S., & Torabi, S. A. (2010). A possibilistic programming approach for closed-loop supply chain network design under uncertainty. Fuzzy Sets and Systems,161(20), 2668\u20132683.","journal-title":"Fuzzy Sets and Systems"},{"key":"3538_CR45","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1108\/13552510810861950","volume":"14","author":"A Ramudhin","year":"2008","unstructured":"Ramudhin, A., Alzaman, C., & Bulgak, A. (2008). Incorporating the cost of quality in supply chain design. Journal of Quality in Maintenance Engineering,14, 71\u201386.","journal-title":"Journal of Quality in Maintenance Engineering"},{"issue":"3","key":"3538_CR46","doi-asserted-by":"crossref","first-page":"1017","DOI":"10.1016\/j.ejor.2016.11.041","volume":"259","author":"S Rezapour","year":"2017","unstructured":"Rezapour, S., Farahani, R. Z., & Pourakbar, M. (2017). Resilient supply chain network design under competition: A case study. European Journal of Operational Research,259(3), 1017\u20131035.","journal-title":"European Journal of Operational Research"},{"issue":"7","key":"3538_CR47","doi-asserted-by":"crossref","first-page":"1345","DOI":"10.1016\/j.cor.2011.08.003","volume":"39","author":"H Sadjady","year":"2012","unstructured":"Sadjady, H., & Davoudpour, H. (2012). Two-echelon, multi-commodity supply chain network design with mode selection, lead-times and inventory costs. Computers & Operations Research,39(7), 1345\u20131354.","journal-title":"Computers & Operations Research"},{"issue":"1","key":"3538_CR48","doi-asserted-by":"crossref","first-page":"96","DOI":"10.1016\/j.ejor.2004.01.046","volume":"167","author":"T Santos","year":"2005","unstructured":"Santos, T., Ahmed, S., Goetschalckx, M., & Shapiro, A. (2005). A stochastic programming approach for supply chain network design under uncertainty. European Journal of Operational Research,167(1), 96\u2013115.","journal-title":"European Journal of Operational Research"},{"key":"3538_CR49","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/j.cor.2014.08.010","volume":"54","author":"K Sarrafha","year":"2015","unstructured":"Sarrafha, K., Rahmati, S. H. A., Niaki, S. T. A., & Zaretalab, A. (2015). A bi-objective integrated procurement, production, and distribution problem of a multi-echelon supply chain network design: A new tuned MOEA. Computers & Operations Research,54, 35\u201351.","journal-title":"Computers & Operations Research"},{"key":"3538_CR56","volume-title":"Operations research","author":"NH Shah","year":"2007","unstructured":"Shah, N. H., Gor, R. M., & Soni, H. (2007). Operations research. New Delhi: PHI Learning Pvt. Ltd."},{"key":"3538_CR50","unstructured":"Stevenson, W. J., Hojati, M., & Cao, J. (2007). Operations management. McGraw-Hill Irwin."},{"issue":"1","key":"3538_CR51","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1108\/13598549610799040","volume":"1","author":"DR Towill","year":"1996","unstructured":"Towill, D. R. (1996). Time compression and supply chain management\u2014A guided tour. Supply Chain Management: An International Journal,1(1), 15\u201327.","journal-title":"Supply Chain Management: An International Journal"},{"key":"3538_CR52","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1016\/j.ijpe.2015.08.020","volume":"170","author":"B Vahdani","year":"2015","unstructured":"Vahdani, B., & Mohammadi, M. (2015). A bi-objective interval-stochastic robust optimization model for designing closed loop supply chain network with multi-priority queuing system. International Journal of Production Economics,170, 67\u201387.","journal-title":"International Journal of Production Economics"},{"key":"3538_CR53","doi-asserted-by":"crossref","first-page":"236","DOI":"10.1016\/j.omega.2015.11.009","volume":"66","author":"M Varsei","year":"2017","unstructured":"Varsei, M., & Polyakovskiy, S. (2017). Sustainable supply chain network design: A case of the wine industry in Australia. Omega,66, 236\u2013247.","journal-title":"Omega"},{"issue":"5","key":"3538_CR54","doi-asserted-by":"crossref","first-page":"802","DOI":"10.1016\/j.mcm.2009.10.014","volume":"51","author":"MF Yang","year":"2010","unstructured":"Yang, M. F. (2010). Supply chain integrated inventory model with present value and dependent crashing cost is polynomial. Mathematical and Computer Modelling,51(5), 802\u2013809.","journal-title":"Mathematical and Computer Modelling"},{"issue":"4","key":"3538_CR55","doi-asserted-by":"crossref","first-page":"661","DOI":"10.1111\/deci.12160","volume":"47","author":"H Yildiz","year":"2016","unstructured":"Yildiz, H., Yoon, J., Talluri, S., & Ho, W. (2016). Reliable supply chain network design. Decision Sciences,47(4), 661\u2013698.","journal-title":"Decision Sciences"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-020-03538-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10479-020-03538-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-020-03538-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,2,19]],"date-time":"2021-02-19T05:43:19Z","timestamp":1613713399000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10479-020-03538-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,2,18]]},"references-count":54,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2020,5]]}},"alternative-id":["3538"],"URL":"https:\/\/doi.org\/10.1007\/s10479-020-03538-3","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,2,18]]},"assertion":[{"value":"18 February 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}