{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,20]],"date-time":"2025-11-20T12:48:00Z","timestamp":1763642880231,"version":"3.37.3"},"reference-count":40,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2020,5,19]],"date-time":"2020-05-19T00:00:00Z","timestamp":1589846400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,5,19]],"date-time":"2020-05-19T00:00:00Z","timestamp":1589846400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2022,8]]},"DOI":"10.1007\/s10479-020-03627-3","type":"journal-article","created":{"date-parts":[[2020,5,18]],"date-time":"2020-05-18T23:15:59Z","timestamp":1589843759000},"page":"867-898","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Locomotive assignment problem: integrating the strategic, tactical and operational level aspects"],"prefix":"10.1007","volume":"315","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-9410-178X","authenticated-orcid":false,"given":"Prashant","family":"Premkumar","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"P. N.","family":"Ram\u00a0Kumar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2020,5,19]]},"reference":[{"issue":"4","key":"3627_CR1","doi-asserted-by":"publisher","first-page":"503","DOI":"10.1287\/trsc.1050.0115","volume":"39","author":"RK Ahuja","year":"2005","unstructured":"Ahuja, R. K., Liu, J., Orlin, J. B., Sharma, D., & Shughart, L. A. (2005). Solving real-life locomotive-scheduling problems. Transportation Science, 39(4), 503\u2013517.","journal-title":"Transportation Science"},{"unstructured":"Ahuja, R. K., Shughart, L. A., Liu, J., & Vaidyanathan, B. (2006). An optimization-based approach for locomotive planning. Technical report. Gainesville, FL: Innovative Scheduling. http:\/\/citeseerx.ist.psu.edu\/viewdoc\/download.","key":"3627_CR2"},{"issue":"10","key":"3627_CR3","doi-asserted-by":"publisher","first-page":"1004","DOI":"10.1057\/palgrave.jors.2600802","volume":"50","author":"M Al-Amin","year":"1999","unstructured":"Al-Amin, M., Forbes, M. A., & Noble, D. H. (1999). Production of locomotive rosters for a multi-class single-locomotive problem. Journal of the Operational Research Society, 50(10), 1004\u20131010.","journal-title":"Journal of the Operational Research Society"},{"issue":"1","key":"3627_CR4","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1016\/0191-2615(80)90036-3","volume":"14","author":"AA Assad","year":"1980","unstructured":"Assad, A. A. (1980). Modelling of rail networks: Toward a routing\/makeup model. Transportation Research Part B: Methodological, 14(1), 101\u2013114.","journal-title":"Transportation Research Part B: Methodological"},{"unstructured":"Begegnungs und Forschungszentrum fur Informatik (IBFI), Zurich, Switzerland.","key":"3627_CR5"},{"issue":"10","key":"3627_CR6","doi-asserted-by":"publisher","first-page":"943","DOI":"10.1057\/jors.1980.170","volume":"31","author":"JMP Booler","year":"1980","unstructured":"Booler, J. M. P. (1980). The solution of a railway locomotive scheduling problem. Journal of the Operational Research Society, 31(10), 943\u2013948.","journal-title":"Journal of the Operational Research Society"},{"issue":"1","key":"3627_CR7","doi-asserted-by":"publisher","first-page":"123","DOI":"10.1057\/jors.1995.13","volume":"46","author":"JMP Booler","year":"1995","unstructured":"Booler, J. M. P. (1995a). A note on the use of Lagrangean relaxation in railway scheduling. Journal of the Operational Research Society, 46(1), 123\u2013127.","journal-title":"Journal of the Operational Research Society"},{"issue":"1","key":"3627_CR8","doi-asserted-by":"publisher","first-page":"123","DOI":"10.2307\/2583842","volume":"46","author":"JMP Booler","year":"1995","unstructured":"Booler, J. M. P. (1995b). A Note on the Use of Lagrangean Relaxation in Railway Scheduling. The Journal of the Operational Research Society, 46(1), 123\u2013127. https:\/\/doi.org\/10.2307\/2583842.","journal-title":"The Journal of the Operational Research Society"},{"issue":"8","key":"3627_CR9","doi-asserted-by":"publisher","first-page":"767","DOI":"10.1016\/S0191-2615(00)00022-9","volume":"35","author":"J-F Cordeau","year":"2001","unstructured":"Cordeau, J.-F., Desaulniers, G., Lingaya, N., Soumis, F., & Desrosiers, J. (2001a). Simultaneous locomotive and car assignment at VIA Rail Canada. Transportation Research Part B: Methodological, 35(8), 767\u2013787.","journal-title":"Transportation Research Part B: Methodological"},{"issue":"4","key":"3627_CR10","doi-asserted-by":"publisher","first-page":"531","DOI":"10.1287\/opre.49.4.531.11226","volume":"49","author":"J-F Cordeau","year":"2001","unstructured":"Cordeau, J.-F., Soumis, F., & Desrosiers, J. (2001b). Simultaneous assignment of locomotives and cars to passenger trains. Operations Research, 49(4), 531\u2013548.","journal-title":"Operations Research"},{"unstructured":"Electric Loco Maintenance Sheds. (2011, February 4). Retrieved June 15, 2017, from http:\/\/www.indianrailways.gov.in\/railwayboard\/view_section.jsp?lang=0&id=0, 1, 304, 366, 549, 687, 709.","key":"3627_CR11"},{"issue":"2","key":"3627_CR12","first-page":"121","volume":"14","author":"M Florian","year":"1976","unstructured":"Florian, M., Bushell, G., Ferland, J., Guerin, G., & Nastansky, L. (1976). The engine scheduling problem in a railway network. INFOR: Information Systems and Operational Research, 14(2), 121\u2013138.","journal-title":"INFOR: Information Systems and Operational Research"},{"issue":"4","key":"3627_CR13","doi-asserted-by":"publisher","first-page":"478","DOI":"10.1287\/trsc.1080.0248","volume":"42","author":"A Fugenschuh","year":"2008","unstructured":"Fugenschuh, A., Homfeld, H., Huck, A., Martin, A., & Yuan, Z. (2008). Scheduling locomotives and car transfers in freight transport. Transportation Science, 42(4), 478\u2013491.","journal-title":"Transportation Science"},{"issue":"2","key":"3627_CR14","first-page":"119","volume":"5","author":"SF Ghannadpour","year":"2017","unstructured":"Ghannadpour, S. F., & Zarrabi, A. (2017). The special application of vehicle routing problem with uncertainty travel times: Locomotive routing problem. International Journal of Transportation Engineereing, 5(2), 119\u2013136.","journal-title":"International Journal of Transportation Engineereing"},{"issue":"1","key":"3627_CR15","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1016\/j.asoc.2009.06.004","volume":"10","author":"K Ghoseiri","year":"2010","unstructured":"Ghoseiri, K., & Ghannadpour, S. F. (2010). A hybrid genetic algorithm for multi-depot homogenous locomotive assignment with time windows. Applied Soft Computing, 10(1), 53\u201365.","journal-title":"Applied Soft Computing"},{"key":"3627_CR16","doi-asserted-by":"publisher","first-page":"155","DOI":"10.1023\/A:1018988203220","volume":"76","author":"R Gopalan","year":"1998","unstructured":"Gopalan, R., & Talluri, K. T. (1998). Mathematical models in airline schedule planning: A survey. Annals of Operations Research, 76, 155\u2013185.","journal-title":"Annals of Operations Research"},{"issue":"11","key":"3627_CR17","doi-asserted-by":"publisher","first-page":"2153","DOI":"10.3923\/itj.2013.2153.2159","volume":"12","author":"SN Iie Zhang","year":"2013","unstructured":"Iie Zhang, S. N., Ge, L., & Wang, Y. (2013). A two-stage heuristic algorithm for locomotive scheduling. Information Technology Journal, 12(11), 2153\u20132159.","journal-title":"Information Technology Journal"},{"unstructured":"Ill\u00e9s, T., Makai, M., & Vaik, Z. (2005). Railway engine assignment models based on combinatorial and integer programming. Technical report 2005-04, Eovtos Lor\u00e1nd University of Sciences, Department of Operations Research.","key":"3627_CR18"},{"unstructured":"Ill\u00e9s, T., Makai, M., Vaik, Z., Kroon, L. G., & M\u00f6hring, R. H. (2006). Combinatorial optimization model for railway engine assignment problem. In L.G. Kroon, R.H. Mohring (Eds.) 5th workshop on algorithmic methods and models for optimization of railways. Internationales.","key":"3627_CR19"},{"unstructured":"Jaumard, B., & Tian, H. (2016). Multi-column generation model for the locomotive assignment problem. In OASIcs-open access series in informatics (Vol. 54).","key":"3627_CR20"},{"issue":"1","key":"3627_CR21","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.jrtpm.2018.02.001","volume":"8","author":"T Lid\u00e9n","year":"2018","unstructured":"Lid\u00e9n, T., Kalinowski, T., & Waterer, H. (2018). Resource considerations for integrated planning of railway traffic and maintenance windows. Journal of Rail Transport Planning and Management, 8(1), 1\u201315.","journal-title":"Journal of Rail Transport Planning and Management"},{"unstructured":"Lin, B. (2017). A short-term planning model for high-speed train assignment and maintenance scheduling. Preprint arXiv:1709.04324.","key":"3627_CR22"},{"unstructured":"Locomotive Links & Coach Composition Database (Beta). (2014, March 10). Retrieved December 15, 2015, from https:\/\/www.irfca.org\/apps\/locolinks\/list.","key":"3627_CR23"},{"issue":"2","key":"3627_CR24","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1287\/trsc.37.2.183.15251","volume":"37","author":"ME L\u00fcbbecke","year":"2003","unstructured":"L\u00fcbbecke, M. E., & Zimmermann, U. T. (2003). Engine routing and scheduling at industrial in-plant railroads. Transportation Science, 37(2), 183\u2013197.","journal-title":"Transportation Science"},{"issue":"1\u20132","key":"3627_CR25","doi-asserted-by":"publisher","first-page":"425","DOI":"10.1007\/s10479-018-2933-9","volume":"274","author":"JD Maywald","year":"2019","unstructured":"Maywald, J. D., Reiman, A. D., Overstreet, R. E., & Johnson, A. W. (2019). Aircraft selection modeling: A multi-step heuristic to enumerate airlift alternatives. Annals of Operations Research, 274(1\u20132), 425\u2013445.","journal-title":"Annals of Operations Research"},{"issue":"11","key":"3627_CR26","doi-asserted-by":"publisher","first-page":"1191","DOI":"10.1057\/palgrave.jors.2601210","volume":"52","author":"DH Noble","year":"2001","unstructured":"Noble, D. H., Al-Amin, M., & Mills, R. G. J. (2001). Production of locomotive rosters for a multi-class multi-locomotive problem. Journal of the Operational Research Society, 52(11), 1191\u20131200.","journal-title":"Journal of the Operational Research Society"},{"issue":"1","key":"3627_CR27","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1186\/2251-712X-8-9","volume":"8","author":"S Noori","year":"2012","unstructured":"Noori, S., & Ghannadpour, S. F. (2012). Locomotive assignment problem with train precedence using genetic algorithm. Journal of Industrial Engineering International, 8(1), 1\u201313.","journal-title":"Journal of Industrial Engineering International"},{"key":"3627_CR28","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1016\/j.tre.2015.07.003","volume":"82","author":"F Piu","year":"2015","unstructured":"Piu, F., Kumar, V. P., Bierlaire, M., & Speranza, M. G. (2015). Introducing a preliminary consists selection in the locomotive assignment problem. Transportation Research Part E: Logistics and Transportation Review, 82, 217\u2013237.","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"issue":"3","key":"3627_CR29","doi-asserted-by":"publisher","first-page":"327","DOI":"10.1111\/itor.12062","volume":"21","author":"F Piu","year":"2014","unstructured":"Piu, F., & Speranza, M. G. (2014). The locomotive assignment problem: A survey on optimization models. International Transactions in Operational Research, 21(3), 327\u2013352.","journal-title":"International Transactions in Operational Research"},{"unstructured":"Railways, I. (2015a). Evolution. Retrieved July 28, 2016, from http:\/\/www.indianrailways.gov.in\/railwayboard\/view_section.jsp?lang=0&id=0,1,261.","key":"3627_CR30"},{"unstructured":"Railways, I. (2015b). Statistical summary-Indian Railways. Retrieved July 28, 2016, from http:\/\/www.indianrailways.gov.in\/railwayboard\/uploads\/directorate\/stat_econ\/2014-15\/Summary Sheet_Eng.pdf.","key":"3627_CR31"},{"issue":"5","key":"3627_CR32","doi-asserted-by":"publisher","first-page":"404","DOI":"10.1016\/j.trb.2005.05.005","volume":"40","author":"S Rouillon","year":"2006","unstructured":"Rouillon, S., Desaulniers, G., & Soumis, F. (2006). An extended branch-and-bound method for locomotive assignment. Transportation Research Part B: Methodological, 40(5), 404\u2013423.","journal-title":"Transportation Research Part B: Methodological"},{"issue":"2","key":"3627_CR33","doi-asserted-by":"publisher","first-page":"486","DOI":"10.1590\/S0101-74382010000200013","volume":"30","author":"JA Sabino","year":"2010","unstructured":"Sabino, J. A., Leal, J. E., St\u00fctzle, T., & Birattari, M. (2010). A multi-objective ant colony optimization method applied to switch engine scheduling in railroad yards. Pesquisa Operacional, 30(2), 486\u2013514.","journal-title":"Pesquisa Operacional"},{"key":"3627_CR34","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1155\/2015\/583909","volume":"2015","author":"D Teichmann","year":"2015","unstructured":"Teichmann, D., Dorda, M., Golc, K., & Binov\u00e1, H. (2015). Locomotive assignment problem with heterogeneous vehicle fleet and hiring external locomotives. Mathematical Problems in Engineering, 2015, 7.","journal-title":"Mathematical Problems in Engineering"},{"issue":"4","key":"3627_CR35","doi-asserted-by":"publisher","first-page":"492","DOI":"10.1287\/trsc.1080.0244","volume":"42","author":"B Vaidyanathan","year":"2008","unstructured":"Vaidyanathan, B., Ahuja, R. K., & Orlin, J. B. (2008). The locomotive routing problem. Transportation Science, 42(4), 492\u2013507.","journal-title":"Transportation Science"},{"issue":"2","key":"3627_CR36","doi-asserted-by":"publisher","first-page":"187","DOI":"10.1057\/jors.1989.23","volume":"40","author":"MB Wright","year":"1989","unstructured":"Wright, M. B. (1989). Applying stochastic algorithms to a locomotive scheduling problem. Journal of the Operational Research Society, 40(2), 187\u2013192.","journal-title":"Journal of the Operational Research Society"},{"issue":"1\u20132","key":"3627_CR37","doi-asserted-by":"publisher","first-page":"477","DOI":"10.1007\/s10479-017-2740-8","volume":"264","author":"E Yak\u0131c\u0131","year":"2018","unstructured":"Yak\u0131c\u0131, E., Dell, R. F., Hartman, T., & McLemore, C. (2018). Daily aircraft routing for amphibious ready groups. Annals of Operations Research, 264(1\u20132), 477\u2013498.","journal-title":"Annals of Operations Research"},{"issue":"B1","key":"3627_CR38","first-page":"93","volume":"29","author":"K Ziarati","year":"2005","unstructured":"Ziarati, K., Chizari, H., & Nezhad, A. (2005). Locomotive optimization using artificial intelligence approach. Iranian Journal of Science & Technology, Transaction B, Engineering, 29(B1), 93\u2013105.","journal-title":"Iranian Journal of Science & Technology, Transaction B, Engineering"},{"issue":"2","key":"3627_CR39","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1016\/S0377-2217(96)00198-1","volume":"97","author":"K Ziarati","year":"1997","unstructured":"Ziarati, K., Soumis, F., Desrosiers, J., G\u00e9linas, S., & Saintonge, A. (1997). Locomotive assignment with heterogeneous consists at CN North America. European Journal of Operational Research, 97(2), 281\u2013292.","journal-title":"European Journal of Operational Research"},{"issue":"8","key":"3627_CR40","doi-asserted-by":"publisher","first-page":"1156","DOI":"10.1287\/mnsc.45.8.1156","volume":"45","author":"K Ziarati","year":"1999","unstructured":"Ziarati, K., Soumis, F., Desrosiers, J., & Solomon, M. M. (1999). A branch-first, cut-second approach for locomotive assignment. Management Science, 45(8), 1156\u20131168.","journal-title":"Management Science"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-020-03627-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-020-03627-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-020-03627-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,8,12]],"date-time":"2022-08-12T11:17:21Z","timestamp":1660303041000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-020-03627-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,5,19]]},"references-count":40,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2022,8]]}},"alternative-id":["3627"],"URL":"https:\/\/doi.org\/10.1007\/s10479-020-03627-3","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"type":"print","value":"0254-5330"},{"type":"electronic","value":"1572-9338"}],"subject":[],"published":{"date-parts":[[2020,5,19]]},"assertion":[{"value":"19 May 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"The authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}