{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,15]],"date-time":"2026-01-15T03:45:03Z","timestamp":1768448703312,"version":"3.49.0"},"reference-count":60,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2021,1,4]],"date-time":"2021-01-04T00:00:00Z","timestamp":1609718400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,1,4]],"date-time":"2021-01-04T00:00:00Z","timestamp":1609718400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2022,4]]},"DOI":"10.1007\/s10479-020-03904-1","type":"journal-article","created":{"date-parts":[[2021,1,4]],"date-time":"2021-01-04T04:15:53Z","timestamp":1609733753000},"page":"695-730","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":10,"title":["A stochastic programming model for an energy planning problem: formulation, solution method and application"],"prefix":"10.1007","volume":"311","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-2369-364X","authenticated-orcid":false,"given":"Chandra Ade","family":"Irawan","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5658-7056","authenticated-orcid":false,"given":"Peter S.","family":"Hofman","sequence":"additional","affiliation":[]},{"given":"Hing Kai","family":"Chan","sequence":"additional","affiliation":[]},{"given":"Antony","family":"Paulraj","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2021,1,4]]},"reference":[{"issue":"5","key":"3904_CR1","doi-asserted-by":"crossref","first-page":"3978","DOI":"10.3390\/en8053978","volume":"8","author":"L Ahmadi","year":"2015","unstructured":"Ahmadi, L., Elkamel, A., Abdul-Wahab, S. A., Pan, M., Croiset, E., Douglas, P. L., et al. (2015). Multi-period optimization model for electricity generation planning considering plug-in hybrid electric vehicle penetration. Energies, 8(5), 3978\u20134002.","journal-title":"Energies"},{"issue":"4","key":"3904_CR2","doi-asserted-by":"publisher","first-page":"1504","DOI":"10.1021\/ef101569q","volume":"25","author":"MS Ba-Shammakh","year":"2011","unstructured":"Ba-Shammakh, M. S. (2011). A multiperiod mathematical model for integrating planning and so2 mitigation in the power generation sector. Energy & Fuels, 25(4), 1504\u20131509. https:\/\/doi.org\/10.1021\/ef101569q.","journal-title":"Energy & Fuels"},{"key":"3904_CR3","doi-asserted-by":"crossref","first-page":"98","DOI":"10.1016\/j.epsr.2011.12.008","volume":"86","author":"GA Bakirtzis","year":"2012","unstructured":"Bakirtzis, G. A., Biskas, P. N., & Chatziathanasiou, V. (2012). Generation expansion planning by milp considering mid-term scheduling decisions. Electric Power Systems Research, 86, 98\u2013112.","journal-title":"Electric Power Systems Research"},{"key":"3904_CR4","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/j.enconman.2015.05.001","volume":"100","author":"A Betancourt-Torcat","year":"2015","unstructured":"Betancourt-Torcat, A., & Almansoori, A. (2015). Design multiperiod optimization model for the electricity sector under uncertainty\u2014A case study of the emirate of Abu Dhabi. Energy Conversion and Management, 100, 177\u2013190.","journal-title":"Energy Conversion and Management"},{"key":"3904_CR5","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4614-0237-4","volume-title":"Introduction to stochastic programming","author":"JR Birge","year":"2011","unstructured":"Birge, J. R., & Louveaux, F. (2011). Introduction to stochastic programming. Berlin: Springer."},{"key":"3904_CR6","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1016\/j.enbuild.2015.10.020","volume":"110","author":"EL Cano","year":"2016","unstructured":"Cano, E. L., Moguerza, J. M., & Alonso-Ayuso, A. (2016). A multi-stage stochastic optimization model for energy systems planning and risk management. Energy and Buildings, 110, 49\u201356.","journal-title":"Energy and Buildings"},{"key":"3904_CR7","doi-asserted-by":"crossref","first-page":"1333","DOI":"10.1016\/j.apenergy.2016.09.097","volume":"183","author":"H Chen","year":"2016","unstructured":"Chen, H., Tang, B. J., Liao, H., & Wei, Y. M. (2016). A multi-period power generation planning model incorporating the non-carbon external costs: A case study of China. Applied Energy, 183, 1333\u20131345.","journal-title":"Applied Energy"},{"key":"3904_CR8","doi-asserted-by":"publisher","first-page":"158","DOI":"10.1016\/j.eneco.2017.03.021","volume":"64","author":"OL Costa","year":"2017","unstructured":"Costa, O. L., de Oliveira Ribeiro, C., Rego, E. E., Stern, J. M., Parente, V., & Kileber, S. (2017). Robust portfolio optimization for electricity planning: An application based on the Brazilian electricity mix. Energy Economics, 64, 158\u2013169. https:\/\/doi.org\/10.1016\/j.eneco.2017.03.021.","journal-title":"Energy Economics"},{"issue":"12","key":"3904_CR9","doi-asserted-by":"crossref","first-page":"3168","DOI":"10.1002\/aic.11835","volume":"55","author":"A Elkamel","year":"2009","unstructured":"Elkamel, A., Hashim, H., Douglas, P. L., & Croiset, E. (2009). Optimization of energy usage for fleet-wide power generating system under carbon mitigation options. AIChE Journal, 55(12), 3168\u20133190.","journal-title":"AIChE Journal"},{"issue":"2","key":"3904_CR10","doi-asserted-by":"crossref","first-page":"610","DOI":"10.1002\/aic.15393","volume":"63","author":"M Elsholkami","year":"2017","unstructured":"Elsholkami, M., & Elkamel, A. (2017). General optimization model for the energy planning of industries including renewable energy: A case study on oil sands. AIChE Journal, 63(2), 610\u2013638.","journal-title":"AIChE Journal"},{"issue":"1","key":"3904_CR11","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1016\/j.cor.2012.05.005","volume":"40","author":"Y Feng","year":"2013","unstructured":"Feng, Y., & Ryan, S. M. (2013). Scenario construction and reduction applied to stochastic power generation expansion planning. Computers & Operations Research, 40(1), 9\u201323.","journal-title":"Computers & Operations Research"},{"key":"3904_CR12","doi-asserted-by":"crossref","first-page":"232","DOI":"10.1016\/j.epsr.2016.02.011","volume":"136","author":"A Flores-Quiroz","year":"2016","unstructured":"Flores-Quiroz, A., Palma-Behnke, R., Zakeri, G., & Moreno, R. (2016). A column generation approach for solving generation expansion planning problems with high renewable energy penetration. Electric Power Systems Research, 136, 232\u2013241.","journal-title":"Electric Power Systems Research"},{"issue":"1","key":"3904_CR13","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1109\/59.221258","volume":"8","author":"BG Gorenstin","year":"1993","unstructured":"Gorenstin, B. G., Campodonico, N. M., Costa, J. P., & Pereira, M. V. F. (1993). Power system expansion planning under uncertainty. IEEE Transactions on Power Systems, 8(1), 129\u2013136.","journal-title":"IEEE Transactions on Power Systems"},{"issue":"3","key":"3904_CR14","first-page":"296","volume":"1","author":"Y Haimes","year":"1971","unstructured":"Haimes, Y., Lasdon, L., & Wismer, D. (1971). On a bicriterion formulation of the problems of integrated system identification and system optimization. IEEE Transactions on Systems, Man, and Cybernetics SMC, 1(3), 296\u2013297.","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics SMC"},{"issue":"4","key":"3904_CR15","doi-asserted-by":"crossref","first-page":"879","DOI":"10.1021\/ie049766o","volume":"44","author":"H Hashim","year":"2005","unstructured":"Hashim, H., Douglas, P., Elkamel, A., & Croiset, E. (2005). Optimization model for energy planning with CO2 emission considerations. Industrial & Engineering Chemistry Research, 44(4), 879\u2013890.","journal-title":"Industrial & Engineering Chemistry Research"},{"issue":"1","key":"3904_CR16","doi-asserted-by":"crossref","first-page":"55","DOI":"10.3808\/jei.201400257","volume":"23","author":"Q Hu","year":"2014","unstructured":"Hu, Q., Huang, G. H., Cai, Y. P., & Sun, W. (2014). Planning of electric power generation systems under multiple uncertainties and constraint-violation levels. Journal of Environmental Informatics, 23(1), 55\u201364.","journal-title":"Journal of Environmental Informatics"},{"key":"3904_CR17","doi-asserted-by":"crossref","first-page":"760","DOI":"10.1016\/j.eneco.2019.02.013","volume":"80","author":"A Ioannou","year":"2019","unstructured":"Ioannou, A., Fuzuli, G., Brennan, F., Yudha, S. W., & Angus, A. (2019). Multi-stage stochastic optimization framework for power generation system planning integrating hybrid uncertainty modelling. Energy Economics, 80, 760\u2013776.","journal-title":"Energy Economics"},{"issue":"1","key":"3904_CR18","doi-asserted-by":"crossref","first-page":"238","DOI":"10.1016\/j.ejor.2011.03.012","volume":"213","author":"D Jones","year":"2011","unstructured":"Jones, D. (2011). A practical weight sensitivity algorithm for goal and multiple objective programming. European Journal of Operational Research, 213(1), 238\u2013245.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"3904_CR19","doi-asserted-by":"crossref","first-page":"466","DOI":"10.1109\/TPWRS.2004.840451","volume":"20","author":"S Kannan","year":"2005","unstructured":"Kannan, S., Slochanal, S. M. R., & Padhy, N. P. (2005). Application and comparison of metaheuristic techniques to generation expansion planning problem. IEEE Transactions on Power Systems, 20(1), 466\u2013475.","journal-title":"IEEE Transactions on Power Systems"},{"issue":"1","key":"3904_CR20","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1049\/iet-gtd:20050271","volume":"1","author":"S Kannan","year":"2007","unstructured":"Kannan, S., Raja Slochanal, S. M., Baskar, S., & Murugan, P. (2007). Application and comparison of metaheuristic techniques to generation expansion planning in the partially deregulated environment. IET Generation, Transmission Distribution, 1(1), 111\u2013118.","journal-title":"IET Generation, Transmission Distribution"},{"key":"3904_CR21","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-019-03430-9","author":"F Kaveh","year":"2019","unstructured":"Kaveh, F., Tavakkoli-Moghaddam, R., Triki, C., Rahimi, Y., & Jamili, A. (2019). A new bi-objective model of the urban public transportation hub network design under uncertainty. Annals of Operations Research,. https:\/\/doi.org\/10.1007\/s10479-019-03430-9.","journal-title":"Annals of Operations Research"},{"key":"3904_CR22","doi-asserted-by":"crossref","first-page":"456","DOI":"10.1016\/j.apenergy.2013.10.042","volume":"115","author":"NE Koltsaklis","year":"2014","unstructured":"Koltsaklis, N. E., Dagoumas, A. S., Kopanos, G. M., Pistikopoulos, E. N., & Georgiadis, M. C. (2014). A spatial multi-period long-term energy planning model: A case study of the greek power system. Applied Energy, 115, 456\u2013482.","journal-title":"Applied Energy"},{"key":"3904_CR23","doi-asserted-by":"crossref","unstructured":"Koltsaklis, N. E., & Georgiadis, M. C. (2015a). An integrated unit commitment and generation expansion planning model. In K. V. Gernaey, J. K. Huusom, & R. Gani (Eds.), 12th international symposium on process systems engineering and 25th European symposium on computer aided process engineering, computer aided chemical engineering (Vol. 37, pp. 2273\u20132278). Elsevier.","DOI":"10.1016\/B978-0-444-63576-1.50073-X"},{"key":"3904_CR24","doi-asserted-by":"crossref","first-page":"310","DOI":"10.1016\/j.apenergy.2015.08.054","volume":"158","author":"NE Koltsaklis","year":"2015","unstructured":"Koltsaklis, N. E., & Georgiadis, M. C. (2015b). A multi-period, multi-regional generation expansion planning model incorporating unit commitment constraints. Applied Energy, 158, 310\u2013331.","journal-title":"Applied Energy"},{"key":"3904_CR25","doi-asserted-by":"crossref","first-page":"1364","DOI":"10.1016\/j.apenergy.2017.08.040","volume":"205","author":"NE Koltsaklis","year":"2017","unstructured":"Koltsaklis, N. E., & Nazos, K. (2017). A stochastic milp energy planning model incorporating power market dynamics. Applied Energy, 205, 1364\u20131383.","journal-title":"Applied Energy"},{"issue":"10","key":"3904_CR26","doi-asserted-by":"crossref","first-page":"1809","DOI":"10.1016\/j.energy.2007.02.003","volume":"32","author":"P Krukanont","year":"2007","unstructured":"Krukanont, P., & Tezuka, T. (2007). Implications of capacity expansion under uncertainty and value of information: The near-term energy planning of Japan. Energy, 32(10), 1809\u20131824.","journal-title":"Energy"},{"issue":"3","key":"3904_CR27","doi-asserted-by":"crossref","first-page":"1037","DOI":"10.1016\/j.ejor.2018.05.039","volume":"271","author":"CL Lara","year":"2018","unstructured":"Lara, C. L., Mallapragada, D. S., Papageorgiou, D. J., Venkatesh, A., & Grossmann, I. E. (2018). Deterministic electric power infrastructure planning: Mixed-integer programming model and nested decomposition algorithm. European Journal of Operational Research, 271(3), 1037\u20131054.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"3904_CR28","doi-asserted-by":"crossref","first-page":"932","DOI":"10.1016\/j.ejor.2004.08.029","volume":"169","author":"M Laumanns","year":"2006","unstructured":"Laumanns, M., Thiele, L., & Zitzler, E. (2006). An efficient, adaptive parameter variation scheme for metaheuristics based on the epsilon-constraint method. European Journal of Operational Research, 169(3), 932\u2013942.","journal-title":"European Journal of Operational Research"},{"key":"3904_CR29","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/j.renene.2013.11.013","volume":"64","author":"G Li","year":"2014","unstructured":"Li, G., Huang, G., Sun, W., & Ding, X. (2014). An inexact optimization model for energy-environment systems management in the mixed fuzzy, dual-interval and stochastic environment. Renewable Energy, 64, 153\u2013163.","journal-title":"Renewable Energy"},{"key":"3904_CR30","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/j.enconman.2011.12.018","volume":"57","author":"Y Li","year":"2012","unstructured":"Li, Y., & Huang, G. (2012). Electric-power systems planning and greenhouse-gas emission management under uncertainty. Energy Conversion and Management, 57, 173\u2013182.","journal-title":"Energy Conversion and Management"},{"issue":"1","key":"3904_CR31","doi-asserted-by":"crossref","first-page":"475","DOI":"10.1016\/j.enpol.2009.09.038","volume":"38","author":"Y Li","year":"2010","unstructured":"Li, Y., Huang, G., Li, Y., Xu, Y., & Chen, W. (2010). Regional-scale electric power system planning under uncertainty\u2014A multistage interval-stochastic integer linear programming approach. Energy Policy, 38(1), 475\u2013490.","journal-title":"Energy Policy"},{"key":"3904_CR32","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-019-03265-4","author":"B Maddah","year":"2019","unstructured":"Maddah, B., Ben Abdelaziz, F., & Tarhini, H. (2019). Bi-objective optimization of retailer\u2019s profit and customer surplus in assortment and pricing planning. Annals of Operations Research,. https:\/\/doi.org\/10.1007\/s10479-019-03265-4.","journal-title":"Annals of Operations Research"},{"issue":"9","key":"3904_CR33","doi-asserted-by":"crossref","first-page":"1040","DOI":"10.1057\/jors.1994.169","volume":"45","author":"SA Malcolm","year":"1994","unstructured":"Malcolm, S. A., & Zenios, S. A. (1994). Robust optimization for power systems capacity expansion under uncertainty. The Journal of the Operational Research Society, 45(9), 1040\u20131049.","journal-title":"The Journal of the Operational Research Society"},{"key":"3904_CR34","doi-asserted-by":"publisher","first-page":"1544","DOI":"10.1016\/j.enpol.2013.07.104","volume":"62","author":"D Min","year":"2013","unstructured":"Min, D., & Chung, J. (2013). Evaluation of the long-term power generation mix: The case study of south korea\u2019s energy policy. Energy Policy, 62, 1544\u20131552. https:\/\/doi.org\/10.1016\/j.enpol.2013.07.104.","journal-title":"Energy Policy"},{"issue":"5","key":"3904_CR35","doi-asserted-by":"crossref","first-page":"1063","DOI":"10.1016\/j.jenvman.2009.11.009","volume":"91","author":"H Mirzaesmaeeli","year":"2010","unstructured":"Mirzaesmaeeli, H., Elkamel, A., Douglas, P., Croiset, E., & Gupta, M. (2010). A multi-period optimization model for energy planning with CO2 emission consideration. Journal of Environmental Management, 91(5), 1063\u20131070.","journal-title":"Journal of Environmental Management"},{"issue":"2","key":"3904_CR36","doi-asserted-by":"crossref","first-page":"1512","DOI":"10.1016\/j.enconman.2010.10.019","volume":"52","author":"S Moghddas-Tafreshi","year":"2011","unstructured":"Moghddas-Tafreshi, S., Shayanfar, H., Saliminia Lahiji, A., Rabiee, A., & Aghaei, J. (2011). Generation expansion planning in pool market: A hybrid modified game theory and particle swarm optimization. Energy Conversion and Management, 52(2), 1512\u20131519.","journal-title":"Energy Conversion and Management"},{"key":"3904_CR37","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2019.06.015","author":"S Moret","year":"2019","unstructured":"Moret, S., Babonneau, F., Bierlaire, M., & Mar\u00e9chal, F. (2019). Decision support for strategic energy planning: A robust optimization framework. European Journal of Operational Research,. https:\/\/doi.org\/10.1016\/j.ejor.2019.06.015.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"3904_CR38","doi-asserted-by":"crossref","first-page":"552","DOI":"10.1002\/apj.586","volume":"6","author":"ZA Muis","year":"2011","unstructured":"Muis, Z. A., Hashim, H., Manan, Z. A., & Douglas, P. L. (2011). Effects of fossil fuel price fluctuations on electricity planning comprising renewable energy. Asia-Pacific Journal of Chemical Engineering, 6(3), 552\u2013562.","journal-title":"Asia-Pacific Journal of Chemical Engineering"},{"issue":"2","key":"3904_CR39","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1287\/opre.43.2.264","volume":"43","author":"JM Mulvey","year":"1995","unstructured":"Mulvey, J. M., Vanderbei, R. J., & Zenios, S. A. (1995). Robust optimization of large-scale systems. Operations Research, 43(2), 264\u2013281.","journal-title":"Operations Research"},{"issue":"1","key":"3904_CR40","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1080\/05695558208975038","volume":"14","author":"FH Murphy","year":"1982","unstructured":"Murphy, F. H., Sen, S., & Soyster, A. L. (1982). Electric utility capacity expansion planning with uncertain load forecasts. A I I E Transactions, 14(1), 52\u201359.","journal-title":"A I I E Transactions"},{"key":"3904_CR41","doi-asserted-by":"crossref","first-page":"206","DOI":"10.1016\/j.jclepro.2014.10.083","volume":"105","author":"N Neshat","year":"2015","unstructured":"Neshat, N., & Amin-Naseri, M. (2015). Cleaner power generation through market-driven generation expansion planning: An agent-based hybrid framework of game theory and particle swarm optimization. Journal of Cleaner Production, 105, 206\u2013217.","journal-title":"Journal of Cleaner Production"},{"key":"3904_CR42","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1016\/j.eneco.2016.11.019","volume":"61","author":"S Nie","year":"2017","unstructured":"Nie, S., Li, Y., Liu, J., & Huang, C. Z. (2017). Risk management of energy system for identifying optimal power mix with financial-cost minimization and environmental-impact mitigation under uncertainty. Energy Economics, 61, 313\u2013329.","journal-title":"Energy Economics"},{"issue":"7","key":"3904_CR43","doi-asserted-by":"crossref","first-page":"2050","DOI":"10.1016\/j.compeleceng.2014.07.001","volume":"40","author":"M Ozcan","year":"2014","unstructured":"Ozcan, M., Ozturk, S., & Yildirim, M. (2014). Turkey\u2019s long-term generation expansion planning with the inclusion of renewable-energy sources. Computers & Electrical Engineering, 40(7), 2050\u20132061.","journal-title":"Computers & Electrical Engineering"},{"issue":"2","key":"3904_CR44","doi-asserted-by":"crossref","first-page":"1026","DOI":"10.1109\/TPWRS.2014.2386872","volume":"30","author":"H Park","year":"2015","unstructured":"Park, H., & Baldick, R. (2015). Stochastic generation capacity expansion planning reducing greenhouse gas emissions. IEEE Transactions on Power Systems, 30(2), 1026\u20131034.","journal-title":"IEEE Transactions on Power Systems"},{"issue":"8","key":"3904_CR45","doi-asserted-by":"crossref","first-page":"5180","DOI":"10.1016\/j.energy.2011.06.021","volume":"36","author":"AJ Pereira","year":"2011","unstructured":"Pereira, A. J., & Saraiva, J. T. (2011). Generation expansion planning (GEP)\u2014A long-term approach using system dynamics and genetic algorithms (gas). Energy, 36(8), 5180\u20135199.","journal-title":"Energy"},{"key":"3904_CR46","unstructured":"PLN. (2019). Rencana usaha penyediaan tenaga listrik (rutpl) 2019\u20132028. Technical Report, Indonesia."},{"issue":"2","key":"3904_CR47","doi-asserted-by":"crossref","first-page":"622","DOI":"10.1016\/j.ijpe.2010.11.002","volume":"140","author":"AA Rentizelas","year":"2012","unstructured":"Rentizelas, A. A., Tolis, A. I., & Tatsiopoulos, I. P. (2012). Investment planning in electricity production under CO2 price uncertainty. International Journal of Production Economics, 140(2), 622\u2013629.","journal-title":"International Journal of Production Economics"},{"issue":"6","key":"3904_CR48","doi-asserted-by":"crossref","first-page":"1557","DOI":"10.1016\/j.enconman.2007.12.004","volume":"49","author":"A Sadegheih","year":"2008","unstructured":"Sadegheih, A., & Drake, P. (2008). System network planning expansion using mathematical programming, genetic algorithms and tabu search. Energy Conversion and Management, 49(6), 1557\u20131566.","journal-title":"Energy Conversion and Management"},{"issue":"3","key":"3904_CR49","doi-asserted-by":"crossref","first-page":"1092","DOI":"10.1109\/TPWRS.2007.901092","volume":"22","author":"J Sirikum","year":"2007","unstructured":"Sirikum, J., Techanitisawad, A., & Kachitvichyanukul, V. (2007). A new efficient GA-benders\u2019 decomposition method: For power generation expansion planning with emission controls. IEEE Transactions on Power Systems, 22(3), 1092\u20131100.","journal-title":"IEEE Transactions on Power Systems"},{"key":"3904_CR50","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-019-03205-2","author":"X Song","year":"2019","unstructured":"Song, X., Jones, D., Asgari, N., & Pigden, T. (2019). Multi-objective vehicle routing and loading with time window constraints: A real-life application. Annals of Operations Research,. https:\/\/doi.org\/10.1007\/s10479-019-03205-2.","journal-title":"Annals of Operations Research"},{"key":"3904_CR51","volume-title":"Multiple criteria optimization: Theory, computation, and application","author":"R Steuer","year":"1986","unstructured":"Steuer, R. (1986). Multiple criteria optimization: Theory, computation, and application. Hoboken: Wiley."},{"issue":"12","key":"3904_CR52","doi-asserted-by":"crossref","first-page":"1394","DOI":"10.1016\/j.epsr.2010.05.007","volume":"80","author":"H Tekiner","year":"2010","unstructured":"Tekiner, H., Coit, D. W., & Felder, F. A. (2010). Multi-period multi-objective electricity generation expansion planning problem with Monte-Carlo simulation. Electric Power Systems Research, 80(12), 1394\u20131405.","journal-title":"Electric Power Systems Research"},{"key":"3904_CR53","doi-asserted-by":"crossref","first-page":"959","DOI":"10.1016\/j.apenergy.2015.05.087","volume":"154","author":"SR Thangavelu","year":"2015","unstructured":"Thangavelu, S. R., Khambadkone, A. M., & Karimi, I. A. (2015). Long-term optimal energy mix planning towards high energy security and low GHG emission. Applied Energy, 154, 959\u2013969.","journal-title":"Applied Energy"},{"issue":"11","key":"3904_CR54","doi-asserted-by":"crossref","first-page":"3791","DOI":"10.1016\/j.apenergy.2011.04.054","volume":"88","author":"AI Tolis","year":"2011","unstructured":"Tolis, A. I., & Rentizelas, A. A. (2011). An impact assessment of electricity and emission allowances pricing in optimised expansion planning of power sector portfolios. Applied Energy, 88(11), 3791\u20133806.","journal-title":"Applied Energy"},{"key":"3904_CR55","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-019-03375-z","author":"F Torabi Yeganeh","year":"2020","unstructured":"Torabi Yeganeh, F., & Zegordi, S. H. (2020). A multi-objective optimization approach to project scheduling with resiliency criteria under uncertain activity duration. Annals of Operations Research,. https:\/\/doi.org\/10.1007\/s10479-019-03375-z.","journal-title":"Annals of Operations Research"},{"key":"3904_CR56","doi-asserted-by":"crossref","first-page":"374","DOI":"10.1016\/j.enpol.2011.10.060","volume":"41","author":"P Vithayasrichareon","year":"2012","unstructured":"Vithayasrichareon, P., & MacGill, I. F. (2012). A monte carlo based decision-support tool for assessing generation portfolios in future carbon constrained electricity industries. Energy Policy, 41, 374\u2013392.","journal-title":"Energy Policy"},{"key":"3904_CR57","unstructured":"Wijaya, A., Chrysolite, H., Ge, M., Wibowo, C. K., Pradana, A., Utami, A. F., & Austin, K. (2017). How can Indonesia achieve its climate change mitigation goal? An analysis of potential emissions reductions from energy and land-use policies. Technical report, Working Paper. Jakarta, Indonesia: World Resources Institute."},{"key":"3904_CR58","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-019-03434-5","author":"V Yakavenka","year":"2019","unstructured":"Yakavenka, V., Mallidis, I., Vlachos, D., Iakovou, E., & Eleni, Z. (2019). Development of a multi-objective model for the design of sustainable supply chains: The case of perishable food products. Annals of Operations Research,. https:\/\/doi.org\/10.1007\/s10479-019-03434-5.","journal-title":"Annals of Operations Research"},{"key":"3904_CR59","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1016\/j.renene.2014.03.030","volume":"69","author":"A Yoza","year":"2014","unstructured":"Yoza, A., Yona, A., Senjyu, T., & Funabashi, T. (2014). Optimal capacity and expansion planning methodology of PV and battery in smart house. Renewable Energy, 69, 25\u201333.","journal-title":"Renewable Energy"},{"key":"3904_CR60","doi-asserted-by":"crossref","first-page":"1424","DOI":"10.1016\/j.apenergy.2013.03.073","volume":"112","author":"Q Zhang","year":"2013","unstructured":"Zhang, Q., Mclellan, B. C., Tezuka, T., & Ishihara, K. N. (2013). An integrated model for long-term power generation planning toward future smart electricity systems. Applied Energy, 112, 1424\u20131437.","journal-title":"Applied Energy"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-020-03904-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-020-03904-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-020-03904-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,5,11]],"date-time":"2022-05-11T16:21:47Z","timestamp":1652286107000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-020-03904-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,1,4]]},"references-count":60,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2022,4]]}},"alternative-id":["3904"],"URL":"https:\/\/doi.org\/10.1007\/s10479-020-03904-1","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,1,4]]},"assertion":[{"value":"8 December 2020","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"4 January 2021","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}