{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,26]],"date-time":"2026-10-26T02:35:46Z","timestamp":1792982146303,"version":"4.5.0"},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2021,4,8]],"date-time":"2021-04-08T00:00:00Z","timestamp":1617840000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2021,4,8]],"date-time":"2021-04-08T00:00:00Z","timestamp":1617840000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"DOI":"10.13039\/501100001659","name":"Deutsche Forschungsgemeinschaft","doi-asserted-by":"crossref","award":["ME 3825\/1"],"award-info":[{"award-number":["ME 3825\/1"]}],"id":[{"id":"10.13039\/501100001659","id-type":"DOI","asserted-by":"crossref"}]},{"DOI":"10.13039\/501100003246","name":"Nederlandse Organisatie voor Wetenschappelijk Onderzoek","doi-asserted-by":"crossref","award":["024.002.003"],"award-info":[{"award-number":["024.002.003"]}],"id":[{"id":"10.13039\/501100003246","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2021,9]]},"abstract":"<jats:title>Abstract<\/jats:title>\n                  <jats:p>We consider a natural generalization of classical scheduling problems to a setting in which using a time unit for processing a job causes some time-dependent cost, the time-of-use tariff, which must be paid in addition to the standard scheduling cost. We focus on preemptive single-machine scheduling and two classical scheduling cost functions, the sum of (weighted) completion times and the maximum completion time, that is, the makespan. While these problems are easy to solve in the classical scheduling setting, they are considerably more complex when time-of-use tariffs must be considered. We contribute optimal polynomial-time algorithms and best possible approximation algorithms. For the problem of minimizing the total (weighted) completion time on a single machine, we present a polynomial-time algorithm that computes for any given sequence of jobs an optimal schedule, i.e., the optimal set of time slots to be used for preemptively scheduling jobs according to the given sequence. This result is based on dynamic programming using a subtle analysis of the structure of optimal solutions and a potential function argument. With this algorithm, we solve the unweighted problem optimally in polynomial time. For the more general problem, in which jobs may have individual weights, we develop a polynomial-time approximation scheme\u00a0(PTAS) based on a dual scheduling approach introduced for scheduling on a machine of varying speed. As the weighted problem is strongly NP-hard, our PTAS is the best possible approximation we can hope for. For preemptive scheduling to minimize the makespan, we show that there is a comparably simple optimal algorithm with polynomial running time. This is true even in a certain generalized model with unrelated machines.<\/jats:p>","DOI":"10.1007\/s10479-021-04059-3","type":"journal-article","created":{"date-parts":[[2021,4,7]],"date-time":"2021-04-07T19:16:14Z","timestamp":1617822974000},"page":"85-107","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":16,"title":["Optimal algorithms for scheduling under time-of-use tariffs"],"prefix":"10.1007","volume":"304","author":[{"given":"Lin","family":"Chen","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Nicole","family":"Megow","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2657-2811","authenticated-orcid":false,"given":"Roman","family":"Rischke","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Leen","family":"Stougie","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Jos\u00e9","family":"Verschae","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2021,4,8]]},"reference":[{"issue":"5","key":"4059_CR1","doi-asserted-by":"publisher","first-page":"86","DOI":"10.1145\/1735223.1735245","volume":"53","author":"S Albers","year":"2010","unstructured":"Albers, S. (2010). Energy-efficient algorithms. Communications of the ACM, 53(5), 86\u201396.","journal-title":"Communications of the ACM"},{"issue":"5","key":"4059_CR2","doi-asserted-by":"publisher","first-page":"1684","DOI":"10.1137\/130911317","volume":"43","author":"N Bansal","year":"2014","unstructured":"Bansal, N., & Pruhs, K. (2014). The geometry of scheduling. SIAM Journal on Computing, 43(5), 1684\u20131698.","journal-title":"SIAM Journal on Computing"},{"issue":"3","key":"4059_CR3","doi-asserted-by":"publisher","first-page":"900","DOI":"10.1016\/j.ejor.2018.11.002","volume":"274","author":"B Chen","year":"2019","unstructured":"Chen, B., & Zhang, X. (2019). Scheduling with time-of-use costs. European Journal of Operational Research, 274(3), 900\u2013908.","journal-title":"European Journal of Operational Research"},{"key":"4059_CR4","doi-asserted-by":"crossref","unstructured":"Chen, L., Megow, N., Rischke, R., Stougie, L., & Verschae, J. (2015). Optimal algorithms and a PTAS for cost-aware scheduling. Proceedings of the 40th international symposium on mathematical foundations of computer science (MFCS), LNCS (Vol. 9235, pp. 211\u2013222). Springer.","DOI":"10.1007\/978-3-662-48054-0_18"},{"key":"4059_CR5","doi-asserted-by":"crossref","unstructured":"Cheung, M., & Shmoys, D. B. (2011). A primal-dual approximation algorithm for min-sum single-machine scheduling problems. In Proceedings of the 14th international workshop on approximation, randomization, and combinatorial optimization (APPROX), LNCS (Vol. 6845, pp. 135\u2013146). Springer.","DOI":"10.1007\/978-3-642-22935-0_12"},{"issue":"2","key":"4059_CR6","doi-asserted-by":"publisher","first-page":"825","DOI":"10.1137\/16M1086819","volume":"31","author":"M Cheung","year":"2017","unstructured":"Cheung, M., Mestre, J., Shmoys, D. B., & Verschae, J. (2017). A primal-dual approximation algorithm for min-sum single-machine scheduling problems. SIAM Journal on Discrete Mathematics, 31(2), 825\u2013838.","journal-title":"SIAM Journal on Discrete Mathematics"},{"issue":"2","key":"4059_CR7","doi-asserted-by":"publisher","first-page":"268","DOI":"10.1287\/mnsc.11.2.268","volume":"11","author":"WL Eastman","year":"1964","unstructured":"Eastman, W. L., Even, S., & Isaac, M. (1964). Bounds for the optimal scheduling of n jobs on m processors. Management Science, 11(2), 268\u2013279.","journal-title":"Management Science"},{"issue":"3","key":"4059_CR8","doi-asserted-by":"publisher","first-page":"565","DOI":"10.1137\/110844210","volume":"41","author":"L Epstein","year":"2012","unstructured":"Epstein, L., Levin, A., Marchetti-Spaccamela, A., Megow, N., Mestre, J., Skutella, M., et al. (2012). Universal sequencing on an unreliable machine. SIAM Journal on Computing, 41(3), 565\u2013586.","journal-title":"SIAM Journal on Computing"},{"issue":"1","key":"4059_CR9","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1007\/s10479-015-2003-5","volume":"238","author":"K Fang","year":"2016","unstructured":"Fang, K., Uhan, N. A., Zhao, F., & Sutherland, J. W. (2016). Scheduling on a single machine under time-of-use electricity tariffs. Annals of Operations Research, 238(1), 199\u2013227.","journal-title":"Annals of Operations Research"},{"issue":"3","key":"4059_CR10","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1137\/S0895480197330254","volume":"13","author":"MX Goemans","year":"2000","unstructured":"Goemans, M. X., & Williamson, D. P. (2000). Two-dimensional gantt charts and a scheduling algorithm of lawler. SIAM Journal on Discrete Mathematics, 13(3), 281\u2013294.","journal-title":"SIAM Journal on Discrete Mathematics"},{"key":"4059_CR11","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"RL Graham","year":"1979","unstructured":"Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, 5, 287\u2013326.","journal-title":"Annals of Discrete Mathematics"},{"key":"4059_CR12","volume-title":"Introduction to operations research","author":"FS Hillier","year":"2014","unstructured":"Hillier, F. S., & Lieberman, G. J. (2014). Introduction to operations research (10th ed.). New York: McGraw-Hill.","edition":"10"},{"key":"4059_CR13","doi-asserted-by":"crossref","unstructured":"H\u00f6hn, W., & Jacobs, T. (2015). On the performance of Smith\u2019s rule in single-machine scheduling with nonlinear cost. ACM Transactions on Algorithms, 11(4), No. 25.","DOI":"10.1145\/2629652"},{"issue":"4","key":"4059_CR14","doi-asserted-by":"publisher","first-page":"1191","DOI":"10.1007\/s00453-017-0300-x","volume":"80","author":"W H\u00f6hn","year":"2018","unstructured":"H\u00f6hn, W., Mestre, J., & Wiese, A. (2018). How unsplittable-flow-covering helps scheduling with job-dependent cost functions. Algorithmica, 80(4), 1191\u20131213.","journal-title":"Algorithmica"},{"key":"4059_CR15","doi-asserted-by":"crossref","unstructured":"Kulkarni, J., & Munagala, K. (2013). Algorithms for cost-aware scheduling. In Proceedings of the 10th international workshop on approximation and online algorithms (WAOA), LNCS (Vol. 7846, pp. 201\u2013214). Springer.","DOI":"10.1007\/978-3-642-38016-7_17"},{"issue":"4","key":"4059_CR16","doi-asserted-by":"publisher","first-page":"612","DOI":"10.1145\/322092.322101","volume":"25","author":"EL Lawler","year":"1978","unstructured":"Lawler, E. L., & Labetoulle, J. (1978). On preemptive scheduling of unrelated parallel processors by linear programming. Journal of the ACM, 25(4), 612\u2013619.","journal-title":"Journal of the ACM"},{"key":"4059_CR17","volume-title":"Handbook of scheduling","author":"CY Lee","year":"2004","unstructured":"Lee, C. Y. (2004). Machine scheduling with availability constraints. In J. Y. T. Leung (Ed.), Handbook of scheduling. Boca Raton: CRC Press."},{"issue":"3","key":"4059_CR18","doi-asserted-by":"publisher","first-page":"1541","DOI":"10.1137\/16M105589X","volume":"32","author":"N Megow","year":"2018","unstructured":"Megow, N., & Verschae, J. (2018). Dual techniques for scheduling on a machine with varying speed. SIAM Journal on Discrete Mathematics, 32(3), 1541\u20131571.","journal-title":"SIAM Journal on Discrete Mathematics"},{"key":"4059_CR19","unstructured":"Megow, N., & Verschae, J. (2009). Short note on scheduling on a single machine with one non-availability period. Matheon Preprint 533. urn:nbn:de:0296-matheon-5392."},{"key":"4059_CR20","unstructured":"Rischke, R. (2016). Deterministic, stochastic, and robust cost-aware scheduling. Ph.D. thesis, Technical University of Munich."},{"key":"4059_CR21","volume-title":"Operations research: An introduction","author":"HA Taha","year":"2007","unstructured":"Taha, H. A. (2007). Operations research: An introduction. Upper Saddle River: Pearson\/Prentice Hall."},{"key":"4059_CR22","volume-title":"The theory and practice of revenue management","author":"KT Talluri","year":"2006","unstructured":"Talluri, K. T., & Van Ryzin, G. J. (2006). The theory and practice of revenue management (Vol. 68). New York: Springer."},{"key":"4059_CR23","doi-asserted-by":"publisher","first-page":"159","DOI":"10.1002\/nav.20393","volume":"57","author":"G Wan","year":"2010","unstructured":"Wan, G., & Qi, X. (2010). Scheduling with variable time slot costs. Naval Research Logistics, 57, 159\u2013171.","journal-title":"Naval Research Logistics"},{"key":"4059_CR24","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1007\/s10479-004-5032-z","volume":"133","author":"G Wang","year":"2005","unstructured":"Wang, G., Sun, H., & Chu, C. (2005). Preemptive scheduling with availability constraints to minimize total weighted completion times. Annals of Operations Research, 133, 183\u2013192.","journal-title":"Annals of Operations Research"},{"issue":"1","key":"4059_CR25","doi-asserted-by":"publisher","first-page":"46","DOI":"10.1016\/j.ejor.2006.01.025","volume":"178","author":"JJ Yuan","year":"2007","unstructured":"Yuan, J. J., Lin, Y. X., Ng, C. T., & Cheng, T. C. E. (2007). Approximability of single machine scheduling with fixed jobs to minimize total completion time. European Journal of Operational Research, 178(1), 46\u201356.","journal-title":"European Journal of Operational Research"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-021-04059-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-021-04059-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-021-04059-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,8,6]],"date-time":"2021-08-06T11:27:25Z","timestamp":1628249245000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-021-04059-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,4,8]]},"references-count":25,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2021,9]]}},"alternative-id":["4059"],"URL":"https:\/\/doi.org\/10.1007\/s10479-021-04059-3","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,4,8]]},"assertion":[{"value":"24 March 2021","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"8 April 2021","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}