{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,21]],"date-time":"2026-07-21T05:10:39Z","timestamp":1784610639558,"version":"3.55.0"},"reference-count":47,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2021,8,12]],"date-time":"2021-08-12T00:00:00Z","timestamp":1628726400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,8,12]],"date-time":"2021-08-12T00:00:00Z","timestamp":1628726400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["71772002"],"award-info":[{"award-number":["71772002"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"name":"Open Fund of Key Laboratory of Anhui Higher Education Institutes","award":["CS2019-ZD01"],"award-info":[{"award-number":["CS2019-ZD01"]}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2022,3]]},"DOI":"10.1007\/s10479-021-04217-7","type":"journal-article","created":{"date-parts":[[2021,8,12]],"date-time":"2021-08-12T01:02:15Z","timestamp":1628730135000},"page":"119-151","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":26,"title":["Steelmaking-continuous casting scheduling problem with multi-position refining furnaces under time-of-use tariffs"],"prefix":"10.1007","volume":"310","author":[{"given":"Ruilin","family":"Pan","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Qiong","family":"Wang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Zhenghong","family":"Li","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6263-5018","authenticated-orcid":false,"given":"Jianhua","family":"Cao","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Yongjin","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2021,8,12]]},"reference":[{"issue":"2","key":"4217_CR1","doi-asserted-by":"publisher","first-page":"260","DOI":"10.1016\/j.ijpe.2004.10.016","volume":"104","author":"A Bellabdaoui","year":"2006","unstructured":"Bellabdaoui, A., & Teghem, J. (2006). A mixed-integer linear programming model for the continuous casting planning. International Journal of Production Economics, 104(2), 260\u2013270.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"4217_CR2","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1109\/TASE.2011.2168817","volume":"9","author":"R Buil","year":"2012","unstructured":"Buil, R., Piera, M. \u00c0., & Luh, P. B. (2012). Improvement of Lagrangian relaxation convergence for production scheduling. iEEE Transactions on Automation Science and Engineering, 9(1), 137\u2013147.","journal-title":"iEEE Transactions on Automation Science and Engineering"},{"issue":"3","key":"4217_CR3","doi-asserted-by":"publisher","first-page":"499","DOI":"10.1016\/S0377-2217(02)00470-8","volume":"149","author":"HX Chen","year":"2003","unstructured":"Chen, H. X., & Luh, P. B. (2003). An alternative framework to Lagrangian relaxation approach for job shop scheduling. European Journal of Operational Research, 149(3), 499\u2013512.","journal-title":"European Journal of Operational Research"},{"key":"4217_CR4","doi-asserted-by":"crossref","unstructured":"Chen, K., Zheng, Z., Liu, Y., & Gao, X. Q. (2010). Real-time scheduling method for steelmaking-continuous casting. In: 2010 IEEE International conference on industrial engineering and engineering management (pp. 2366\u20132370).","DOI":"10.1109\/IEEM.2010.5674363"},{"issue":"2","key":"4217_CR5","doi-asserted-by":"publisher","first-page":"245","DOI":"10.1007\/s11228-016-0376-5","volume":"25","author":"JYB Cruz","year":"2017","unstructured":"Cruz, J. Y. B. (2017). On proximal subgradient splitting method for minimizing the sum of two nonsmooth convex functions. Set-Valued and Variational Analysis, 25(2), 245\u2013263.","journal-title":"Set-Valued and Variational Analysis"},{"key":"4217_CR6","doi-asserted-by":"publisher","first-page":"133","DOI":"10.1016\/j.compchemeng.2017.05.026","volume":"106","author":"HJ Cui","year":"2017","unstructured":"Cui, H. J., & Luo, X. C. (2017). An improved Lagrangian relaxation approach to scheduling steelmaking-continuous casting process. Computers and Chemical Engineering, 106, 133\u2013146.","journal-title":"Computers and Chemical Engineering"},{"issue":"20","key":"4217_CR7","doi-asserted-by":"publisher","first-page":"5747","DOI":"10.1080\/00207543.2011.624563","volume":"50","author":"HY Dong","year":"2012","unstructured":"Dong, H. Y., Huang, M., Ip, W. H., & Wang, X. W. (2012). Improved variable neighbourhood search for integrated tundish planning in primary steelmaking processes. International Journal of Production Research, 50(20), 5747\u20135761.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"4217_CR8","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1007\/s10479-015-2003-5","volume":"238","author":"K Fang","year":"2016","unstructured":"Fang, K., Uhan, N. A., Zhao, F., & Sutherland, J. W. (2016). Scheduling on a single machine under time-of-use electricity tariffs. Annals of Operations Research, 238(1), 199\u2013227.","journal-title":"Annals of Operations Research"},{"key":"4217_CR9","doi-asserted-by":"publisher","first-page":"373","DOI":"10.1016\/B978-0-444-63456-6.50063-6","volume":"33","author":"H Hadera","year":"2014","unstructured":"Hadera, H., Harjunkoski, I., Grossmann, I. E., Sand, G., & Engell, S. (2014). Steel production scheduling optimization under time-sensitive electricity costs. Computer Aided Chemical Engineering, 33, 373\u2013378.","journal-title":"Computer Aided Chemical Engineering"},{"issue":"1","key":"4217_CR10","doi-asserted-by":"publisher","first-page":"173","DOI":"10.1007\/s10479-012-1059-8","volume":"213","author":"N Hashemian","year":"2014","unstructured":"Hashemian, N., Diallo, C., & Vizv\u00e1ri, B. (2014). Makespan minimization for parallel machines scheduling with multiple availability constraints. Annals of Operations Research, 213(1), 173\u2013186.","journal-title":"Annals of Operations Research"},{"key":"4217_CR11","doi-asserted-by":"publisher","first-page":"159","DOI":"10.1016\/j.knosys.2016.08.010","volume":"111","author":"SL Jiang","year":"2016","unstructured":"Jiang, S. L., Liu, M., Lin, J. H., & Zhong, H. X. (2016). A prediction-based online soft scheduling algorithm for the real-world steelmaking-continuous casting production. Knowledge-Based Systems, 111, 159\u2013172.","journal-title":"Knowledge-Based Systems"},{"issue":"11","key":"4217_CR12","doi-asserted-by":"publisher","first-page":"16","DOI":"10.3390\/math6110220","volume":"6","author":"TH Jiang","year":"2018","unstructured":"Jiang, T. H., Zhang, C., Zhu, H. Q., Gu, J. C., & Deng, G. L. (2018). Energy-efficient scheduling for a job shop using an improved whale optimization algorithm. Mathematics, 6(11), 16.","journal-title":"Mathematics"},{"issue":"2","key":"4217_CR13","doi-asserted-by":"publisher","first-page":"555","DOI":"10.1007\/s00158-018-1907-5","volume":"58","author":"Y Jung","year":"2018","unstructured":"Jung, Y., Kang, N., & Lee, I. (2018). Modified augmented Lagrangian coordination and alternating direction method of multipliers with parallelization in non-hierarchical analytical target cascading. Structural and Multidisciplinary Optimization, 58(2), 555\u2013573.","journal-title":"Structural and Multidisciplinary Optimization"},{"key":"4217_CR14","doi-asserted-by":"publisher","first-page":"400","DOI":"10.1016\/j.cor.2019.06.012","volume":"111","author":"M Khatami","year":"2019","unstructured":"Khatami, M., Salehipour, A., & Hwang, F. J. (2019). Makespan minimization for the m-machine ordered flow shop scheduling problem. Computers and Operations Research, 111, 400\u2013414.","journal-title":"Computers and Operations Research"},{"key":"4217_CR15","doi-asserted-by":"crossref","unstructured":"Li, L., Tang, Q. H., Zheng, P., Zhang, L. P., & Floudas, C. A. (2016). An improved self-adaptive genetic algorithm for scheduling steel-making continuous casting production. In: Proceedings of the 6th International asia conference on industrial engineering and management innovation (pp. 399\u2013410).","DOI":"10.2991\/978-94-6239-148-2_40"},{"issue":"3","key":"4217_CR16","doi-asserted-by":"publisher","first-page":"688","DOI":"10.1016\/j.cie.2011.12.021","volume":"62","author":"XS Li","year":"2012","unstructured":"Li, X. S., Ishii, H., & Masuda, T. (2012). Single machine batch scheduling problem with fuzzy batch size. Computers and Industrial Engineering, 62(3), 688\u2013692.","journal-title":"Computers and Industrial Engineering"},{"issue":"8","key":"4217_CR17","doi-asserted-by":"publisher","first-page":"17","DOI":"10.3390\/math7080688","volume":"7","author":"F Luan","year":"2019","unstructured":"Luan, F., Cai, Z. Y., Wu, S. Q., Liu, S. Q., & He, Y. X. (2019). Optimizing the low-carbon flexible job shop scheduling problem with discrete whale optimization algorithm. Mathematics, 7(8), 17.","journal-title":"Mathematics"},{"issue":"3","key":"4217_CR18","doi-asserted-by":"publisher","first-page":"1140","DOI":"10.1109\/TASE.2014.2332511","volume":"12","author":"K Mao","year":"2015","unstructured":"Mao, K., Pan, Q. K., Chai, T. Y., & Luh, P. B. (2015). An effective subgradient method for scheduling a steelmaking-continuous casting process. IEEE Transactions on Automation Science & Engineering, 12(3), 1140\u20131152.","journal-title":"IEEE Transactions on Automation Science & Engineering"},{"issue":"1","key":"4217_CR19","doi-asserted-by":"publisher","first-page":"51","DOI":"10.1016\/j.ejor.2013.11.010","volume":"236","author":"K Mao","year":"2014","unstructured":"Mao, K., Pan, Q. K., Pang, X. F., & Chai, T. Y. (2014). A novel Lagrangian relaxation approach for a hybrid flowshop scheduling problem in the steelmaking-continuous casting process. European Journal of Operational Research, 236(1), 51\u201360.","journal-title":"European Journal of Operational Research"},{"issue":"15","key":"4217_CR20","doi-asserted-by":"publisher","first-page":"4147","DOI":"10.1080\/00207540801950136","volume":"47","author":"H Missbauer","year":"2009","unstructured":"Missbauer, H., Hauber, W., & Stadler, W. (2009). A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry. International Journal of Production Research, 47(15), 4147\u20134172.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"4217_CR21","doi-asserted-by":"publisher","first-page":"189","DOI":"10.1016\/j.cor.2009.04.008","volume":"37","author":"T Nishi","year":"2010","unstructured":"Nishi, T., Hiranaka, Y., & Inuiguchi, M. (2010). Lagrangian relaxation with cut generation for hybrid flowshop scheduling problems to minimize the total weighted tardiness. Computers and Operations Research, 37(1), 189\u2013198.","journal-title":"Computers and Operations Research"},{"issue":"12","key":"4217_CR22","doi-asserted-by":"publisher","first-page":"2823","DOI":"10.1016\/j.compchemeng.2004.08.031","volume":"28","author":"D Pacciarelli","year":"2004","unstructured":"Pacciarelli, D., & Pranzo, M. (2004). Production scheduling in a steelmaking-continuous casting plant. Computers and Chemical Engineering, 28(12), 2823\u20132835.","journal-title":"Computers and Chemical Engineering"},{"issue":"3","key":"4217_CR23","doi-asserted-by":"publisher","first-page":"207","DOI":"10.1093\/comjnl\/12.3.207-a","volume":"12","author":"MJD Powell","year":"1969","unstructured":"Powell, M. J. D. (1969). Nonlinear programming: sequential unconstrained minimization techniques. The Computer Journal, 12(3), 207.","journal-title":"The Computer Journal"},{"issue":"3","key":"4217_CR24","doi-asserted-by":"publisher","first-page":"581","DOI":"10.1016\/S0377-2217(03)00264-9","volume":"153","author":"M Pranzo","year":"2004","unstructured":"Pranzo, M. (2004). Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times. European Journal of Operational Research, 153(3), 581\u2013592.","journal-title":"European Journal of Operational Research"},{"key":"4217_CR25","doi-asserted-by":"publisher","first-page":"106658","DOI":"10.1016\/j.compchemeng.2019.106658","volume":"133","author":"S Rahal","year":"2020","unstructured":"Rahal, S., Li, Z. K., & Papageorgiou, D. J. (2020). Proactive and reactive scheduling of the steelmaking and continuous casting process through adaptive robust optimization. Computers and Chemical Engineering, 133, 106658.","journal-title":"Computers and Chemical Engineering"},{"issue":"1","key":"4217_CR26","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2009.09.024","volume":"205","author":"R Ruiz","year":"2010","unstructured":"Ruiz, R., & V\u00e1zquez-Rodr\u00edguez, J. A. (2010). The hybrid flow shop scheduling problem. European Journal of Operational Research, 205(1), 1\u201318.","journal-title":"European Journal of Operational Research"},{"key":"4217_CR27","unstructured":"Sporre, G., & Forsgren, A. (2002). Relations between Divergence of Multipliers and Convergence to Infeasible Points in Primal-Dual Interior Methods for Nonconvex Nonlinear Programming. In: Report TRITA-MAT-2002-OS7. Stockholm, Sweden."},{"key":"4217_CR28","doi-asserted-by":"crossref","unstructured":"Sr., W. G. B., Banerjee, S., & Banerjee, A. (1998). RTSS: An interactive decision support system for solving real time scheduling problems considering customer and job priorities with schedule interruptions. Computers and Operations Research, 25(11), 981-995.","DOI":"10.1016\/S0305-0548(97)00092-0"},{"key":"4217_CR29","doi-asserted-by":"publisher","first-page":"295","DOI":"10.1016\/j.cie.2016.09.018","volume":"101","author":"N Suhaimi","year":"2016","unstructured":"Suhaimi, N., Nguyen, C., & Damodaran, P. (2016). Lagrangian approach to minimize makespan of non-identical parallel batch processing machines. Computers and Industrial Engineering, 101, 295\u2013302.","journal-title":"Computers and Industrial Engineering"},{"issue":"4","key":"4217_CR30","doi-asserted-by":"publisher","first-page":"3105","DOI":"10.1109\/LRA.2018.2849500","volume":"3","author":"LL Sun","year":"2018","unstructured":"Sun, L. L., Jin, H., & Li, Y. (2018). Research on scheduling of iron and steel scrap steelmaking and continuous casting process aiming at power saving and carbon emissions reducing. IEEE Robotics and Automation Letters, 3(4), 3105\u20133112.","journal-title":"IEEE Robotics and Automation Letters"},{"issue":"7","key":"4217_CR31","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S1006-706X(13)60118-1","volume":"20","author":"YY Tan","year":"2013","unstructured":"Tan, Y. Y., Huang, Y. L., & Liu, S. X. (2013). Two-stage mathematical programming approach for steelmaking process scheduling under variable electricity price. Journal of Iron and Steel Research, International, 20(7), 1\u20138.","journal-title":"Journal of Iron and Steel Research, International"},{"issue":"4","key":"4217_CR32","doi-asserted-by":"publisher","first-page":"1032","DOI":"10.1080\/00207543.2013.828179","volume":"52","author":"YY Tan","year":"2014","unstructured":"Tan, Y. Y., & Liu, S. X. (2014). Models and optimisation approaches for scheduling steelmaking\u2013refining\u2013continuous casting production under variable electricity price. International Journal of Production Research, 52(4), 1032\u20131049.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"4217_CR33","doi-asserted-by":"publisher","first-page":"344","DOI":"10.1016\/j.cor.2012.07.004","volume":"40","author":"S Tanaka","year":"2013","unstructured":"Tanaka, S., & Araki, M. (2013). An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times. Computers and Operations Research, 40(1), 344\u2013352.","journal-title":"Computers and Operations Research"},{"issue":"7","key":"4217_CR34","doi-asserted-by":"publisher","first-page":"1133","DOI":"10.1080\/00207720903308389","volume":"42","author":"LX Tang","year":"2011","unstructured":"Tang, L. X., & Zhang, Y. Y. (2011). A new Lagrangian Relaxation Algorithm for scheduling dissimilar parallel machines with release dates. International Journal of Systems Science, 42(7), 1133\u20131141.","journal-title":"International Journal of Systems Science"},{"key":"4217_CR35","doi-asserted-by":"crossref","unstructured":"Tian, X. K., Ma, B. C., Zhang, J. W., Zhao, R. Y., & Wang, J. (2019). Research on multi-objective optimization and simulation to HFSSP hybrid flow-shop scheduling problem for energy saving. In H. J. Fan (Ed.), 2nd International Workshop on Materials Science and Mechanical Engineering (Vol. 504).","DOI":"10.1088\/1757-899X\/504\/1\/012108"},{"issue":"1","key":"4217_CR36","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1007\/s10479-018-3003-z","volume":"271","author":"W van Ackooij","year":"2018","unstructured":"van Ackooij, W., Danti Lopez, I., Frangioni, A., Lacalandra, F., & Tahanan, M. (2018). Large-scale unit commitment under uncertainty: An updated literature survey. Annals of Operations Research, 271(1), 11\u201385.","journal-title":"Annals of Operations Research"},{"issue":"4","key":"4217_CR37","doi-asserted-by":"publisher","first-page":"1257","DOI":"10.1109\/TMC.2019.2962125","volume":"20","author":"X Wang","year":"2021","unstructured":"Wang, X., Liu, Z., Gao, Y., Zheng, X., Dang, Z., & Shen, X. (2021). A near-optimal protocol for the grouping problem in RFID systems. IEEE Transactions on Mobile Computing, 20(4), 1257\u20131272.","journal-title":"IEEE Transactions on Mobile Computing"},{"key":"4217_CR38","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-019-03494-7","author":"P Wu","year":"2019","unstructured":"Wu, P., Cheng, J. H., & Chu, F. (2019). Large-scale energy-conscious bi-objective single-machine batch scheduling under time-of-use electricity tariffs via effective iterative heuristics. Annals of Operations Research. https:\/\/doi.org\/10.1007\/s10479-019-03494-7","journal-title":"Annals of Operations Research"},{"issue":"4","key":"4217_CR39","doi-asserted-by":"publisher","first-page":"607","DOI":"10.1007\/s11047-016-9607-9","volume":"16","author":"W Xiang","year":"2017","unstructured":"Xiang, W. (2017). A multi-objective ACO for operating room scheduling optimization. Natural Computing, 16(4), 607\u2013617.","journal-title":"Natural Computing"},{"key":"4217_CR40","doi-asserted-by":"publisher","first-page":"368","DOI":"10.1016\/j.compchemeng.2018.03.010","volume":"116","author":"WJ Xu","year":"2018","unstructured":"Xu, W. J., Tang, L. X., & Pistikopoulos, E. N. (2018). Modeling and solution for steelmaking scheduling with batching decisions and energy constraints. Computers and Chemical Engineering, 116, 368\u2013384.","journal-title":"Computers and Chemical Engineering"},{"issue":"9","key":"4217_CR41","doi-asserted-by":"publisher","first-page":"2718","DOI":"10.1016\/j.cor.2005.10.014","volume":"34","author":"H Xuan","year":"2007","unstructured":"Xuan, H., & Tang, L. X. (2007). Scheduling a hybrid flowshop with batch production at the last stage. Computers and Operations Research, 34(9), 2718\u20132733.","journal-title":"Computers and Operations Research"},{"key":"4217_CR42","doi-asserted-by":"crossref","unstructured":"Ye, H. X., Zhai, Q. Z., Ge, Y. Y., & Wu, H. Y. (2011). A Revised Subgradient Method for Solving the Dual Problem of Hydrothermal Scheduling. In: 2011 Asia-Pacific Power and Energy Engineering Conference (pp. 1\u20136).","DOI":"10.1109\/APPEEC.2011.5748445"},{"key":"4217_CR43","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1016\/j.compchemeng.2014.02.028","volume":"66","author":"Y Ye","year":"2014","unstructured":"Ye, Y., Li, J., Li, Z., Tang, Q., Xiao, X., & Floudas, C. A. (2014). Robust optimization and stochastic programming approaches for medium-term production scheduling of a large-scale steelmaking continuous casting process under demand uncertainty. Computers and Chemical Engineering, 66, 165\u2013185.","journal-title":"Computers and Chemical Engineering"},{"issue":"4","key":"4217_CR44","doi-asserted-by":"publisher","first-page":"1105","DOI":"10.1109\/TAC.2017.2738153","volume":"63","author":"H Yu","year":"2018","unstructured":"Yu, H., & Neely, M. J. (2018). On the convergence time of dual subgradient methods for strongly convex programs. IEEE Transactions on Automatic Control, 63(4), 1105\u20131112.","journal-title":"IEEE Transactions on Automatic Control"},{"key":"4217_CR45","doi-asserted-by":"crossref","unstructured":"Zhang, L., Xin, H., & Ju, L. (2018). A Multiobjective Scheduling Optimization Model for Multienergy Complementary System Integrated by Wind-Photovoltaic-Convention Gas Turbines considering Demand Response. Mathematical Problems in Engineering, 2018.","DOI":"10.1155\/2018\/3208934"},{"key":"4217_CR46","doi-asserted-by":"publisher","first-page":"501","DOI":"10.1016\/j.trb.2017.04.006","volume":"104","author":"YL Zhang","year":"2017","unstructured":"Zhang, Y. L., Shen, Z. J. M., & Song, S. J. (2017). Lagrangian relaxation for the reliable shortest path problem with correlated link travel times. Transportation Research Part B-Methodological, 104, 501\u2013521.","journal-title":"Transportation Research Part B-Methodological"},{"issue":"10","key":"4217_CR47","doi-asserted-by":"publisher","first-page":"1727","DOI":"10.1080\/0305215X.2018.1542693","volume":"51","author":"FQ Zhao","year":"2019","unstructured":"Zhao, F. Q., Zhang, L. X., Liu, H., Zhang, Y., Ma, W. M., Zhang, C., & Song, H. B. (2019). An improved water wave optimization algorithm with the single wave mechanism for the no-wait flow-shop scheduling problem. Engineering Optimization, 51(10), 1727\u20131742.","journal-title":"Engineering Optimization"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-021-04217-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-021-04217-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-021-04217-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,2,25]],"date-time":"2022-02-25T16:34:00Z","timestamp":1645806840000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-021-04217-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,8,12]]},"references-count":47,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2022,3]]}},"alternative-id":["4217"],"URL":"https:\/\/doi.org\/10.1007\/s10479-021-04217-7","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,8,12]]},"assertion":[{"value":"23 July 2021","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"12 August 2021","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}