{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,24]],"date-time":"2026-03-24T03:16:27Z","timestamp":1774322187214,"version":"3.50.1"},"reference-count":56,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2021,12,1]],"date-time":"2021-12-01T00:00:00Z","timestamp":1638316800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,12,1]],"date-time":"2021-12-01T00:00:00Z","timestamp":1638316800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100000038","name":"Natural Sciences and Engineering Research Council of Canada","doi-asserted-by":"crossref","id":[{"id":"10.13039\/501100000038","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2022,9]]},"DOI":"10.1007\/s10479-021-04362-z","type":"journal-article","created":{"date-parts":[[2021,12,1]],"date-time":"2021-12-01T14:03:39Z","timestamp":1638367419000},"page":"401-444","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":21,"title":["Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems"],"prefix":"10.1007","volume":"316","author":[{"given":"Aseem K.","family":"Mishra","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6842-2803","authenticated-orcid":false,"given":"Divya","family":"Shrivastava","sequence":"additional","affiliation":[]},{"given":"Devesh","family":"Tarasia","sequence":"additional","affiliation":[]},{"given":"Abdur","family":"Rahim","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2021,12,1]]},"reference":[{"key":"4362_CR1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2020.104943","volume":"122","author":"R Boufellouh","year":"2020","unstructured":"Boufellouh, R., & Belkaid, F. (2020). Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: Application to the permutation flow shop problem. Computers and Operations Research, 122, 104943. https:\/\/doi.org\/10.1016\/j.cor.2020.104943","journal-title":"Computers and Operations Research"},{"issue":"1","key":"4362_CR2","doi-asserted-by":"publisher","first-page":"181","DOI":"10.1007\/S40092-018-0280-8","volume":"15","author":"R Buddala","year":"2018","unstructured":"Buddala, R., & Mahapatra, S. S. (2018). An integrated approach for scheduling flexible job-shop using teaching\u2013learning-based optimization method. Journal of Industrial Engineering International, 15(1), 181\u2013192. https:\/\/doi.org\/10.1007\/S40092-018-0280-8","journal-title":"Journal of Industrial Engineering International"},{"issue":"3","key":"4362_CR3","doi-asserted-by":"publisher","first-page":"407","DOI":"10.1002\/nav.20000","volume":"51","author":"K B\u00fclb\u00fcl","year":"2004","unstructured":"B\u00fclb\u00fcl, K., Kaminsky, P., & Yano, C. (2004). Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs. Naval Research Logistics (NRL), 51(3), 407\u2013445. https:\/\/doi.org\/10.1002\/nav.20000","journal-title":"Naval Research Logistics (NRL)"},{"key":"4362_CR4","doi-asserted-by":"publisher","first-page":"440","DOI":"10.1016\/j.cie.2016.04.018","volume":"102","author":"N Chalabi","year":"2016","unstructured":"Chalabi, N., Dahane, M., Beldjilali, B., & Neki, A. (2016). Optimisation of preventive maintenance grouping strategy for multi-component series systems: Particle swarm based approach. Computers and Industrial Engineering, 102, 440\u2013451. https:\/\/doi.org\/10.1016\/j.cie.2016.04.018","journal-title":"Computers and Industrial Engineering"},{"issue":"1","key":"4362_CR5","doi-asserted-by":"publisher","first-page":"70","DOI":"10.17531\/ein.2015.1.10","volume":"17","author":"X Chen","year":"2015","unstructured":"Chen, X. (2015). An integrated model of production scheduling and maintenance planning under imperfect preventive maintenance. Maintenance and Reliability, 17(1), 70\u201379.","journal-title":"Maintenance and Reliability"},{"key":"4362_CR6","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1016\/j.jmsy.2019.12.004","volume":"54","author":"X Chen","year":"2020","unstructured":"Chen, X., An, Y., Zhang, Z., & Li, Y. (2020). An approximate nondominated sorting genetic algorithm to integrate optimization of production scheduling and accurate maintenance based on reliability intervals. Journal of Manufacturing Systems, 54, 227\u2013241. https:\/\/doi.org\/10.1016\/j.jmsy.2019.12.004","journal-title":"Journal of Manufacturing Systems"},{"issue":"2","key":"4362_CR7","doi-asserted-by":"publisher","first-page":"773","DOI":"10.1016\/j.cirp.2014.05.002","volume":"63","author":"M Colledani","year":"2014","unstructured":"Colledani, M., Tolio, T., Fischer, A., Iung, B., Lanza, G., Schmitt, R., & V\u00e1ncza, J. (2014). Design and management of manufacturing systems for production quality. CIRP Annals - Manufacturing Technology, 63(2), 773\u2013796. https:\/\/doi.org\/10.1016\/j.cirp.2014.05.002","journal-title":"CIRP Annals - Manufacturing Technology"},{"key":"4362_CR8","doi-asserted-by":"publisher","unstructured":"Cui, L. (2008). Maintenance models and optimization. In Handbook of performability engineering (pp. 789\u2013805). London: Springer London. https:\/\/doi.org\/10.1007\/978-1-84800-131-2_48","DOI":"10.1007\/978-1-84800-131-2_48"},{"issue":"2017","key":"4362_CR9","doi-asserted-by":"publisher","first-page":"342","DOI":"10.1016\/j.cie.2017.11.020","volume":"115","author":"W Cui","year":"2018","unstructured":"Cui, W., Lu, Z., Li, C., & Han, X. (2018). A proactive approach to solve integrated production scheduling and maintenance planning problem in flow shops. Computers and Industrial Engineering, 115(2017), 342\u2013353. https:\/\/doi.org\/10.1016\/j.cie.2017.11.020","journal-title":"Computers and Industrial Engineering"},{"key":"4362_CR10","doi-asserted-by":"publisher","DOI":"10.1016\/J.JKSUCI.2020.05.002","author":"H Das","year":"2020","unstructured":"Das, H., Naik, B., & Behera, H. S. (2020). A Jaya algorithm based wrapper method for optimal feature selection in supervised classification. Journal of King Saud University - Computer and Information Sciences. https:\/\/doi.org\/10.1016\/J.JKSUCI.2020.05.002","journal-title":"Journal of King Saud University - Computer and Information Sciences"},{"key":"4362_CR11","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2019.107566","volume":"225","author":"A De","year":"2020","unstructured":"De, A., Mogale, D. G., Zhang, M., Pratap, S., Kumar, S. K., & Huang, G. Q. (2020). Multi-period multi-echelon inventory transportation problem considering stakeholders behavioural tendencies. International Journal of Production Economics, 225, 107566. https:\/\/doi.org\/10.1016\/j.ijpe.2019.107566","journal-title":"International Journal of Production Economics"},{"issue":"September","key":"4362_CR12","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1080\/0305215X.2017.1367392","volume":"0273","author":"D-C Du","year":"2017","unstructured":"Du, D.-C., Vinh, H.-H., Trung, V.-D., Hong Quyen, N.-T., & Trung, N.-T. (2017). Efficiency of Jaya algorithm for solving the optimization-based structural damage identification problem based on a hybrid objective function. Engineering Optimization, 0273(September), 1\u201319. https:\/\/doi.org\/10.1080\/0305215X.2017.1367392","journal-title":"Engineering Optimization"},{"key":"4362_CR13","unstructured":"Ebeling, C. E. (2004). An introduction to reliability and maintainability engineering. McGraw-Hill. https:\/\/books.google.co.in\/books\/about\/An_introduction_to_reliability_and_maint.html?id=iFumyeVLIEAC. Accessed 21 February 2018."},{"issue":"9","key":"4362_CR14","doi-asserted-by":"publisher","first-page":"1529","DOI":"10.1080\/0305215X.2018.1540696","volume":"51","author":"H Feng","year":"2019","unstructured":"Feng, H., Tan, C., Xia, T., Pan, E., & Xi, L. (2019). Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups. Engineering Optimization, 51(9), 1529\u20131546. https:\/\/doi.org\/10.1080\/0305215X.2018.1540696","journal-title":"Engineering Optimization"},{"issue":"3","key":"4362_CR15","doi-asserted-by":"publisher","first-page":"493","DOI":"10.1109\/JSEE.2015.00057","volume":"26","author":"J Geng","year":"2015","unstructured":"Geng, J., Azarian, M., & Pecht, M. (2015). Opportunistic maintenance for multi-component systems considering structural dependence and economic dependence. Journal of Systems Engineering and Electronics, 26(3), 493\u2013501. https:\/\/doi.org\/10.1109\/JSEE.2015.00057","journal-title":"Journal of Systems Engineering and Electronics"},{"key":"4362_CR16","unstructured":"Hadidi, L. A., Turki, U. M. Al, & Rahim, A. (2012). Integrating production scheduling and maintenance: Practical implications. In 2012 International conference on industrial engineering and operations management, (2010) (pp. 336\u2013343)."},{"issue":"1","key":"4362_CR17","doi-asserted-by":"publisher","first-page":"21","DOI":"10.1504\/ijise.2012.044042","volume":"10","author":"LA Hadidi","year":"2011","unstructured":"Hadidi, L. A., Turki, U. M., & Al Rahim, A. (2011). Integrated models in production planning and scheduling, maintenance and quality: A review. International Journal of Industrial and Systems Engineering, 10(1), 21. https:\/\/doi.org\/10.1504\/ijise.2012.044042","journal-title":"International Journal of Industrial and Systems Engineering"},{"key":"4362_CR18","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1016\/j.asoc.2014.06.020","volume":"23","author":"V Kaplano\u01e7lu","year":"2014","unstructured":"Kaplano\u01e7lu, V. (2014). Multi-agent based approach for single machine scheduling with sequence-dependent setup times and machine maintenance. Applied Soft Computing Journal, 23, 165\u2013179. https:\/\/doi.org\/10.1016\/j.asoc.2014.06.020","journal-title":"Applied Soft Computing Journal"},{"key":"4362_CR19","doi-asserted-by":"publisher","unstructured":"Kennedy, J., & Eberhart, R. (1995). Particle swarm optimization. In Proceedings of ICNN\u201995\u2014international conference on neural networks (Vol. 4, pp. 1942\u20131948). IEEE. https:\/\/doi.org\/10.1109\/ICNN.1995.488968","DOI":"10.1109\/ICNN.1995.488968"},{"issue":"4598","key":"4362_CR20","doi-asserted-by":"publisher","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S Kirkpatrick","year":"1983","unstructured":"Kirkpatrick, S., Gelatt, C. D., & Vecchi, M. P. (1983). Optimization by simulated annealing. Science (new York, n.y.), 220(4598), 671\u2013680. https:\/\/doi.org\/10.1126\/science.220.4598.671","journal-title":"Science (new York, n.y.)"},{"key":"4362_CR21","doi-asserted-by":"publisher","DOI":"10.1108\/IJQRM-10-2019-0335","author":"A Kolus","year":"2020","unstructured":"Kolus, A., El-Khalifa, A., Al-Turki, U. M., & Duffuaa, S. O. (2020). An integrated mathematical model for production scheduling and preventive maintenance planning. International Journal of Quality and Reliability Management. https:\/\/doi.org\/10.1108\/IJQRM-10-2019-0335","journal-title":"International Journal of Quality and Reliability Management"},{"key":"4362_CR22","unstructured":"Kumar, S., Purohit, B. S., & Lad, B. K. (2014). Integrated approach for job scheduling and multi-component maintenance planning ina production system. In 5th international & 26th All India Manufacturing Technology, Design and Research Conference (AIMTDR 2014) December 12th\u201314th, 2014, IIT Guwahati, Assam, India."},{"issue":"22","key":"4362_CR23","doi-asserted-by":"publisher","first-page":"6971","DOI":"10.1080\/00207543.2018.1424367","volume":"56","author":"S Kumar","year":"2018","unstructured":"Kumar, S., Purohit, B. S., Manjrekar, V., Singh, V., & Lad, B. K. (2018). Investigating the value of integrated operations planning: A case-based approach from automotive industry. International Journal of Production Research, 56(22), 6971\u20136992. https:\/\/doi.org\/10.1080\/00207543.2018.1424367","journal-title":"International Journal of Production Research"},{"key":"4362_CR24","doi-asserted-by":"publisher","unstructured":"Lee, J., Lapira, E., Yang, S., & Kao, A. (2013). Predictive manufacturing system - Trends of next-generation production systems. IFAC Proceedings Volumes (IFAC-PapersOnline) (Vol. 46). IFAC. https:\/\/doi.org\/10.3182\/20130522-3-BR-4036.00107","DOI":"10.3182\/20130522-3-BR-4036.00107"},{"key":"4362_CR25","doi-asserted-by":"publisher","unstructured":"Li, M., Li, H., & Liu, Q. (2010). Integrated production scheduling and opportunistic preventive maintenance in the flowshop manufacturing system. In 2nd international conference on information science and engineering, ICISE2010 - Proceedings, (pp. 294\u2013298). https:\/\/doi.org\/10.1109\/ICISE.2010.5690889","DOI":"10.1109\/ICISE.2010.5690889"},{"issue":"6","key":"4362_CR26","doi-asserted-by":"publisher","first-page":"916","DOI":"10.1109\/TSMC.2016.2523802","volume":"47","author":"N Li","year":"2017","unstructured":"Li, N., Chan, F. T. S., Chung, S. H., & Tai, A. H. (2017). A stochastic production-inventory model in a two-state production system with inventory deterioration, rework process, and backordering. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 47(6), 916\u2013926. https:\/\/doi.org\/10.1109\/TSMC.2016.2523802","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics: Systems"},{"issue":"01","key":"4362_CR27","doi-asserted-by":"publisher","first-page":"111","DOI":"10.1142\/S0217595907001139","volume":"24","author":"J-H Lim","year":"2007","unstructured":"Lim, J.-H., & Park, D. H. (2007). Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances. Asia-Pacific Journal of Operational Research, 24(01), 111\u2013124. https:\/\/doi.org\/10.1142\/S0217595907001139","journal-title":"Asia-Pacific Journal of Operational Research"},{"issue":"4","key":"4362_CR28","doi-asserted-by":"publisher","first-page":"4348","DOI":"10.1016\/j.eswa.2010.09.104","volume":"38","author":"H Liu","year":"2011","unstructured":"Liu, H., Gao, L., & Pan, Q. (2011). A hybrid particle swarm optimization with estimation of distribution algorithm for solving permutation flowshop scheduling problem. Expert Systems with Applications, 38(4), 4348\u20134360. https:\/\/doi.org\/10.1016\/j.eswa.2010.09.104","journal-title":"Expert Systems with Applications"},{"key":"4362_CR29","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2014.06.011","volume-title":"Minimizing total earliness and tardiness on a permutation flow shop using VNS and MIP. Computers and Industrial Engineering","author":"R M\u2019Hallah","year":"2014","unstructured":"M\u2019Hallah, R. (2014). Minimizing total earliness and tardiness on a permutation flow shop using VNS and MIP. Computers and Industrial Engineering (Vol. 75). Elsevier. https:\/\/doi.org\/10.1016\/j.cie.2014.06.011"},{"issue":"2","key":"4362_CR30","doi-asserted-by":"publisher","first-page":"94","DOI":"10.1080\/23302674.2014.942408","volume":"1","author":"MM Mazdeh","year":"2014","unstructured":"Mazdeh, M. M., & Rostami, M. (2014). A branch-and-bound algorithm for two-machine flow-shop scheduling problems with batch delivery costs. International Journal of Systems Science: Operations & Logistics, 1(2), 94\u2013104. https:\/\/doi.org\/10.1080\/23302674.2014.942408","journal-title":"International Journal of Systems Science: Operations & Logistics"},{"key":"4362_CR31","doi-asserted-by":"publisher","DOI":"10.1007\/978-981-13-8196-6_11","volume-title":"An efficient Jaya algorithm for multi-objective permutation flow shop scheduling problem. Advances in intelligent systems and computing","author":"AK Mishra","year":"2020","unstructured":"Mishra, A. K., Shrivastava, D., Bundela, B., & Sircar, S. (2020). An efficient Jaya algorithm for multi-objective permutation flow shop scheduling problem. Advances in intelligent systems and computing (Vol. 949). Singapore: Springer. https:\/\/doi.org\/10.1007\/978-981-13-8196-6_11"},{"issue":"July","key":"4362_CR32","doi-asserted-by":"publisher","first-page":"509","DOI":"10.1016\/J.CIE.2018.07.049","volume":"124","author":"A Mishra","year":"2018","unstructured":"Mishra, A., & Shrivastava, D. (2018). A TLBO and a Jaya heuristics for permutation flow shop scheduling to minimize the sum of inventory holding and batch delay costs. Computers & Industrial Engineering, 124(July), 509\u2013522. https:\/\/doi.org\/10.1016\/J.CIE.2018.07.049","journal-title":"Computers & Industrial Engineering"},{"issue":"2","key":"4362_CR33","doi-asserted-by":"publisher","first-page":"603","DOI":"10.1007\/s12597-019-00422-y","volume":"57","author":"AK Mishra","year":"2019","unstructured":"Mishra, A. K., Shrivastava, D., & Vrat, P. (2019). An opportunistic group maintenance model for the multi-unit series system employing Jaya algorithm. Opsearch, 57(2), 603\u2013628. https:\/\/doi.org\/10.1007\/s12597-019-00422-y","journal-title":"Opsearch"},{"key":"4362_CR34","doi-asserted-by":"publisher","first-page":"79","DOI":"10.1016\/j.cie.2019.05.034","volume":"135","author":"HH Miyata","year":"2019","unstructured":"Miyata, H. H., Nagano, M. S., & Gupta, J. N. D. (2019a). Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization. Computers and Industrial Engineering, 135, 79\u2013104. https:\/\/doi.org\/10.1016\/j.cie.2019.05.034","journal-title":"Computers and Industrial Engineering"},{"issue":"4","key":"4362_CR35","doi-asserted-by":"publisher","first-page":"680","DOI":"10.1080\/0305215X.2018.1485903","volume":"51","author":"HH Miyata","year":"2019","unstructured":"Miyata, H. H., Nagano, M. S., & Gupta, J. N. D. (2019b). Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: A computational study. Engineering Optimization, 51(4), 680\u2013698. https:\/\/doi.org\/10.1080\/0305215X.2018.1485903","journal-title":"Engineering Optimization"},{"key":"4362_CR36","doi-asserted-by":"publisher","first-page":"52","DOI":"10.1016\/j.cor.2013.10.008","volume":"44","author":"J Navaei","year":"2014","unstructured":"Navaei, J., Fatemi Ghomi, S. M. T., Jolai, F., & Mozdgir, A. (2014). Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs. Computers and Operations Research, 44, 52\u201365. https:\/\/doi.org\/10.1016\/j.cor.2013.10.008","journal-title":"Computers and Operations Research"},{"key":"4362_CR37","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1504\/IJAOM.2010.034583","volume":"2","author":"D Pandey","year":"2010","unstructured":"Pandey, D., Kulkarni, M. S., & Vrat, P. (2010). Joint consideration of production scheduling, maintenance and quality policies: A review and conceptual framework. International Journal of Advanced Operations Management, 2, 1. https:\/\/doi.org\/10.1504\/IJAOM.2010.034583","journal-title":"International Journal of Advanced Operations Management"},{"issue":"4","key":"4362_CR38","doi-asserted-by":"publisher","first-page":"1098","DOI":"10.1016\/j.cie.2011.06.023","volume":"61","author":"D Pandey","year":"2011","unstructured":"Pandey, D., Kulkarni, M. S., & Vrat, P. (2011). A methodology for joint optimization for maintenance planning, process quality and production scheduling. Computers & Industrial Engineering, 61(4), 1098\u20131106. https:\/\/doi.org\/10.1016\/j.cie.2011.06.023","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"4362_CR39","doi-asserted-by":"publisher","first-page":"425","DOI":"10.1016\/S0377-2217(96)00099-9","volume":"94","author":"H Pham","year":"1996","unstructured":"Pham, H., & Wang, H. (1996). Imperfect maintenance. European Journal of Operational Research, 94(3), 425\u2013438. https:\/\/doi.org\/10.1016\/S0377-2217(96)00099-9","journal-title":"European Journal of Operational Research"},{"issue":"9\u201312","key":"4362_CR40","doi-asserted-by":"publisher","first-page":"3179","DOI":"10.1007\/s00170-016-8415-9","volume":"86","author":"BS Purohit","year":"2016","unstructured":"Purohit, B. S., & Lad, B. K. (2016). Production and maintenance planning: An integrated approach under uncertainties. The International Journal of Advanced Manufacturing Technology, 86(9\u201312), 3179\u20133191. https:\/\/doi.org\/10.1007\/s00170-016-8415-9","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"4362_CR41","doi-asserted-by":"publisher","first-page":"12","DOI":"10.1016\/j.cie.2015.08.006","volume":"90","author":"HF Rahman","year":"2015","unstructured":"Rahman, H. F., Sarker, R., & Essam, D. (2015). A genetic algorithm for permutation flow shop scheduling under make to stock production system. Computers and Industrial Engineering, 90, 12\u201324. https:\/\/doi.org\/10.1016\/j.cie.2015.08.006","journal-title":"Computers and Industrial Engineering"},{"key":"4362_CR42","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.106273","volume":"140","author":"H Rivera-G\u00f3mez","year":"2020","unstructured":"Rivera-G\u00f3mez, H., Gharbi, A., Kenn\u00e9, J. P., Monta\u00f1o-Arango, O., & Corona-Armenta, J. R. (2020). Joint optimization of production and maintenance strategies considering a dynamic sampling strategy for a deteriorating system. Computers and Industrial Engineering, 140, 106273. https:\/\/doi.org\/10.1016\/j.cie.2020.106273","journal-title":"Computers and Industrial Engineering"},{"key":"4362_CR43","doi-asserted-by":"crossref","unstructured":"Rojoko A. (2017). EBSCOhost | 124305798 | Industry 4.0 Concept: Background and Overview. Accessed 2 July 2021","DOI":"10.3991\/ijim.v11i5.7072"},{"issue":"5\u20138","key":"4362_CR44","doi-asserted-by":"publisher","first-page":"757","DOI":"10.1007\/s00170-009-2151-3","volume":"46","author":"E Safari","year":"2010","unstructured":"Safari, E., Sadjadi, S. J., & Shahanaghi, K. (2010). Scheduling flowshops with condition-based maintenance constraint to minimize expected makespan. International Journal of Advanced Manufacturing Technology, 46(5\u20138), 757\u2013767. https:\/\/doi.org\/10.1007\/s00170-009-2151-3","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"1","key":"4362_CR45","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1007\/s00291-012-0296-1","volume":"35","author":"F Seeanner","year":"2013","unstructured":"Seeanner, F., & Meyr, H. (2013). Multi-stage simultaneous lot-sizing and scheduling for flow line production. Or Spectrum, 35(1), 33\u201373. https:\/\/doi.org\/10.1007\/s00291-012-0296-1","journal-title":"Or Spectrum"},{"issue":"2011","key":"4362_CR46","doi-asserted-by":"publisher","first-page":"1146","DOI":"10.1016\/j.proeng.2012.01.974","volume":"30","author":"K Suresh","year":"2012","unstructured":"Suresh, K., & Kumarappan, N. (2012). Particle swarm optimization based generation maintenance scheduling using probabilistic approach. Procedia Engineering, 30(2011), 1146\u20131154. https:\/\/doi.org\/10.1016\/j.proeng.2012.01.974","journal-title":"Procedia Engineering"},{"issue":"3","key":"4362_CR47","doi-asserted-by":"publisher","first-page":"407","DOI":"10.1007\/s13198-013-0183-4","volume":"5","author":"PP Tambe","year":"2014","unstructured":"Tambe, P. P., & Kulkarni, M. S. (2014). A novel approach for production scheduling of a high pressure die casting machine subjected to selective maintenance and a sampling procedure for quality control. International Journal of System Assurance Engineering and Management, 5(3), 407\u2013426. https:\/\/doi.org\/10.1007\/s13198-013-0183-4","journal-title":"International Journal of System Assurance Engineering and Management"},{"key":"4362_CR48","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1016\/j.jmsy.2015.09.009","volume":"37","author":"PP Tambe","year":"2015","unstructured":"Tambe, P. P., & Kulkarni, M. S. (2015). A superimposition based approach for maintenance and quality plan optimization with production schedule, availability, repair time and detection time constraints for a single machine. Journal of Manufacturing Systems, 37, 17\u201332. https:\/\/doi.org\/10.1016\/j.jmsy.2015.09.009","journal-title":"Journal of Manufacturing Systems"},{"issue":"5\u20138","key":"4362_CR49","doi-asserted-by":"publisher","first-page":"1743","DOI":"10.1007\/s00170-013-5122-7","volume":"69","author":"PP Tambe","year":"2013","unstructured":"Tambe, P. P., Mohite, S., & Kulkarni, M. S. (2013). Optimisation of opportunistic maintenance of a multi-component system considering the effect of failures on quality and production schedule: A case study. International Journal of Advanced Manufacturing Technology, 69(5\u20138), 1743\u20131756. https:\/\/doi.org\/10.1007\/s00170-013-5122-7","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"4362_CR50","doi-asserted-by":"publisher","unstructured":"Venkata Rao, R. (2019). Introduction. In Jaya: An advanced optimization algorithm and its engineering applications (pp. 1\u20138). Cham: Springer International Publishing. https:\/\/doi.org\/10.1007\/978-3-319-78922-4_1","DOI":"10.1007\/978-3-319-78922-4_1"},{"key":"4362_CR51","doi-asserted-by":"publisher","first-page":"68","DOI":"10.1016\/j.ress.2015.10.013","volume":"146","author":"L Xiao","year":"2016","unstructured":"Xiao, L., Song, S., Chen, X., & Coit, D. W. (2016). Joint optimization of production scheduling and machine group preventive maintenance. Reliability Engineering and System Safety, 146, 68\u201378. https:\/\/doi.org\/10.1016\/j.ress.2015.10.013","journal-title":"Reliability Engineering and System Safety"},{"key":"4362_CR52","doi-asserted-by":"publisher","first-page":"26","DOI":"10.1016\/j.cie.2016.03.024","volume":"97","author":"AJ Yu","year":"2016","unstructured":"Yu, A. J., & Seif, J. (2016). Minimizing tardiness and maintenance costs in flow shop scheduling by a lower-bound-based GA. Computers and Industrial Engineering, 97, 26\u201340. https:\/\/doi.org\/10.1016\/j.cie.2016.03.024","journal-title":"Computers and Industrial Engineering"},{"key":"4362_CR53","doi-asserted-by":"publisher","first-page":"449","DOI":"10.1016\/j.asoc.2017.04.060","volume":"58","author":"M Zandieh","year":"2017","unstructured":"Zandieh, M., Khatami, A. R., & Rahmati, S. H. A. (2017). Flexible job shop scheduling under condition-based maintenance: Improved version of imperialist competitive algorithm. Applied Soft Computing Journal, 58, 449\u2013464. https:\/\/doi.org\/10.1016\/j.asoc.2017.04.060","journal-title":"Applied Soft Computing Journal"},{"key":"4362_CR54","doi-asserted-by":"publisher","first-page":"549","DOI":"10.1016\/j.jmsy.2021.03.020","volume":"59","author":"Z Zhang","year":"2021","unstructured":"Zhang, Z., Tang, Q., & Chica, M. (2021). Maintenance costs and makespan minimization for assembly permutation flow shop scheduling by considering preventive and corrective maintenance. Journal of Manufacturing Systems, 59, 549\u2013564. https:\/\/doi.org\/10.1016\/j.jmsy.2021.03.020","journal-title":"Journal of Manufacturing Systems"},{"key":"4362_CR55","doi-asserted-by":"publisher","first-page":"14","DOI":"10.1016\/j.ress.2012.01.005","volume":"101","author":"X Zhou","year":"2012","unstructured":"Zhou, X., Lu, Z., & Xi, L. (2012). Preventive maintenance optimization for a multi-component system under changing job shop schedule. Reliability Engineering and System Safety, 101, 14\u201320. https:\/\/doi.org\/10.1016\/j.ress.2012.01.005","journal-title":"Reliability Engineering and System Safety"},{"issue":"2","key":"4362_CR56","doi-asserted-by":"publisher","first-page":"361","DOI":"10.1016\/j.ijpe.2008.09.012","volume":"118","author":"X Zhou","year":"2009","unstructured":"Zhou, X., Xi, L., & Lee, J. (2009). Opportunistic preventive maintenance scheduling for a multi-unit series system based on dynamic programming. International Journal of Production Economics, 118(2), 361\u2013366. https:\/\/doi.org\/10.1016\/j.ijpe.2008.09.012","journal-title":"International Journal of Production Economics"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-021-04362-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-021-04362-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-021-04362-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,8,17]],"date-time":"2022-08-17T16:41:15Z","timestamp":1660754475000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-021-04362-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,12,1]]},"references-count":56,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2022,9]]}},"alternative-id":["4362"],"URL":"https:\/\/doi.org\/10.1007\/s10479-021-04362-z","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,12,1]]},"assertion":[{"value":"19 October 2021","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"1 December 2021","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}