{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,29]],"date-time":"2026-05-29T18:24:33Z","timestamp":1780079073917,"version":"3.54.0"},"reference-count":96,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2022,3,10]],"date-time":"2022-03-10T00:00:00Z","timestamp":1646870400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2022,3,10]],"date-time":"2022-03-10T00:00:00Z","timestamp":1646870400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2023,3]]},"DOI":"10.1007\/s10479-022-04598-3","type":"journal-article","created":{"date-parts":[[2022,3,10]],"date-time":"2022-03-10T07:02:36Z","timestamp":1646895756000},"page":"241-272","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":22,"title":["Supply chain risk network value at risk assessment using Bayesian belief networks and Monte Carlo simulation"],"prefix":"10.1007","volume":"322","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-6648-3306","authenticated-orcid":false,"given":"Abroon","family":"Qazi","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Mecit Can Emre","family":"Simsekler","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Steven","family":"Formaneck","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2022,3,10]]},"reference":[{"issue":"1","key":"4598_CR1","doi-asserted-by":"publisher","first-page":"290","DOI":"10.1016\/j.ejor.2014.03.035","volume":"238","author":"F Ackermann","year":"2014","unstructured":"Ackermann, F., Howick, S., Quigley, J., Walls, L., & Houghton, T. (2014). Systemic risk elicitation: Using causal maps to engage stakeholders and build a comprehensive view of risks. European Journal of Operational Research, 238(1), 290\u2013299. https:\/\/doi.org\/10.1016\/j.ejor.2014.03.035","journal-title":"European Journal of Operational Research"},{"key":"4598_CR2","doi-asserted-by":"publisher","unstructured":"Adedipe, T., Shafiee, M., & Zio, E. (2020). Bayesian network modelling for the wind energy industry: An overview. Reliability Engineering & System Safety, 202. https:\/\/doi.org\/10.1016\/j.ress.2020.107053","DOI":"10.1016\/j.ress.2020.107053"},{"issue":"5","key":"4598_CR3","doi-asserted-by":"publisher","first-page":"735","DOI":"10.1108\/14637151211270135","volume":"18","author":"D Aloini","year":"2012","unstructured":"Aloini, D., Dulmin, R., Mininno, V., & Ponticelli, S. (2012). Supply chain management: A review of implementation risks in the construction industry. Business Process Management Journal, 18(5), 735\u2013761. https:\/\/doi.org\/10.1108\/14637151211270135","journal-title":"Business Process Management Journal"},{"key":"4598_CR4","doi-asserted-by":"publisher","unstructured":"Aqlan, F., & Lam, S. S. (2015). A fuzzy-based integrated framework for supply chain risk assessment. International Journal of Production Economics, 161, 54\u201363. https:\/\/doi.org\/10.1016\/j.ijpe.2014.11.013","DOI":"10.1016\/j.ijpe.2014.11.013"},{"key":"4598_CR5","doi-asserted-by":"publisher","unstructured":"Aven, T. (2016a). Risk assessment and risk management: Review of recent advances on their foundation. European Journal of Operational Research, 253(1), 1\u201313. https:\/\/doi.org\/10.1016\/j.ejor.2015.12.023","DOI":"10.1016\/j.ejor.2015.12.023"},{"key":"4598_CR6","doi-asserted-by":"publisher","first-page":"51","DOI":"10.1016\/j.ress.2016.03.003","volume":"152","author":"T Aven","year":"2016","unstructured":"Aven, T. (2016b). Supplementing quantitative risk assessments with a stage addressing the risk understanding of the decision maker. Reliability Engineering & System Safety, 152, 51\u201357. https:\/\/doi.org\/10.1016\/j.ress.2016.03.003","journal-title":"Reliability Engineering & System Safety"},{"key":"4598_CR7","doi-asserted-by":"publisher","first-page":"42","DOI":"10.1016\/j.ress.2017.05.006","volume":"167","author":"T Aven","year":"2017","unstructured":"Aven, T. (2017). Improving risk characterisations in practical situations by highlighting knowledge aspects, with applications to risk matrices. Reliability Engineering & System Safety, 167, 42\u201348. https:\/\/doi.org\/10.1016\/j.ress.2017.05.006","journal-title":"Reliability Engineering & System Safety"},{"issue":"5","key":"4598_CR8","doi-asserted-by":"publisher","first-page":"631","DOI":"10.1108\/JMTM-10-2012-0097","volume":"25","author":"F Badurdeen","year":"2014","unstructured":"Badurdeen, F., Shuaib, M., Wijekoon, K., Brown, A., Faulkner, W., Amundson, J., et al. (2014). Quantitative modeling and analysis of supply chain risks using Bayesian theory. Journal of Manufacturing Technology Management, 25(5), 631\u2013654. https:\/\/doi.org\/10.1108\/JMTM-10-2012-0097","journal-title":"Journal of Manufacturing Technology Management"},{"key":"4598_CR9","doi-asserted-by":"publisher","unstructured":"Berger, P. D., Gerstenfeld, A., & Zeng, A. Z. (2004). How many suppliers are best? A decision-analysis approach. Omega, 32(1), 9\u201315. https:\/\/doi.org\/10.1016\/j.omega.2003.09.001","DOI":"10.1016\/j.omega.2003.09.001"},{"key":"4598_CR10","doi-asserted-by":"publisher","first-page":"325","DOI":"10.1016\/j.ijpe.2018.06.017","volume":"209","author":"P Boutselis","year":"2019","unstructured":"Boutselis, P., & McNaught, K. (2019). Using Bayesian Networks to forecast spares demand from equipment failures in a changing service logistics context. International Journal of Production Economics, 209, 325\u2013333. https:\/\/doi.org\/10.1016\/j.ijpe.2018.06.017","journal-title":"International Journal of Production Economics"},{"key":"4598_CR11","doi-asserted-by":"publisher","unstructured":"Cao, S., Bryceson, K., & Hine, D. (2019). An ontology-based Bayesian network modelling for supply chain risk propagation. Industrial Management and Data Systems, 119(8), 1691\u20131711. https:\/\/doi.org\/10.1108\/IMDS-01-2019-0032","DOI":"10.1108\/IMDS-01-2019-0032"},{"issue":"10","key":"4598_CR12","doi-asserted-by":"publisher","first-page":"2790","DOI":"10.1080\/00207543.2012.654922","volume":"51","author":"A Chaudhuri","year":"2013","unstructured":"Chaudhuri, A., Mohanty, B. K., & Singh, K. N. (2013). Supply chain risk assessment during new product development: A group decision making approach using numeric and linguistic data. International Journal of Production Research, 51(10), 2790\u20132804. https:\/\/doi.org\/10.1080\/00207543.2012.654922","journal-title":"International Journal of Production Research"},{"key":"4598_CR13","doi-asserted-by":"publisher","first-page":"489","DOI":"10.1007\/s10479-013-1386-4","volume":"240","author":"C-H Chiu","year":"2016","unstructured":"Chiu, C.-H., & Choi, T.-M. (2016). Supply chain risk analysis with mean-variance models: A technical review. Annals of Operations Research, 240, 489\u2013507. https:\/\/doi.org\/10.1007\/s10479-013-1386-4","journal-title":"Annals of Operations Research"},{"key":"4598_CR14","doi-asserted-by":"publisher","DOI":"10.1016\/j.tre.2020.102190","volume":"145","author":"T-M Choi","year":"2021","unstructured":"Choi, T.-M. (2021). Risk analysis in logistics systems: A research agenda during and after the COVID-19 pandemic. Transportation Research Part e: Logistics and Transportation Review, 145, 102190. https:\/\/doi.org\/10.1016\/j.tre.2020.102190","journal-title":"Transportation Research Part e: Logistics and Transportation Review"},{"key":"4598_CR15","unstructured":"Chopra, S., & Sodhi, M. S. (2004). Managing risk to avoid supply-chain breakdown. MIT Sloan Management Review, 46(1), 53\u201361. https:\/\/sloanreview.mit.edu\/article\/managing-risk-to-avoid-supplychain-breakdown\/"},{"issue":"11","key":"4598_CR16","doi-asserted-by":"publisher","first-page":"3039","DOI":"10.1080\/00207543.2011.588619","volume":"50","author":"A Diabat","year":"2012","unstructured":"Diabat, A., Govindan, K., & Panicker, V. V. (2012). Supply chain risk management and its mitigation in a food industry. International Journal of Production Research, 50(11), 3039\u20133050. https:\/\/doi.org\/10.1080\/00207543.2011.588619","journal-title":"International Journal of Production Research"},{"issue":"4","key":"4598_CR17","doi-asserted-by":"publisher","first-page":"1072","DOI":"10.1016\/j.cie.2011.06.021","volume":"61","author":"I Dogan","year":"2011","unstructured":"Dogan, I., & Aydin, N. (2011). Combining Bayesian networks and total cost of ownership method for supplier selection analysis. Computers and Industrial Engineering, 61(4), 1072\u20131085. https:\/\/doi.org\/10.1016\/j.cie.2011.06.021","journal-title":"Computers and Industrial Engineering"},{"key":"4598_CR18","doi-asserted-by":"publisher","first-page":"144","DOI":"10.1016\/j.ijpe.2016.08.021","volume":"182","author":"Q Dong","year":"2016","unstructured":"Dong, Q., & Cooper, O. (2016). An orders-of-magnitude AHP supply chain risk assessment framework. International Journal of Production Economics, 182, 144\u2013156. https:\/\/doi.org\/10.1016\/j.ijpe.2016.08.021","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"4598_CR19","doi-asserted-by":"publisher","first-page":"8","DOI":"10.1109\/TEM.2017.2723042","volume":"66","author":"R Dubey","year":"2019","unstructured":"Dubey, R., Gunasekaran, A., Childe, S. J., Papadopoulos, T., Blome, C., & Luo, Z. (2019). Antecedents of resilient supply chains: An empirical study. IEEE Transactions on Engineering Management, 66(1), 8\u201319. https:\/\/doi.org\/10.1109\/TEM.2017.2723042","journal-title":"IEEE Transactions on Engineering Management"},{"key":"4598_CR20","doi-asserted-by":"publisher","first-page":"21","DOI":"10.1016\/j.ssci.2015.02.014","volume":"76","author":"NJ Duijm","year":"2015","unstructured":"Duijm, N. J. (2015). Recommendations on the use and design of risk matrices. Safety Science, 76, 21\u201331. https:\/\/doi.org\/10.1016\/j.ssci.2015.02.014","journal-title":"Safety Science"},{"issue":"1","key":"4598_CR21","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2015.04.034","volume":"247","author":"B Fahimnia","year":"2015","unstructured":"Fahimnia, B., Tang, C. S., Davarzani, H., & Sarkis, J. (2015). Quantitative models for managing supply chain risks: A review. European Journal of Operational Research, 247(1), 1\u201315. https:\/\/doi.org\/10.1016\/j.ejor.2015.04.034","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"4598_CR22","doi-asserted-by":"publisher","first-page":"414","DOI":"10.1109\/TEM.2016.2598814","volume":"63","author":"H Fan","year":"2016","unstructured":"Fan, H., Cheng, T. C. E., Li, G., & Lee, P. K. C. (2016). The effectiveness of supply chain risk information processing capability: An information processing perspective. IEEE Transactions on Engineering Management, 63(4), 414\u2013425. https:\/\/doi.org\/10.1109\/TEM.2016.2598814","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"12","key":"4598_CR23","doi-asserted-by":"publisher","first-page":"2441","DOI":"10.1109\/TKDE.2019.2891680","volume":"31","author":"NE Fenton","year":"2019","unstructured":"Fenton, N. E., Noguchi, T., & Neil, M. (2019). An extension to the noisy-or function to resolve the \u2018Explaining Away\u2019 deficiency for practical Bayesian network problems. IEEE Transactions on Knowledge and Data Engineering, 31(12), 2441\u20132445. https:\/\/doi.org\/10.1109\/TKDE.2019.2891680","journal-title":"IEEE Transactions on Knowledge and Data Engineering"},{"issue":"2","key":"4598_CR24","doi-asserted-by":"publisher","first-page":"618","DOI":"10.1016\/j.ejor.2014.10.034","volume":"243","author":"MD Garvey","year":"2015","unstructured":"Garvey, M. D., Carnovale, S., & Yeniyurt, S. (2015). An analytical framework for supply network risk propagation: A Bayesian network approach. European Journal of Operational Research, 243(2), 618\u2013627. https:\/\/doi.org\/10.1016\/j.ejor.2014.10.034","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"4598_CR25","doi-asserted-by":"publisher","first-page":"114","DOI":"10.1108\/09574090610663464","volume":"17","author":"B Gaudenzi","year":"2006","unstructured":"Gaudenzi, B., & Borghesi, A. (2006). Managing risks in the supply chain using the AHP method. International Journal of Logistics Management, 17(1), 114\u2013136. https:\/\/doi.org\/10.1108\/09574090610663464","journal-title":"International Journal of Logistics Management"},{"key":"4598_CR26","doi-asserted-by":"publisher","unstructured":"Gaudenzi, B., & Qazi, A. (2021). Assessing project risks from a supply chain quality management (SCQM) perspective. International Journal of Quality & Reliability Management, 38(4), 908\u2013931. https:\/\/doi.org\/10.1108\/IJQRM-01-2020-0011","DOI":"10.1108\/IJQRM-01-2020-0011"},{"key":"4598_CR27","unstructured":"GeNIe 2.0. The Decision Systems Laboratory, GeNIe and SMILE. Retrieved June 5, 2015, from http:\/\/genie.sis.pitt.edu\/about.html"},{"issue":"5","key":"4598_CR28","doi-asserted-by":"publisher","first-page":"523","DOI":"10.1108\/scm-11-2012-0366","volume":"18","author":"A Ghadge","year":"2013","unstructured":"Ghadge, A., Dani, S., Chester, M., & Kalawsky, R. (2013). A systems approach for modelling supply chain risks. Supply Chain Management: An International Journal, 18(5), 523\u2013538. https:\/\/doi.org\/10.1108\/scm-11-2012-0366","journal-title":"Supply Chain Management: An International Journal"},{"key":"4598_CR29","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1016\/j.omega.2014.10.004","volume":"52","author":"I Heckmann","year":"2015","unstructured":"Heckmann, I., Comes, T., & Nickel, S. (2015). A critical review on supply chain risk\u2014Definition, measure and modeling. Omega, 52, 119\u2013132. https:\/\/doi.org\/10.1016\/j.omega.2014.10.004","journal-title":"Omega"},{"issue":"16","key":"4598_CR30","doi-asserted-by":"publisher","first-page":"5031","DOI":"10.1080\/00207543.2015.1030467","volume":"53","author":"W Ho","year":"2015","unstructured":"Ho, W., Zheng, T., Yildiz, H., & Talluri, S. (2015). Supply chain risk management: A literature review. International Journal of Production Research, 53(16), 5031\u20135069. https:\/\/doi.org\/10.1080\/00207543.2015.1030467","journal-title":"International Journal of Production Research"},{"key":"4598_CR31","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2020.106898","volume":"198","author":"NUI Hossain","year":"2020","unstructured":"Hossain, N. U. I., Amrani, S. E., Jaradat, R., Marufuzzaman, M., Buchanan, R., Rinaudo, C., et al. (2020). Modeling and assessing interdependencies between critical infrastructures using Bayesian network: A case study of inland waterway port and surrounding supply chain network. Reliability Engineering & System Safety, 198, 106898. https:\/\/doi.org\/10.1016\/j.ress.2020.106898","journal-title":"Reliability Engineering & System Safety"},{"key":"4598_CR32","doi-asserted-by":"publisher","first-page":"211","DOI":"10.1016\/j.jmsy.2016.09.006","volume":"41","author":"S Hosseini","year":"2016","unstructured":"Hosseini, S., Al Khaled, A., & Sarder, M. D. (2016). A general framework for assessing system resilience using Bayesian networks: A case study of sulfuric acid manufacturer. Journal of Manufacturing Systems, 41, 211\u2013227. https:\/\/doi.org\/10.1016\/j.jmsy.2016.09.006","journal-title":"Journal of Manufacturing Systems"},{"key":"4598_CR33","doi-asserted-by":"publisher","first-page":"68","DOI":"10.1016\/j.ijpe.2016.07.007","volume":"180","author":"S Hosseini","year":"2016","unstructured":"Hosseini, S., & Barker, K. (2016). A Bayesian network model for resilience-based supplier selection. International Journal of Production Economics, 180, 68\u201387. https:\/\/doi.org\/10.1016\/j.ijpe.2016.07.007","journal-title":"International Journal of Production Economics"},{"key":"4598_CR34","doi-asserted-by":"publisher","unstructured":"Hosseini, S., & Ivanov, D. (2019). A new resilience measure for supply networks with the ripple effect considerations: A Bayesian network approach. Annals of Operations Research. https:\/\/doi.org\/10.1007\/s10479-019-03350-8","DOI":"10.1007\/s10479-019-03350-8"},{"key":"4598_CR35","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2020.113649","volume":"161","author":"S Hosseini","year":"2020","unstructured":"Hosseini, S., & Ivanov, D. (2020). Bayesian networks for supply chain risk, resilience and ripple effect analysis: A literature review. Expert Systems with Applications, 161, 113649. https:\/\/doi.org\/10.1016\/j.eswa.2020.113649","journal-title":"Expert Systems with Applications"},{"key":"4598_CR36","doi-asserted-by":"publisher","DOI":"10.1109\/TEM.2020.3026465","author":"S Hosseini","year":"2020","unstructured":"Hosseini, S., Ivanov, D., & Blackhurst, J. (2020a). Conceptualization and measurement of supply chain resilience in an open-system context. IEEE Transactions on Engineering Management. https:\/\/doi.org\/10.1109\/TEM.2020.3026465","journal-title":"IEEE Transactions on Engineering Management"},{"key":"4598_CR37","doi-asserted-by":"publisher","first-page":"285","DOI":"10.1016\/j.tre.2019.03.001","volume":"125","author":"S Hosseini","year":"2019","unstructured":"Hosseini, S., Ivanov, D., & Dolgui, A. (2019a). Review of quantitative methods for supply chain resilience analysis. Transportation Research Part e: Logistics and Transportation Review, 125, 285\u2013307. https:\/\/doi.org\/10.1016\/j.tre.2019.03.001","journal-title":"Transportation Research Part e: Logistics and Transportation Review"},{"key":"4598_CR38","doi-asserted-by":"publisher","unstructured":"Hosseini, S., Ivanov, D., & Dolgui, A. (2020b). Ripple effect modelling of supplier disruption: Integrated Markov chain and dynamic Bayesian network approach. International Journal of Production Research, 58(11), 3284\u20133303. https:\/\/doi.org\/10.1080\/00207543.2019.1661538","DOI":"10.1080\/00207543.2019.1661538"},{"key":"4598_CR39","doi-asserted-by":"publisher","first-page":"124","DOI":"10.1016\/j.ijpe.2019.03.018","volume":"213","author":"S Hosseini","year":"2019","unstructured":"Hosseini, S., Morshedlou, N., Ivanov, D., Sarder, M. D., Barker, K., & Khaled, A. A. (2019b). Resilient supplier selection and optimal order allocation under disruption risks. International Journal of Production Economics, 213, 124\u2013137. https:\/\/doi.org\/10.1016\/j.ijpe.2019.03.018","journal-title":"International Journal of Production Economics"},{"key":"4598_CR40","doi-asserted-by":"publisher","DOI":"10.1007\/978-0-387-68282-2","volume-title":"Bayesian networks and decision graphs","author":"FV Jensen","year":"2007","unstructured":"Jensen, F. V., & Nielsen, T. D. (2007). Bayesian networks and decision graphs. Springer."},{"key":"4598_CR41","doi-asserted-by":"publisher","DOI":"10.1016\/j.tre.2020.101965","volume":"139","author":"M Jiang","year":"2020","unstructured":"Jiang, M., & Lu, J. (2020). The analysis of maritime piracy occurred in Southeast Asia by using Bayesian network. Transportation Research Part e: Logistics and Transportation Review, 139, 101965. https:\/\/doi.org\/10.1016\/j.tre.2020.101965","journal-title":"Transportation Research Part e: Logistics and Transportation Review"},{"issue":"3","key":"4598_CR42","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1111\/jbl.12086","volume":"36","author":"A K\u00e4ki","year":"2015","unstructured":"K\u00e4ki, A., Salo, A., & Talluri, S. (2015). Disruptions in supply networks: A probabilistic risk assessment approach. Journal of Business Logistics, 36(3), 273\u2013287. https:\/\/doi.org\/10.1111\/jbl.12086","journal-title":"Journal of Business Logistics"},{"issue":"6","key":"4598_CR43","doi-asserted-by":"publisher","first-page":"905","DOI":"10.1016\/j.ibusrev.2013.01.003","volume":"22","author":"I Kardes","year":"2013","unstructured":"Kardes, I., Ozturk, A., Cavusgil, S. T., & Cavusgil, E. (2013). Managing global megaprojects: Complexity and risk management. International Business Review, 22(6), 905\u2013917. https:\/\/doi.org\/10.1016\/j.ibusrev.2013.01.003","journal-title":"International Business Review"},{"key":"4598_CR44","doi-asserted-by":"crossref","unstructured":"Kjaerulff, U. B., & Madsen, A. L. (2013). Bayesian networks and influence diagrams\u202f: A guide to construction and analysis. Springer.","DOI":"10.1007\/978-1-4614-5104-4"},{"issue":"2","key":"4598_CR45","doi-asserted-by":"publisher","first-page":"141","DOI":"10.1016\/j.jom.2008.06.002","volume":"27","author":"AM Knemeyer","year":"2009","unstructured":"Knemeyer, A. M., Zinn, W., & Eroglu, C. (2009). Proactive planning for catastrophic events in supply chains. Journal of Operations Management, 27(2), 141\u2013153. https:\/\/doi.org\/10.1016\/j.jom.2008.06.002","journal-title":"Journal of Operations Management"},{"issue":"3","key":"4598_CR46","doi-asserted-by":"publisher","first-page":"409","DOI":"10.1109\/TEM.2008.922627","volume":"55","author":"TJ Kull","year":"2008","unstructured":"Kull, T. J., & Talluri, S. (2008). A supply risk reduction model using integrated multicriteria decision making. IEEE Transactions on Engineering Management, 55(3), 409\u2013419. https:\/\/doi.org\/10.1109\/TEM.2008.922627","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"4","key":"4598_CR48","doi-asserted-by":"publisher","first-page":"541","DOI":"10.1108\/02635571211225477","volume":"112","author":"CKM Lee","year":"2012","unstructured":"Lee, C. K. M., Yeung, Y. C., & Hong, Z. (2012). An integrated framework for outsourcing risk management. Industrial Management & Data Systems, 112(4), 541\u2013558. https:\/\/doi.org\/10.1108\/02635571211225477","journal-title":"Industrial Management & Data Systems"},{"issue":"6","key":"4598_CR49","doi-asserted-by":"publisher","first-page":"1072","DOI":"10.1111\/j.1539-6924.2012.01790.x","volume":"32","author":"L Li","year":"2012","unstructured":"Li, L., Wang, J., Leung, H., & Zhao, S. (2012). A Bayesian method to mine spatial data sets to evaluate the vulnerability of human beings to catastrophic risk. Risk Analysis, 32(6), 1072\u20131092. https:\/\/doi.org\/10.1111\/j.1539-6924.2012.01790.x","journal-title":"Risk Analysis"},{"key":"4598_CR50","doi-asserted-by":"publisher","unstructured":"Lin, P., Neil, M., & Fenton, N. (2020). Improved high dimensional discrete Bayesian network inference using triplet region construction. Journal of Artificial Intelligence Research, 69, 231\u2013295. https:\/\/doi.org\/10.1613\/jair.1.12198","DOI":"10.1613\/jair.1.12198"},{"key":"4598_CR51","unstructured":"Liu, Z., Lai, M., Zhou, T., & Zhou, Y. (2009). A supply chain risk assessment model based on multistage influence diagram. In 6th International conference on service systems and service management, 72\u201375. IEEE."},{"key":"4598_CR52","doi-asserted-by":"publisher","unstructured":"Lockamy, A., & McCormack, K. (2010). Analysing risks in supply networks to facilitate outsourcing decisions. International Journal of Production Research, 48(2), 593\u2013611. https:\/\/doi.org\/10.1080\/00207540903175152","DOI":"10.1080\/00207540903175152"},{"issue":"2","key":"4598_CR53","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1108\/02635571211204317","volume":"112","author":"A Lockamy","year":"2012","unstructured":"Lockamy, A., & McCormack, K. (2012). Modeling supplier risks using Bayesian networks. Industrial Management & Data Systems, 112(2), 313\u2013333. https:\/\/doi.org\/10.1108\/02635571211204317","journal-title":"Industrial Management & Data Systems"},{"key":"4598_CR54","doi-asserted-by":"publisher","unstructured":"Luo, L., Zhang, L., & Wu, G. (2020). Bayesian belief network-based project complexity measurement considering causal relationships. Journal of Civil Engineering and Management, 26(2), 200\u2013215. https:\/\/doi.org\/10.3846\/jcem.2020.11930","DOI":"10.3846\/jcem.2020.11930"},{"issue":"1","key":"4598_CR55","doi-asserted-by":"publisher","first-page":"133","DOI":"10.1002\/j.2158-1592.2008.tb00072.x","volume":"29","author":"I Manuj","year":"2008","unstructured":"Manuj, I., & Mentzer, J. T. (2008). Global supply chain risk management. Journal of Business Logistics, 29(1), 133\u2013155. https:\/\/doi.org\/10.1002\/j.2158-1592.2008.tb00072.x","journal-title":"Journal of Business Logistics"},{"key":"4598_CR56","unstructured":"Mengshoel, O. J., Poll, S., & Kurtoglu, T. (2009). Developing large-scale Bayesian networks by composition: fault diagnosis of electrical power systems in aircraft and spacecraft. In the IJCAI-09 Workshop on Self-* and Autonomous Systems: reasoning and integration challenges (SAS-09), Pasadena, California, USA."},{"issue":"3","key":"4598_CR57","doi-asserted-by":"publisher","first-page":"316","DOI":"10.1109\/TEM.2016.2567539","volume":"63","author":"R Mogre","year":"2016","unstructured":"Mogre, R., Talluri, S., & Amico, F. D. (2016). A decision framework to mitigate supply chain risks: An application in the offshore-wind industry. IEEE Transactions on Engineering Management, 63(3), 316\u2013325. https:\/\/doi.org\/10.1109\/TEM.2016.2567539","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"2","key":"4598_CR58","doi-asserted-by":"publisher","first-page":"259","DOI":"10.1016\/S0167-9236(03)00095-2","volume":"38","author":"S Nadkarni","year":"2004","unstructured":"Nadkarni, S., & Shenoy, P. P. (2004). A causal mapping approach to constructing Bayesian networks. Decision Support Systems, 38(2), 259\u2013281. https:\/\/doi.org\/10.1016\/S0167-9236(03)00095-2","journal-title":"Decision Support Systems"},{"issue":"6","key":"4598_CR59","doi-asserted-by":"publisher","first-page":"585","DOI":"10.1016\/j.tre.2005.07.002","volume":"41","author":"A Nagurney","year":"2005","unstructured":"Nagurney, A., & Matsypura, D. (2005). Global supply chain network dynamics with multicriteria decision-making under risk and uncertainty. Transportation Research Part e: Logistics and Transportation Review, 41(6), 585\u2013612. https:\/\/doi.org\/10.1016\/j.tre.2005.07.002","journal-title":"Transportation Research Part e: Logistics and Transportation Review"},{"issue":"7","key":"4598_CR60","doi-asserted-by":"publisher","first-page":"1306","DOI":"10.1109\/TKDE.2011.87","volume":"24","author":"M Neil","year":"2012","unstructured":"Neil, M., Chen, X., & Fenton, N. (2012). Optimizing the calculation of conditional probability tables in hybrid Bayesian networks using binary factorization. IEEE Transactions on Knowledge and Data Engineering, 24(7), 1306\u20131312. https:\/\/doi.org\/10.1109\/TKDE.2011.87","journal-title":"IEEE Transactions on Knowledge and Data Engineering"},{"issue":"3","key":"4598_CR61","doi-asserted-by":"publisher","first-page":"257","DOI":"10.1017\/s0269888900003039","volume":"15","author":"M Neil","year":"2000","unstructured":"Neil, M., Fenton, N., & Nielson, L. (2000). Building large-scale Bayesian networks. Knowledge Engineering Review, 15(3), 257\u2013284. https:\/\/doi.org\/10.1017\/s0269888900003039","journal-title":"Knowledge Engineering Review"},{"key":"4598_CR62","doi-asserted-by":"publisher","unstructured":"Nepal, B., & Yadav, O. P. (2015). Bayesian belief network-based framework for sourcing risk analysis during supplier selection. International Journal of Production Research, 53(20), 6114\u20136135. https:\/\/doi.org\/10.1080\/00207543.2015.1027011","DOI":"10.1080\/00207543.2015.1027011"},{"issue":"7","key":"4598_CR63","doi-asserted-by":"publisher","first-page":"940","DOI":"10.1016\/j.ress.2007.03.006","volume":"93","author":"L Norrington","year":"2008","unstructured":"Norrington, L., Quigley, J., Russell, A., & Van der Meer, R. (2008). Modelling the reliability of search and rescue operations with Bayesian belief networks. Reliability Engineering & System Safety, 93(7), 940\u2013949. https:\/\/doi.org\/10.1016\/j.ress.2007.03.006","journal-title":"Reliability Engineering & System Safety"},{"issue":"17","key":"4598_CR64","doi-asserted-by":"publisher","first-page":"5795","DOI":"10.1080\/00207543.2018.1467059","volume":"56","author":"R Ojha","year":"2018","unstructured":"Ojha, R., Ghadge, A., Tiwari, M. K., & Bititci, U. S. (2018). Bayesian network modelling for supply chain risk propagation. International Journal of Production Research, 56(17), 5795\u20135819. https:\/\/doi.org\/10.1080\/00207543.2018.1467059","journal-title":"International Journal of Production Research"},{"issue":"2","key":"4598_CR65","doi-asserted-by":"publisher","first-page":"303","DOI":"10.1109\/TEM.2017.2773574","volume":"65","author":"A Pavlov","year":"2018","unstructured":"Pavlov, A., Ivanov, D., Dolgui, A., & Sokolov, B. (2018). Hybrid fuzzy-probabilistic approach to supply chain resilience assessment. IEEE Transactions on Engineering Management, 65(2), 303\u2013315. https:\/\/doi.org\/10.1109\/TEM.2017.2773574","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"1","key":"4598_CR66","doi-asserted-by":"publisher","first-page":"162","DOI":"10.1016\/j.eswa.2012.07.026","volume":"40","author":"J Pitchforth","year":"2013","unstructured":"Pitchforth, J., & Mengersen, K. (2013). A proposed validation framework for expert elicited Bayesian networks. Expert Systems with Applications, 40(1), 162\u2013167. https:\/\/doi.org\/10.1016\/j.eswa.2012.07.026","journal-title":"Expert Systems with Applications"},{"key":"4598_CR67","doi-asserted-by":"publisher","unstructured":"Qazi, A., & Akhtar, P. (2020). Risk matrix driven supply chain risk management: Adapting risk matrix based tools to modelling interdependent risks and risk appetite. Computers & Industrial Engineering, 139. https:\/\/doi.org\/10.1016\/j.cie.2018.08.002","DOI":"10.1016\/j.cie.2018.08.002"},{"key":"4598_CR68","doi-asserted-by":"publisher","first-page":"24","DOI":"10.1016\/j.ijpe.2017.11.008","volume":"196","author":"A Qazi","year":"2018","unstructured":"Qazi, A., Dickson, A., Quigley, J., & Gaudenzi, B. (2018). Supply chain risk network management: A Bayesian belief network and expected utility based approach for managing supply chain risks. International Journal of Production Economics, 196, 24\u201342. https:\/\/doi.org\/10.1016\/j.ijpe.2017.11.008","journal-title":"International Journal of Production Economics"},{"key":"4598_CR69","doi-asserted-by":"publisher","unstructured":"Qazi, A., Quigley, J., Dickson, A., & Ekici, \u015e\u00d6. (2017). Exploring dependency based probabilistic supply chain risk measures for prioritising interdependent risks and strategies. European Journal of Operational Research, 259(1), 189\u2013204. https:\/\/doi.org\/10.1016\/j.ejor.2016.10.023","DOI":"10.1016\/j.ejor.2016.10.023"},{"issue":"7","key":"4598_CR70","doi-asserted-by":"publisher","first-page":"1183","DOI":"10.1016\/j.ijproman.2016.05.008","volume":"34","author":"A Qazi","year":"2016","unstructured":"Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016). Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects. International Journal of Project Management, 34(7), 1183\u20131198. https:\/\/doi.org\/10.1016\/j.ijproman.2016.05.008","journal-title":"International Journal of Project Management"},{"key":"4598_CR71","doi-asserted-by":"publisher","unstructured":"Qazi, A., & Simsekler, M. C. E. (2022). Worst Expected Best method for assessment of probabilistic network expected value at risk: Application in supply chain risk management. International Journal of Quality & Reliability Management, 39(1), 155\u2013175. https:\/\/doi.org\/10.1108\/IJQRM-07-2020-0238","DOI":"10.1108\/IJQRM-07-2020-0238"},{"key":"4598_CR72","doi-asserted-by":"publisher","unstructured":"Rodgers, M., & Oppenheim, R. (2019). Ishikawa diagrams and Bayesian belief networks for continuous improvement applications. The TQM Journal, 31(3), 294\u2013318. https:\/\/doi.org\/10.1108\/TQM-11-2018-0184","DOI":"10.1108\/TQM-11-2018-0184"},{"key":"4598_CR73","doi-asserted-by":"publisher","unstructured":"Rodgers, M., & Singham, D. (2020). A framework for assessing disruptions in a clinical supply chain using Bayesian belief networks. Journal of Pharmaceutical Innovation, 15, 467\u2013481. https:\/\/doi.org\/10.1007\/s12247-019-09396-2","DOI":"10.1007\/s12247-019-09396-2"},{"key":"4598_CR74","doi-asserted-by":"publisher","first-page":"190","DOI":"10.1016\/j.ijpe.2018.06.009","volume":"203","author":"R Ruiz-Ben\u00edtez","year":"2018","unstructured":"Ruiz-Ben\u00edtez, R., L\u00f3pez, C., & Real, J. C. (2018). The lean and resilient management of the supply chain and its impact on performance. International Journal of Production Economics, 203, 190\u2013202. https:\/\/doi.org\/10.1016\/j.ijpe.2018.06.009","journal-title":"International Journal of Production Economics"},{"issue":"4","key":"4598_CR75","doi-asserted-by":"publisher","first-page":"451","DOI":"10.1109\/TEM.2016.2596144","volume":"63","author":"S Sarker","year":"2016","unstructured":"Sarker, S., Engwall, M., Trucco, P., & Feldmann, A. (2016). Internal visibility of external supplier risks and the dynamics of risk management silos. IEEE Transactions on Engineering Management, 63(4), 451\u2013461. https:\/\/doi.org\/10.1109\/TEM.2016.2596144","journal-title":"IEEE Transactions on Engineering Management"},{"key":"4598_CR76","doi-asserted-by":"crossref","unstructured":"Segal, S. (2011). Corporate value of enterprise risk management: The next step in business management. Wiley.","DOI":"10.1002\/9781119200741"},{"key":"4598_CR77","doi-asserted-by":"publisher","unstructured":"Sener, A., Barut, M., Dag, A., & Yildirim, M. B. (2021). Impact of commitment, information sharing, and information usage on supplier performance: A Bayesian belief network approach. Annals of Operations Research, 303, 125\u2013158. https:\/\/doi.org\/10.1007\/s10479-019-03504-8","DOI":"10.1007\/s10479-019-03504-8"},{"key":"4598_CR78","doi-asserted-by":"publisher","first-page":"415","DOI":"10.1016\/j.jclepro.2018.10.120","volume":"208","author":"MK Shad","year":"2019","unstructured":"Shad, M. K., Lai, F.-W., Fatt, C. L., Kleme\u0161, J. J., & Bokhari, A. (2019). Integrating sustainability reporting into enterprise risk management and its relationship with business performance: A conceptual framework. Journal of Cleaner Production, 208, 415\u2013425. https:\/\/doi.org\/10.1016\/j.jclepro.2018.10.120","journal-title":"Journal of Cleaner Production"},{"issue":"2","key":"4598_CR79","doi-asserted-by":"publisher","first-page":"238","DOI":"10.1108\/JEIM-03-2014-0031","volume":"29","author":"S Sharma","year":"2016","unstructured":"Sharma, S., & Routroy, S. (2016). Modeling information risk in supply chain using Bayesian networks. Journal of Enterprise Information Management, 29(2), 238\u2013254. https:\/\/doi.org\/10.1108\/JEIM-03-2014-0031","journal-title":"Journal of Enterprise Information Management"},{"key":"4598_CR47","doi-asserted-by":"publisher","unstructured":"Sharma, S. K., & Sharma, S. (2015). Developing a Bayesian network model for supply chain risk assessment. Supply Chain Forum: An International Journal, 16(4), 50\u201372. https:\/\/doi.org\/10.1080\/16258312.2015.11728693","DOI":"10.1080\/16258312.2015.11728693"},{"key":"4598_CR80","doi-asserted-by":"publisher","unstructured":"Simsekler, M. C. E., & Qazi, A. (2020). Adoption of a data-driven Bayesian belief network investigating organizational factors that influence patient safety. Risk Analysis. https:\/\/doi.org\/10.1111\/risa.13610","DOI":"10.1111\/risa.13610"},{"issue":"2","key":"4598_CR81","doi-asserted-by":"publisher","first-page":"154","DOI":"10.1108\/13598540410527051","volume":"9","author":"PR Sinha","year":"2004","unstructured":"Sinha, P. R., Whitman, L. E., & Malzahn, D. (2004). Methodology to mitigate supplier risk in an aerospace supply chain. Supply Chain Management: An International Journal, 9(2), 154\u2013168. https:\/\/doi.org\/10.1108\/13598540410527051","journal-title":"Supply Chain Management: An International Journal"},{"key":"4598_CR82","unstructured":"SRA. (2015). Society for risk analysis glossary. https:\/\/www.sra.org\/risk-analysis-introduction\/risk-analysis-glossary\/."},{"key":"4598_CR83","doi-asserted-by":"publisher","DOI":"10.1017\/9781316882214","volume-title":"Financial enterprise risk management","author":"P Sweeting","year":"2017","unstructured":"Sweeting, P. (2017). Financial enterprise risk management. Cambridge University Press."},{"issue":"4","key":"4598_CR84","doi-asserted-by":"publisher","first-page":"253","DOI":"10.1111\/jbl.12025","volume":"34","author":"S Talluri","year":"2013","unstructured":"Talluri, S., Kull, T. J., Yildiz, H., & Yoon, J. (2013). Assessing the efficiency of risk mitigation strategies in supply chains. Journal of Business Logistics, 34(4), 253\u2013269. https:\/\/doi.org\/10.1111\/jbl.12025","journal-title":"Journal of Business Logistics"},{"key":"4598_CR85","doi-asserted-by":"publisher","unstructured":"Tang, C. S., Zimmerman, J. D., & Nelson, J. I. (2009). Managing new product development and supply chain risks: The Boeing 787 case. Supply Chain Forum: An International Journal, 10(2), 74\u201386. https:\/\/doi.org\/10.1080\/16258312.2009.11517219","DOI":"10.1080\/16258312.2009.11517219"},{"issue":"2","key":"4598_CR86","doi-asserted-by":"publisher","first-page":"04018132","DOI":"10.1061\/(ASCE)CO.1943-7862.0001595","volume":"145","author":"OB Tokdemir","year":"2019","unstructured":"Tokdemir, O. B., Erol, H., & Dikmen, I. (2019). Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2), 04018132. https:\/\/doi.org\/10.1061\/(ASCE)CO.1943-7862.0001595","journal-title":"Journal of Construction Engineering and Management"},{"key":"4598_CR87","doi-asserted-by":"publisher","first-page":"598","DOI":"10.1016\/j.jclepro.2018.02.286","volume":"184","author":"R Tong","year":"2018","unstructured":"Tong, R., Cheng, M., Zhang, L., Liu, M., Yang, X., Li, X., et al. (2018). The construction dust-induced occupational health risk using Monte-Carlo simulation. Journal of Cleaner Production, 184, 598\u2013608. https:\/\/doi.org\/10.1016\/j.jclepro.2018.02.286","journal-title":"Journal of Cleaner Production"},{"issue":"2","key":"4598_CR88","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1016\/j.ijpe.2009.03.002","volume":"119","author":"P Trkman","year":"2009","unstructured":"Trkman, P., & McCormack, K. (2009). Supply chain risk in turbulent environments\u2014A conceptual model for managing supply chain network risk. International Journal of Production Economics, 119(2), 247\u2013258. https:\/\/doi.org\/10.1016\/j.ijpe.2009.03.002","journal-title":"International Journal of Production Economics"},{"key":"4598_CR89","doi-asserted-by":"publisher","unstructured":"Tse, Y. K., Zhang, M., Tan, K. H., Pawar, K., & Fernandes, K. (2019). Managing quality risk in supply chain to drive firm\u2019s performance: The roles of control mechanisms. Journal of Business Research, 97, 291\u2013303. https:\/\/doi.org\/10.1016\/j.jbusres.2018.01.029","DOI":"10.1016\/j.jbusres.2018.01.029"},{"issue":"6","key":"4598_CR90","doi-asserted-by":"publisher","first-page":"474","DOI":"10.1108\/13598541111171165","volume":"16","author":"R Tummala","year":"2011","unstructured":"Tummala, R., & Schoenherr, T. (2011). Assessing and managing risks using the Supply Chain Risk Management Process (SCRMP). Supply Chain Management: An International Journal, 16(6), 474\u2013483. https:\/\/doi.org\/10.1108\/13598541111171165","journal-title":"Supply Chain Management: An International Journal"},{"key":"4598_CR91","doi-asserted-by":"publisher","first-page":"222","DOI":"10.1016\/j.tre.2019.03.011","volume":"125","author":"C Wan","year":"2019","unstructured":"Wan, C., Yan, X., Zhang, D., Qu, Z., & Yang, Z. (2019). An advanced fuzzy Bayesian-based FMEA approach for assessing maritime supply chain risks. Transportation Research Part e: Logistics and Transportation Review, 125, 222\u2013240. https:\/\/doi.org\/10.1016\/j.tre.2019.03.011","journal-title":"Transportation Research Part e: Logistics and Transportation Review"},{"issue":"3","key":"4598_CR92","doi-asserted-by":"publisher","first-page":"801","DOI":"10.1016\/j.ejor.2016.10.018","volume":"258","author":"C Werner","year":"2017","unstructured":"Werner, C., Bedford, T., Cooke, R. M., Hanea, A. M., & Morales-N\u00e1poles, O. (2017). Expert judgement for dependence in probabilistic modelling: A systematic literature review and future research directions. European Journal of Operational Research, 258(3), 801\u2013819. https:\/\/doi.org\/10.1016\/j.ejor.2016.10.018","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"4598_CR93","doi-asserted-by":"publisher","first-page":"295","DOI":"10.1016\/j.tre.2005.09.008","volume":"43","author":"MC Wilson","year":"2007","unstructured":"Wilson, M. C. (2007). The impact of transportation disruptions on supply chain performance. Transportation Research Part e: Logistics and Transportation Review, 43(4), 295\u2013320. https:\/\/doi.org\/10.1016\/j.tre.2005.09.008","journal-title":"Transportation Research Part e: Logistics and Transportation Review"},{"issue":"4","key":"4598_CR94","doi-asserted-by":"publisher","first-page":"676","DOI":"10.1109\/TEM.2012.2190986","volume":"60","author":"T Wu","year":"2013","unstructured":"Wu, T., Huang, S., Blackhurst, J., Zhang, X., & Wang, S. (2013). Supply chain risk management: An agent-based simulation to study the impact of retail stockouts. IEEE Transactions on Engineering Management, 60(4), 676\u2013686. https:\/\/doi.org\/10.1109\/TEM.2012.2190986","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"1","key":"4598_CR95","doi-asserted-by":"publisher","first-page":"8","DOI":"10.1111\/risa.13374","volume":"40","author":"G Zhang","year":"2020","unstructured":"Zhang, G., Thai, V. V., Law, A.W.-K., Yuen, K. F., Loh, H. S., & Zhou, Q. (2020). Quantitative risk assessment of seafarers\u2019 nonfatal injuries due to occupational accidents based on bayesian network modeling. Risk Analysis, 40(1), 8\u201323. https:\/\/doi.org\/10.1111\/risa.13374","journal-title":"Risk Analysis"},{"issue":"5","key":"4598_CR96","doi-asserted-by":"publisher","first-page":"819","DOI":"10.1016\/j.ijproman.2016.03.001","volume":"34","author":"Y Zhang","year":"2016","unstructured":"Zhang, Y. (2016). Selecting risk response strategies considering project risk interdependence. International Journal of Project Management, 34(5), 819\u2013830. https:\/\/doi.org\/10.1016\/j.ijproman.2016.03.001","journal-title":"International Journal of Project Management"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-022-04598-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-022-04598-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-022-04598-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,13]],"date-time":"2023-02-13T16:27:10Z","timestamp":1676305630000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-022-04598-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,3,10]]},"references-count":96,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2023,3]]}},"alternative-id":["4598"],"URL":"https:\/\/doi.org\/10.1007\/s10479-022-04598-3","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,3,10]]},"assertion":[{"value":"14 February 2022","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"10 March 2022","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}