{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T09:05:51Z","timestamp":1777712751547,"version":"3.51.4"},"reference-count":62,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2022,4,19]],"date-time":"2022-04-19T00:00:00Z","timestamp":1650326400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2022,4,19]],"date-time":"2022-04-19T00:00:00Z","timestamp":1650326400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2023,5]]},"DOI":"10.1007\/s10479-022-04666-8","type":"journal-article","created":{"date-parts":[[2022,4,19]],"date-time":"2022-04-19T07:18:04Z","timestamp":1650352684000},"page":"543-572","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":34,"title":["Sustainable inventory management with hybrid production system and investment to reduce defects"],"prefix":"10.1007","volume":"324","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-8677-5402","authenticated-orcid":false,"given":"Wakhid Ahmad","family":"Jauhari","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9587-8152","authenticated-orcid":false,"given":"I Nyoman","family":"Pujawan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mokh","family":"Suef","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2022,4,19]]},"reference":[{"key":"4666_CR1","doi-asserted-by":"crossref","first-page":"807","DOI":"10.1016\/j.jclepro.2018.02.289","volume":"186","author":"W Ahmed","year":"2018","unstructured":"Ahmed, W., & Sarkar, B. (2018). Impact of carbon emissions in a sustainable supply chain management for a second generation biofuel. Journal of Cleaner Production, 186, 807\u2013820.","journal-title":"Journal of Cleaner Production"},{"key":"4666_CR2","doi-asserted-by":"crossref","first-page":"335","DOI":"10.1016\/j.ijpe.2017.05.017","volume":"191","author":"M AlDurgam","year":"2017","unstructured":"AlDurgam, M., Adegbola, K., & Glock, C. H. (2017). A single vendor single manufacturer integrated inventory model with stochastic demand and variable production rate. International Journal of Production Economics, 191, 335\u2013350.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"4666_CR4","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/j.ijpe.2009.10.033","volume":"133","author":"M Bonney","year":"2011","unstructured":"Bonney, M., & Jaber, M. Y. (2011). Environmentally responsible inventory models: Nonclassical models for a non-classical era. International Journal of Production Economics, 133(1), 43\u201353.","journal-title":"International Journal of Production Economics"},{"issue":"3\/4","key":"4666_CR5","doi-asserted-by":"crossref","first-page":"535","DOI":"10.1016\/j.mcm.2006.11.031","volume":"46","author":"SW Chiu","year":"2007","unstructured":"Chiu, S. W., Ting, C. K., & Chiu, Y. S. P. (2007). Optimal production lot sizing with rework, scrap rate and service level constraint. Mathematical and Computer Modeling, 46(3\/4), 535\u2013549.","journal-title":"Mathematical and Computer Modeling"},{"issue":"1","key":"4666_CR6","first-page":"26","volume":"14","author":"Y Daryanto","year":"2021","unstructured":"Daryanto, Y., & Wee, H. M. (2021). Three-Echelon green supply chain inventory decision for imperfect quality deteriorating items. Operations and Supply Chain Management, 14(1), 26\u201338.","journal-title":"Operations and Supply Chain Management"},{"issue":"3","key":"4666_CR7","doi-asserted-by":"crossref","first-page":"1","DOI":"10.3390\/math7030234","volume":"7","author":"Y Daryanto","year":"2019","unstructured":"Daryanto, Y., Wee, H. M., & Widyadana, G. A. (2019). Low carbon supply chain coordination for imperfect quality deteriorating items. Mathematics, 7(3), 1\u201324.","journal-title":"Mathematics"},{"issue":"1","key":"4666_CR8","doi-asserted-by":"crossref","first-page":"222","DOI":"10.1016\/j.ijpe.2014.02.004","volume":"155","author":"O Dey","year":"2014","unstructured":"Dey, O., & Giri, B. C. (2014). Optimal vendor investment for reducing defect rate in a vendor-buyer integrated system with imperfect production process. International Journal of Production Economics, 155(1), 222\u2013228.","journal-title":"International Journal of Production Economics"},{"key":"4666_CR9","unstructured":"Drake, D., Kleindorfer, P. and van Wassenhove, L. (2010) \u2018Heidelberg Cement: Technology Choice under Carbon Regulation\u2019, Case 610\u2013014\u20131, European Case Clearing House."},{"issue":"1","key":"4666_CR10","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1016\/S0925-5273(98)00102-9","volume":"59","author":"S Eiamkanchanalai","year":"1999","unstructured":"Eiamkanchanalai, S., & Banerjee, A. (1999). Production lot sizing with variable production rate and explicit idle capacity cost. International Journal of Production Economics, 59(1), 251\u2013259.","journal-title":"International Journal of Production Economics"},{"key":"4666_CR11","doi-asserted-by":"crossref","unstructured":"Entezaminia, A., Gharbi, A. and Ouhimmou, M. (2020) \u2018Environmental hedging point policies for collaborative unreliable manufacturing systems with variant emitting level technologies\u2019, Journal of Cleaner Production, Vol. 250, 119539","DOI":"10.1016\/j.jclepro.2019.119539"},{"issue":"1","key":"4666_CR12","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1016\/j.ejor.2004.11.024","volume":"173","author":"M Freimer","year":"2006","unstructured":"Freimer, M., Thomas, D., & Tyworth, J. (2006). The value of setup cost reduction and process improvement for economic production quantity model defects. European Journal of Operational Research, 173(1), 241\u2013251.","journal-title":"European Journal of Operational Research"},{"key":"4666_CR13","doi-asserted-by":"crossref","first-page":"5925","DOI":"10.1080\/00207540903170906","volume":"48","author":"CH Glock","year":"2010","unstructured":"Glock, C. H. (2010). Batch sizing with controllable production rates. International Journal of Production Research, 48, 5925\u20135942.","journal-title":"International Journal of Production Research"},{"key":"4666_CR14","doi-asserted-by":"crossref","first-page":"6017","DOI":"10.1080\/00207543.2010.528058","volume":"49","author":"CH Glock","year":"2011","unstructured":"Glock, C. H. (2011). Batch sizing with controllable production rates in a multi-stage production system. International Journal of Production Research, 49, 6017\u20136039.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"4666_CR15","doi-asserted-by":"crossref","first-page":"908","DOI":"10.1287\/opre.2013.1189","volume":"61","author":"X Gong","year":"2013","unstructured":"Gong, X., & Zhou, S. X. (2013). Optimal production planning with emissions trading. Operations Research, 61(4), 908\u2013924.","journal-title":"Operations Research"},{"key":"4666_CR16","doi-asserted-by":"crossref","unstructured":"Goyal, S.K., Dan Nebebe F., (2000). Determination of economic production-shipment policy for single-vendor\u2013single-buyer system. European Journal of Operational Research. 121, 175\u2013178.","DOI":"10.1016\/S0377-2217(99)00013-2"},{"key":"4666_CR17","unstructured":"Hendriks, C.A., Worrell, E., Jager, D., Blok, K. and Reimer, P. (2004) \u2018Emission reduction of Greenhouse Gases from the cement industry\u2019, Greenhouse Gas Control Technologies Conference Paper."},{"key":"4666_CR18","doi-asserted-by":"crossref","first-page":"96","DOI":"10.1016\/j.ejor.2015.11.015","volume":"251","author":"Z Hong","year":"2016","unstructured":"Hong, Z., Chu, C., & Yu, Y. (2016). Dual-mode production planning for manufacturing with emission constraints. European Journal of Operational Research, 251, 96\u2013106.","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"4666_CR19","doi-asserted-by":"crossref","first-page":"939","DOI":"10.5267\/j.ijiec.2012.05.007","volume":"3","author":"JT Hsu","year":"2012","unstructured":"Hsu, J. T., & Hsu, L. F. (2012). A note: Optimal inventory model for items with imperfect quality and shortage backordering. International Journal of Industrial Engineering Computations, 3(5), 939\u2013948.","journal-title":"International Journal of Industrial Engineering Computations"},{"key":"4666_CR20","doi-asserted-by":"crossref","first-page":"178","DOI":"10.1016\/j.ijpe.2011.03.024","volume":"132","author":"G Hua","year":"2011","unstructured":"Hua, G., Cheng, T. C. E., & Wang, S. (2011). Managing carbon footprint in inventory management. International Journal of Production Economics, 132, 178\u2013185.","journal-title":"International Journal of Production Economics"},{"issue":"4","key":"4666_CR21","doi-asserted-by":"crossref","first-page":"355","DOI":"10.1080\/09537280110112424","volume":"13","author":"CK Huang","year":"2002","unstructured":"Huang, C. K. (2002). An integrated vendor-buyer cooperative inventory model for items with imperfect quality. Production Planning Control, 13(4), 355\u2013361.","journal-title":"Production Planning Control"},{"key":"4666_CR22","doi-asserted-by":"publisher","unstructured":"Islam, M.T.,\u00a0Azeem, A.,\u00a0Jabir, M.,\u00a0Paul, A.,\u00a0and Paul, S.K. (2020). An inventory model for a three-stage supply chain with random capacities considering disruptions and supplier reliability. Annals of Operations Research. https:\/\/doi.org\/10.1007\/s10479-020-03639-z","DOI":"10.1007\/s10479-020-03639-z"},{"issue":"1","key":"4666_CR23","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1080\/00207543.2011.651656","volume":"51","author":"MY Jaber","year":"2013","unstructured":"Jaber, M. Y., Glock, C. H., & El-Saadany, A. M. A. (2013). Supply chain coordination with emissions reduction incentives. International Journal of Production Research, 51(1), 69\u201382.","journal-title":"International Journal of Production Research"},{"key":"4666_CR24","doi-asserted-by":"crossref","unstructured":"Jauhari, W.A., Pujawan, I.N. and Suef, M. (2021). A closed-loop supply chain inventory model with stochastic demand, hybrid production, carbon emissions, and take-back incentives. Journal of Cleaner Production, 320, 128835.","DOI":"10.1016\/j.jclepro.2021.128835"},{"key":"4666_CR25","doi-asserted-by":"crossref","first-page":"1308653","DOI":"10.1080\/23311916.2017.1308653","volume":"4","author":"WA Jauhari","year":"2017","unstructured":"Jauhari, W. A., Mayangsari, S., Kurdhi, N. A., & Wong, K. Y. (2017). A fuzzy periodic review integrated inventory model involving stochastic demand, imperfect production process and inspection errors. Cogent Engineering, 4, 1308653.","journal-title":"Cogent Engineering"},{"issue":"1","key":"4666_CR26","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1504\/IJOR.2014.060517","volume":"20","author":"WA Jauhari","year":"2014","unstructured":"Jauhari, W. A., & Pujawan, I. N. (2014). Joint economic lot size (JELS) model for single-vendor single-buyer with variable production rate and partial backorder. International Journal of Operational Research, 20(1), 91\u2013108.","journal-title":"International Journal of Operational Research"},{"issue":"1","key":"4666_CR27","doi-asserted-by":"crossref","first-page":"371","DOI":"10.1080\/21693277.2017.1401965","volume":"5","author":"WA Jauhari","year":"2017","unstructured":"Jauhari, W. A., & Saga, R. S. (2017). A stochastic periodic review inventory model for vendor\u2013buyer system with setup cost reduction and service-level constraint. Production and Manufacturing System, 5(1), 371\u2013389.","journal-title":"Production and Manufacturing System"},{"issue":"6","key":"4666_CR28","doi-asserted-by":"crossref","first-page":"733","DOI":"10.1504\/IJPM.2016.079983","volume":"9","author":"WA Jauhari","year":"2016","unstructured":"Jauhari, W. A., Sejati, N., & Rosyidi, C. N. (2016). A collaborative supply chain inventory model with defective items, adjusted production rate and variable lead time. International Journal of Procurement Management, 9(6), 733\u2013750.","journal-title":"International Journal of Procurement Management"},{"key":"4666_CR29","doi-asserted-by":"crossref","first-page":"4067","DOI":"10.1080\/002075499189934","volume":"37","author":"M Khouja","year":"1999","unstructured":"Khouja, M. (1999). A note on deliberately slowing down output in a family production context. International Journal of Production Research, 37, 4067\u20134077.","journal-title":"International Journal of Production Research"},{"issue":"12","key":"4666_CR30","doi-asserted-by":"crossref","first-page":"1405","DOI":"10.1057\/jors.1994.217","volume":"45","author":"M Khouja","year":"1994","unstructured":"Khouja, M., & Mehrez, A. (1994). Economic production lot size model with variable production rate and imperfect quality. Journal of the Operational Research Society, 45(12), 1405\u20131417.","journal-title":"Journal of the Operational Research Society"},{"key":"4666_CR31","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/j.jmsy.2018.04.016","volume":"47","author":"MS Kim","year":"2018","unstructured":"Kim, M. S., Kim, J. S., Sarkar, B., Sarkar, M., & Iqbal, M. W. (2018). An improved way to calculate imperfect items during long-run production in an integrated inventory model with backorders. Journal of Manufacturing Systems, 47, 153\u2013167.","journal-title":"Journal of Manufacturing Systems"},{"key":"4666_CR32","doi-asserted-by":"crossref","first-page":"572","DOI":"10.1016\/j.jclepro.2016.11.052","volume":"144","author":"MS Kim","year":"2017","unstructured":"Kim, M. S., & Sarkar, B. (2017). Multi-stage cleaner production process with quality improvement and lead time dependent ordering cost. Journal of Cleaner Production, 144, 572\u2013590.","journal-title":"Journal of Cleaner Production"},{"key":"4666_CR33","first-page":"1041","volume":"8","author":"MG Kumar","year":"2017","unstructured":"Kumar, M. G., & Uthayakumar, R. (2017). An integrated single vendor-buyer inventory model for imperfect production process with stochastic demand in controllable lead time. International Journal Assurance and Engineering Management, 8, 1041\u20131054.","journal-title":"International Journal Assurance and Engineering Management"},{"issue":"9","key":"4666_CR34","doi-asserted-by":"crossref","first-page":"775","DOI":"10.1057\/jors.1991.148","volume":"42","author":"JS Lee","year":"1991","unstructured":"Lee, J. S., & Park, K. S. (1991). Joint determination of production cycle and inspection intervals in a deteriorating production. Journal of Operational Research, 42(9), 775\u2013783.","journal-title":"Journal of Operational Research"},{"key":"4666_CR35","doi-asserted-by":"crossref","unstructured":"Li, Z. and Hai, J. (2019). Inventory management for one warehouse multi-retailer systems with carbon emission costs. Computers and Industrial Engineering. 130, 565\u2013574.","DOI":"10.1016\/j.cie.2019.03.015"},{"key":"4666_CR36","doi-asserted-by":"crossref","unstructured":"Lin, Y.J. (2010). A stochastic periodic review integrated inventory model involving defective items, backorder price discount, and variable lead time. 4OR. 8(3), 281\u2013297.","DOI":"10.1007\/s10288-010-0124-x"},{"issue":"4","key":"4666_CR37","first-page":"200","volume":"3","author":"YJ Lin","year":"2016","unstructured":"Lin, Y. J., & Lin, H. J. (2016). Optimal ordering and recovery policy in a periodic review integrated inventory model. International Journal of Systems Sciences, 3(4), 200\u2013210.","journal-title":"International Journal of Systems Sciences"},{"issue":"2","key":"4666_CR38","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1080\/21681015.2017.1415230","volume":"35","author":"AK Manna","year":"2018","unstructured":"Manna, A. K., Dey, J. K., & Mondal, S. K. (2018). Two layers supply chain in an imperfect production inventory model with two storage facilities under reliability consideration. Journal of Industrial and Production Engineering, 35(2), 57\u201373.","journal-title":"Journal of Industrial and Production Engineering"},{"key":"4666_CR39","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1016\/j.ijpe.2019.01.017","volume":"211","author":"B Marchi","year":"2019","unstructured":"Marchi, B., Zanoni, S., Zavanella, L. E., & Jaber, M. Y. (2019). Supply chain models with greenhouse gasses emissions, energy usage, imperfect process under different coordination decisions. International Journal of Production Economics, 211, 145\u2013153.","journal-title":"International Journal of Production Economics"},{"key":"4666_CR40","doi-asserted-by":"crossref","unstructured":"Martin, N., Anglani, N., Einstein, D., Khrushch, M., Worrell, E., and Price, L.K. (2000) \u2018Opportunities to improve energy efficiency and reduce greenhouse gas emissions in the U.S. pulp and paper industry\u2019, LBNL-46141, Environmental Energy Technologies Division, Ernest Orlando Lawrence Berkeley National Laboratory, Berkeley, CA.","DOI":"10.2172\/767608"},{"key":"4666_CR41","doi-asserted-by":"crossref","first-page":"509","DOI":"10.1504\/IJOR.2016.077725","volume":"26","author":"A Memari","year":"2016","unstructured":"Memari, A., Rahim, A. R. A., Ahmad, R., & Hassan, A. (2016). A literature review on green supply chain modelling for optimising CO2 emission. International Journal of Operational Research, 26, 509\u2013525.","journal-title":"International Journal of Operational Research"},{"issue":"4","key":"4666_CR42","doi-asserted-by":"crossref","first-page":"1277","DOI":"10.1051\/ro\/2018014","volume":"52","author":"DJ Mohanty","year":"2018","unstructured":"Mohanty, D. J., Kumar, R. S., & Goswami, A. (2018). Vendor-buyer integrated production-inventory system for imperfect quality item under trade credit finance and variable setup cost. RAIRO - Operations Research, 52(4), 1277\u20131293.","journal-title":"RAIRO - Operations Research"},{"key":"4666_CR43","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1007\/s40092-019-00326-y","volume":"15","author":"A Mukherjee","year":"2019","unstructured":"Mukherjee, A., Dey, O., & Giri, B. C. (2019). An integrated vendor-buyer model with stochastic demand, lot-size dependent lead-time and learning in production. Journal of Industrial Engineering International, 15, 165\u2013178.","journal-title":"Journal of Industrial Engineering International"},{"issue":"6","key":"4666_CR44","doi-asserted-by":"crossref","first-page":"598","DOI":"10.1080\/095372800414160","volume":"11","author":"LY Ouyang","year":"2000","unstructured":"Ouyang, L. Y., & Chang, H. C. (2000). Impact of investing in quality improvement on (Q, r, L) model involving the imperfect production process. Production Planning Control, 11(6), 598\u2013607.","journal-title":"Production Planning Control"},{"key":"4666_CR45","doi-asserted-by":"crossref","first-page":"1701","DOI":"10.1016\/S0305-0548(01)00051-X","volume":"29","author":"LY Ouyang","year":"2002","unstructured":"Ouyang, L. Y., Chen, C. K., & Chang, H. C. (2002). Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process. Computers and Operation Research, 29, 1701\u20131717.","journal-title":"Computers and Operation Research"},{"issue":"11\u201312","key":"4666_CR46","doi-asserted-by":"crossref","first-page":"1232","DOI":"10.1007\/s00170-005-0008-y","volume":"29","author":"LY Ouyang","year":"2006","unstructured":"Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2006). Analysis of optimal vendor-buyer integrated policy involving defective items. The Journal of Advanced Manufacturing Technology, 29(11\u201312), 1232\u20131245.","journal-title":"The Journal of Advanced Manufacturing Technology"},{"key":"4666_CR47","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1016\/j.cie.2017.02.003","volume":"106","author":"S Pal","year":"2017","unstructured":"Pal, S., & Mahapatra, G. S. (2017). A manufacturing-oriented supply chain model for imperfect quality with inspection errors, stochastic demand under rework and shortages. Computers and Industrial Engineering, 106, 299\u2013314.","journal-title":"Computers and Industrial Engineering"},{"key":"4666_CR48","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1016\/j.orl.2019.06.003","volume":"47","author":"SL Phouratsamay","year":"2019","unstructured":"Phouratsamay, S. L., & Cheng, T. C. E. (2019). The single-item-lot-sizing problem with two production modes, inventory bounds and periodic carbon emissions capacity. Operations Research Letters, 47, 339\u2013343.","journal-title":"Operations Research Letters"},{"key":"4666_CR49","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1287\/opre.34.1.137","volume":"34","author":"EL Porteus","year":"1986","unstructured":"Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operation Research, 34, 137\u2013144.","journal-title":"Operation Research"},{"issue":"6","key":"4666_CR50","doi-asserted-by":"crossref","first-page":"1487","DOI":"10.1111\/itor.12202","volume":"24","author":"S Priyan","year":"2017","unstructured":"Priyan, S., & Uthayakumar, R. (2017). An integrated production\u2013distribution inventory system involving probabilistic defective and errors in quality inspection under variable setup cost. International Transactions in Operational Research, 24(6), 1487\u20131524.","journal-title":"International Transactions in Operational Research"},{"key":"4666_CR51","doi-asserted-by":"crossref","first-page":"625","DOI":"10.1016\/j.apm.2016.11.003","volume":"57","author":"MA Rad","year":"2018","unstructured":"Rad, M. A., Khoshalhan, F., & Glock, C. H. (2018). Optimal production and distribution policies for a two-stage supply chain with imperfect items and price- and advertisement-sensitive demand: A note. Applied Mathematical Modelling, 57, 625\u2013632.","journal-title":"Applied Mathematical Modelling"},{"key":"4666_CR52","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1080\/07408178608975329","volume":"18","author":"MJ Rosenblatt","year":"1986","unstructured":"Rosenblatt, M. J., & Lee, H. L. (1986). Economic production cycles with imperfect production process. IIE Transactions, 18, 48\u201355.","journal-title":"IIE Transactions"},{"issue":"1","key":"4666_CR53","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1504\/IJLSM.2019.102062","volume":"34","author":"RS Saga","year":"2019","unstructured":"Saga, R. S., Jauhari, W. A., Laksono, P. W., & Dwicahyani, A. R. (2019). Investigating carbon emissions in a production-inventory model under imperfect production, inspection errors and service-level constraint. International Journal of Logistics Systems and Management, 34(1), 29\u201355.","journal-title":"International Journal of Logistics Systems and Management"},{"key":"4666_CR54","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1016\/j.jmsy.2014.11.003","volume":"34","author":"B Sarkar","year":"2015","unstructured":"Sarkar, B., Chaudhuri, K., & Moon, I. (2015). Manufacturing setup cost reduction and quality improvement for the distribution free continuous-review inventory model with a service level constraint. Journal of Manufacturing System, 34, 74\u201382.","journal-title":"Journal of Manufacturing System"},{"issue":"4","key":"4666_CR55","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1504\/IJPM.2010.035467","volume":"3","author":"B Sarkar","year":"2010","unstructured":"Sarkar, B., Chaudhuri, K., & Sana, S. S. (2010). A stock-dependent inventory model in an imperfect production process. International Journal of Procurement Management, 3(4), 361\u2013378.","journal-title":"International Journal of Procurement Management"},{"issue":"2","key":"4666_CR56","doi-asserted-by":"crossref","first-page":"202","DOI":"10.1108\/13598541211212924","volume":"17","author":"J Sarkis","year":"2012","unstructured":"Sarkis, J. (2012). A boundaries and flaws perspective of green supply chain management. Supply Chain Management: International Journal, 17(2), 202\u2013216.","journal-title":"Supply Chain Management: International Journal"},{"key":"4666_CR57","first-page":"22","volume":"29","author":"RL Schwaller","year":"1988","unstructured":"Schwaller, R. L. (1988). EOQ under inspection costs. Production and Inventory Management, 29, 22\u201324.","journal-title":"Production and Inventory Management"},{"key":"4666_CR58","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1016\/j.jclepro.2018.04.261","volume":"192","author":"S Tiwari","year":"2018","unstructured":"Tiwari, S., Daryanto, Y., & Wee, H. M. (2018). Sustainable inventory management with deteriorating and imperfect quality items considering carbon emission. Journal of Cleaner Production, 192, 281\u2013292.","journal-title":"Journal of Cleaner Production"},{"key":"4666_CR59","doi-asserted-by":"publisher","unstructured":"Turken, N.,\u00a0Geda, A.,\u00a0Takasi, V.D.G. (2021). The impact of co-location in emissions regulation clusters on traditional and vendor managed supply chain inventory decisions. Annals of Operations Research. https:\/\/doi.org\/10.1007\/s10479-021-03954-z","DOI":"10.1007\/s10479-021-03954-z"},{"key":"4666_CR60","unstructured":"US-EPA (2018). Accessed on10th December 2019. https:\/\/www.epa.gov\/ghgemissions\/global-greenhouse-gas-emissions-data#Sector"},{"issue":"1","key":"4666_CR61","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1016\/j.ijpe.2011.06.008","volume":"134","author":"MIM Wahab","year":"2011","unstructured":"Wahab, M. I. M., Mamun, S. M. H., & Ongkunaruk, P. (2011). EOQ models for a coordinated two-level international supply chain considering imperfect items and environmental impact. International Journal of Production Economics, 134(1), 151\u2013158.","journal-title":"International Journal of Production Economics"},{"key":"4666_CR62","doi-asserted-by":"crossref","first-page":"453","DOI":"10.5267\/j.ijiec.2017.3.003","volume":"8","author":"ID Wangsa","year":"2017","unstructured":"Wangsa, I. D. (2017). Greenhouse gas penalty and incentive policies for a joint economic lot size model with industrial and transport emissions. International Journal of Industrial Engineering Computations, 8, 453\u2013480.","journal-title":"International Journal of Industrial Engineering Computations"},{"issue":"1","key":"4666_CR63","first-page":"7","volume":"35","author":"HM Wee","year":"2007","unstructured":"Wee, H. M., Yu, J., & Chen, M. J. (2007). Optimal inventory model for items with imperfect quality and shortage backordering. The International Journal of Management Science, 35(1), 7\u201311.","journal-title":"The International Journal of Management Science"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-022-04666-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-022-04666-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-022-04666-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,4,28]],"date-time":"2023-04-28T12:48:34Z","timestamp":1682686114000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-022-04666-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,4,19]]},"references-count":62,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2023,5]]}},"alternative-id":["4666"],"URL":"https:\/\/doi.org\/10.1007\/s10479-022-04666-8","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,4,19]]},"assertion":[{"value":"9 March 2022","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"19 April 2022","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}