{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,8]],"date-time":"2026-04-08T01:43:07Z","timestamp":1775612587525,"version":"3.50.1"},"reference-count":54,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2022,12,14]],"date-time":"2022-12-14T00:00:00Z","timestamp":1670976000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2022,12,14]],"date-time":"2022-12-14T00:00:00Z","timestamp":1670976000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2023,2]]},"DOI":"10.1007\/s10479-022-05118-z","type":"journal-article","created":{"date-parts":[[2022,12,14]],"date-time":"2022-12-14T09:03:05Z","timestamp":1671008585000},"page":"507-540","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":15,"title":["Benders\u2019 decomposition based exact solution method for multi-manned assembly line balancing problem with walking workers"],"prefix":"10.1007","volume":"321","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-3173-1749","authenticated-orcid":false,"given":"Murat","family":"\u015eahin","sequence":"first","affiliation":[]},{"given":"Talip","family":"Kelleg\u00f6z","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2022,12,14]]},"reference":[{"key":"5118_CR1","doi-asserted-by":"crossref","unstructured":"Agussurja, L., Kumar, A., & Lau, H. C. (2018, April). Resource-constrained scheduling for maritime traffic management. In\u00a0Thirty-Second AAAI Conference on Artificial Intelligence.","DOI":"10.1609\/aaai.v32i1.12086"},{"issue":"5","key":"5118_CR2","doi-asserted-by":"crossref","first-page":"755","DOI":"10.1080\/00207548308942409","volume":"21","author":"F Akagi","year":"1983","unstructured":"Akagi, F., Osaki, H., & Kikuchi, S. (1983). A method for assembly line balancing with more than one worker in each station. The International Journal of Production Research, 21(5), 755\u2013770.","journal-title":"The International Journal of Production Research"},{"issue":"2","key":"5118_CR3","doi-asserted-by":"crossref","first-page":"527","DOI":"10.1016\/j.ejor.2016.11.001","volume":"259","author":"S Akpinar","year":"2017","unstructured":"Akpinar, S., Elmi, A., & Bekta\u015f, T. (2017). Combinatorial benders cuts for assembly line balancing problems with setups. European Journal of Operational Research, 259(2), 527\u2013537.","journal-title":"European Journal of Operational Research"},{"key":"5118_CR4","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/j.procir.2012.07.041","volume":"3","author":"A Al-Zuheri","year":"2012","unstructured":"Al-Zuheri, A., Luong, L., & Xing, K. (2012). The role of randomness of a manual assembly line with walking workers on model validation. Procedia CIRP, 3, 233\u2013238.","journal-title":"Procedia CIRP"},{"issue":"1","key":"5118_CR5","doi-asserted-by":"crossref","first-page":"96","DOI":"10.1016\/j.ejor.2021.12.002","volume":"302","author":"E Andreu-Casas","year":"2022","unstructured":"Andreu-Casas, E., Garc\u00eda-Villoria, A., & Pastor, R. (2022). Multi-manned assembly line balancing problem with dependent task times: A heuristic based on solving a partition problem with constraints. European Journal of Operational Research, 302(1), 96\u2013116.","journal-title":"European Journal of Operational Research"},{"issue":"7","key":"5118_CR6","first-page":"925","volume":"5","author":"SR Azzam","year":"2011","unstructured":"Azzam, S. R., Arias, L. C., & Zhou, S. (2011). Managing a manufacturing system with integration of walking worker and lean thinking. World Academy of Science, Engineering and Technology, 5(7), 925\u2013927.","journal-title":"World Academy of Science, Engineering and Technology"},{"issue":"1","key":"5118_CR7","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1287\/opre.44.1.21","volume":"44","author":"JJ Bartholdi III","year":"1996","unstructured":"Bartholdi, J. J., III., & Eisenstein, D. D. (1996). A production line that balances itself. Operations Research, 44(1), 21\u201334.","journal-title":"Operations Research"},{"issue":"2","key":"5118_CR8","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1016\/j.ejor.2008.11.051","volume":"199","author":"C Becker","year":"2009","unstructured":"Becker, C., & Scholl, A. (2009). Balancing assembly lines with variable parallel workplaces: problem definition and effective solution procedure. European Journal of Operational Research, 199(2), 359\u2013374.","journal-title":"European Journal of Operational Research"},{"key":"5118_CR9","doi-asserted-by":"crossref","first-page":"238","DOI":"10.1007\/BF01386316","volume":"4","author":"JF Benders","year":"1962","unstructured":"Benders, J. F. (1962). Partitioning procedures for solving mixed-variables programming problems. Numerische Mathematik, 4, 238\u2013252.","journal-title":"Numerische Mathematik"},{"key":"5118_CR10","unstructured":"Boozer, K. (2020). The Assembly Line.\u00a0Science, Technology, & Society: A Student-Led Exploration."},{"issue":"9","key":"5118_CR11","doi-asserted-by":"crossref","first-page":"2971","DOI":"10.1007\/s00170-020-06438-9","volume":"112","author":"M Calzavara","year":"2021","unstructured":"Calzavara, M., Faccio, M., Persona, A., & Zennaro, I. (2021). Walking worker vs fixed worker assembly considering the impact of components exposure on assembly time and energy expenditure. The International Journal of Advanced Manufacturing Technology, 112(9), 2971\u20132988.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"3","key":"5118_CR12","doi-asserted-by":"crossref","first-page":"649","DOI":"10.1080\/00207543.2019.1587190","volume":"58","author":"E Cevikcan","year":"2020","unstructured":"Cevikcan, E., Aslan, D., & Yeni, F. B. (2020). Disassembly line design with multi-manned workstations: A novel heuristic optimisation approach. International Journal of Production Research, 58(3), 649\u2013670.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"5118_CR13","first-page":"327","volume":"13","author":"HJ Chang","year":"2010","unstructured":"Chang, H. J., & Chang, T. M. (2010). Simultaneous perspective-based mixed-model assembly line balancing problem. Journal of Applied Science and Engineering, 13(3), 327\u2013336.","journal-title":"Journal of Applied Science and Engineering"},{"key":"5118_CR14","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1016\/j.jmsy.2018.07.001","volume":"48","author":"YY Chen","year":"2018","unstructured":"Chen, Y. Y., Cheng, C. Y., & Li, J. Y. (2018). Resource-constrained assembly line balancing problems with multi-manned workstations. Journal of Manufacturing Systems, 48, 107\u2013119.","journal-title":"Journal of Manufacturing Systems"},{"issue":"4","key":"5118_CR15","doi-asserted-by":"crossref","first-page":"756","DOI":"10.1287\/opre.1060.0286","volume":"54","author":"G Codato","year":"2006","unstructured":"Codato, G., & Fischetti, M. (2006). Combinatorial Benders\u2019 cuts for mixed-integer linear programming. Operations Research, 54(4), 756\u2013766.","journal-title":"Operations Research"},{"issue":"9","key":"5118_CR16","doi-asserted-by":"crossref","first-page":"2757","DOI":"10.1016\/j.cor.2005.02.027","volume":"33","author":"G Dimitriadis","year":"2006","unstructured":"Dimitriadis, G. (2006). Assembly line balancing and groupworking: A heuristic procedure forworkers\u2019 groups operating on the same product and workstation. Computers & Operations Research, 33(9), 2757\u20132774.","journal-title":"Computers & Operations Research"},{"key":"5118_CR17","doi-asserted-by":"crossref","unstructured":"Ebrahimi, M., Mahmoodjanloo, M., Einabadi, B., Baboli, A., & Rother, E. (2022). A mixed-model assembly line sequencing problem with parallel stations and walking workers: a case study in the automotive industry.\u00a0International Journal of Production Research, 1\u201320.","DOI":"10.1080\/00207543.2021.2022801"},{"issue":"1\u20134","key":"5118_CR18","doi-asserted-by":"crossref","first-page":"363","DOI":"10.1007\/s00170-010-2832-y","volume":"53","author":"P Fattahi","year":"2011","unstructured":"Fattahi, P., Roshani, A., & Roshani, A. (2011). A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem. The International Journal of Advanced Manufacturing Technology, 53(1\u20134), 363\u2013378.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"1","key":"5118_CR19","doi-asserted-by":"crossref","first-page":"170","DOI":"10.1080\/0305215X.2021.1953003","volume":"54","author":"A Furugi","year":"2022","unstructured":"Furugi, A. (2022). Sequence-dependent time-and cost-oriented assembly line balancing problems: A combinatorial Benders\u2019 decomposition approach. Engineering Optimization, 54(1), 170\u2013184.","journal-title":"Engineering Optimization"},{"key":"5118_CR20","doi-asserted-by":"crossref","DOI":"10.1002\/9781118033036","volume-title":"Logic-based methods for optimization: Combining optimization and constraint satisfaction","author":"JN Hooker","year":"2000","unstructured":"Hooker, J. N. (2000). Logic-based methods for optimization: Combining optimization and constraint satisfaction. Wiley."},{"issue":"1","key":"5118_CR21","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1007\/s10107-003-0375-9","volume":"96","author":"JN Hooker","year":"2003","unstructured":"Hooker, J. N., & Ottosson, G. (2003). Logic-based benders decomposition. Mathematical Programming, 96(1), 33\u201360.","journal-title":"Mathematical Programming"},{"issue":"8","key":"5118_CR22","doi-asserted-by":"crossref","first-page":"2598","DOI":"10.1080\/00207543.2021.1901152","volume":"60","author":"D Huang","year":"2022","unstructured":"Huang, D., Mao, Z., Fang, K., & Yuan, B. (2022). Combinatorial benders decomposition for mixed-model two-sided assembly line balancing problem. International Journal of Production Research, 60(8), 2598\u20132624.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"5118_CR23","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1504\/IJSOM.2013.056765","volume":"16","author":"A Kazemi","year":"2013","unstructured":"Kazemi, A., & Sedighi, A. (2013). A cost-oriented model for balancing mixed-model assembly lines with multi-manned workstations. International Journal of Services and Operations Management, 16(3), 289\u2013309.","journal-title":"International Journal of Services and Operations Management"},{"key":"5118_CR24","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1155\/2016\/9315024","volume":"2016","author":"T Kelleg\u00f6z","year":"2016","unstructured":"Kelleg\u00f6z, T. (2016). Balancing lexicographic multi-objective assembly lines with multi-manned stations. Mathematical Problems in Engineering, 2016, 1\u201320.","journal-title":"Mathematical Problems in Engineering"},{"issue":"1","key":"5118_CR25","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1007\/s10479-016-2156-x","volume":"253","author":"T Kelleg\u00f6z","year":"2017","unstructured":"Kelleg\u00f6z, T. (2017). Assembly line balancing problems with multi-manned stations: A new mathematical formulation and gantt based heuristic method. Annals of Operations Research, 253(1), 377\u2013404.","journal-title":"Annals of Operations Research"},{"issue":"12","key":"5118_CR26","doi-asserted-by":"crossref","first-page":"3344","DOI":"10.1016\/j.cor.2012.04.019","volume":"39","author":"T Kelleg\u00f6z","year":"2012","unstructured":"Kelleg\u00f6z, T., & Toklu, B. (2012). An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations. Computers & Operations Research, 39(12), 3344\u20133360.","journal-title":"Computers & Operations Research"},{"issue":"3","key":"5118_CR27","doi-asserted-by":"crossref","first-page":"736","DOI":"10.1080\/00207543.2014.920548","volume":"53","author":"T Kelleg\u00f6z","year":"2015","unstructured":"Kelleg\u00f6z, T., & Toklu, B. (2015). A priority rule-based constructive heuristic and an improvement method for balancing assembly lines with parallel multi-manned workstations. International Journal of Production Research, 53(3), 736\u2013756.","journal-title":"International Journal of Production Research"},{"key":"5118_CR28","volume":"50","author":"Z Li","year":"2019","unstructured":"Li, Z., Janardhanan, M. N., Tang, Q., & Ponnambalam, S. G. (2019). Model and metaheuristics for robotic two-sided assembly line balancing problems with setup times. Swarm and Evolutionary Computation, 50, 100567.","journal-title":"Swarm and Evolutionary Computation"},{"key":"5118_CR29","doi-asserted-by":"crossref","DOI":"10.1016\/j.omega.2019.04.006","volume":"95","author":"TC Lopes","year":"2020","unstructured":"Lopes, T. C., Pastre, G. V., Michels, A. S., & Magat\u00e3o, L. (2020). Flexible multi-manned assembly line balancing problem: Model, heuristic procedure, and lower bounds for line length minimization. Omega, 95, 102063.","journal-title":"Omega"},{"key":"5118_CR30","volume-title":"Knapsack problems: Algorithms and computer implementations","author":"S Martello","year":"1990","unstructured":"Martello, S., & Toth, P. (1990). Knapsack problems: Algorithms and computer implementations. Wiley."},{"key":"5118_CR31","doi-asserted-by":"crossref","first-page":"100163","DOI":"10.1016\/j.orp.2020.100163","volume":"7","author":"AS Michels","year":"2020","unstructured":"Michels, A. S., Lopes, T. C., & Magat\u00e3o, L. (2020). An exact method with decomposition techniques and combinatorial Benders\u2019 cuts for the type-2 multi-manned assembly line balancing problem. Operations Research Perspectives, 7, 100163.","journal-title":"Operations Research Perspectives"},{"issue":"3","key":"5118_CR32","doi-asserted-by":"crossref","first-page":"796","DOI":"10.1016\/j.ejor.2019.05.001","volume":"278","author":"AS Michels","year":"2019","unstructured":"Michels, A. S., Lopes, T. C., Sikora, C. G. S., & Magat\u00e3o, L. (2019). A Benders\u2019 decomposition algorithm with combinatorial cuts for the multi-manned assembly line balancing problem. European Journal of Operational Research, 278(3), 796\u2013808.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"5118_CR33","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1080\/00207543.2018.1476786","volume":"57","author":"B Naderi","year":"2019","unstructured":"Naderi, B., Azab, A., & Borooshan, K. (2019). A realistic multi-manned five-sided mixed-model assembly line balancing and scheduling problem with moving workers and limited workspace. International Journal of Production Research, 57(3), 643\u2013661.","journal-title":"International Journal of Production Research"},{"issue":"6","key":"5118_CR34","doi-asserted-by":"crossref","first-page":"2523","DOI":"10.3390\/app11062523","volume":"11","author":"F Pilati","year":"2021","unstructured":"Pilati, F., Ferrari, E., Gamberi, M., & Margelli, S. (2021). Multi-manned assembly line balancing: Workforce synchronization for big data sets through simulated annealing. Applied Sciences, 11(6), 2523.","journal-title":"Applied Sciences"},{"issue":"3","key":"5118_CR35","doi-asserted-by":"crossref","first-page":"801","DOI":"10.1016\/j.ejor.2016.12.005","volume":"259","author":"R Rahmaniani","year":"2017","unstructured":"Rahmaniani, R., Crainic, T. G., Gendreau, M., & Rei, W. (2017). The Benders decomposition algorithm: A literature review. European Journal of Operational Research, 259(3), 801\u2013817.","journal-title":"European Journal of Operational Research"},{"key":"5118_CR36","unstructured":"Roshani, A., & A. Roshani. (2012). \u201cMulti-manned assembly line balancing problem: Minimizing cycle time. In: Proceeding of the IEE Asian Conference, Singapore."},{"issue":"1","key":"5118_CR37","doi-asserted-by":"crossref","first-page":"34","DOI":"10.1108\/AA-02-2016-016","volume":"37","author":"A Roshani","year":"2017","unstructured":"Roshani, A., & Ghazi Nezami, F. (2017). Mixed-model multi-manned assembly line balancing problem: A mathematical model and a simulated annealing approach. Assembly Automation, 37(1), 34\u201350.","journal-title":"Assembly Automation"},{"issue":"10","key":"5118_CR38","doi-asserted-by":"crossref","first-page":"2731","DOI":"10.1080\/00207543.2016.1181286","volume":"55","author":"A Roshani","year":"2017","unstructured":"Roshani, A., & Giglio, D. (2017). Simulated annealing algorithms for the multi-manned assembly line balancing problem: Minimising cycle time. International Journal of Production Research, 55(10), 2731\u20132751.","journal-title":"International Journal of Production Research"},{"issue":"20","key":"5118_CR39","doi-asserted-by":"crossref","first-page":"6487","DOI":"10.1080\/00207543.2019.1566672","volume":"57","author":"M \u015eahin","year":"2019","unstructured":"\u015eahin, M., & Kelleg\u00f6z, T. (2019a). Balancing multi-manned assembly lines with walking workers: Problem definition, mathematical formulation, and an electromagnetic field optimisation algorithm. International Journal of Production Research, 57(20), 6487\u20136505.","journal-title":"International Journal of Production Research"},{"key":"5118_CR40","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1016\/j.cie.2019.04.056","volume":"133","author":"M \u015eahin","year":"2019","unstructured":"\u015eahin, M., & Kelleg\u00f6z, T. (2019b). A new mixed-integer linear programming formulation and particle swarm optimization based hybrid heuristic for the problem of resource investment and balancing of the assembly line with multi-manned workstations. Computers & Industrial Engineering, 133, 107\u2013120.","journal-title":"Computers & Industrial Engineering"},{"key":"5118_CR41","first-page":"6","volume-title":"Balancing and sequencing of assembly lines","year":"1999","unstructured":"Scholl, A. (Ed.). (1999). Balancing and sequencing of assembly lines (pp. 6\u201318). Physica-Verlag Heidelberg."},{"issue":"13","key":"5118_CR42","doi-asserted-by":"crossref","first-page":"3485","DOI":"10.1080\/00207540601115997","volume":"46","author":"JP Shewchuk","year":"2008","unstructured":"Shewchuk, J. P. (2008). Worker allocation in lean U-shaped production lines. International Journal of Production Research, 46(13), 3485\u20133502.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"5118_CR43","doi-asserted-by":"crossref","first-page":"108","DOI":"10.1016\/j.ejor.2020.10.019","volume":"292","author":"CGS Sikora","year":"2021","unstructured":"Sikora, C. G. S. (2021). Benders\u2019 decomposition for the balancing of assembly lines with stochastic demand. European Journal of Operational Research, 292(1), 108\u2013124.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"5118_CR44","doi-asserted-by":"crossref","first-page":"949","DOI":"10.1016\/j.ejor.2016.11.027","volume":"259","author":"CGS Sikora","year":"2017","unstructured":"Sikora, C. G. S., Lopes, T. C., & Magat\u00e3o, L. (2017). Traveling worker assembly line (re) balancing problem: Model, reduction techniques, and real case studies. European Journal of Operational Research, 259(3), 949\u2013971.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"5118_CR45","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1080\/09511920600667358","volume":"20","author":"Q Wang","year":"2007","unstructured":"Wang, Q., Owen, G. W., & ve Mileham, A. R. (2007). Determining numbers of workstations and operators for a linear walking-worker assembly line. International Journal of Computer Integrated Manufacturing, 20(1), 1\u201310.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"5","key":"5118_CR46","doi-asserted-by":"crossref","first-page":"1576","DOI":"10.1108\/BIJ-08-2019-0386","volume":"28","author":"A Yadav","year":"2020","unstructured":"Yadav, A., Kumar, S., & Agrawal, S. (2020). Reconfiguration of assembly line balancing\u2013an automobile case study solved by the exact solution procedure. Benchmarking An International Journal, 28(5), 1576\u20131604.","journal-title":"Benchmarking An International Journal"},{"issue":"1","key":"5118_CR47","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1108\/AA-05-2014-041","volume":"35","author":"H Yilmaz","year":"2015","unstructured":"Yilmaz, H., & Yilmaz, M. (2015). Multi-manned assembly line balancing problem with balanced load density. Assembly Automation, 35(1), 137\u2013142.","journal-title":"Assembly Automation"},{"key":"5118_CR500","doi-asserted-by":"crossref","unstructured":"Yilmaz, H., & Yilmaz, M. (2016). A multi-manned assembly line balancing problem with classified teams: A new approach. Assembly Automation, 36(1), 51\u201359.","DOI":"10.1108\/AA-04-2015-035"},{"issue":"5","key":"5118_CR48","doi-asserted-by":"crossref","first-page":"856","DOI":"10.1080\/0305215X.2019.1618288","volume":"52","author":"H Yilmaz","year":"2020","unstructured":"Yilmaz, H., & Yilmaz, M. (2020). A mathematical model and tabu search algorithm for multi-manned assembly line balancing problems with assignment restrictions. Engineering Optimization, 52(5), 856\u2013874.","journal-title":"Engineering Optimization"},{"issue":"1","key":"5118_CR49","doi-asserted-by":"crossref","first-page":"13","DOI":"10.4995\/ijpme.2021.16084","volume":"10","author":"M Zakaraia","year":"2022","unstructured":"Zakaraia, M., Zaher, H., & Ragaa, N. (2022). Solving stochastic multi-manned U-shaped assembly line balancing problem using differential evolution algorithm. International Journal of Production Management and Engineering, 10(1), 13\u201322.","journal-title":"International Journal of Production Management and Engineering"},{"issue":"4","key":"5118_CR50","doi-asserted-by":"crossref","first-page":"733","DOI":"10.3926\/jiem.3542","volume":"14","author":"N Zamzam","year":"2021","unstructured":"Zamzam, N., & Elakkad, A. (2021). Time and space multi-manned assembly line balancing problem using genetic algorithm. Journal of Industrial Engineering and Management, 14(4), 733\u2013749.","journal-title":"Journal of Industrial Engineering and Management"},{"key":"5118_CR51","doi-asserted-by":"crossref","first-page":"106862","DOI":"10.1016\/j.cie.2020.106862","volume":"150","author":"Z Zhang","year":"2020","unstructured":"Zhang, Z., Tang, Q., & Chica, M. (2020). Multi-manned assembly line balancing with time and space constraints: A MILP model and memetic ant colony system. Computers & Industrial Engineering, 150, 106862.","journal-title":"Computers & Industrial Engineering"},{"key":"5118_CR52","doi-asserted-by":"crossref","first-page":"107513","DOI":"10.1016\/j.asoc.2021.107513","volume":"109","author":"Z Zhang","year":"2021","unstructured":"Zhang, Z., Tang, Q., & Chica, M. (2021). A robust MILP and gene expression programming based on heuristic rules for mixed-model multi-manned assembly line balancing. Applied Soft Computing, 109, 107513.","journal-title":"Applied Soft Computing"},{"key":"5118_CR53","doi-asserted-by":"crossref","first-page":"106121","DOI":"10.1016\/j.cie.2019.106121","volume":"138","author":"Y Zhong","year":"2019","unstructured":"Zhong, Y., Deng, Z., & Xu, K. (2019). An effective artificial fish swarm optimization algorithm for two-sided assembly line balancing problems. Computers & Industrial Engineering, 138, 106121.","journal-title":"Computers & Industrial Engineering"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-022-05118-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-022-05118-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-022-05118-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,1,25]],"date-time":"2023-01-25T19:13:51Z","timestamp":1674674031000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-022-05118-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,12,14]]},"references-count":54,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2023,2]]}},"alternative-id":["5118"],"URL":"https:\/\/doi.org\/10.1007\/s10479-022-05118-z","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,12,14]]},"assertion":[{"value":"29 November 2022","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"14 December 2022","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors whose names are listed above certify that they have no affiliations with or involvement in any organization or entity with any financial interest (such as honoraria; educational grants; participation in speakers\u2019 bureaus; membership, employment, consultancies, stock ownership, or other equity interest; and expert testimony or patent- licensing arrangements), or non-financial interest (such as personal or professional relationships, affiliations, knowledge or beliefs) in the subject matter or materials discussed in this manuscript.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflicts of interest"}},{"value":"The manuscript has not been submitted to another journal for simultaneous consideration. This work is original and has not been published elsewhere in any form or language. This study is unique and has not been split up into several parts to increase the quantity of submissions. Results have been presented clearly, honestly, and without fabrication, falsification or inappropriate data manipulation. The authors adhered to the discipline required by ethical rules in data collection, selection and processing. Required citations and statements taken from other studies are stated in accordance with ethical rules. Authors are sure they have permissions for the software used in the study. All procedures performed in studies involving human participants were in accordance with the ethical standards of the institutional and\/or national research committee and with the 1964 Helsinki declaration and its later amendments or comparable ethical standards. The authors guarantee the accuracy of the above-mentioned statements and accept any liability and deprivation of rights that may arise.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethical approval"}}]}}