{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,24]],"date-time":"2025-10-24T08:29:24Z","timestamp":1761294564450,"version":"3.40.5"},"reference-count":76,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2022,12,31]],"date-time":"2022-12-31T00:00:00Z","timestamp":1672444800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2022,12,31]],"date-time":"2022-12-31T00:00:00Z","timestamp":1672444800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"funder":[{"DOI":"10.13039\/501100001809","name":"the National Natural Science Foundation of China","doi-asserted-by":"crossref","award":["71871064","72171054"],"award-info":[{"award-number":["71871064","72171054"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2025,5]]},"DOI":"10.1007\/s10479-022-05134-z","type":"journal-article","created":{"date-parts":[[2022,12,31]],"date-time":"2022-12-31T03:02:43Z","timestamp":1672455763000},"page":"1-27","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["Multi-stage mine production timetabling with\n         optimising the sizes of mining operations: an application of parallel-machine flow shop\n         scheduling with lot streaming"],"prefix":"10.1007","volume":"348","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-2370-5519","authenticated-orcid":false,"given":"Shi Qiang","family":"Liu","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3208-702X","authenticated-orcid":false,"given":"Erhan","family":"Kozan","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0130-4327","authenticated-orcid":false,"given":"Mahmoud","family":"Masoud","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0003-4077-3107","authenticated-orcid":false,"given":"Debiao","family":"Li","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0943-8645","authenticated-orcid":false,"given":"Kai","family":"Luo","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2022,12,31]]},"reference":[{"issue":"3","key":"5134_CR1","doi-asserted-by":"publisher","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","volume":"34","author":"J Adams","year":"1998","unstructured":"Adams, J., Balas, E., & Zawack, D. (1998). The shifting bottleneck\n               procedure for job shop scheduling. Management\n                  Science,\n               34(3), 391\u2013401. https:\/\/doi.org\/10.1287\/mnsc.34.3.391","journal-title":"Management Science"},{"key":"5134_CR2","unstructured":"Albanese, T., & McGagh, J. (2011). Chapter 1.3 Future Trends in\n               Mining. In Peter Darling (Ed.), The third edition SME Mining\n                  Engineering Handbook (3rd ed., pp. 21\u201336). Brisbane, Queensland,\n               Australia: Society for Mining, Metallurgy, and Exploration Inc."},{"key":"5134_CR3","doi-asserted-by":"publisher","unstructured":"Andrade, A. B., & Rampazzo, P. C. B. (2019). Understanding plan\u2019s\n               priorities: Short term scheduling optimization. In Mining\n                  Goes Digital - Proceedings of the 39th international symposium on Application of\n                  Computers and Operations Research in the Mineral Industry, APCOM 2019,\n               386\u2013392. https:\/\/doi.org\/10.1201\/9780429320774-44","DOI":"10.1201\/9780429320774-44"},{"issue":"1","key":"5134_CR4","doi-asserted-by":"publisher","first-page":"32","DOI":"10.1504\/ajmsa.2021.10042072","volume":"6","author":"K Aragane","year":"2021","unstructured":"Aragane, K., Fukuba, T., & Shiina, T. (2021). Multi-period\n               stochastic lateral transshipment problem for rental products. Asian Journal of Management Science and Applications,\n               6(1), 32\u201348. https:\/\/doi.org\/10.1504\/ajmsa.2021.10042072","journal-title":"Asian Journal of Management Science and Applications"},{"key":"5134_CR5","doi-asserted-by":"publisher","unstructured":"\u00c5strand, M., Johansson, M., & Zanarini, A. (2018). Fleet scheduling\n               in underground mines using constraint programming. In W. van Hoeve (Ed.), Integration of Constraint Programming, Artificial Intelligence, and\n                  Operations Research. CPAIOR 2018. Lecture Notes in Computer Science, vol 10848.\n                  Springer, Cham. (Vol. 10848, pp. 605\u2013613). https:\/\/doi.org\/10.1007\/978-3-319-93031-2_44","DOI":"10.1007\/978-3-319-93031-2_44"},{"key":"5134_CR6","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2020.105036","author":"M \u00c5strand","year":"2020","unstructured":"\u00c5strand, M., Johansson, M., & Zanarini, A. (2020). Underground mine\n               scheduling of mobile machines using constraint programming and large neighborhood\n               search. Computers and Operations Research. https:\/\/doi.org\/10.1016\/j.cor.2020.105036","journal-title":"Computers and Operations Research"},{"issue":"5","key":"5134_CR7","doi-asserted-by":"publisher","first-page":"561","DOI":"10.1016\/0305-0483(93)90024-F","volume":"21","author":"KR Baker","year":"1993","unstructured":"Baker, K. R., & Jia, D. (1993). A comparative study of lot\n               streaming procedures. Omega,\n               21(5), 561\u2013566. https:\/\/doi.org\/10.1016\/0305-0483(93)90024-F","journal-title":"Omega"},{"issue":"3","key":"5134_CR8","doi-asserted-by":"publisher","first-page":"475","DOI":"10.1111\/j.1540-5915.1990.tb00328.x","volume":"21","author":"K Baker","year":"1990","unstructured":"Baker, K., & Pyke, D. (1990). Solution procedures for the\n               lot-streaming problem. Decision Sciences,\n               21(3), 475\u2013491. https:\/\/doi.org\/10.1111\/j.1540-5915.1990.tb00328.x","journal-title":"Decision Sciences"},{"key":"5134_CR9","unstructured":"Berkhimer, E. N. (2011). Chapter 10.4 Selection and sizing of\n               excavating, loading and hauling equipment. In P. Darling (Ed.), The 3rd SME Mining Engineering Handbook. Society for\n               Mining, Metallurgy, and Exploration Inc."},{"key":"5134_CR10","doi-asserted-by":"publisher","first-page":"1064","DOI":"10.1016\/j.cor.2007.12.006","volume":"36","author":"N Boland","year":"2009","unstructured":"Boland, N., Dumitrescu, I., Froyland, G., & Gleixner, A. M. (2009).\n               LP-based disaggregation approaches to solving the open pit mining production\n               scheduling problem with block processing selectivity. Computers and Operations Research,\n               36, 1064\u20131089. https:\/\/doi.org\/10.1016\/j.cor.2007.12.006","journal-title":"Computers and Operations Research"},{"key":"5134_CR11","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0166-218X(88)90030-3","volume":"21","author":"L Caccetta","year":"1988","unstructured":"Caccetta, L., & Giannini, L. M. (1988). An application of discrete\n               mathematics in the design of an open pit mine. Discrete\n                  Applied Mathematics,\n               21, 1\u201319. https:\/\/doi.org\/10.1016\/0166-218X(88)90030-3","journal-title":"Discrete Applied Mathematics"},{"key":"5134_CR12","doi-asserted-by":"publisher","first-page":"349","DOI":"10.1023\/A:1024835022186","volume":"27","author":"L Caccetta","year":"2003","unstructured":"Caccetta, L., & Hill, S. P. (2003). An application of branch and\n               cut to open pit mine scheduling. Journal of Global\n                  Optimization,\n               27, 349\u2013365. https:\/\/doi.org\/10.1023\/A:1024835022186","journal-title":"Journal of Global Optimization"},{"key":"5134_CR13","doi-asserted-by":"publisher","first-page":"42","DOI":"10.1016\/S0377-2217(82)80007-6","volume":"11","author":"J Carlier","year":"1982","unstructured":"Carlier, J. (1982). The one-machine sequencing problem. European Journal of Operational Research,\n               11, 42\u201347. https:\/\/doi.org\/10.1016\/S0377-2217(82)80007-6","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"5134_CR14","doi-asserted-by":"publisher","first-page":"1","DOI":"10.22068\/ijiepr.33.2.3","volume":"33","author":"FC \u00c7etinkaya","year":"2022","unstructured":"\u00c7etinkaya, F. C., & Yozgat, G. B. (2022). Customer order scheduling\n               with job-based processing and lot streaming in a two-machine flow shop. International Journal of Industrial Engineering & Production\n                  Research,\n               33(2), 1\u201317. https:\/\/doi.org\/10.22068\/ijiepr.33.2.3","journal-title":"International Journal of Industrial Engineering & Production Research"},{"issue":"8","key":"5134_CR15","doi-asserted-by":"publisher","first-page":"1515","DOI":"10.1080\/00207540412331325396","volume":"43","author":"JH Chang","year":"2005","unstructured":"Chang, J. H., & Chiu, H. N. (2005). A comprehensive review of lot\n               streaming. International Journal of Production\n                  Research,\n               43(8), 1515\u20131536. https:\/\/doi.org\/10.1080\/00207540412331325396","journal-title":"International Journal of Production Research"},{"issue":"1\u20132","key":"5134_CR16","doi-asserted-by":"publisher","first-page":"813","DOI":"10.1007\/s10479-018-2969-x","volume":"290","author":"TL Chen","year":"2020","unstructured":"Chen, T. L., Cheng, C. Y., & Chou, Y. H. (2020). Multi-objective\n               genetic algorithm for energy-efficient hybrid flow shop scheduling with lot\n               streaming. Annals of Operations Research,\n               290(1\u20132), 813\u2013836. https:\/\/doi.org\/10.1007\/s10479-018-2969-x","journal-title":"Annals of Operations Research"},{"issue":"2","key":"5134_CR17","doi-asserted-by":"publisher","first-page":"140","DOI":"10.1016\/S0453-4514(01)90003-1","volume":"44","author":"J Cheng","year":"2001","unstructured":"Cheng, J., Karuno, Y., & Kise, H. (2001). A shifting bottleneck\n               approach for a parallel-machine flowshop scheduling problem. Journal of the Operations Research Society of Japan,\n               44(2), 140\u2013156. https:\/\/doi.org\/10.1016\/S0453-4514(01)90003-1","journal-title":"Journal of the Operations Research Society of Japan"},{"key":"5134_CR18","doi-asserted-by":"publisher","first-page":"7023","DOI":"10.1080\/00207543.2013.774506","volume":"51","author":"M Cheng","year":"2013","unstructured":"Cheng, M., Mukherjee, N. J., & Sarin, S. C. (2013). A review of lot\n               streaming. International Journal of Production\n                  Research,\n               51, 7023\u20137046. https:\/\/doi.org\/10.1080\/00207543.2013.774506","journal-title":"International Journal of Production Research"},{"issue":"3","key":"5134_CR19","doi-asserted-by":"publisher","first-page":"517","DOI":"10.1287\/opre.1120.1050","volume":"60","author":"R Chicoisne","year":"2012","unstructured":"Chicoisne, R., Espinoza, D., Goycoolea, M., Moreno, E., & Rubio, E.\n               (2012). A new algorithm for the open-pit mine production scheduling problem.\n                  Operations Research,\n               60(3), 517\u2013528. https:\/\/doi.org\/10.1287\/opre.1120.1050","journal-title":"Operations Research"},{"key":"5134_CR20","doi-asserted-by":"publisher","DOI":"10.1016\/j.resourpol.2022.102693","volume":"77","author":"P Chimunhu","year":"2022","unstructured":"Chimunhu, P., Topal, E., Ajak, A. D., & Asad, W. (2022). A review\n               of machine learning applications for underground mine planning and scheduling.\n                  Resources Policy,\n               77, 102693. https:\/\/doi.org\/10.1016\/j.resourpol.2022.102693","journal-title":"Resources Policy"},{"issue":"3","key":"5134_CR21","doi-asserted-by":"publisher","first-page":"708","DOI":"10.1287\/trsc.2018.0865","volume":"53","author":"P Corry","year":"2019","unstructured":"Corry, P., & Bierwirth, C. (2019). The berth allocation problem\n               with channel restrictions. Transportation Science,\n               53(3), 708\u2013727. https:\/\/doi.org\/10.1287\/trsc.2018.0865","journal-title":"Transportation Science"},{"key":"5134_CR22","doi-asserted-by":"publisher","first-page":"365","DOI":"10.1007\/s11590-011-0306-2","volume":"5","author":"C Cullenbine","year":"2011","unstructured":"Cullenbine, C., Wood, R. K., & Newman, A. (2011). A sliding time\n               window heuristic for open pit mine block sequencing. Optimization Letters,\n               5, 365\u2013377. https:\/\/doi.org\/10.1007\/s11590-011-0306-2","journal-title":"Optimization Letters"},{"key":"5134_CR23","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1007\/s10479-012-1258-3","volume":"206","author":"D Espinoza","year":"2013","unstructured":"Espinoza, D., Goycoolea, M., Moreno, E., & Newman, A. (2013).\n               MineLib: A library of open pit mining problems. Annals of\n                  Operations Research,\n               206, 93\u2013114. https:\/\/doi.org\/10.1007\/s10479-012-1258-3","journal-title":"Annals of Operations Research"},{"issue":"2","key":"5134_CR24","doi-asserted-by":"publisher","first-page":"11920","DOI":"10.1016\/j.ifacol.2020.12.712","volume":"53","author":"Y Fu","year":"2020","unstructured":"Fu, Y., & Aldrich, C. (2020). Deep learning in mining and mineral\n               processing operations: A review. IFAC-PapersOnLine,\n               53(2), 11920\u201311925. https:\/\/doi.org\/10.1016\/j.ifacol.2020.12.712","journal-title":"IFAC-PapersOnLine"},{"key":"5134_CR25","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1016\/j.knosys.2018.02.029","volume":"148","author":"D Gong","year":"2018","unstructured":"Gong, D., Han, Y., & Sun, J. (2018). A novel hybrid multi-objective\n               artificial bee colony algorithm for blocking lot-streaming flow shop scheduling\n               problems. Knowledge-Based Systems,\n               148, 115\u2013130. https:\/\/doi.org\/10.1016\/j.knosys.2018.02.029","journal-title":"Knowledge-Based Systems"},{"issue":"1","key":"5134_CR26","doi-asserted-by":"publisher","first-page":"184","DOI":"10.1109\/TCYB.2017.2771213","volume":"49","author":"Y Han","year":"2019","unstructured":"Han, Y., Gong, D., Jin, Y., & Pan, Q. (2019). Evolutionary\n               multiobjective blocking lot-streaming flow shop scheduling with machine breakdowns.\n                  IEEE Transactions on Cybernetics,\n               49(1), 184\u2013197. https:\/\/doi.org\/10.1109\/TCYB.2017.2771213","journal-title":"IEEE Transactions on Cybernetics"},{"issue":"6","key":"5134_CR27","doi-asserted-by":"publisher","first-page":"894","DOI":"10.1287\/opre.48.6.894.12392","volume":"48","author":"DS Hochbaum","year":"2000","unstructured":"Hochbaum, D. S., & Chen, A. (2000). Performance analysis and best\n               implementations of old and new algorithms for the open-pit mining problem. Operations Research,\n               48(6), 894\u2013914. https:\/\/doi.org\/10.1287\/opre.48.6.894.12392","journal-title":"Operations Research"},{"key":"5134_CR28","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.jmsy.2020.02.004","volume":"55","author":"L Hu","year":"2020","unstructured":"Hu, L., Liu, Z., Hu, W., Wang, Y., Tan, J., & Wu, F. (2020).\n               Petri-net-based dynamic scheduling of flexible manufacturing system via deep\n               reinforcement learning with graph convolutional network. Journal of Manufacturing Systems,\n               55, 1\u201314. https:\/\/doi.org\/10.1016\/j.jmsy.2020.02.004","journal-title":"Journal of Manufacturing Systems"},{"issue":"12","key":"5134_CR29","doi-asserted-by":"publisher","first-page":"2093","DOI":"10.1016\/S0305-0548(03)00243-0","volume":"31","author":"W Huang","year":"2004","unstructured":"Huang, W., & Yin, A. (2004). An improved shifting bottleneck\n               procedure for the job shop scheduling problem. Computers and\n                  Operations Research,\n               31(12), 2093\u20132110. https:\/\/doi.org\/10.1016\/S0305-0548(03)00243-0","journal-title":"Computers and Operations Research"},{"issue":"2","key":"5134_CR30","doi-asserted-by":"publisher","first-page":"252","DOI":"10.1016\/0377-2217(95)00353-3","volume":"90","author":"P Ivens","year":"1996","unstructured":"Ivens, P., & Lambrecht, M. (1996). Extending the shifting\n               bottleneck procedure to real-life applications. European\n                  Journal of Operational Research,\n               90(2), 252\u2013268. https:\/\/doi.org\/10.1016\/0377-2217(95)00353-3","journal-title":"European Journal of Operational Research"},{"key":"5134_CR31","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2019.03.004","volume":"94","author":"E J\u00e9lvez","year":"2020","unstructured":"J\u00e9lvez, E., Morales, N., Nancel-Penard, P., & Cornillier, F.\n               (2020). A new hybrid heuristic algorithm for the precedence constrained production\n               scheduling problem: A mining application. Omega,\n               94, 102046. https:\/\/doi.org\/10.1016\/j.omega.2019.03.004","journal-title":"Omega"},{"issue":"3","key":"5134_CR32","doi-asserted-by":"publisher","first-page":"1169","DOI":"10.1016\/j.ejor.2015.10.044","volume":"249","author":"E J\u00e9lvez","year":"2016","unstructured":"J\u00e9lvez, E., Morales, N., Nancel-Penard, P., Peypouquet, J., &\n               Reyes, P. (2016). Aggregation heuristic for the open-pit block scheduling problem.\n                  European Journal of Operational Research,\n               249(3), 1169\u20131177. https:\/\/doi.org\/10.1016\/j.ejor.2015.10.044","journal-title":"European Journal of Operational Research"},{"key":"5134_CR33","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1016\/j.tre.2019.10.005","volume":"132","author":"WA Khan","year":"2019","unstructured":"Khan, W. A., Chung, S. H., Ma, H. L., Liu, S. Q., & Chan, C. Y.\n               (2019). A novel self-organizing constructive neural network for estimating aircraft\n               trip fuel consumption. Transportation Research Part\n                  E,\n               132, 72\u201396. https:\/\/doi.org\/10.1016\/j.tre.2019.10.005","journal-title":"Transportation Research Part E"},{"issue":"5","key":"5134_CR34","doi-asserted-by":"publisher","first-page":"547","DOI":"10.1016\/S0305-0483(97)00015-7","volume":"25","author":"JS Kim","year":"1997","unstructured":"Kim, J. S., Kang, S. H., & Lee, S. M. (1997). Transfer batch\n               scheduling for a two-stage flowshop with identical parallel machines at each stage.\n                  Omega,\n               25(5), 547\u2013555. https:\/\/doi.org\/10.1016\/S0305-0483(97)00015-7","journal-title":"Omega"},{"issue":"1","key":"5134_CR35","doi-asserted-by":"publisher","first-page":"121","DOI":"10.1287\/opre.26.1.121","volume":"26","author":"H Kise","year":"1978","unstructured":"Kise, H., Ibaraki, T., & Mine, H. (1978). A solvable case of the\n               one-machine scheduling problem with ready and due times. Operations Research,\n               26(1), 121\u2013126. https:\/\/doi.org\/10.1287\/opre.26.1.121","journal-title":"Operations Research"},{"key":"5134_CR36","unstructured":"Kozan, E., Liu, S. Q., & Wolff, R. (2013). A short-term production\n               scheduling methodology for open-pit mines. In International\n                  Symposium on the 36th Applications of Computers and Operations Research in the\n                  Mineral Industry (the 36th APCOM) (pp. 465\u2013473). Porto Alegre,\n               Brazil."},{"key":"5134_CR37","doi-asserted-by":"publisher","first-page":"665","DOI":"10.1016\/j.dss.2012.08.012","volume":"54","author":"E Kozan","year":"2012","unstructured":"Kozan, E., & Liu, S. Q. (2012). A demand-responsive decision\n               support system for coal transportation. Decision Support\n                  Systems,\n               54, 665\u2013680. https:\/\/doi.org\/10.1016\/j.dss.2012.08.012","journal-title":"Decision Support Systems"},{"issue":"1","key":"5134_CR38","doi-asserted-by":"publisher","first-page":"47","DOI":"10.1179\/1743286315Y.0000000031","volume":"125","author":"E Kozan","year":"2016","unstructured":"Kozan, E., & Liu, S. Q. (2016). A new open-pit multi-stage mine\n               production timetabling model for drilling, blasting and excavating operations.\n                  Mining Technology,\n               125(1), 47\u201353. https:\/\/doi.org\/10.1179\/1743286315Y.0000000031","journal-title":"Mining Technology"},{"issue":"7","key":"5134_CR39","doi-asserted-by":"publisher","first-page":"457","DOI":"10.1080\/17480930.2016.1160818","volume":"31","author":"E Kozan","year":"2017","unstructured":"Kozan, E., & Liu, S. Q. (2017). An operational-level multi-stage\n               mine production timetabling model for optimally synchronising drilling, blasting and\n               excavating operations. International Journal of Mining,\n                  Reclamation and Environment,\n               31(7), 457\u2013474. https:\/\/doi.org\/10.1080\/17480930.2016.1160818","journal-title":"International Journal of Mining, Reclamation and Environment"},{"issue":"2","key":"5134_CR40","doi-asserted-by":"publisher","first-page":"127","DOI":"10.1016\/j.ejor.2016.07.004","volume":"44","author":"WB Lambert","year":"2014","unstructured":"Lambert, W. B., Brickey, A., Newman, A. M., & Eurek, K. (2014).\n               Open-pit block-sequencing formulations: A tutorial. Interfaces,\n               44(2), 127\u2013142. https:\/\/doi.org\/10.1016\/j.ejor.2016.07.004","journal-title":"Interfaces"},{"issue":"1","key":"5134_CR41","doi-asserted-by":"publisher","first-page":"419","DOI":"10.1007\/s10479-012-1287-y","volume":"222","author":"WB Lambert","year":"2014","unstructured":"Lambert, W. B., & Newman, A. M. (2014). Tailored Lagrangian\n               Relaxation for the open pit block sequencing problem. Annals\n                  of Operations Research,\n               222(1), 419\u2013438. https:\/\/doi.org\/10.1007\/s10479-012-1287-y","journal-title":"Annals of Operations Research"},{"issue":"4","key":"5134_CR42","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1080\/17480930.2019.1579693","volume":"34","author":"JMLG Leite","year":"2020","unstructured":"Leite, J. M. L. G., Arruda, E. F., Bahiense, L., & Marujo, L. G.\n               (2020). Modeling the integrated mine-to-client supply chain: A survey. International Journal of Mining, Reclamation and\n                  Environment,\n               34(4), 247\u2013293. https:\/\/doi.org\/10.1080\/17480930.2019.1579693","journal-title":"International Journal of Mining, Reclamation and Environment"},{"issue":"5","key":"5134_CR43","doi-asserted-by":"publisher","first-page":"1425","DOI":"10.1287\/opre.2019.1965","volume":"68","author":"O Letelier","year":"2020","unstructured":"Letelier, O., Espinoza, D., Goycoolea, M., Moreno, E., & Mu\u00f1oz, G.\n               (2020). Production scheduling for strategic open pit mine planning: A mixed integer\n               programming approach. Operations Research,\n               68(5), 1425\u20131444. https:\/\/doi.org\/10.1287\/opre.2019.1965","journal-title":"Operations Research"},{"key":"5134_CR44","doi-asserted-by":"publisher","first-page":"168","DOI":"10.1057\/jors.2011.4","volume":"63","author":"SQ Liu","year":"2012","unstructured":"Liu, S. Q., & Kozan, E. (2012). A hybrid shifting bottleneck\n               procedure algorithm for the parallel-machine job-shop scheduling problem. Journal of the Operational Research Society,\n               63, 168\u2013182. https:\/\/doi.org\/10.1057\/jors.2011.4","journal-title":"Journal of the Operational Research Society"},{"key":"5134_CR45","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1016\/j.cor.2016.04.023","volume":"74","author":"SQ Liu","year":"2016","unstructured":"Liu, S. Q., & Kozan, E. (2016a). Parallel-identical-machine\n               job-shop scheduling with different stage-dependent buffering requirements. Computers and Operations Research,\n               74, 31\u201341. https:\/\/doi.org\/10.1016\/j.cor.2016.04.023","journal-title":"Computers and Operations Research"},{"key":"5134_CR46","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/j.eswa.2015.08.044","volume":"43","author":"SQ Liu","year":"2016","unstructured":"Liu, S. Q., & Kozan, E. (2016b). New graph-based algorithms to\n               efficiently solve large scale open pit mining optimisation problems. Expert Systems with Applications,\n               43, 59\u201365. https:\/\/doi.org\/10.1016\/j.eswa.2015.08.044","journal-title":"Expert Systems with Applications"},{"issue":"1","key":"5134_CR47","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1080\/23302674.2017.1344330","volume":"6","author":"SQ Liu","year":"2019","unstructured":"Liu, S. Q., & Kozan, E. (2019). Integration of mathematical models\n               for ore mining industry. International Journal of Systems\n                  Science: Operations and Logistics,\n               6(1), 55\u201368. https:\/\/doi.org\/10.1080\/23302674.2017.1344330","journal-title":"International Journal of Systems Science: Operations and Logistics"},{"key":"5134_CR48","doi-asserted-by":"publisher","DOI":"10.1007\/s11081-022-09741-4","author":"SQ Liu","year":"2022","unstructured":"Liu, S. Q., Kozan, E., Corry, P., Masoud, M., & Luo, K. (2022b). A\n               real-world mine excavators timetabling methodology in open-pit mining. Optimization and Engineering. https:\/\/doi.org\/10.1007\/s11081-022-09741-4","journal-title":"Optimization and Engineering"},{"key":"5134_CR49","doi-asserted-by":"publisher","first-page":"769","DOI":"10.3390\/mining2040043","volume":"2","author":"SQ Liu","year":"2022","unstructured":"Liu, S. Q., Lin, Z., Li, D., Li, X., Kozan, E., & Masoud, M.\n               (2022a). Recent research agendas in mining equipment management: A review. Mining,\n               2, 769\u2013790. https:\/\/doi.org\/10.3390\/mining2040043","journal-title":"Mining"},{"key":"5134_CR50","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2020.106208","volume":"91","author":"S Luo","year":"2020","unstructured":"Luo, S. (2020). Dynamic scheduling for flexible job shop with new job\n               insertions by deep reinforcement learning. Applied Soft\n                  Computing Journal,\n               91, 106208. https:\/\/doi.org\/10.1016\/j.asoc.2020.106208","journal-title":"Applied Soft Computing Journal"},{"issue":"3","key":"5134_CR51","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1002\/jos.102","volume":"5","author":"SJ Mason","year":"2002","unstructured":"Mason, S. J., Fowler, J. W., & Matthew Carlyle, W. (2002). A\n               modified shifting bottleneck heuristic for minimizing total weighted tardiness in\n               complex job shops. Journal of Scheduling,\n               5(3), 247\u2013262. https:\/\/doi.org\/10.1002\/jos.102","journal-title":"Journal of Scheduling"},{"key":"5134_CR52","doi-asserted-by":"publisher","DOI":"10.1016\/j.swevo.2020.100804","volume":"60","author":"T Meng","year":"2021","unstructured":"Meng, T., & Pan, Q. K. (2021). A distributed heterogeneous\n               permutation flowshop scheduling problem with lot-streaming and carryover\n               sequence-dependent setup time. Swarm and Evolutionary\n                  Computation,\n               60, 100804. https:\/\/doi.org\/10.1016\/j.swevo.2020.100804","journal-title":"Swarm and Evolutionary Computation"},{"key":"5134_CR53","first-page":"83","volume-title":"Industrial Engineering Non-Traditional Applications in International Settings","author":"A Mousavi","year":"2014","unstructured":"Mousavi, A., Kozan, E., & Liu, S. Q. (2014). Chapter 5: Integrated\n               approach to optimize open-pit mine block sequencing. In B. Bidanda, I. Sabuncuoglu,\n               & B. Y. Kara (Eds.), Industrial Engineering\n                  Non-Traditional Applications in International Settings (pp. 83\u201398). CRC\n               Press."},{"issue":"11","key":"5134_CR54","doi-asserted-by":"publisher","first-page":"1932","DOI":"10.1080\/0305215X.2016.1142080","volume":"48","author":"A Mousavi","year":"2016","unstructured":"Mousavi, A., Kozan, E., & Liu, S. Q. (2016a). Open-pit block\n               sequencing optimization: A mathematical model and solution technique. Engineering Optimization,\n               48(11), 1932\u20131950. https:\/\/doi.org\/10.1080\/0305215X.2016.1142080","journal-title":"Engineering Optimization"},{"key":"5134_CR55","doi-asserted-by":"publisher","first-page":"301","DOI":"10.1007\/s10732-016-9311-z","volume":"22","author":"A Mousavi","year":"2016","unstructured":"Mousavi, A., Kozan, E., & Liu, S. Q. (2016b). Comparative analysis\n               of three metaheuristics for short-term open pit block sequencing. Journal of Heuristics,\n               22, 301\u2013329. https:\/\/doi.org\/10.1007\/s10732-016-9311-z","journal-title":"Journal of Heuristics"},{"key":"5134_CR56","doi-asserted-by":"publisher","DOI":"10.1007\/s10489-022-03456-w","author":"W Pan","year":"2022","unstructured":"Pan, W., & Liu, S. Q. (2022). Deep reinforcement learning for the\n               dynamic and uncertain vehicle routing problem. Applied\n                  Intelligence. https:\/\/doi.org\/10.1007\/s10489-022-03456-w","journal-title":"Applied Intelligence"},{"key":"5134_CR57","doi-asserted-by":"publisher","DOI":"10.1109\/TCYB.2022.3164165","author":"Y Pan","year":"2022","unstructured":"Pan, Y., Gao, K., Li, Z., & Wu, N. (2022). Solving biobjective\n               distributed flow-shop scheduling problems with lot-streaming using an improved Jaya\n               algorithm. IEEE Transactions on Cybernetics. https:\/\/doi.org\/10.1109\/TCYB.2022.3164165","journal-title":"IEEE Transactions on Cybernetics"},{"issue":"1","key":"5134_CR58","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1002\/(SICI)1520-6750(199902)46:1<1::AID-NAV1>3.0.CO;2-#","volume":"46","author":"M Pinedo","year":"1999","unstructured":"Pinedo, M., & Singer, M. (1999). A shifting bottleneck heuristic\n               for minimizing the total weighted tardiness in a job shop. Naval Research Logistics,\n               46(1), 1\u201317. https:\/\/doi.org\/10.1002\/(sici)1520-6750(199902)46:1%3c1::aid-nav1%3e3.0.co;2-#","journal-title":"Naval Research Logistics"},{"issue":"2","key":"5134_CR59","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1016\/j.matpr.2020.05.108","volume":"37","author":"C Ramesh","year":"2020","unstructured":"Ramesh, C., Kamalakannan, R., Karthik, R., Pavin, C., & Dhivaharan,\n               S. (2020). A lot streaming based flow shop scheduling problem using simulated\n               annealing algorithm. Materials Today: Proceedings,\n               37(2), 241\u2013244. https:\/\/doi.org\/10.1016\/j.matpr.2020.05.108","journal-title":"Materials Today: Proceedings"},{"issue":"5","key":"5134_CR60","doi-asserted-by":"publisher","first-page":"1243","DOI":"10.1287\/opre.2013.1208","volume":"61","author":"K Rustogi","year":"2013","unstructured":"Rustogi, K., & Strusevich, V. A. (2013). Parallel machine\n               scheduling: Impact of adding extra machines. Operations\n                  Research,\n               61(5), 1243\u20131257. https:\/\/doi.org\/10.1287\/opre.2013.1208","journal-title":"Operations Research"},{"key":"5134_CR61","doi-asserted-by":"publisher","first-page":"67","DOI":"10.3390\/designs5040067","volume":"5","author":"A Salazar-Moya","year":"2021","unstructured":"Salazar-Moya, A., & Garcia, M. V. (2021). Lot streaming in\n               different types of production processes: A prisma systematic review. Designs,\n               5, 67. https:\/\/doi.org\/10.3390\/designs5040067","journal-title":"Designs"},{"key":"5134_CR62","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1016\/j.ejor.2016.07.004","volume":"257","author":"M Samavati","year":"2017","unstructured":"Samavati, M., Essam, D., Nehring, M., & Sarker, R. (2017). A local\n               branching heuristic for the open pit mine production scheduling problem. European Journal of Operational Research,\n               257, 261\u2013271. https:\/\/doi.org\/10.1016\/j.ejor.2016.07.004","journal-title":"European Journal of Operational Research"},{"key":"5134_CR63","doi-asserted-by":"publisher","first-page":"169","DOI":"10.1016\/j.omega.2017.10.008","volume":"81","author":"M Samavati","year":"2018","unstructured":"Samavati, M., Essam, D., Nehring, M., & Sarker, R. (2018). A new\n               methodology for the open-pit mine production scheduling problem. Omega,\n               81, 169\u2013182. https:\/\/doi.org\/10.1016\/j.omega.2017.10.008","journal-title":"Omega"},{"issue":"2","key":"5134_CR64","doi-asserted-by":"publisher","first-page":"365","DOI":"10.1007\/s00291-015-0414-y","volume":"38","author":"M Schulze","year":"2016","unstructured":"Schulze, M., Rieck, J., Seifi, C., & Zimmermann, J. (2016). Machine\n               scheduling in underground mining: An application in the potash industry. OR Spectrum,\n               38(2), 365\u2013403. https:\/\/doi.org\/10.1007\/s00291-015-0414-y","journal-title":"Or Spectrum"},{"key":"5134_CR65","doi-asserted-by":"publisher","first-page":"27","DOI":"10.1016\/j.ejor.2020.10.007","volume":"292","author":"C Seifi","year":"2021","unstructured":"Seifi, C., Schulze, M., & Zimmermann, J. (2021). A new mathematical\n               formulation for a potash-mine shift scheduling problem with a simultaneous assignment\n               of machines and workers. European Journal of Operational\n                  Research,\n               292, 27\u201342. https:\/\/doi.org\/10.1016\/j.ejor.2020.10.007","journal-title":"European Journal of Operational Research"},{"key":"5134_CR66","doi-asserted-by":"publisher","DOI":"10.1287\/opre.41.6.1065","author":"D Trietsch","year":"1993","unstructured":"Trietsch, D., & Baker, K. R. (1993). Basic techniques for lot\n               streaming. Operations Research. https:\/\/doi.org\/10.1287\/opre.41.6.1065","journal-title":"Operations Research"},{"key":"5134_CR67","doi-asserted-by":"publisher","first-page":"96","DOI":"10.1016\/S0377-2217(97)00141-0","volume":"107","author":"R Underwood","year":"1998","unstructured":"Underwood, R., & Tolwinski, B. (1998). A mathematical programming\n               viewpoint for solving the ultimate pit problem. European\n                  Journal of Operational Research,\n               107, 96\u2013107. https:\/\/doi.org\/10.1016\/S0377-2217(97)00141-0","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"5134_CR68","doi-asserted-by":"publisher","first-page":"771","DOI":"10.1287\/opre.2016.1516","volume":"64","author":"TWM Vossen","year":"2016","unstructured":"Vossen, T. W. M., Wood, R. K., & Newman, A. M. (2016). Hierarchical\n               benders decomposition for open-pit mine block sequencing. Operations Research,\n               64(4), 771\u2013793. https:\/\/doi.org\/10.1287\/opre.2016.1516","journal-title":"Operations Research"},{"key":"5134_CR69","doi-asserted-by":"publisher","first-page":"89782","DOI":"10.1109\/ACCESS.2020.2993881","volume":"8","author":"P Wang","year":"2020","unstructured":"Wang, P., Sang, H., Tao, Q., Guo, H., Li, J., Gao, K., & Han, Y.\n               (2020). Improved migrating birds optimization algorithm to solve hybrid flowshop\n               scheduling problem with lot-streaming. IEEE\n                  Access,\n               8, 89782\u201389792. https:\/\/doi.org\/10.1109\/ACCESS.2020.2993881","journal-title":"IEEE Access"},{"key":"5134_CR70","doi-asserted-by":"publisher","DOI":"10.1016\/j.knosys.2021.107874","volume":"238","author":"W Wang","year":"2022","unstructured":"Wang, W., Xu, Z., & Gu, X. (2022). A two-stage discrete water wave\n               optimization algorithm for the flowshop lot-streaming scheduling problem with\n               intermingling and variable lot sizes. Knowledge-Based\n                  Systems,\n               238, 107874. https:\/\/doi.org\/10.1016\/j.knosys.2021.107874","journal-title":"Knowledge-Based Systems"},{"key":"5134_CR71","unstructured":"Wetherelt, A., & Van der Wielen, K. P. (2011). Chapter 10.1\n               Introduction to open-pit mining. In P. Darling (Ed.), The 3rd\n                  edition SME Mining Engineering Handbook. Society for Mining,\n               Metallurgy, and Exploration."},{"key":"5134_CR72","doi-asserted-by":"publisher","DOI":"10.1016\/j.resourpol.2021.102274","volume":"74","author":"L Zeng","year":"2021","unstructured":"Zeng, L., Liu, S. Q., Kozan, E., Corry, P., & Masoud, M. (2021). A\n               comprehensive interdisciplinary review of mine supply chain management. Resources Policy,\n               74, 102274. https:\/\/doi.org\/10.1016\/j.resourpol.2021.102274","journal-title":"Resources Policy"},{"issue":"2","key":"5134_CR73","doi-asserted-by":"publisher","first-page":"163","DOI":"10.1504\/AJMSA.2021.120437PDF","volume":"6","author":"J Zhang","year":"2021","unstructured":"Zhang, J., Yamamoto, H., Sun, J., & Kajihara, Y. (2021). A study of\n               optimal assignment with different workers\u2019 capacities for each process in a reset\n               limited-cycle problem with multiple periods. Asian Journal of\n                  Management Science and Applications,\n               6(2), 163\u2013188. https:\/\/doi.org\/10.1504\/AJMSA.2021.120437PDF","journal-title":"Asian Journal of Management Science and Applications"},{"issue":"4","key":"5134_CR74","doi-asserted-by":"publisher","first-page":"433","DOI":"10.1504\/IJISE.2020.108547","volume":"35","author":"Z Zhang","year":"2020","unstructured":"Zhang, Z., Shao, L., & Yin, Y. (2020). PSO-based algorithm for\n               solving lot splitting in unbalanced seru production system. International Journal of Industrial and Systems Engineering,\n               35(4), 433\u2013450. https:\/\/doi.org\/10.1504\/IJISE.2020.108547","journal-title":"International Journal of Industrial and Systems Engineering"},{"issue":"2","key":"5134_CR75","doi-asserted-by":"publisher","first-page":"1119","DOI":"10.1007\/s10479-021-04515-0","volume":"312","author":"Z Zhang","year":"2022","unstructured":"Zhang, Z., Song, X., Huang, H., Yin, Y., & Lev, B. (2022).\n               Scheduling problem in seru production system considering DeJong\u2019s learning effect and\n               job splitting. Annals of Operations Research,\n               312(2), 1119\u20131141. https:\/\/doi.org\/10.1007\/s10479-021-04515-0","journal-title":"Annals of Operations Research"},{"issue":"2","key":"5134_CR76","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1504\/AJMSA.2020.112740","volume":"5","author":"X Zhao","year":"2020","unstructured":"Zhao, X., Yamamoto, H., & Sun, J. (2020). An optimal assignment\n               with discrete target variable of processing time in reset limited-cycle multiple\n               production periods. Asian Journal of Management Science and\n                  Applications,\n               5(2), 93\u2013110. https:\/\/doi.org\/10.1504\/AJMSA.2020.112740","journal-title":"Asian Journal of Management Science and Applications"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-022-05134-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-022-05134-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-022-05134-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,5,12]],"date-time":"2025-05-12T07:17:06Z","timestamp":1747034226000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-022-05134-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,12,31]]},"references-count":76,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2025,5]]}},"alternative-id":["5134"],"URL":"https:\/\/doi.org\/10.1007\/s10479-022-05134-z","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"type":"print","value":"0254-5330"},{"type":"electronic","value":"1572-9338"}],"subject":[],"published":{"date-parts":[[2022,12,31]]},"assertion":[{"value":"7 December 2022","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"31 December 2022","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare that there is no conflict of interest regarding\n               the publication of this paper.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflicts of interest"}},{"value":"This research is not involved human participants and animals.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Human and animal participants"}},{"value":"This article does not contain any studies with human participants\n               performed by any of the authors.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Informed consent"}}]}}