{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,23]],"date-time":"2026-03-23T03:27:18Z","timestamp":1774236438208,"version":"3.50.1"},"reference-count":56,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2023,11,20]],"date-time":"2023-11-20T00:00:00Z","timestamp":1700438400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,11,20]],"date-time":"2023-11-20T00:00:00Z","timestamp":1700438400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2024,7]]},"DOI":"10.1007\/s10479-023-05653-3","type":"journal-article","created":{"date-parts":[[2023,11,20]],"date-time":"2023-11-20T10:05:02Z","timestamp":1700474702000},"page":"675-708","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["A novel framework for risk management of software projects by integrating a new COPRAS method under cloud model and machine learning algorithms"],"prefix":"10.1007","volume":"338","author":[{"given":"Mohammad Hossein","family":"Haghighi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-0953-6381","authenticated-orcid":false,"given":"Maryam","family":"Ashrafi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2023,11,20]]},"reference":[{"issue":"1","key":"5653_CR1","first-page":"5","volume":"24","author":"MH Aghdaie","year":"2013","unstructured":"Aghdaie, M. H., Zolfani, S. H., & Zavadskas, E. K. (2013). Decision making in machine tool selection: An integrated approach with SWARA and COPRAS-G methods. Engineering Economics, 24(1), 5\u201317.","journal-title":"Engineering Economics"},{"issue":"4","key":"5653_CR2","doi-asserted-by":"crossref","first-page":"1","DOI":"10.17065\/huiibf.10920","volume":"33","author":"E Aksoy","year":"2015","unstructured":"Aksoy, E., \u00d6m\u00fcrbek, N., & Karaatli, M. (2015). AHP temelli MULTIMOORA ve COPRAS y\u00f6ntemi ile T\u00fcrkiye K\u00f6m\u00fcr \u0130\u015fletmeleri\u2019nin performans de\u011ferlendirmesi. Hacettepe \u00dcniversitesi Iktisadi Ve Idari Bilimler Fak\u00fcltesi Dergisi, 33(4), 1\u201328.","journal-title":"Hacettepe \u00dcniversitesi Iktisadi Ve Idari Bilimler Fak\u00fcltesi Dergisi"},{"issue":"3","key":"5653_CR3","doi-asserted-by":"crossref","first-page":"392","DOI":"10.1080\/15623599.2021.1877875","volume":"23","author":"A Alvand","year":"2023","unstructured":"Alvand, A., Mirhosseini, S. M., Ehsanifar, M., Zeighami, E., & Mohammadi, A. (2023). Identification and assessment of risk in construction projects using the integrated FMEA-SWARA-WASPAS model under fuzzy environment: A case study of a construction project in Iran. International Journal of Construction Management, 23(3), 392\u2013404.","journal-title":"International Journal of Construction Management"},{"key":"5653_CR4","volume-title":"The influence of software risk management on software project success","author":"H Arafeh","year":"2017","unstructured":"Arafeh, H., El-Ahmad, A., & Pierce, P. (2017). The influence of software risk management on software project success. Lund University School of Economics and Management."},{"issue":"4","key":"5653_CR5","doi-asserted-by":"crossref","first-page":"172","DOI":"10.3390\/buildings11040172","volume":"11","author":"D Banerjee Chattapadhyay","year":"2021","unstructured":"Banerjee Chattapadhyay, D., Putta, J., & Rama Mohan Rao, P. (2021). Risk identification, assessments, and prediction for mega construction projects: A risk prediction paradigm based on cross analytical-machine learning model. Buildings, 11(4), 172.","journal-title":"Buildings"},{"key":"5653_CR6","first-page":"123","volume":"24","author":"L Breiman","year":"1996","unstructured":"Breiman, L. (1996). Bagging Predictors. Machine Learning, 24, 123\u2013140.","journal-title":"Machine Learning"},{"issue":"3","key":"5653_CR7","doi-asserted-by":"crossref","first-page":"147","DOI":"10.11648\/j.ijema.20150303.16","volume":"3","author":"HM Cekirge","year":"2015","unstructured":"Cekirge, H. M. (2015). Quantitative risk assessment for crude oil pipelines. International Journal of Environmental Monitoring and Analysis., 3(3), 147\u2013153.","journal-title":"International Journal of Environmental Monitoring and Analysis."},{"key":"5653_CR8","doi-asserted-by":"crossref","DOI":"10.1016\/j.autcon.2021.103699","volume":"127","author":"E Celik","year":"2021","unstructured":"Celik, E., & Gul, M. (2021). Hazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment. Automation in Construction, 127, 103699.","journal-title":"Automation in Construction"},{"issue":"1","key":"5653_CR9","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1109\/TEM.2020.2972078","volume":"68","author":"HH Elmousalami","year":"2020","unstructured":"Elmousalami, H. H. (2020). Comparison of artificial intelligence techniques for project conceptual cost prediction: A case study and comparative analysis. IEEE Transactions on Engineering Management, 68(1), 183\u2013196.","journal-title":"IEEE Transactions on Engineering Management"},{"issue":"4","key":"5653_CR10","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1080\/15623599.2018.1536963","volume":"21","author":"SM El-Sayegh","year":"2021","unstructured":"El-Sayegh, S. M., Manjikian, S., Ibrahim, A., Abouelyousr, A., & Jabbour, R. (2021). Risk identification and assessment in sustainable construction projects in the UAE. International Journal of Construction Management, 21(4), 327\u2013336.","journal-title":"International Journal of Construction Management"},{"key":"5653_CR11","doi-asserted-by":"crossref","DOI":"10.1016\/j.infsof.2020.106497","volume":"131","author":"AS Filippetto","year":"2021","unstructured":"Filippetto, A. S., Lima, R., & Barbosa, J. L. V. (2021). A risk prediction model for software project management based on similarity analysis of context histories. Information and Software Technology, 131, 106497.","journal-title":"Information and Software Technology"},{"issue":"1","key":"5653_CR12","doi-asserted-by":"crossref","first-page":"04019085","DOI":"10.1061\/(ASCE)CO.1943-7862.0001736","volume":"146","author":"A Gondia","year":"2020","unstructured":"Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H. (2020). Machine learning algorithms for construction projects delay risk prediction. Journal of Construction Engineering and Management, 146(1), 04019085.","journal-title":"Journal of Construction Engineering and Management"},{"key":"5653_CR13","doi-asserted-by":"crossref","first-page":"12668","DOI":"10.1016\/j.egyr.2022.09.064","volume":"8","author":"MH Haghighi","year":"2022","unstructured":"Haghighi, M. H., & Ashrafi, M. (2022). A new qualitative and quantitative analytical approach for risk management in energy project time-cost trade-off problem under interval type-2 fuzzy uncertainty: A case study in the gas industry. Energy Reports, 8, 12668\u201312685.","journal-title":"Energy Reports"},{"issue":"7","key":"5653_CR14","doi-asserted-by":"crossref","first-page":"226","DOI":"10.3390\/a15070226","volume":"15","author":"MH Haghighi","year":"2022","unstructured":"Haghighi, M. H., & Mousavi, S. M. (2022). A mathematical model and two fuzzy approaches based on credibility and expected interval for project cost-quality-risk trade-off problem in time-constrained conditions. Algorithms, 15(7), 226.","journal-title":"Algorithms"},{"key":"5653_CR15","doi-asserted-by":"crossref","DOI":"10.1016\/j.esr.2023.101189","volume":"50","author":"MH Haghighi","year":"2023","unstructured":"Haghighi, M. H., Mousavi, S. M., & Rajabzadeh, M. (2023). An optimization model for energy project scheduling problem with cost-risk-quality-social consideration trade-off under uncertainty: A real-world application. Energy Strategy Reviews, 50, 101189.","journal-title":"Energy Strategy Reviews"},{"issue":"9","key":"5653_CR16","doi-asserted-by":"crossref","first-page":"1","DOI":"10.14257\/ijmue.2015.10.9.01","volume":"10","author":"W Han","year":"2015","unstructured":"Han, W., Jiang, L., Lu, T., & Zhang, X. (2015). Comparison of machine learning algorithms for software project time prediction. International Journal of Multimedia and Ubiquitous Engineering, 10(9), 1\u20138.","journal-title":"International Journal of Multimedia and Ubiquitous Engineering"},{"issue":"1","key":"5653_CR17","first-page":"9","volume":"2","author":"M Hasher","year":"2022","unstructured":"Hasher, M., & Shafiq, M. (2022). Software project risk management practices and their effects on project success. Journal of Innovation and Emerging Technologies, 2(1), 9\u201330.","journal-title":"Journal of Innovation and Emerging Technologies"},{"key":"5653_CR18","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2022.118674","volume":"211","author":"IM Hezam","year":"2023","unstructured":"Hezam, I. M., Mishra, A. R., Rani, P., Saha, A., Smarandache, F., & Pamucar, D. (2023). An integrated decision support framework using single-valued neutrosophic-MASWIP-COPRAS for sustainability assessment of bioenergy production technologies. Expert Systems with Applications, 211, 118674.","journal-title":"Expert Systems with Applications"},{"issue":"6","key":"5653_CR19","doi-asserted-by":"crossref","first-page":"775","DOI":"10.1016\/j.jiph.2021.03.003","volume":"14","author":"S Hezer","year":"2021","unstructured":"Hezer, S., Gelmez, E., & \u00d6zceylan, E. (2021). Comparative analysis of TOPSIS, VIKOR and COPRAS methods for the COVID-19 regional safety assessment. Journal of Infection and Public Health, 14(6), 775\u2013786.","journal-title":"Journal of Infection and Public Health"},{"key":"5653_CR20","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1007\/s12652-016-0372-5","volume":"9","author":"MY Hsieh","year":"2018","unstructured":"Hsieh, M. Y., Hsu, Y. C., & Lin, C. T. (2018). Risk assessment in new software development projects at the front end: A fuzzy logic approach. Journal of Ambient Intelligence and Humanized Computing, 9, 295\u2013305.","journal-title":"Journal of Ambient Intelligence and Humanized Computing"},{"key":"5653_CR21","doi-asserted-by":"crossref","first-page":"555","DOI":"10.1016\/j.psep.2021.09.047","volume":"155","author":"Y Jianxing","year":"2021","unstructured":"Jianxing, Y., Shibo, W., Haicheng, C., Yang, Y., Haizhao, F., & Jiahao, L. (2021). Risk assessment of submarine pipelines using modified FMEA approach based on cloud model and extended VIKOR method. Process Safety and Environmental Protection, 155, 555\u2013574.","journal-title":"Process Safety and Environmental Protection"},{"issue":"16","key":"5653_CR22","doi-asserted-by":"crossref","first-page":"10515","DOI":"10.1007\/s00521-021-05809-x","volume":"33","author":"S Kayapinar Kaya","year":"2021","unstructured":"Kayapinar Kaya, S., & Aycin, E. (2021). An integrated interval type 2 fuzzy AHP and COPRAS-G methodologies for supplier selection in the era of Industry 4.0. Neural Computing and Applications, 33(16), 10515\u201310535.","journal-title":"Neural Computing and Applications"},{"issue":"2","key":"5653_CR23","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1016\/j.ijproman.2011.05.004","volume":"30","author":"J Kim","year":"2012","unstructured":"Kim, J., Kang, C., & Hwang, I. (2012). A practical approach to project scheduling: Considering the potential quality loss cost in the time\u2013cost tradeoff problem. International Journal of Project Management, 30(2), 264\u2013272.","journal-title":"International Journal of Project Management"},{"issue":"1","key":"5653_CR24","doi-asserted-by":"crossref","first-page":"29","DOI":"10.3390\/risks7010029","volume":"7","author":"M Leo","year":"2019","unstructured":"Leo, M., Sharma, S., & Maddulety, K. (2019). Machine learning in banking risk management: A literature review. Risks, 7(1), 29.","journal-title":"Risks"},{"issue":"3","key":"5653_CR25","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1002\/int.20340","volume":"24","author":"D Li","year":"2009","unstructured":"Li, D., Liu, C., & Gan, W. (2009). A new cognitive model: Cloud model. International Journal of Intelligent Systems, 24(3), 357\u2013375.","journal-title":"International Journal of Intelligent Systems"},{"issue":"3","key":"5653_CR26","doi-asserted-by":"crossref","first-page":"312","DOI":"10.1061\/(ASCE)CO.1943-7862.0000605","volume":"139","author":"F Li","year":"2013","unstructured":"Li, F., Phoon, K. K., Du, X., & Zhang, M. (2013). Improved AHP method and its application in risk identification. Journal of Construction Engineering and Management, 139(3), 312\u2013320.","journal-title":"Journal of Construction Engineering and Management"},{"issue":"5","key":"5653_CR27","doi-asserted-by":"crossref","first-page":"2110","DOI":"10.1002\/qre.2848","volume":"37","author":"J Li","year":"2021","unstructured":"Li, J., & Xu, K. (2021). A combined fuzzy DEMATEL and cloud model approach for risk assessment in process industries to improve system reliability. Quality and Reliability Engineering International, 37(5), 2110\u20132133.","journal-title":"Quality and Reliability Engineering International"},{"key":"5653_CR28","volume":"122","author":"SS Lin","year":"2021","unstructured":"Lin, S. S., Shen, S. L., Zhou, A., & Xu, Y. S. (2021). Risk assessment and management of excavation system based on fuzzy set theory and machine learning methods. Automation in Construction, 122, 103490.","journal-title":"Automation in Construction"},{"issue":"4","key":"5653_CR29","doi-asserted-by":"crossref","first-page":"1058","DOI":"10.1109\/TR.2017.2754642","volume":"66","author":"HC Liu","year":"2017","unstructured":"Liu, H. C., Li, Z., Song, W., & Su, Q. (2017). Failure mode and effect analysis using cloud model theory and PROMETHEE method. IEEE Transactions on Reliability, 66(4), 1058\u20131072.","journal-title":"IEEE Transactions on Reliability"},{"key":"5653_CR30","volume":"34","author":"Y Liu","year":"2021","unstructured":"Liu, Y., Chen, H., & Wang, X. J. (2021). Research on green renovations of existing public buildings based on a cloud model\u2013TOPSIS method. Journal of Building Engineering, 34, 101930.","journal-title":"Journal of Building Engineering"},{"issue":"1","key":"5653_CR31","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s40314-021-01695-0","volume":"41","author":"Z Liu","year":"2022","unstructured":"Liu, Z., Wang, X., Wang, W., Wang, D., & Liu, P. (2022). An integrated TOPSIS\u2013ORESTE-based decision-making framework for new energy investment assessment with cloud model. Computational and Applied Mathematics, 41(1), 1\u201338.","journal-title":"Computational and Applied Mathematics"},{"issue":"2","key":"5653_CR32","doi-asserted-by":"crossref","first-page":"369","DOI":"10.3846\/tede.2021.14211","volume":"27","author":"J Lu","year":"2021","unstructured":"Lu, J., Zhang, S., Wu, J., & Wei, Y. (2021). COPRAS method for multiple attribute group decision making under picture fuzzy environment and their application to green supplier selection. Technological and Economic Development of Economy, 27(2), 369\u2013385.","journal-title":"Technological and Economic Development of Economy"},{"issue":"3","key":"5653_CR33","doi-asserted-by":"crossref","first-page":"04019112","DOI":"10.1061\/(ASCE)CO.1943-7862.0001757","volume":"146","author":"HM Lyu","year":"2020","unstructured":"Lyu, H. M., Sun, W. J., Shen, S. L., & Zhou, A. N. (2020). Risk assessment using a new consulting process in fuzzy AHP. Journal of Construction Engineering and Management, 146(3), 04019112.","journal-title":"Journal of Construction Engineering and Management"},{"key":"5653_CR34","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1007\/s00521-020-05006-2","volume":"33","author":"A Mahmoodzadeh","year":"2021","unstructured":"Mahmoodzadeh, A., Mohammadi, M., Daraei, A., Farid Hama Ali, H., Ismail Abdullah, A., & Kameran Al-Salihi, N. (2021). Forecasting tunnel geology, construction time and costs using machine learning methods. Neural Computing and Applications, 33, 321\u2013348.","journal-title":"Neural Computing and Applications"},{"issue":"1","key":"5653_CR35","doi-asserted-by":"crossref","first-page":"516","DOI":"10.1080\/1331677X.2015.1075139","volume":"28","author":"A Mardani","year":"2015","unstructured":"Mardani, A., Jusoh, A., Nor, K., Khalifah, Z., Zakwan, N., & Valipour, A. (2015). Multiple criteria decision-making techniques and their applications\u2013a review of the literature from 2000 to 2014. Economic Research-Ekonomska Istra\u017eivanja, 28(1), 516\u2013571.","journal-title":"Economic Research-Ekonomska Istra\u017eivanja"},{"key":"5653_CR36","doi-asserted-by":"crossref","first-page":"1149","DOI":"10.1007\/s11219-018-9427-5","volume":"27","author":"J Menezes","year":"2019","unstructured":"Menezes, J., Gusm\u00e3o, C., & Moura, H. (2019). Risk factors in software development projects: A systematic literature review. Software Quality Journal, 27, 1149\u20131174.","journal-title":"Software Quality Journal"},{"key":"5653_CR37","doi-asserted-by":"crossref","DOI":"10.1016\/j.asoc.2022.108570","volume":"119","author":"AR Mishra","year":"2022","unstructured":"Mishra, A. R., Liu, P., & Rani, P. (2022). COPRAS method based on interval-valued hesitant Fermatean fuzzy sets and its application in selecting desalination technology. Applied Soft Computing, 119, 108570.","journal-title":"Applied Soft Computing"},{"key":"5653_CR38","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/j.cie.2016.02.025","volume":"95","author":"F Mohammadipour","year":"2016","unstructured":"Mohammadipour, F., & Sadjadi, S. J. (2016). Project cost\u2013quality\u2013risk tradeoff analysis in a time-constrained problem. Computers & Industrial Engineering, 95, 111\u2013121.","journal-title":"Computers & Industrial Engineering"},{"key":"5653_CR39","doi-asserted-by":"crossref","first-page":"32453","DOI":"10.1109\/ACCESS.2019.2903229","volume":"7","author":"M Mrad","year":"2019","unstructured":"Mrad, M., Al-Gahtani, K. S., Hulchafo, R., Souayah, N., & Bamatraf, K. (2019). Risk assessment for discrete stochastic time-cost-quality trade-off problem using simulation-based integer linear programming approach. IEEE Access., 7, 32453\u201332463.","journal-title":"IEEE Access."},{"key":"5653_CR40","doi-asserted-by":"crossref","first-page":"954","DOI":"10.1016\/j.scitotenv.2018.07.054","volume":"644","author":"F Sajedi-Hosseini","year":"2018","unstructured":"Sajedi-Hosseini, F., Malekian, A., Choubin, B., Rahmati, O., Cipullo, S., Coulon, F., & Pradhan, B. (2018). A novel machine learning-based approach for the risk assessment of nitrate groundwater contamination. Science of the Total Environment, 644, 954\u2013962.","journal-title":"Science of the Total Environment"},{"issue":"11","key":"5653_CR41","doi-asserted-by":"crossref","first-page":"2134","DOI":"10.1080\/15623599.2020.1768326","volume":"22","author":"MO Sanni-Anibire","year":"2022","unstructured":"Sanni-Anibire, M. O., Zin, R. M., & Olatunji, S. O. (2022). Machine learning model for delay risk assessment in tall building projects. International Journal of Construction Management, 22(11), 2134\u20132143.","journal-title":"International Journal of Construction Management"},{"issue":"3","key":"5653_CR42","doi-asserted-by":"crossref","first-page":"62","DOI":"10.3390\/logistics5030062","volume":"5","author":"M Schroeder","year":"2021","unstructured":"Schroeder, M., & Lodemann, S. (2021). A systematic investigation of the integration of machine learning into supply chain risk management. Logistics, 5(3), 62.","journal-title":"Logistics"},{"issue":"1","key":"5653_CR43","doi-asserted-by":"crossref","first-page":"1984","DOI":"10.2478\/otmcj-2019-0005","volume":"11","author":"AF Serpell","year":"2019","unstructured":"Serpell, A. F., Ferrada, X., & Rubio, L. (2019). Measuring the performance of project risk management: A preliminary model. Organization, Technology & Management in Construction: An International Journal., 11(1), 1984\u20131991.","journal-title":"Organization, Technology & Management in Construction: An International Journal."},{"key":"5653_CR44","volume":"199","author":"SL Shen","year":"2022","unstructured":"Shen, S. L., Zhang, N., Zhou, A., & Yin, Z. Y. (2022). Enhancement of neural networks with an alternative activation function tanhLU. Expert Systems with Applications, 199, 117181.","journal-title":"Expert Systems with Applications"},{"issue":"2","key":"5653_CR45","doi-asserted-by":"crossref","first-page":"128","DOI":"10.1080\/10429247.2018.1450030","volume":"30","author":"A Sols","year":"2018","unstructured":"Sols, A. (2018). A comprehensive approach to dynamic project risk management. Engineering Management Journal., 30(2), 128\u2013140.","journal-title":"Engineering Management Journal."},{"key":"5653_CR46","doi-asserted-by":"crossref","first-page":"1683","DOI":"10.1007\/s00500-019-03997-2","volume":"24","author":"K Suresh","year":"2020","unstructured":"Suresh, K., & Dillibabu, R. (2020). A novel fuzzy mechanism for risk assessment in software projects. Soft Computing, 24, 1683\u20131705.","journal-title":"Soft Computing"},{"issue":"6","key":"5653_CR47","doi-asserted-by":"crossref","first-page":"561","DOI":"10.1080\/08874417.2020.1839813","volume":"61","author":"BG Tavares","year":"2021","unstructured":"Tavares, B. G., Keil, M., Sanches da Silva, C. E., & de Souza, A. D. (2021). A risk management tool for agile software development. Journal of Computer Information Systems, 61(6), 561\u2013570.","journal-title":"Journal of Computer Information Systems"},{"key":"5653_CR48","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/j.ins.2014.02.130","volume":"274","author":"JQ Wang","year":"2014","unstructured":"Wang, J. Q., Peng, L., Zhang, H. Y., & Chen, X. H. (2014). Method of multi-criteria group decision-making based on cloud aggregation operators with linguistic information. Information Sciences, 274, 177\u2013191.","journal-title":"Information Sciences"},{"issue":"5","key":"5653_CR49","doi-asserted-by":"crossref","first-page":"688","DOI":"10.3390\/su9050688","volume":"9","author":"KQ Wang","year":"2017","unstructured":"Wang, K. Q., Liu, H. C., Liu, L., & Huang, J. (2017). Green supplier evaluation and selection using cloud model theory and the QUALIFLEX method. Sustainability, 9(5), 688.","journal-title":"Sustainability"},{"key":"5653_CR50","doi-asserted-by":"crossref","first-page":"92","DOI":"10.1016\/j.autcon.2014.07.014","volume":"47","author":"M Wauters","year":"2014","unstructured":"Wauters, M., & Vanhoucke, M. (2014). Support vector machine regression for project control forecasting. Automation in Construction, 47, 92\u2013106.","journal-title":"Automation in Construction"},{"issue":"3","key":"5653_CR51","doi-asserted-by":"crossref","first-page":"1097","DOI":"10.1016\/j.ejor.2016.11.018","volume":"259","author":"M Wauters","year":"2017","unstructured":"Wauters, M., & Vanhoucke, M. (2017). A nearest neighbour extension to project duration forecasting with artificial intelligence. European Journal of Operational Research, 259(3), 1097\u20131111.","journal-title":"European Journal of Operational Research"},{"issue":"01","key":"5653_CR52","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1142\/S0219622019410013","volume":"18","author":"D Wu","year":"2019","unstructured":"Wu, D., Zhu, X., Wan, J., Bao, C., & Li, J. (2019). A multiobjective optimization approach for selecting risk response strategies of software project: From the perspective of risk correlations. International Journal of Information Technology & Decision Making, 18(01), 339\u2013364.","journal-title":"International Journal of Information Technology & Decision Making"},{"issue":"14","key":"5653_CR53","doi-asserted-by":"crossref","first-page":"11267","DOI":"10.3390\/su151411267","volume":"15","author":"I Yilmaz","year":"2023","unstructured":"Yilmaz, I. (2023). A hybrid DEA\u2013fuzzy COPRAS approach to the evaluation of renewable energy: A case of wind farms in Turkey. Sustainability, 15(14), 11267.","journal-title":"Sustainability"},{"key":"5653_CR54","first-page":"131","volume":"1","author":"E Zavadskas","year":"1994","unstructured":"Zavadskas, E., Kaklauskas, A., & Sarka, V. (1994). The new method of multi-criteria complex proportional assessment of projects. Technological and Economic Development of Economy, 1, 131\u2013139.","journal-title":"Technological and Economic Development of Economy"},{"key":"5653_CR55","volume":"277","author":"D Zhao","year":"2020","unstructured":"Zhao, D., Li, C., Wang, Q., & Yuan, J. (2020). Comprehensive evaluation of national electric power development based on cloud model and entropy method and TOPSIS: A case study in 11 countries. Journal of Cleaner Production, 277, 123190.","journal-title":"Journal of Cleaner Production"},{"key":"5653_CR56","doi-asserted-by":"crossref","first-page":"616","DOI":"10.1016\/j.renene.2019.12.125","volume":"150","author":"S Zhou","year":"2020","unstructured":"Zhou, S., & Yang, P. (2020). Risk management in distributed wind energy implementing analytic hierarchy process. Renewable Energy, 150, 616\u2013623.","journal-title":"Renewable Energy"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-023-05653-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-023-05653-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-023-05653-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,15]],"date-time":"2024-07-15T16:26:01Z","timestamp":1721060761000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-023-05653-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,11,20]]},"references-count":56,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2024,7]]}},"alternative-id":["5653"],"URL":"https:\/\/doi.org\/10.1007\/s10479-023-05653-3","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,11,20]]},"assertion":[{"value":"30 November 2022","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"8 October 2023","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"20 November 2023","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors have no competing interests to declare that are relevant to the content of this article.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"This article does not contain any studies with human participants or animals performed by any of the authors.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethical approval"}},{"value":"Informed consent was obtained from all individual participants included in the study.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Informed consent"}}]}}