{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,27]],"date-time":"2026-05-27T17:42:24Z","timestamp":1779903744325,"version":"3.53.1"},"reference-count":66,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2024,1,20]],"date-time":"2024-01-20T00:00:00Z","timestamp":1705708800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,1,20]],"date-time":"2024-01-20T00:00:00Z","timestamp":1705708800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"funder":[{"DOI":"10.13039\/100012964","name":"Minist\u00e8re de l\u2019Enseignement Sup\u00e9rieur et de la Recherche Scientifique","doi-asserted-by":"publisher","award":["MOBIDOC scheme"],"award-info":[{"award-number":["MOBIDOC scheme"]}],"id":[{"id":"10.13039\/100012964","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2025,12]]},"DOI":"10.1007\/s10479-023-05787-4","type":"journal-article","created":{"date-parts":[[2024,1,20]],"date-time":"2024-01-20T19:40:53Z","timestamp":1705779653000},"page":"3081-3098","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["A modified particle swarm optimization algorithm in a rolling horizon framework for the aggregate production planning problem: pharmaceutical industry case"],"prefix":"10.1007","volume":"355","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-4669-1965","authenticated-orcid":false,"given":"Imen","family":"Boujnah","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Mounira","family":"Tlili","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ouajdi","family":"Korbaa","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2024,1,20]]},"reference":[{"key":"5787_CR1","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2016\/1679315","volume":"2016","author":"M Abu Bakar","year":"2016","unstructured":"Abu Bakar, M., Bakhuet, A.-J., Kamil, F., Kalaf, B., Abbas, I., & Lee, L. S. (2016). Enhanced simulated annealing for solving aggregate production planning. Math-Ematical Problems in Engineering, 2016, 1\u20139. https:\/\/doi.org\/10.1155\/2016\/1679315","journal-title":"Math-Ematical Problems in Engineering"},{"key":"5787_CR2","doi-asserted-by":"publisher","first-page":"5636","DOI":"10.1021\/acs.iecr.6b04958","volume":"56","author":"AM Aguirre","year":"2017","unstructured":"Aguirre, A. M., Liu, S., & Papageorgiou, L. G. (2017). Mixed integer linear programming based approaches for medium-term planning and scheduling in multiproduct multistage continuous plants. Industrial & Engineering Chemistry Research, 56, 5636\u20135651. https:\/\/doi.org\/10.1021\/acs.iecr.6b04958","journal-title":"Industrial & Engineering Chemistry Research"},{"key":"5787_CR3","doi-asserted-by":"publisher","first-page":"765","DOI":"10.1007\/s00170-011-3396-1","volume":"58","author":"SMJM Al-E-Hashem","year":"2012","unstructured":"Al-E-Hashem, S. M. J. M., Aryanezhad, M.-B., & Sadjadi, S. J. (2012). An efficient algorithm to solve a multi-objective robust aggregate production planning in an uncertain environment. The International Journal of Advanced Manufacturing Technology, 58, 765\u2013782. https:\/\/doi.org\/10.1007\/s00170-011-3396-1","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"5787_CR4","first-page":"506","volume":"25","author":"N Al-gazaly","year":"2020","unstructured":"Al-gazaly, N., Yousif, N., Atiyah, B., & Zenad, J. (2020). Hybrid heuristics methods to solve app problems in industrial management techniques. Productivity Management, 25, 506.","journal-title":"Productivity Management"},{"key":"5787_CR5","doi-asserted-by":"publisher","first-page":"233","DOI":"10.1016\/j.cor.2014.03.017","volume":"55","author":"H Andersson","year":"2015","unstructured":"Andersson, H., Fagerholt, K., & Hobbesland, K. (2015). Integrated maritime fleet deployment and speed optimization: Case study from roro shipping. Computers Operations Research, 55, 233\u2013240. https:\/\/doi.org\/10.1016\/j.cor.2014.03.017","journal-title":"Computers Operations Research"},{"issue":"2","key":"5787_CR6","doi-asserted-by":"publisher","first-page":"1","DOI":"10.12660\/joscmv11n2p01-15","volume":"11","author":"RA Aziz","year":"2018","unstructured":"Aziz, R. A., Paul, H. K., Karim, T. M., Ahmed, I., & Azeem, A. (2018). Modeling and optimization of multi-layer aggregate production planning. Journal of Operations and Supply Chain Management (JOSCM), 11(2), 1\u201315. https:\/\/doi.org\/10.12660\/joscmv11n2p01-15","journal-title":"Journal of Operations and Supply Chain Management (JOSCM)"},{"key":"5787_CR7","doi-asserted-by":"publisher","first-page":"19","DOI":"10.1111\/j.1540-5915.1977.tb01065.x","volume":"8","author":"KR Baker","year":"1977","unstructured":"Baker, K. R. (1977). An experimental study of the effectiveness of rolling schedules in production planning. Decision Sciences, 8, 19\u201327. https:\/\/doi.org\/10.1111\/j.1540-5915.1977.tb01065.x","journal-title":"Decision Sciences"},{"key":"5787_CR8","doi-asserted-by":"publisher","first-page":"3685","DOI":"10.1080\/00207540110061607","volume":"39","author":"A Baykasoglu","year":"2001","unstructured":"Baykasoglu, A. (2001). Moapps 1.0: Aggregate production planning using the multiple-objective tabu search. International Journal of Production Research, 39, 3685\u20133702. https:\/\/doi.org\/10.1080\/00207540110061607","journal-title":"International Journal of Production Research"},{"key":"5787_CR9","doi-asserted-by":"publisher","first-page":"5218","DOI":"10.1080\/00207543.2020.1713415","volume":"58","author":"E Brevik","year":"2020","unstructured":"Brevik, E., Lauen, A., Rolke, M. C. B., Fagerholt, K., & Hansen, J. R. (2020). Optimisation of the broiler production supply chain. International Journal of Production Research, 58, 5218\u20135237. https:\/\/doi.org\/10.1080\/00207543.2020.1713415","journal-title":"International Journal of Production Research"},{"key":"5787_CR10","unstructured":"Cao, Y. (2015). Long-distance procurement planning in global sourcing (PhD thesis). Chemical and Process Engineering. Ecole Centrale Paris. Retreived from https:\/\/ theses.hal.science\/tel-01154871\/document"},{"key":"5787_CR11","doi-asserted-by":"crossref","unstructured":"Cedillo-Robles, J.A., Smith, N.R., Gonz\u00b4alez-Ramirez, R.G., Alonso-Stocker, J., Alonso-Stocker, J., Askin, R.G. (2021). A production planning milp optimization model for a manufacturing company. In: D.A. Rossit, F. Tohm\u00b4e, & G. Mej\u00b4\u0131a Delgadillo (Eds.), Production research (p. 85\u201396).","DOI":"10.1007\/978-3-030-76307-7_7"},{"key":"5787_CR12","doi-asserted-by":"publisher","first-page":"7102","DOI":"10.1016\/j.eswa.2010.12.059","volume":"38","author":"R-M Chen","year":"2011","unstructured":"Chen, R.-M. (2011). Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem. Expert Systems with Applications, 38, 7102\u20137111. https:\/\/doi.org\/10.1016\/j.eswa.2010.12.059","journal-title":"Expert Systems with Applications"},{"key":"5787_CR13","doi-asserted-by":"publisher","first-page":"1","DOI":"10.4018\/IJFSA.2020040101","volume":"9","author":"N Chiadamrong","year":"2020","unstructured":"Chiadamrong, N., & Sutthibutr, N. (2020). Integrating a weighted additive multiple objective linear model with possibilistic linear programming for fuzzy aggregate production planning problems. International Journal of Fuzzy System Applications, 9, 1\u201330. https:\/\/doi.org\/10.4018\/IJFSA.2020040101","journal-title":"International Journal of Fuzzy System Applications"},{"key":"5787_CR14","doi-asserted-by":"publisher","first-page":"401","DOI":"10.1016\/0305-0483(87)90041-7","volume":"15","author":"C-H Chung","year":"1987","unstructured":"Chung, C.-H., & Krajewski, L. J. (1987). Interfacing aggregate plans and master production schedules via a rolling horizon feedback procedure. Omega, 15, 401\u2013409. https:\/\/doi.org\/10.1016\/0305-0483(87)90041-7","journal-title":"Omega"},{"key":"5787_CR15","doi-asserted-by":"publisher","first-page":"196","DOI":"10.1016\/j.eneco.2014.07.005","volume":"45","author":"AF da Silva","year":"2014","unstructured":"da Silva, A. F., & Marins, F. A. S. (2014). A fuzzy goal programming model for solving aggregate production-planning problems under uncertainty: A case study in a Brazilian sugar mill. Energy Economics, 45, 196\u2013204. https:\/\/doi.org\/10.1016\/j.eneco.2014.07.005","journal-title":"Energy Economics"},{"key":"5787_CR16","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1016\/j.ijpe.2017.01.003","volume":"190","author":"RJ de Sampaio","year":"2017","unstructured":"de Sampaio, R. J., Wollmann, R. R., & Vieira, P. F. (2017). A flexible production planning for rolling-horizons. International Journal of Production Economics, 190, 31\u201336. https:\/\/doi.org\/10.1016\/j.ijpe.2017.01.003","journal-title":"International Journal of Production Economics"},{"key":"5787_CR17","doi-asserted-by":"publisher","first-page":"45","DOI":"10.1016\/j.ijpe.2018.05.001","volume":"202","author":"E Demirel","year":"2018","unstructured":"Demirel, E., O\u00a8 zelkan, E. C., & Lim, C. (2018). Aggregate planning with flexibility requirements profile. International Journal of Production Economics, 202, 45\u201358. https:\/\/doi.org\/10.1016\/j.ijpe.2018.05.001","journal-title":"International Journal of Production Economics"},{"key":"5787_CR18","doi-asserted-by":"publisher","first-page":"63","DOI":"10.1016\/j.jmsy.2016.06.004","volume":"40","author":"A Entezaminia","year":"2016","unstructured":"Entezaminia, A., Heydari, M., & Rahmani, D. (2016). A multi-objective model for multi-product multi-site aggregate production planning in a green supply chain: Considering collection and recycling centers. Journal of Manufacturing Systems, 40, 63\u201375. https:\/\/doi.org\/10.1016\/j.jmsy.2016.06.004","journal-title":"Journal of Manufacturing Systems"},{"key":"5787_CR19","unstructured":"Fahimnia, B., Luong, L.H., Marian, R.M. (2008). Modeling and optimization of aggregate production planning\u2014A Genetic Algorithm Approach. World Academy of Science, Engineering and  Technology, International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering, 2, 1064\u20131069"},{"key":"5787_CR20","doi-asserted-by":"publisher","first-page":"6537","DOI":"10.1021\/acs.iecr.8b05710","volume":"58","author":"GP Georgiadis","year":"2019","unstructured":"Georgiadis, G. P., Kopanos, G. M., Karkaris, A., Ksafopoulos, H., & Georgiadis, M. C. (2019). Optimal production scheduling in the dairy industries. Industrial & Engineering Chemistry Research, 58, 6537\u20136550. https:\/\/doi.org\/10.1021\/acs.iecr.8b05710","journal-title":"Industrial & Engineering Chemistry Research"},{"key":"5787_CR21","doi-asserted-by":"publisher","first-page":"585","DOI":"10.1016\/j.asoc.2015.08.041","volume":"37","author":"N Gholamian","year":"2015","unstructured":"Gholamian, N., Mahdavi, I., Tavakkoli-Moghaddam, R., & Mahdavi-Amiri, N. (2015). Comprehensive fuzzy multi-objective multi-product multi-site aggregate production planning decisions in a supply chain under uncertainty. Applied Soft Computing, 37, 585\u2013607. https:\/\/doi.org\/10.1016\/j.asoc.2015.08.041","journal-title":"Applied Soft Computing"},{"key":"5787_CR22","doi-asserted-by":"publisher","first-page":"200","DOI":"10.1016\/j.asoc.2016.04.011","volume":"44","author":"BS Girish","year":"2016","unstructured":"Girish, B. S. (2016). An efficient hybrid particle swarm optimization algorithm in a rolling horizon framework for the aircraft landing problem. Applied Soft Computing, 44, 200\u2013221. https:\/\/doi.org\/10.1016\/j.asoc.2016.04.011","journal-title":"Applied Soft Computing"},{"key":"5787_CR23","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1016\/S0925-5273(03)00113-0","volume":"85","author":"M Gnoni","year":"2003","unstructured":"Gnoni, M., Iavagnilio, R., Mossa, G., Mummolo, G., & Di Leva, A. (2003). Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industry. International Journal of Production Economics, 85, 251\u2013262. https:\/\/doi.org\/10.1016\/S0925-5273(03)00113-0","journal-title":"International Journal of Production Economics"},{"key":"5787_CR24","unstructured":"Grand-View-Research (2021). Retreived from https:\/\/www.marketresearch.com\/ Grand-View-Research-v4060\/Pharmaceutical-Manufacturing-Size-Share-Trends -14883445\/)"},{"key":"5787_CR25","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2020.102373","author":"Z Haonan","year":"2021","unstructured":"Haonan, Z., Samavati, M., & Hill, A. J. (2021). Heuristics for integrated blending optimisation in a mining supply chain. Omega. https:\/\/doi.org\/10.1016\/j.omega.2020.102373","journal-title":"Omega"},{"issue":"2","key":"5787_CR26","doi-asserted-by":"publisher","first-page":"159","DOI":"10.1287\/mnsc.2.2.159","volume":"2","author":"CC Holt","year":"1956","unstructured":"Holt, C. C., Modigliani, F., & Muth, J. F. (1956). Derivation of a linear decision rule for production and employment. Management Science, 2(2), 159\u2013177.","journal-title":"Management Science"},{"key":"5787_CR27","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1287\/mnsc.2.1.1","volume":"2","author":"CC Holt","year":"1955","unstructured":"Holt, C. C., Modigliani, F., & Simon, H. A. (1955). A linear decision rule for production and employment scheduling. Management Science, 2, 1\u201330.","journal-title":"Management Science"},{"key":"5787_CR28","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2018\/8601209","volume":"2018","author":"R-H Huang","year":"2018","unstructured":"Huang, R.-H., Yu, T.-H., & Lee, C.-Y. (2018). Rolling supply chain scheduling considering suppliers, production, and delivery lot-size. Mathematical Problems in Engineering, 2018, 1\u201314. https:\/\/doi.org\/10.1155\/2018\/8601209","journal-title":"Mathematical Problems in Engineering"},{"key":"5787_CR29","doi-asserted-by":"publisher","first-page":"257","DOI":"10.1109\/66.492820","volume":"9","author":"Y-F Hung","year":"1996","unstructured":"Hung, Y.-F., & Leachman, R. (1996). A production planning methodology for semi-conductor manufacturing based on iterative simulation and linear programming calculations. IEEE Transactions on Semiconductor Manufacturing, 9, 257\u2013269. https:\/\/doi.org\/10.1109\/66.492820","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"5787_CR30","doi-asserted-by":"publisher","first-page":"4341","DOI":"10.1021\/ie970927g","volume":"37","author":"MG Ierapetritou","year":"1998","unstructured":"Ierapetritou, M. G., & Floudas, C. A. (1998). Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes. Industrial & Engineering Chemistry Research, 37, 4341\u20134359.","journal-title":"Industrial & Engineering Chemistry Research"},{"key":"5787_CR31","unstructured":"Islam, M.R., Aziz, M.S., Muftee, M.M.H., Hossain, M.S. (2014). Application of particle swarm optimization in aggregate production planning and comparison with genetic algorithm. In International conference on mechanical, industrial and energy engineering. December 25\u201326, Khulna, BANGLADESH."},{"issue":"5","key":"5787_CR32","doi-asserted-by":"publisher","first-page":"1213","DOI":"10.1016\/j.cor.2003.11.001","volume":"32","author":"A Jain","year":"2005","unstructured":"Jain, A., & Palekar, U. S. (2005). Aggregate production planning for a continuous reconfigurable manufacturing process. Computers Operations Research, 32(5), 1213\u20131236.","journal-title":"Computers Operations Research"},{"issue":"1","key":"5787_CR33","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1021\/acs.iecr.9b00733","volume":"59","author":"M Jalanko","year":"2020","unstructured":"Jalanko, M., & Mahalec, V. (2020). Gasoline blend planning under demand uncertainty: Aggregate supply-demand pinch algorithm with rolling horizon. Industrial and Engineering Chemistry Research, 59(1), 281\u2013298. https:\/\/doi.org\/10.1021\/acs.iecr.9b00733","journal-title":"Industrial and Engineering Chemistry Research"},{"key":"5787_CR34","doi-asserted-by":"publisher","first-page":"159","DOI":"10.1007\/s00170-018-3151-y","volume":"102","author":"A Jamalnia","year":"2019","unstructured":"Jamalnia, A., Yang, J.-B., Feili, A., Xu, D., & Jamali, G. (2019). Aggregate production planning under uncertainty: A comprehensive literature survey and future research directions. The International Journal of Advanced Manufacturing Technology, 102, 159\u2013181.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"5787_CR35","doi-asserted-by":"publisher","first-page":"54","DOI":"10.1016\/j.cie.2017.09.044","volume":"114","author":"A Jamalnia","year":"2017","unstructured":"Jamalnia, A., Yang, J.-B., Xu, D.-L., & Feili, A. (2017). Novel decision model based on mixed chase and level strategy for aggregate production planning under uncertainty: Case study in beverage industry. Computers Industrial Engineering, 114, 54\u201368.","journal-title":"Computers Industrial Engineering"},{"key":"5787_CR36","doi-asserted-by":"publisher","first-page":"106367","DOI":"10.1016\/j.cie.2020.106367","volume":"142","author":"J Jang","year":"2020","unstructured":"Jang, J., & Chung, B. D. (2020). Aggregate production planning considering implementation error: A robust optimization approach using bi-level particle swarm optimization. Computers and Industrial Engineering, 142, 106367.","journal-title":"Computers and Industrial Engineering"},{"key":"5787_CR37","doi-asserted-by":"crossref","unstructured":"Jiang, G., Kong, J., Li, G. (2008). Aggregate production planning model of production line in iron and steel enterprise based on genetic algorithm. In 2008 7th world congress on intelligent control and automation (pp. 7716\u20137719).","DOI":"10.1109\/WCICA.2008.4594130"},{"issue":"3","key":"5787_CR38","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1007\/s00291-002-0101-7","volume":"24","author":"J Kallrath","year":"2002","unstructured":"Kallrath, J. (2002). Planning and scheduling in the process industry. OR Spectrum, 24(3), 219\u2013250.","journal-title":"OR Spectrum"},{"key":"5787_CR39","doi-asserted-by":"crossref","unstructured":"Kennedy, J., & Eberhart, R. (1995). Particle swarm optimization. In Proceedings of icnn\u201995\u2014international conference on neural networks (Vol. 4, p. 1942\u20131948).","DOI":"10.1109\/ICNN.1995.488968"},{"key":"5787_CR40","unstructured":"Kondili, E. (1988). Optimal scheduling of batch chemical processes (PhD thesis). Imperial College London (University of London)"},{"issue":"22","key":"5787_CR41","doi-asserted-by":"publisher","first-page":"5887","DOI":"10.1016\/j.ces.2010.08.010","volume":"65","author":"Z Li","year":"2010","unstructured":"Li, Z., & Ierapetritou, M. G. (2010). Rolling horizon based planning and scheduling integration with production capacity consideration. Chemical Engineering Science, 65(22), 5887\u20135900. https:\/\/doi.org\/10.1016\/j.ces.2010.08.010","journal-title":"Chemical Engineering Science"},{"issue":"13","key":"5787_CR42","doi-asserted-by":"publisher","first-page":"3927","DOI":"10.1080\/00207543.2016.1165356","volume":"54","author":"P-C Lin","year":"2016","unstructured":"Lin, P.-C., & Uzsoy, R. (2016). Chance-constrained formulations in rolling horizon production planning: An experimental study. International Journal of Production Research, 54(13), 3927\u20133942. https:\/\/doi.org\/10.1080\/00207543.2016.1165356","journal-title":"International Journal of Production Research"},{"key":"5787_CR43","doi-asserted-by":"crossref","unstructured":"Lu, S., Su, H., Wang, Y., Xie, L., Zhang, Q. (2015). Multi-product multi-stage production planning with lead time on a rolling horizon basis (Vol. 28, pp. 1162\u20131167).","DOI":"10.1016\/j.ifacol.2015.09.125"},{"key":"5787_CR44","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1007\/978-3-642-03211-019","volume":"236","author":"RI Lung","year":"2009","unstructured":"Lung, R. I., & Dumitrescu, D. (2009). Evolutionary multimodal optimization for nash equilibria detection. Studies in Computational Intelligence, 236, 227\u2013237. https:\/\/doi.org\/10.1007\/978-3-642-03211-019","journal-title":"Studies in Computational Intelligence"},{"key":"5787_CR45","doi-asserted-by":"publisher","first-page":"34","DOI":"10.1016\/j.cie.2016.08.005","volume":"100","author":"A Makui","year":"2016","unstructured":"Makui, A., Heydari, M., Aazami, A., & Dehghani, E. (2016). Accelerating benders decomposition approach for robust aggregate production planning of products with a very limited expiration date. Computers and Industrial Engineering, 100, 34\u201351. https:\/\/doi.org\/10.1016\/j.cie.2016.08.005","journal-title":"Computers and Industrial Engineering"},{"key":"5787_CR46","first-page":"44","volume":"2","author":"M Ramazanian","year":"2011","unstructured":"Ramazanian, M., & Modares, M. (2011). Application of particle swarm optimization algorithm to aggregate production planning. Asian Journal of Business Management Studies, 2, 44\u201354.","journal-title":"Asian Journal of Business Management Studies"},{"issue":"1","key":"5787_CR47","doi-asserted-by":"publisher","first-page":"1256","DOI":"10.1016\/j.eswa.2011.07.134","volume":"39","author":"R Ramezanian","year":"2012","unstructured":"Ramezanian, R., Rahmani, D., & Barzinpour, F. (2012). An aggregate production planning model for two phase production systems: Solving with genetic algorithm and tabu search. Expert Systems with Applications, 39(1), 1256\u20131263. https:\/\/doi.org\/10.1016\/j.eswa.2011.07.134","journal-title":"Expert Systems with Applications"},{"issue":"4","key":"5787_CR48","doi-asserted-by":"publisher","first-page":"1289","DOI":"10.1007\/s10100-020-00687-5","volume":"29","author":"G Rius-Sorolla","year":"2021","unstructured":"Rius-Sorolla, G., Maheut, J., Estell\u00e9s-Miguel, S., & Garc\u00eda-Sabater, J. (2021). Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with strokes. Central European Journal of Operations Research, 29(4), 1289\u20131315.","journal-title":"Central European Journal of Operations Research"},{"issue":"18","key":"5787_CR49","doi-asserted-by":"publisher","first-page":"5413","DOI":"10.1080\/00207543.2013.775523","volume":"51","author":"F Sahin","year":"2013","unstructured":"Sahin, F., Narayanan, A., & Robinson, E. P. (2013). Rolling horizon planning in supply chains: Review, implications and directions for future research. International Journal of Production Research, 51(18), 5413\u20135436. https:\/\/doi.org\/10.1080\/00207543.2013.775523","journal-title":"International Journal of Production Research"},{"issue":"2","key":"5787_CR50","first-page":"127","volume":"2","author":"Y Shi","year":"1996","unstructured":"Shi, Y., & Haase, C. (1996). Optimal trade-offs of aggregate production planning with multiple objective and multi-capacity demand levels. International Journal of Operations and Quantitative Management, 2(2), 127\u2013143.","journal-title":"International Journal of Operations and Quantitative Management"},{"key":"5787_CR51","doi-asserted-by":"publisher","first-page":"485","DOI":"10.1016\/j.apenergy.2015.05.090","volume":"155","author":"J Silvente","year":"2015","unstructured":"Silvente, J., Kopanos, G. M., Pistikopoulos, E. N., & Espun\u00f1a, A. (2015). A rolling horizon optimization framework for the simultaneous energy supply and demand planning in microgrids. Applied Energy, 155, 485\u2013501.","journal-title":"Applied Energy"},{"key":"5787_CR52","doi-asserted-by":"publisher","first-page":"299","DOI":"10.1108\/13552511111157407","volume":"17","author":"C Sitompul","year":"2011","unstructured":"Sitompul, C., & Aghezzaf, E.-H. (2011). An integrated hierarchical production and maintenance-planning model. Journal of Quality in Maintenance Engineering, 17, 299\u2013314. https:\/\/doi.org\/10.1108\/13552511111157407","journal-title":"Journal of Quality in Maintenance Engineering"},{"key":"5787_CR53","doi-asserted-by":"publisher","DOI":"10.1111\/itor.12861","author":"A Solano-Blanco","year":"2020","unstructured":"Solano-Blanco, A., Gonz\u00e1lez, J., G\u00f3mez-Rueda, L., Vargas S\u00e1nchez, J. J., & Medaglia, A. (2020). Integrated planning decisions in the broiler chicken supply chain. International Transactions in Operational Research. https:\/\/doi.org\/10.1111\/itor.12861","journal-title":"International Transactions in Operational Research"},{"issue":"1","key":"5787_CR54","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1007\/s10951-020-00655-6","volume":"24","author":"B Spratt","year":"2021","unstructured":"Spratt, B., & Kozan, E. (2021). An integrated rolling horizon approach to increase operating theatre efficiency. Journal of Scheduling, 24(1), 3\u201325. https:\/\/doi.org\/10.1007\/s10951-020-00655-6","journal-title":"Journal of Scheduling"},{"key":"5787_CR55","doi-asserted-by":"publisher","first-page":"143","DOI":"10.1007\/s10696-010-9071-2","volume":"22","author":"H Stephan","year":"2010","unstructured":"Stephan, H., Gschwind, T., & Minner, S. (2010). Manufacturing capacity planning and the value of multi-stage stochastic programming under markovian demand. Flexible Services and Manufacturing Journal, 22, 143\u2013162. https:\/\/doi.org\/10.1007\/s10696-010-9071-2","journal-title":"Flexible Services and Manufacturing Journal"},{"key":"5787_CR56","first-page":"1","volume":"5","author":"M Tasgetiren","year":"2003","unstructured":"Tasgetiren, M., & Liang, Y.-C. (2003). 01). A binary particle swarm optimization algorithm for lot sizing problem. Journal of Economic and Social Research, 5, 1\u201320.","journal-title":"Journal of Economic and Social Research"},{"key":"5787_CR57","doi-asserted-by":"crossref","unstructured":"Tavakkoli-Moghaddam, R., & Safaei, N. (2006). An evolutionary algorithm for a single-item resource-constrained aggregate production planning problem. In 2006 IEEE international conference on evolutionary computation (p. 2851\u20132858).","DOI":"10.1109\/CEC.2006.1688667"},{"key":"5787_CR58","doi-asserted-by":"publisher","first-page":"193","DOI":"10.1007\/s00291-016-0450-2","volume":"39","author":"T Vogel","year":"2017","unstructured":"Vogel, T., Almada-Lobo, B., & Almeder, C. (2017). Integrated versus hierarchical approach to aggregate production planning and master production scheduling. OR Spectrum, 39, 193\u2013229. https:\/\/doi.org\/10.1007\/s00291-016-0450-2","journal-title":"OR Spectrum"},{"issue":"6","key":"5787_CR59","doi-asserted-by":"publisher","first-page":"3069","DOI":"10.1016\/j.eswa.2013.10.038","volume":"41","author":"S-C Wang","year":"2014","unstructured":"Wang, S.-C., & Yeh, M.-F. (2014). A modified particle swarm optimization for aggregate production planning. Expert Systems with Applications, 41(6), 3069\u20133077. https:\/\/doi.org\/10.1016\/j.eswa.2013.10.038","journal-title":"Expert Systems with Applications"},{"issue":"1","key":"5787_CR60","doi-asserted-by":"publisher","first-page":"62","DOI":"10.32738\/JEPPM-2022-0006","volume":"12","author":"AP Wibawa","year":"2022","unstructured":"Wibawa, A. P., Mahmudy, W. F., Rizki, A. M., Yuliastuti, G. E., & Tama, I. P. (2022). Multi-site aggregate production planning using particle swarm optimization. Journal of Engineering, Project, and Production Management, 12(1), 62\u201369. https:\/\/doi.org\/10.32738\/JEPPM-2022-0006","journal-title":"Journal of Engineering, Project, and Production Management"},{"issue":"11","key":"5787_CR61","doi-asserted-by":"publisher","first-page":"1129","DOI":"10.1016\/j.cep.2007.02.021","volume":"46","author":"D Wu","year":"2007","unstructured":"Wu, D., & Ierapetritou, M. (2007). Hierarchical approach for production planning and scheduling under uncertainty. Chemical Engineering and Processing: Process Intensification, 46(11), 1129\u20131140. https:\/\/doi.org\/10.1016\/j.cep.2007.02.021","journal-title":"Chemical Engineering and Processing: Process Intensification"},{"key":"5787_CR62","doi-asserted-by":"publisher","DOI":"10.1016\/j.compchemeng.2021.107268","author":"O Wu","year":"2021","unstructured":"Wu, O., Dalle Ave, G., Harjunkoski, I., & Imsland, L. (2021). A rolling horizon approach for scheduling of multiproduct batch production and maintenance using generalized disjunctive programming models. Computers Chemical Engineering. https:\/\/doi.org\/10.1016\/j.compchemeng.2021.107268","journal-title":"Computers Chemical Engineering"},{"key":"5787_CR63","unstructured":"Yao, X., Almatooq, N., Askin, R., Gruber, G. (2020). Capacity and production planning for automobile assembly with limited model-specific tooling flexibility. Working paper"},{"issue":"11","key":"5787_CR64","doi-asserted-by":"publisher","first-page":"484","DOI":"10.14569\/IJACSA.2019.0101167","volume":"10","author":"GE Yuliastuti","year":"2019","unstructured":"Yuliastuti, G. E., Rizki, A. M., Mahmudy, W. F., & Tama, I. P. (2019). Optimization of multi-product aggregate production planning using hybrid simulated annealing and adaptive genetic algorithm. International Journal of Advanced Computer Science and Applications, 10(11), 484\u2013489. https:\/\/doi.org\/10.14569\/IJACSA.2019.0101167","journal-title":"International Journal of Advanced Computer Science and Applications"},{"key":"5787_CR65","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1504\/IJMOR.2013.050604","volume":"5","author":"MK Zanjani","year":"2013","unstructured":"Zanjani, M. K., Ait-Kadi, D., & Nourelfath, M. (2013). A stochastic programming approach for sawmill production planning. International Journal of Mathematics in Operational Research, 5, 1\u201318. https:\/\/doi.org\/10.1504\/IJMOR.2013.050604","journal-title":"International Journal of Mathematics in Operational Research"},{"issue":"7","key":"5787_CR66","doi-asserted-by":"publisher","first-page":"1957","DOI":"10.1080\/00207541003690074","volume":"49","author":"X Zhang","year":"2011","unstructured":"Zhang, X., Prajapati, M., & Peden, E. (2011). A stochastic production planning model under uncertain seasonal demand and market growth. International Journal of Production Research, 49(7), 1957\u20131975. https:\/\/doi.org\/10.1080\/00207541003690074","journal-title":"International Journal of Production Research"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-023-05787-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-023-05787-4","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-023-05787-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,12,18]],"date-time":"2025-12-18T14:21:10Z","timestamp":1766067670000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-023-05787-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,1,20]]},"references-count":66,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2025,12]]}},"alternative-id":["5787"],"URL":"https:\/\/doi.org\/10.1007\/s10479-023-05787-4","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,1,20]]},"assertion":[{"value":"15 April 2023","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"11 December 2023","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"20 January 2024","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"This article does not contain any studies with human participants or animals performed by any of the authors.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethical approval"}}]}}