{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T12:16:54Z","timestamp":1777637814702,"version":"3.51.4"},"reference-count":56,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2024,4,27]],"date-time":"2024-04-27T00:00:00Z","timestamp":1714176000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,4,27]],"date-time":"2024-04-27T00:00:00Z","timestamp":1714176000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"funder":[{"DOI":"10.13039\/501100003593","name":"Conselho Nacional de Desenvolvimento Cient\u00edfico e Tecnol\u00f3gico","doi-asserted-by":"publisher","award":["309869\/2020-0"],"award-info":[{"award-number":["309869\/2020-0"]}],"id":[{"id":"10.13039\/501100003593","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100003593","name":"Conselho Nacional de Desenvolvimento Cient\u00edfico e Tecnol\u00f3gico","doi-asserted-by":"publisher","award":["305020\/2019-6"],"award-info":[{"award-number":["305020\/2019-6"]}],"id":[{"id":"10.13039\/501100003593","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100004586","name":"Funda\u00e7\u00e3o Carlos Chagas Filho de Amparo \u00e0 Pesquisa do Estado do Rio de Janeiro","doi-asserted-by":"publisher","award":["E-26\/200.926\/2021"],"award-info":[{"award-number":["E-26\/200.926\/2021"]}],"id":[{"id":"10.13039\/501100004586","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100002322","name":"Coordena\u00e7\u00e3o de Aperfei\u00e7oamento de Pessoal de N\u00edvel Superior","doi-asserted-by":"publisher","award":["001"],"award-info":[{"award-number":["001"]}],"id":[{"id":"10.13039\/501100002322","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Ann Oper Res"],"published-print":{"date-parts":[[2025,8]]},"DOI":"10.1007\/s10479-024-05995-6","type":"journal-article","created":{"date-parts":[[2024,4,27]],"date-time":"2024-04-27T07:01:46Z","timestamp":1714201306000},"page":"1155-1183","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["An open-source framework for solving shop scheduling problems in manufacturing environments"],"prefix":"10.1007","volume":"351","author":[{"given":"Carlos R. H.","family":"M\u00e1rquez","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Vanessa","family":"Braganholo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9478-2351","authenticated-orcid":false,"given":"Celso C.","family":"Ribeiro","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2024,4,27]]},"reference":[{"key":"5995_CR1","doi-asserted-by":"publisher","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","volume":"34","author":"J Adams","year":"1988","unstructured":"Adams, J., Balas, E., & Zawack, D. (1988). The shifting bottleneck procedure for job shop scheduling. Management Science, 34, 391\u2013401.","journal-title":"Management Science"},{"key":"5995_CR2","doi-asserted-by":"publisher","first-page":"801","DOI":"10.1016\/j.ejor.2004.06.039","volume":"169","author":"A Agarwal","year":"2006","unstructured":"Agarwal, A., Colak, S., & Eryarsoy, E. (2006). Improvement heuristic for the flow-shop scheduling problem: An adaptive-learning approach. European Journal of Operational Research, 169, 801\u2013815.","journal-title":"European Journal of Operational Research"},{"key":"5995_CR3","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1287\/ijoc.3.2.149","volume":"3","author":"D Applegate","year":"1991","unstructured":"Applegate, D., & Cook, W. (1991). A computational study of the job-shop scheduling problem. ORSA Journal on Computing, 3, 149\u2013156.","journal-title":"ORSA Journal on Computing"},{"key":"5995_CR4","unstructured":"Arisha, A., & Young, P. (2001). Job shop scheduling problem: An overview. In International conference for flexible automation and intelligent manufacturing (pp. 682\u2013693). Technological University Dublin."},{"key":"5995_CR5","doi-asserted-by":"publisher","first-page":"533","DOI":"10.1016\/j.future.2009.10.004","volume":"26","author":"A Bagheri","year":"2010","unstructured":"Bagheri, A., Zandieh, M., Mahdavi, I., & Yazdani, M. (2010). An artificial immune algorithm for the flexible job-shop scheduling problem. Future Generation Computer Systems, 26, 533\u2013541.","journal-title":"Future Generation Computer Systems"},{"key":"5995_CR6","doi-asserted-by":"publisher","unstructured":"Bahouth, S. (2014). Taxonomy of shop scheduling. Online Reference Available at SSRN https:\/\/doi.org\/10.2139\/ssrn.2447152. Accessed January 8, 2023.","DOI":"10.2139\/ssrn.2447152"},{"key":"5995_CR7","unstructured":"Beasley, J. E. (2023). OR-Library: Flow shop scheduling. Online reference at http:\/\/people.brunel.ac.uk\/~mastjjb\/jeb\/orlib\/flowshopinfo.html. Accessed June 8, 2023."},{"key":"5995_CR8","unstructured":"Beasley, J. E. (2023). OR-Library: Job shop scheduling. Online reference at http:\/\/people.brunel.ac.uk\/~mastjjb\/jeb\/orlib\/jobshopinfo.html. Accessed June 8, 2023."},{"key":"5995_CR9","unstructured":"Behnke, D., & Geiger, M. J. (2012). Test instances for the flexible job shop scheduling problem with work centers. Technical Report RR-12-01-01. Helmut-Schmidt Universitat."},{"key":"5995_CR10","doi-asserted-by":"publisher","first-page":"315","DOI":"10.1007\/s10951-008-0080-x","volume":"12","author":"J Bidot","year":"2009","unstructured":"Bidot, J., Vidal, T., Laborie, P., & Beck, J. C. (2009). A theoretic and practical framework for scheduling in a stochastic environment. Journal of Scheduling, 12, 315\u2013344.","journal-title":"Journal of Scheduling"},{"key":"5995_CR11","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1007\/BF01719250","volume":"17","author":"C Bierwirth","year":"1995","unstructured":"Bierwirth, C. (1995). A generalized permutation approach to job shop scheduling with genetic algorithms. OR Spektrum, 17, 87\u201392.","journal-title":"OR Spektrum"},{"key":"5995_CR12","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1162\/evco.1999.7.1.1","volume":"7","author":"C Bierwirth","year":"1999","unstructured":"Bierwirth, C., & Mattfeld, D. C. (1999). Production scheduling and rescheduling with genetic algorithms. Evolutionary Computation, 7, 1\u201317.","journal-title":"Evolutionary Computation"},{"key":"5995_CR13","unstructured":"Bla\u017cewicz, J., Ecker, K., Pesch, E., Schmidt, G., & W\u0229glarz, J. (2007). Handbook on scheduling: From theory to applications. Springer."},{"key":"5995_CR14","doi-asserted-by":"publisher","first-page":"157","DOI":"10.1007\/BF02023073","volume":"41","author":"P Brandimarte","year":"1993","unstructured":"Brandimarte, P. (1993). Routing and scheduling in a flexible job shop by tabu search. Annals of Operations Research, 41, 157\u2013183.","journal-title":"Annals of Operations Research"},{"key":"5995_CR15","volume-title":"Scheduling algorithms","author":"P Brucker","year":"2007","unstructured":"Brucker, P. (2007). Scheduling algorithms (5th ed.). Springer.","edition":"5"},{"key":"5995_CR16","doi-asserted-by":"publisher","first-page":"107","DOI":"10.1016\/0166-218X(94)90204-6","volume":"49","author":"P Brucker","year":"1994","unstructured":"Brucker, P., Jurisch, B., & Sievers, B. (1994). A branch and bound algorithm for the job-shop scheduling problem. Discrete Applied Mathematics, 49, 107\u2013127.","journal-title":"Discrete Applied Mathematics"},{"key":"5995_CR17","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1016\/0377-2217(89)90349-4","volume":"39","author":"G Buxey","year":"1989","unstructured":"Buxey, G. (1989). Production scheduling: Practice and theory. European Journal of Operational Research, 39, 17\u201331.","journal-title":"European Journal of Operational Research"},{"key":"5995_CR18","unstructured":"Fang, H., Ross, P., & Corne, D. (1993). A promising genetic algorithm approach to job-shop scheduling, rescheduling, and open-shop scheduling problems. In S. Forrest (Ed.), Proceedings of the fifth international conference on genetic algorithms (pp. 375\u2013382). Morgan Kaufmann."},{"key":"5995_CR19","first-page":"225","volume-title":"Industrial scheduling","author":"H Fisher","year":"1963","unstructured":"Fisher, H., & Thompson, G. L. (1963). Probabilistic learning combinations of local job shop scheduling rules. In J. F. Muth & G. L. Thompson (Eds.), Industrial scheduling (pp. 225\u2013251). Prentice Hall."},{"key":"5995_CR20","doi-asserted-by":"publisher","first-page":"237","DOI":"10.1016\/j.ejor.2009.09.026","volume":"205","author":"JM Framinan","year":"2010","unstructured":"Framinan, J. M., & Ruiz, R. (2010). Architecture of manufacturing scheduling systems: Literature review and an integrated proposal. European Journal of Operational Research, 205, 237\u2013246.","journal-title":"European Journal of Operational Research"},{"key":"5995_CR21","doi-asserted-by":"publisher","first-page":"1799","DOI":"10.1080\/00207543.2011.564670","volume":"50","author":"JM Framinan","year":"2012","unstructured":"Framinan, J. M., & Ruiz, R. (2012). Guidelines for the deployment and implementation of manufacturing scheduling systems. International Journal of Production Research, 50, 1799\u20131812.","journal-title":"International Journal of Production Research"},{"key":"5995_CR22","unstructured":"Fumagalli, L., Macchi, M., Negri, E., Polenghi, A., & Sottoriva, E. (2017). Simulation-supported framework for job shop scheduling with genetic algorithm. In Proceedings of the summer School Francesco Turco (Vol. 2017, pp. 271\u2013278)."},{"key":"5995_CR23","doi-asserted-by":"publisher","first-page":"487","DOI":"10.1287\/opre.8.4.487","volume":"8","author":"B Giffler","year":"1960","unstructured":"Giffler, B., & Thompson, G. L. (1960). Algorithms for solving production-scheduling problems. Operations Research, 8, 487\u2013503.","journal-title":"Operations Research"},{"key":"5995_CR24","doi-asserted-by":"publisher","first-page":"178","DOI":"10.1287\/opre.8.2.178","volume":"8","author":"J Heller","year":"1960","unstructured":"Heller, J. (1960). Some numerical experiments for an $${M} \\times {J}$$ flow shop and its decision-theoretical aspects. Operations Research, 8, 178\u2013184.","journal-title":"Operations Research"},{"key":"5995_CR25","doi-asserted-by":"publisher","first-page":"953","DOI":"10.1109\/21.247881","volume":"23","author":"CW Holsapple","year":"1993","unstructured":"Holsapple, C. W., Jacob, V. S., Pakath, R., & Zaveri, J. S. (1993). A genetics-based hybrid scheduler for generating static schedules in flexible manufacturing contexts. IEEE Transactions on Systems, Man, and Cybernetics, 23, 953\u2013972.","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics"},{"key":"5995_CR26","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1049\/tpe.1976.0044","volume":"55","author":"JR King","year":"1976","unstructured":"King, J. R. (1976). The theory-practice gap in job-shop scheduling. The Production Engineer, 55, 137\u2013143.","journal-title":"The Production Engineer"},{"key":"5995_CR27","doi-asserted-by":"publisher","first-page":"6186","DOI":"10.3182\/20140824-6-ZA-1003.01245","volume":"47","author":"HYK Lau","year":"2014","unstructured":"Lau, H. Y. K., & Qiu, X. (2014). An artificial immune systems (AIS)-based unified framework for general job shop scheduling. IFAC Proceedings Volumes, 47, 6186\u20136191.","journal-title":"IFAC Proceedings Volumes"},{"key":"5995_CR28","unstructured":"Lawrence, S. (1984). Resource constrained project scheduling: An experimental investigation of heuristic scheduling techniques (Supplement). Technical report. Carnegie-Mellon University."},{"key":"5995_CR29","doi-asserted-by":"publisher","first-page":"1171","DOI":"10.1080\/002075497195605","volume":"35","author":"C-Y Lee","year":"1997","unstructured":"Lee, C.-Y., Piramuthu, S., & Tsai, Y.-K. (1997). Job shop scheduling with a genetic algorithm and machine learning. International Journal of Production Research, 35, 1171\u20131191.","journal-title":"International Journal of Production Research"},{"key":"5995_CR30","doi-asserted-by":"publisher","first-page":"21","DOI":"10.1016\/j.ijpe.2017.06.026","volume":"193","author":"W Liu","year":"2017","unstructured":"Liu, W., Jin, Y., & Price, M. (2017). A new improved NEH heuristic for permutation flowshop scheduling problems. International Journal of Production Economics, 193, 21\u201330.","journal-title":"International Journal of Production Economics"},{"key":"5995_CR31","doi-asserted-by":"publisher","first-page":"999","DOI":"10.1016\/j.jclepro.2018.12.205","volume":"213","author":"W Liu","year":"2019","unstructured":"Liu, W., Ma, W., Hu, Y., Jin, M., Li, K., Chang, X., & Yu, X. (2019). Production planning for stochastic manufacturing\/remanufacturing system with demand substitution using a hybrid ant colony system algorithm. Journal of Cleaner Production, 213, 999\u20131010.","journal-title":"Journal of Cleaner Production"},{"key":"5995_CR32","unstructured":"M\u00e1rquez, C. R. H. (2023). Benchmark results for the SSP-3M framework. Online reference at https:\/\/github.com\/cherreram2012\/jssp-framework\/wiki\/Benchmark-results. Accessed June 5, 2023."},{"key":"5995_CR33","unstructured":"M\u00e1rquez, C. R. H. (2023). SSP-3M framework repository. Online reference at https:\/\/github.com\/cherreram2012\/jssp-framework. Accessed June 5, 2023."},{"key":"5995_CR34","doi-asserted-by":"publisher","first-page":"3237","DOI":"10.1111\/itor.13108","volume":"29","author":"CRH M\u00e1rquez","year":"2022","unstructured":"M\u00e1rquez, C. R. H., & Ribeiro, C. C. (2022). Shop scheduling in manufacturing environments: A review. International Transactions in Operational Research, 29, 3237\u20133293.","journal-title":"International Transactions in Operational Research"},{"key":"5995_CR35","unstructured":"Mastrolilli, M. (2023). Flexible Job Shop Problem. Online reference at https:\/\/people.idsia.ch\/~monaldo\/fjsp.html. Accessed June 8, 2023."},{"key":"5995_CR36","doi-asserted-by":"publisher","first-page":"79","DOI":"10.1016\/S0166-3615(99)00063-9","volume":"42","author":"KN McKay","year":"2000","unstructured":"McKay, K. N., & Buzacott, J. A. (2000). Application of computerized production control systems in job shop environments. Computers in Industry, 42, 79\u201397.","journal-title":"Computers in Industry"},{"key":"5995_CR37","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","volume":"11","author":"M Nawaz","year":"1983","unstructured":"Nawaz, M., Enscore, E. E., & Ham, I. (1983). A heuristic algorithm for the $$m$$-machine, $$n$$-job flow-shop sequencing problem. Omega, 11, 91\u201395.","journal-title":"Omega"},{"key":"5995_CR38","first-page":"563","volume":"35","author":"A Pfeiffer","year":"2006","unstructured":"Pfeiffer, A., K\u00e1d\u00e1r, B., & Monostori, L. (2006). Stability-oriented evaluation of rescheduling strategies, by using simulation. Computers in Industry, 35, 563\u2013570.","journal-title":"Computers in Industry"},{"key":"5995_CR39","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4614-2361-4","volume-title":"Scheduling: Theory, algorithms and systems","author":"ML Pinedo","year":"2012","unstructured":"Pinedo, M. L. (2012). Scheduling: Theory, algorithms and systems. Springer."},{"key":"5995_CR40","doi-asserted-by":"publisher","first-page":"359","DOI":"10.1023\/A:1018986524234","volume":"70","author":"M Pinedo","year":"1997","unstructured":"Pinedo, M., & Yen, B. P. C. (1997). On the design and development of object-oriented scheduling systems. Annals of Operations Research, 70, 359\u2013378.","journal-title":"Annals of Operations Research"},{"key":"5995_CR41","doi-asserted-by":"publisher","first-page":"215","DOI":"10.1016\/S0377-2217(02)00645-8","volume":"152","author":"P Pongcharoen","year":"2004","unstructured":"Pongcharoen, P., Hicks, C., & Braiden, P. M. (2004). The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure. European Journal of Operational Research, 152, 215\u2013225.","journal-title":"European Journal of Operational Research"},{"key":"5995_CR42","doi-asserted-by":"publisher","first-page":"316","DOI":"10.1109\/17.618173","volume":"44","author":"A Reisman","year":"1997","unstructured":"Reisman, A., Kumar, A., & Motwani, J. (1997). Flowshop scheduling\/sequencing research: A statistical review of the literature, 1952\u20131994. IEEE Transactions on Engineering Management, 44, 316\u2013329.","journal-title":"IEEE Transactions on Engineering Management"},{"key":"5995_CR43","doi-asserted-by":"crossref","unstructured":"Resende, M. G. C., & Ribeiro, C. C. (2016). Optimization by GRASP: Greedy randomized adaptive search procedures. Springer.","DOI":"10.1007\/978-1-4939-6530-4"},{"key":"5995_CR44","doi-asserted-by":"crossref","unstructured":"Resende, M. G. C., Ribeiro, C. C., Glover, F., & Mart\u00ed, R. (2010). Scatter search and path-relinking: Fundamentals, advances, and applications. In M. Gendreau & J.-Y. Potvin (Eds.), Handbook of metaheuristics, 2nd edn (pp. 87\u2013107). Springer.","DOI":"10.1007\/978-1-4419-1665-5_4"},{"key":"5995_CR45","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1007\/0-387-25383-1_2","volume-title":"Metaheuristics: Progress as real problem solvers","author":"MGC Resende","year":"2005","unstructured":"Resende, M. G. C., & Ribeiro, C. C. (2005). GRASP with path-relinking: Recent advances and applications. In T. Ibaraki, K. Nonobe, & M. Yagiura (Eds.), Metaheuristics: Progress as real problem solvers (pp. 29\u201363). Springer."},{"key":"5995_CR46","doi-asserted-by":"publisher","first-page":"193","DOI":"10.1007\/s10732-011-9167-1","volume":"18","author":"CC Ribeiro","year":"2012","unstructured":"Ribeiro, C. C., & Resende, M. G. C. (2012). Path-relinking intensification methods for stochastic local search algorithms. Journal of Heuristics, 18, 193\u2013214.","journal-title":"Journal of Heuristics"},{"key":"5995_CR47","doi-asserted-by":"publisher","first-page":"438","DOI":"10.1080\/09537287.2014.919413","volume":"26","author":"R Romero-Silva","year":"2015","unstructured":"Romero-Silva, R., Santos, J., & Hurtado, M. (2015). A framework for studying practical production scheduling. Production Planning & Control, 26, 438\u2013450.","journal-title":"Production Planning & Control"},{"key":"5995_CR48","unstructured":"Roy, B., & Sussmann, B. (1964). Les problemes d\u2019ordonnancement avec contraintes disjonctives. Technical report. SEMA."},{"key":"5995_CR49","doi-asserted-by":"publisher","first-page":"121","DOI":"10.1016\/j.jclepro.2016.11.002","volume":"162","author":"MA Salido","year":"2017","unstructured":"Salido, M. A., Escamilla, J., Barber, F., & Giret, A. (2017). Rescheduling in job-shop problems for sustainable manufacturing systems. Journal of Cleaner Production, 162, 121\u2013132.","journal-title":"Journal of Cleaner Production"},{"key":"5995_CR50","doi-asserted-by":"publisher","first-page":"967","DOI":"10.1080\/00207549408956982","volume":"32","author":"D Sun","year":"1994","unstructured":"Sun, D., & Lin, L. (1994). A dynamic job shop scheduling framework: A backward approach. International Journal of Production Research, 32, 967\u2013985.","journal-title":"International Journal of Production Research"},{"key":"5995_CR51","doi-asserted-by":"publisher","first-page":"278","DOI":"10.1016\/0377-2217(93)90182-M","volume":"64","author":"E Taillard","year":"1993","unstructured":"Taillard, E. (1993). Benchmarks for basic scheduling problems. European Journal of Operational Research, 64, 278\u2013285.","journal-title":"European Journal of Operational Research"},{"key":"5995_CR52","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1023\/A:1022235519958","volume":"6","author":"GE Vieira","year":"2003","unstructured":"Vieira, G. E., Herrmann, J. W., & Lin, E. (2003). Rescheduling manufacturing systems: A framework of strategies, policies, and methods. Journal of Scheduling, 6, 39\u201362.","journal-title":"Journal of Scheduling"},{"key":"5995_CR53","unstructured":"Wall, M. (1996). GAlib: A C++ Library of genetic algorithm components. Online reference at http:\/\/lancet.mit.edu\/ga\/. Accessed May 7, 2023."},{"key":"5995_CR54","doi-asserted-by":"publisher","first-page":"360","DOI":"10.1007\/s00170-005-2513-4","volume":"29","author":"W-J Xia","year":"2006","unstructured":"Xia, W.-J., & Wu, Z.-M. (2006). A hybrid particle swarm optimization approach for the job-shop scheduling problem. The International Journal of Advanced Manufacturing Technology, 29, 360\u2013366.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"5995_CR55","unstructured":"Yamada, T. (2003). Studies on metaheuristics for jobshop and flowshop scheduling problems. PhD thesis, Kyoto University."},{"key":"5995_CR56","doi-asserted-by":"crossref","unstructured":"Yen, B. P. C., & Pinedo, M. (1994). On the design and development of scheduling systems. In Proceedings of the fourth international conference on computer integrated manufacturing and automation technology (pp. 197\u2013204). IEEE Computer Society Press.","DOI":"10.1109\/CIMAT.1994.389073"}],"container-title":["Annals of Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-024-05995-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10479-024-05995-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10479-024-05995-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,9,5]],"date-time":"2025-09-05T19:11:39Z","timestamp":1757099499000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10479-024-05995-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,4,27]]},"references-count":56,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2025,8]]}},"alternative-id":["5995"],"URL":"https:\/\/doi.org\/10.1007\/s10479-024-05995-6","relation":{},"ISSN":["0254-5330","1572-9338"],"issn-type":[{"value":"0254-5330","type":"print"},{"value":"1572-9338","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,4,27]]},"assertion":[{"value":"1 September 2023","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"8 April 2024","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"27 April 2024","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors have no conflict of interest to declare that are relevant to the content of this article.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"The open-source, ready-to-use framework SSP-3M coded in C++ is available at the project repository at  (M\u00e1rquez, ).","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Software availability statement"}}]}}