{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,7]],"date-time":"2026-04-07T22:44:38Z","timestamp":1775601878485,"version":"3.50.1"},"reference-count":34,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2010,3,3]],"date-time":"2010-03-03T00:00:00Z","timestamp":1267574400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Appl Intell"],"published-print":{"date-parts":[[2010,4]]},"DOI":"10.1007\/s10489-010-0215-6","type":"journal-article","created":{"date-parts":[[2010,3,2]],"date-time":"2010-03-02T20:40:53Z","timestamp":1267562453000},"page":"205-215","source":"Crossref","is-referenced-by-count":9,"title":["Integrating rush orders into existent schedules for a complex job shop problem"],"prefix":"10.1007","volume":"32","author":[{"given":"Patrick","family":"Moratori","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sanja","family":"Petrovic","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jos\u00e9 Antonio","family":"V\u00e1zquez-Rodr\u00edguez","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2010,3,3]]},"reference":[{"key":"215_CR1","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1023\/A:1008363208898","volume":"14","author":"R Akkiraju","year":"2001","unstructured":"Akkiraju R, Keskinocak P, Murthy S, Wu F (2001) An agent-based approach for scheduling multiple machines. Appl Intell 14:135\u2013144","journal-title":"Appl Intell"},{"issue":"5","key":"215_CR2","doi-asserted-by":"crossref","first-page":"32","DOI":"10.1080\/07408179408966626","volume":"26","author":"V Leon","year":"1994","unstructured":"Leon V, Wu S, Storer R (1994) Robustness measures and robust scheduling for job shops. IIE Trans 26(5):32\u201343","journal-title":"IIE Trans"},{"issue":"3","key":"215_CR3","doi-asserted-by":"crossref","first-page":"613","DOI":"10.1081\/00207540310001614132","volume":"42","author":"S Mason","year":"2004","unstructured":"Mason S, Jin S, Wessels C (2004) Rescheduling strategies for minimizing total weighted tardiness in complex job shops. Int J Prod Res 42(3):613\u2013628","journal-title":"Int J Prod Res"},{"issue":"6","key":"215_CR4","first-page":"563","volume":"35","author":"A Pfeiffer","year":"2006","unstructured":"Pfeiffer A, K\u00e1d\u00e1r B, Monostori L (2006) Stability-oriented evaluation of hybrid rescheduling methods in a job-shop with machine breakdowns. CIRP J Manuf Syst 35(6):563\u2013570","journal-title":"CIRP J Manuf Syst"},{"issue":"2","key":"215_CR5","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1016\/S0166-3615(01)00119-1","volume":"46","author":"J Sun","year":"2001","unstructured":"Sun J, Xue D (2001) A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources. Comput Ind 46(2):189\u2013207","journal-title":"Comput Ind"},{"issue":"2","key":"215_CR6","doi-asserted-by":"crossref","first-page":"230","DOI":"10.1016\/S0377-2217(01)00355-1","volume":"139","author":"P Cowling","year":"2002","unstructured":"Cowling P, Johansson M (2002) Using real time information for effective dynamic scheduling. Eur J Oper Res 139(2):230\u2013244","journal-title":"Eur J Oper Res"},{"key":"215_CR7","first-page":"99","volume-title":"Intelligent scheduling, 4","author":"N Sadeh","year":"1994","unstructured":"Sadeh N (1994) Micro-opportunistic scheduling: The micro-boss factory scheduler. In: Intelligent scheduling, 4. Morgan Kaufmann, San Mateo, pp 99\u2013136"},{"key":"215_CR8","volume-title":"Intelligent scheduling systems","author":"S Smith","year":"1995","unstructured":"Smith S (1995) Reactive scheduling systems. In: Brown D, Scherer W (eds) Intelligent scheduling systems. Kluwer, Dordrecht"},{"issue":"1","key":"215_CR9","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.cie.2003.09.007","volume":"46","author":"R Rangsaritratsamee","year":"2004","unstructured":"Rangsaritratsamee R, Ferrell\u00a0Jr\u00a0W, Kurz M (2004) Dynamic rescheduling that simultaneously considers efficiency and stability. Comput Ind Eng 46(1):1\u201315","journal-title":"Comput Ind Eng"},{"issue":"1","key":"215_CR10","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1162\/evco.1999.7.1.1","volume":"7","author":"C Bierwirth","year":"1999","unstructured":"Bierwirth C, Mattfeld D (1999) Production scheduling and rescheduling with genetic algorithms. Evol Comput 7(1):1\u201317","journal-title":"Evol Comput"},{"key":"215_CR11","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1007\/BF00871895","volume":"3","author":"M Laguna","year":"1993","unstructured":"Laguna M, Barnes J, Glover F (1993) Intelligent scheduling with tabu search: an application to jobs with linear delay penalties and sequence-dependent setup costs and times. Appl Intell 3:159\u2013172","journal-title":"Appl Intell"},{"key":"215_CR12","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1016\/0166-3615(83)90006-4","volume":"4","author":"F Filip","year":"1983","unstructured":"Filip F, Neagu G, Donciulescu D (1983) Job shop scheduling optimization in real-time production control. Comput Ind 4:395\u2013403","journal-title":"Comput Ind"},{"key":"215_CR13","unstructured":"Petrovic S, Petrovic D, Burke E (2009) Fuzzy logic based production scheduling\/rescheduling in the presence of uncertainty. Springer International Series in Operation Research and Management Science, Advancing the State-of-the-Art Subseries"},{"issue":"1","key":"215_CR14","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1023\/A:1022235519958","volume":"6","author":"G Vieira","year":"2003","unstructured":"Vieira G, Herrmann J, Lin E (2003) Rescheduling manufacturing systems: a framework of strategies, policies and methods. J Sched 6(1):39\u201362","journal-title":"J Sched"},{"issue":"1","key":"215_CR15","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1016\/j.ejor.2003.08.027","volume":"161","author":"H Aytug","year":"2005","unstructured":"Aytug H, Lawley M, McKay K, Mohan S, Uzsoy R (2005) Executing production schedules in the face of uncertainties: a review and some future directions. Eur J Oper Res 161(1):86\u2013110","journal-title":"Eur J Oper Res"},{"issue":"12","key":"215_CR16","doi-asserted-by":"crossref","first-page":"1903\u20131919","DOI":"10.1080\/00207548808948004","volume":"26","author":"M Donath","year":"1988","unstructured":"Donath M, Graves R (1988) Flexible assembly systems: an approach for near real-time scheduling and routing of multiple products. Int J Prod Res 26(12):1903\u20131919","journal-title":"Int J Prod Res"},{"issue":"4","key":"215_CR17","doi-asserted-by":"crossref","first-page":"491","DOI":"10.1109\/9.126583","volume":"37","author":"C Chase","year":"1992","unstructured":"Chase C, Ramadge P (1992) On real-time scheduling policies for flexible manufacturing systems. IEEE Trans Autom Control 37(4):491\u2013496","journal-title":"IEEE Trans Autom Control"},{"key":"215_CR18","unstructured":"Gao H (1995) Building robust schedules using temporal protection an empirical study of constraint based scheduling under machine failure uncertainty. PhD thesis, Toronto University, Canada"},{"key":"215_CR19","unstructured":"Davenport A, Gefflot C, Beck J (2001) Slack-based techniques for robust schedules. In: Proceedings of the sixth European conference on planning, pp 7\u201318"},{"issue":"3","key":"215_CR20","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1109\/TEVC.2003.810067","volume":"7","author":"M Jensen","year":"2003","unstructured":"Jensen M (2003) Generating robust and flexible job shop schedules using genetic algorithms. IEEE Trans Evol Comput 7(3):275\u2013288","journal-title":"IEEE Trans Evol Comput"},{"key":"215_CR21","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1007\/s10489-005-3413-x","volume":"23","author":"G Arroyo-Figueroa","year":"2005","unstructured":"Arroyo-Figueroa G, Sucar L (2005) Temporal bayesian network of events for diagnosis and prediction in dynamic domains. Appl Intell 23:77\u201386","journal-title":"Appl Intell"},{"issue":"2","key":"215_CR22","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1016\/S0377-2217(99)00381-1","volume":"124","author":"H Li","year":"2000","unstructured":"Li H, Li Z, Li L, Hu B (2000) A production rescheduling expert simulation system. Eur J Oper Res 124(2):283\u2013293","journal-title":"Eur J Oper Res"},{"issue":"3","key":"215_CR23","doi-asserted-by":"crossref","first-page":"415","DOI":"10.1016\/S0305-0548(02)00224-1","volume":"31","author":"C Liao","year":"2004","unstructured":"Liao C, Chen W (2004) Scheduling under machine breakdown in a continuous process industry. Comput Oper Res 31(3):415\u2013428","journal-title":"Comput Oper Res"},{"issue":"1","key":"215_CR24","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1016\/j.ejor.2003.11.024","volume":"164","author":"C Duron","year":"2005","unstructured":"Duron C, Proth J, Wardi Y (2005) Insertion of a random task in a schedule: a real-time approach. Eur J Oper Res 164(1):52\u201363","journal-title":"Eur J Oper Res"},{"key":"215_CR25","unstructured":"Bean J, Birge J (1986) Match-up real-time scheduling. In: Proceedings of the symposium on real-time optimization in automated manufacturing facilities, national bureau of standards, special publication 724, pp\u00a0197\u2013212"},{"key":"215_CR26","unstructured":"Birge J, Dempster M (1992) Optimality conditions for match-up strategies in stochastic scheduling. Technical Report 92-58, Department of Industrial and Operations Engineering, The University of Michigan"},{"issue":"2\u20133","key":"215_CR27","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1016\/0166-218X(94)00098-X","volume":"57","author":"J Birge","year":"1995","unstructured":"Birge J, Dempster M (1995) Optimal match-up strategies in stochastic scheduling. Discrete Appl Math 57(2\u20133):105\u2013120","journal-title":"Discrete Appl Math"},{"issue":"3","key":"215_CR28","doi-asserted-by":"crossref","first-page":"470","DOI":"10.1287\/opre.39.3.470","volume":"39","author":"J Bean","year":"1991","unstructured":"Bean J, Birge J, Mittenthal J, Noon C (1991) Matchup scheduling with multiple resources, release dates and disruptions. Oper Res 39(3):470\u2013483","journal-title":"Oper Res"},{"issue":"1","key":"215_CR29","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/S0377-2217(97)00396-2","volume":"112","author":"M Akturk","year":"1999","unstructured":"Akturk M, Gorgulu E (1999) Match-up scheduling under a machine breakdown. Eur J Oper Res 112(1):81\u201397","journal-title":"Eur J Oper Res"},{"key":"215_CR30","doi-asserted-by":"crossref","first-page":"268","DOI":"10.1145\/98784.98830","volume-title":"IEA\/AIE \u201990: Proceedings of the 3rd international conference on industrial and engineering applications of artificial intelligence and expert systems","author":"S Smith","year":"1990","unstructured":"Smith S, Muscettola N, Matthys D, Ow P, Potvin J (1990) Opis: an opportunistic factory scheduling system. In: IEA\/AIE \u201990: Proceedings of the 3rd international conference on industrial and engineering applications of artificial intelligence and expert systems. ACM, New York, pp 268\u2013274"},{"issue":"7","key":"215_CR31","doi-asserted-by":"crossref","first-page":"2065","DOI":"10.1080\/002075497195074","volume":"35","author":"R Abumaizar","year":"1997","unstructured":"Abumaizar R, Svestka J (1997) Rescheduling job shops under random disruptions. Int J Prod Res 35(7):2065\u20132082","journal-title":"Int J Prod Res"},{"issue":"1","key":"215_CR32","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0305-0548(93)90091-V","volume":"20","author":"S Wu","year":"1993","unstructured":"Wu S, Storer R, Chang P (1993) One-machine rescheduling heuristics with efficiency and stability as criteria. Comput Oper Res 20(1):1\u201314","journal-title":"Comput Oper Res"},{"issue":"1","key":"215_CR33","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1007\/s10479-007-0287-9","volume":"159","author":"S Petrovic","year":"2008","unstructured":"Petrovic S, Fayad C, Petrovic D, Burke E, Kendall G (2008) Fuzzy job shop scheduling with lot-sizing. Ann Oper Res 159(1):275\u2013292","journal-title":"Ann Oper Res"},{"key":"215_CR34","volume-title":"Simultaneous statistical inference","author":"R Miller","year":"1991","unstructured":"Miller R (1991) Simultaneous statistical inference. Springer, New York"}],"container-title":["Applied Intelligence"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10489-010-0215-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10489-010-0215-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10489-010-0215-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T18:25:44Z","timestamp":1559154344000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10489-010-0215-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,3,3]]},"references-count":34,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2010,4]]}},"alternative-id":["215"],"URL":"https:\/\/doi.org\/10.1007\/s10489-010-0215-6","relation":{},"ISSN":["0924-669X","1573-7497"],"issn-type":[{"value":"0924-669X","type":"print"},{"value":"1573-7497","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010,3,3]]}}}