{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,31]],"date-time":"2026-10-31T19:48:21Z","timestamp":1793476101626,"version":"4.5.0"},"reference-count":30,"publisher":"Springer Science and Business Media LLC","issue":"10","license":[{"start":{"date-parts":[[2018,2,21]],"date-time":"2018-02-21T00:00:00Z","timestamp":1519171200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["61305149, 61503164, 61573172"],"award-info":[{"award-number":["61305149, 61503164, 61573172"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Appl Intell"],"published-print":{"date-parts":[[2018,10]]},"DOI":"10.1007\/s10489-018-1144-z","type":"journal-article","created":{"date-parts":[[2018,2,20]],"date-time":"2018-02-20T22:07:54Z","timestamp":1519164474000},"page":"3295-3305","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":74,"title":["Ant colony algorithm for satellite control resource scheduling problem"],"prefix":"10.1007","volume":"48","author":[{"given":"Zhaojun","family":"Zhang","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Funian","family":"Hu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Na","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2018,2,21]]},"reference":[{"key":"1144_CR1","doi-asserted-by":"publisher","first-page":"322","DOI":"10.1016\/j.cie.2011.02.015","volume":"61","author":"P Wang","year":"2009","unstructured":"Wang P, Reinelt G, Gerhard G, Yuejin PT (2009) A model, a heuristic and a decision support system to solve the earth observing satellites fleet scheduling problem. Comput Ind Eng 61:322\u2013335","journal-title":"Comput Ind Eng"},{"key":"1144_CR2","volume-title":"Introduction to optimal satellite range scheduling","author":"AJV \u00c1lvarez","year":"2016","unstructured":"\u00c1lvarez AJV, Erwin RS (2016) Introduction to optimal satellite range scheduling. Springer-Verlag, New York"},{"key":"1144_CR3","doi-asserted-by":"crossref","unstructured":"Chitty D (2004) An evolved autonomous controller for satellite task scheduling. In: Genetic and Evolutionary computation\u2013GECCO 2004, pp 253\u2014254","DOI":"10.1007\/978-3-540-24854-5_23"},{"key":"1144_CR4","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s11590-014-0744-8","volume":"9","author":"AJ Vazquez","year":"2015","unstructured":"Vazquez AJ, Erwin RS (2015) On the tractability of satellite range scheduling. Optim Lett 9:1\u201317","journal-title":"Optim Lett"},{"key":"1144_CR5","unstructured":"Clement BJ, Johnston MD (2005) The deep space network scheduling problem. In: The 20th national conference on artificial intelligence and the seventeenth innovative applications of artificial intelligence conference, pp 1514\u20131520"},{"key":"1144_CR6","doi-asserted-by":"crossref","unstructured":"Guillaume A, Lee S, Wang YF, Zheng H, Hovden R, Chau S, Tung YW, Terrile RJ (2007) Deep space network scheduling using evolutionary computational methods. In: 2007 IEEE Aerospace Conference, pp 1\u20136","DOI":"10.1109\/AERO.2007.352900"},{"key":"1144_CR7","first-page":"124","volume":"28","author":"YF Li","year":"2008","unstructured":"Li YF, Wu XY (2008) Application of genetic algorithm in satellite data transmission scheduling problem. Syst Eng Theory Pract 28:124\u2013131","journal-title":"Syst Eng Theory Pract"},{"key":"1144_CR8","doi-asserted-by":"crossref","unstructured":"Li J, Humphrey M, Van Ingen C, Agarwal D, Jackson K, Ryu Y (2010) Escience in the cloud: a modis satellite data reprojection and reduction pipeline in the windows azure platform. In: 2010 IEEE International Conference Parallel & Distributed Processing (IPDPS), pp 1\u201310","DOI":"10.1109\/IPDPS.2010.5470418"},{"key":"1144_CR9","doi-asserted-by":"publisher","first-page":"497","DOI":"10.1007\/978-1-4939-1007-6_21","volume-title":"Case studies in operations research","author":"D Karapetyan","year":"2015","unstructured":"Karapetyan D, Mitrovic-Minic S, Malladi KT, Punnen PA (2015) Case studies in operations research. Springer, New York, pp 497\u2013516"},{"key":"1144_CR10","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1016\/j.omega.2015.01.001","volume":"53","author":"D Karapetyan","year":"2015","unstructured":"Karapetyan D, Minic SM, Malladi KT, Punnen AP (2015) Satellite downlink scheduling problem: A case study. Omega 53:115\u2013 123","journal-title":"Omega"},{"key":"1144_CR11","doi-asserted-by":"publisher","first-page":"806","DOI":"10.1057\/palgrave.jors.2601575","volume":"54","author":"S Rojanasoonthon","year":"2003","unstructured":"Rojanasoonthon S, Bard JF, Reddy SD (2003) Algorithms for parallel machine scheduling: a case study of the tracking and data relay satellite system. J Oper Res Soc 54:806\u2013821","journal-title":"J Oper Res Soc"},{"key":"1144_CR12","doi-asserted-by":"crossref","unstructured":"Lin P, Kuang L, Chen X, Yan J, Lu J, Wang X (2014) Asymmetric path-relinking based heuristics for large-scale job scheduling problem in TDRSS. In: Proceedings 9th International Conference Communications and Networking in China, pp 115\u2013121","DOI":"10.1109\/CHINACOM.2014.7054270"},{"key":"1144_CR13","doi-asserted-by":"publisher","first-page":"567","DOI":"10.1016\/j.ast.2014.06.002","volume":"39","author":"R Vazquez","year":"2014","unstructured":"Vazquez R, Perea F, Vioque JG (2014) Algorithms for parallel machine scheduling: a case study of the tracking and data relay satellite system. Aerosp Sci Technol 39:567\u2013574","journal-title":"Aerosp Sci Technol"},{"key":"1144_CR14","doi-asserted-by":"publisher","first-page":"750","DOI":"10.1016\/j.ejor.2005.12.026","volume":"177","author":"N Bianchessi","year":"2007","unstructured":"Bianchessi N, Cordeau J-F, Desrosiers J, Laporte G, Raymond V (2007) A heuristic for the multi-satellite, multi-orbit and multi-user management of earth observation satellites. Eur J Oper Res 177:750\u2013762","journal-title":"Eur J Oper Res"},{"key":"1144_CR15","first-page":"1572","volume":"38","author":"F Marinelli","year":"2011","unstructured":"Marinelli F, Nocella S, Rossi F, Smriglio S (2011) A Lagrangian heuristic for satellite range scheduling with resource constraints. Eur J Oper Res 38:1572\u20131583","journal-title":"Eur J Oper Res"},{"key":"1144_CR16","doi-asserted-by":"crossref","unstructured":"Xhafa F, Herrero X, Barolli A, Takizawa M (2014) A tabu search algorithm for ground station scheduling problem. In: Proceedings 18th International Conference Advanced Information Networking and Applications, pp 1033\u20131040","DOI":"10.1109\/AINA.2014.151"},{"key":"1144_CR17","doi-asserted-by":"crossref","unstructured":"Barbulescu L, Howe AE, Watson J-P, Whitley LD (2002) Satellite range scheduling: A comparison of genetic, heuristic and local search. In: Proceedings of International Conference Parallel Problem Solving from Nature, pp 611\u2013620","DOI":"10.1007\/3-540-45712-7_59"},{"key":"1144_CR18","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1023\/B:JOSH.0000013053.32600.3c","volume":"7","author":"L Barbulescu","year":"2004","unstructured":"Barbulescu L, Watson JP, Whitley LD, Howe AE (2004) Scheduling space\u2013ground communications for the air force satellite control network. J Scheduling 7:7\u201334","journal-title":"J Scheduling"},{"key":"1144_CR19","first-page":"351","volume":"8","author":"F Xhafa","year":"2012","unstructured":"Xhafa F, Sun J, Barolli A, Biberaj A, Barolli L (2012) Genetic algorithms for satellite scheduling problems. Mob Inf Syst 8:351\u2013377","journal-title":"Mob Inf Syst"},{"key":"1144_CR20","doi-asserted-by":"publisher","first-page":"1086","DOI":"10.1016\/j.jcss.2013.01.023","volume":"79","author":"F Xhafa","year":"2013","unstructured":"Xhafa F, Herrero X, Barolli A, Barolli L, Takizawa M (2013) Evaluation of struggle strategy in genetic algorithms for ground stations scheduling problem. J Comput Syst Sci 79:1086\u2013 1100","journal-title":"J Comput Syst Sci"},{"key":"1144_CR21","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/j.ast.2013.04.001","volume":"29","author":"A Sarkheyli","year":"2013","unstructured":"Sarkheyli A, Bagheri A, Ghorbani-Vaghei B, Askari-Moghadam R (2013) Using an effective tabu search in interactive resources scheduling problem for LEO satellites missions. Aerosp Sci Technol 29:287\u2013295","journal-title":"Aerosp Sci Technol"},{"key":"1144_CR22","doi-asserted-by":"crossref","unstructured":"Wu J, Wang S, Li Y, Dou C, Hu J (2015) Application of differential evolution algorithm in multi-satellite monitoring scheduling. In: Proceedings of 27th International Conference Spacecraft TT&C Technology in China, pp 347\u2013357","DOI":"10.1007\/978-3-662-44687-4_32"},{"key":"1144_CR23","doi-asserted-by":"publisher","first-page":"436","DOI":"10.1007\/s10489-010-0234-3","volume":"35","author":"N Zhang","year":"2011","unstructured":"Zhang N, Feng Z, Ke L (2011) Guidance-solution based ant colony optimization for satellite control resource scheduling problem. Appl Intell 35:436\u2013444","journal-title":"Appl Intell"},{"key":"1144_CR24","doi-asserted-by":"crossref","unstructured":"Gao K, Wu G, Zhu J (2013) Multi-satellite observation scheduling based on a hybrid ant colony optimization. In: Proceedings 2nd International Conference Computer, Communication, Control and Automation, pp 532\u2013536","DOI":"10.2991\/isccca.2013.169"},{"key":"1144_CR25","doi-asserted-by":"publisher","first-page":"1884","DOI":"10.1016\/j.cor.2013.02.009","volume":"40","author":"G Wu","year":"2013","unstructured":"Wu G, Liu J, Ma M, Qiu D (2013) A two-phase scheduling method with the consideration of task clustering for earth observing satellites. Comput Oper Res 40:1884\u20131894","journal-title":"Comput Oper Res"},{"key":"1144_CR26","doi-asserted-by":"publisher","first-page":"2816","DOI":"10.1016\/j.eswa.2013.10.014","volume":"41","author":"Z Zhang","year":"2014","unstructured":"Zhang Z, Zhang N, Feng Z (2014) Multi-satellite control resource scheduling based on ant colony optimization. Expert Syst Appl 41:2816\u20132823","journal-title":"Expert Syst Appl"},{"key":"1144_CR27","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1109\/3477.484436","volume":"26","author":"M Dorigo","year":"1996","unstructured":"Dorigo M, Maniezzo V, Colorni A (1996) Ant system: Optimization by a colony of cooperating agents. IEEE T Syst Man Cy B 26:29\u201341","journal-title":"IEEE T Syst Man Cy B"},{"key":"1144_CR28","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1109\/4235.585892","volume":"1","author":"M Dorigo","year":"1997","unstructured":"Dorigo M, Gambardella LM (1997) Ant colony system: A cooperative learning approach to the traveling salesman problem. IEEE T Evolut Comput 1:53\u201366","journal-title":"IEEE T Evolut Comput"},{"key":"1144_CR29","doi-asserted-by":"publisher","first-page":"889","DOI":"10.1016\/S0167-739X(00)00043-1","volume":"16","author":"T St\u00fctzle","year":"2000","unstructured":"St\u00fctzle T, Hoos HH (2000) MAX\u2013MIN ant system. Future Gener Comp Sy 16:889\u2013914","journal-title":"Future Gener Comp Sy"},{"key":"1144_CR30","doi-asserted-by":"publisher","first-page":"1161","DOI":"10.1109\/TSMCB.2003.821450","volume":"34","author":"C Blum","year":"2004","unstructured":"Blum C, MarcoM D (2004) The hyper-cube framework for ant colony optimization. IEEE T Syst Man Cy B 34:1161\u20131172","journal-title":"IEEE T Syst Man Cy B"}],"container-title":["Applied Intelligence"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10489-018-1144-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10489-018-1144-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10489-018-1144-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,2,20]],"date-time":"2019-02-20T20:21:34Z","timestamp":1550694094000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10489-018-1144-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,2,21]]},"references-count":30,"journal-issue":{"issue":"10","published-print":{"date-parts":[[2018,10]]}},"alternative-id":["1144"],"URL":"https:\/\/doi.org\/10.1007\/s10489-018-1144-z","relation":{},"ISSN":["0924-669X","1573-7497"],"issn-type":[{"value":"0924-669X","type":"print"},{"value":"1573-7497","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,2,21]]},"assertion":[{"value":"21 February 2018","order":1,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}