{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,29]],"date-time":"2025-09-29T08:11:57Z","timestamp":1759133517388,"version":"3.37.3"},"reference-count":37,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2017,1,3]],"date-time":"2017-01-03T00:00:00Z","timestamp":1483401600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Science Foundation of China","doi-asserted-by":"crossref","award":["51605267"],"award-info":[{"award-number":["51605267"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"crossref"}]},{"name":"Natural Science Foundation of Shandong Province, China","award":["ZR2016EEQ07"],"award-info":[{"award-number":["ZR2016EEQ07"]}]},{"name":"Colleges and universities of Shandong province science and technology plan projects","award":["J16LB04"],"award-info":[{"award-number":["J16LB04"]}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Cluster Comput"],"published-print":{"date-parts":[[2017,3]]},"DOI":"10.1007\/s10586-016-0717-z","type":"journal-article","created":{"date-parts":[[2017,1,3]],"date-time":"2017-01-03T14:52:23Z","timestamp":1483455143000},"page":"371-390","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":16,"title":["Multi-objective inverse scheduling optimization of single-machine shop system with uncertain due-dates and processing times"],"prefix":"10.1007","volume":"20","author":[{"given":"Jianhui","family":"Mou","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Liang","family":"Gao","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xinyu","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Quanke","family":"Pan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jiancai","family":"Mu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,1,3]]},"reference":[{"key":"717_CR1","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1016\/j.eswa.2015.09.050","volume":"45","author":"V Kaplano\u011flu","year":"2016","unstructured":"Kaplano\u011flu, V.: An object-oriented approach for multi-objective flexible job-shop scheduling problem. Expert Syst. Appl. 45, 71\u201384 (2016)","journal-title":"Expert Syst. Appl."},{"issue":"5","key":"717_CR2","doi-asserted-by":"crossref","first-page":"475","DOI":"10.1007\/s10951-009-0117-9","volume":"12","author":"P Brucker","year":"2009","unstructured":"Brucker, P., Shakhlevich, N.V.: Inverse scheduling with maximum lateness objective. J. Sched. 12(5), 475\u2013488 (2009)","journal-title":"J. Sched."},{"issue":"3","key":"717_CR3","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1007\/s10951-010-0168-y","volume":"14","author":"P Brucker","year":"2011","unstructured":"Brucker, P., Shakhlevich, N.V.: Inverse scheduling: two-machine flow-shop problem. J. Sched. 14(3), 239\u2013256 (2011)","journal-title":"J. Sched."},{"issue":"4","key":"717_CR4","doi-asserted-by":"crossref","first-page":"417","DOI":"10.1007\/s10951-013-0314-4","volume":"16","author":"SS Li","year":"2013","unstructured":"Li, S.S., Brucker, P., Ng, C.T., Cheng, T.E., Shakhlevich, N.V., Yuan, J.J.: A note on reverse scheduling with maximum lateness objective. J. Sched. 16(4), 417\u2013422 (2013)","journal-title":"J. Sched."},{"key":"717_CR5","doi-asserted-by":"crossref","first-page":"329","DOI":"10.1023\/B:JOCO.0000038914.26975.9b","volume":"8","author":"C Heuberger","year":"2004","unstructured":"Heuberger, C.: Inverse combinatorial optimization: a survey on problems, methods and results. J. Comb. Optim. 8, 329\u2013361 (2004)","journal-title":"J. Comb. Optim."},{"issue":"1","key":"717_CR6","first-page":"35","volume":"1","author":"C Koulamas","year":"2005","unstructured":"Koulamas, C.: Inverse scheduling with controllable job parameters. Int. J. Serv. Oper. Manag. 1(1), 35\u201343 (2005)","journal-title":"Int. J. Serv. Oper. Manag."},{"issue":"2","key":"717_CR7","first-page":"1","volume":"22","author":"RJ Chen","year":"2005","unstructured":"Chen, R.J., Chen, F., Tang, G.C.: Inverse problems of a single machine scheduling to minimize the total completion time. J. Shanghai Second Polytech. Univ. 22(2), 1\u20137 (2005)","journal-title":"J. Shanghai Second Polytech. Univ."},{"issue":"2","key":"717_CR8","first-page":"80","volume":"18","author":"RJ Chen","year":"2009","unstructured":"Chen, R.J., Tang, G.C.: Inverse problems of supply chain scheduling and flow shop scheduling. Oper. Res. Manag. Sci. 18(2), 80\u201384 (2009)","journal-title":"Oper. Res. Manag. Sci."},{"issue":"6","key":"717_CR9","doi-asserted-by":"crossref","first-page":"1099","DOI":"10.1007\/s10845-013-0842-y","volume":"26","author":"JF Chen","year":"2015","unstructured":"Chen, J.F.: Unrelated parallel-machine scheduling to minimize total weighted completion time. J. Intell. Manuf. 26(6), 1099\u20131112 (2015)","journal-title":"J. Intell. Manuf."},{"issue":"6","key":"717_CR10","first-page":"757","volume":"38","author":"H Pham","year":"2012","unstructured":"Pham, H., Lu, X.W.: Inverse problem of total weighted completion time objective with unit processing time on identical parallel machines. J. East China Univ. Sci. Technol. 38(6), 757\u2013761 (2012)","journal-title":"J. East China Univ. Sci. Technol."},{"key":"717_CR11","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1016\/j.ijpe.2016.01.016","volume":"174","author":"X Li","year":"2016","unstructured":"Li, X., Gao, L.: An effective hybrid genetic algorithm and tabu search for flexible job shop scheduling problem. Int. J. Prod. Econ. 174, 93\u2013110 (2016)","journal-title":"Int. J. Prod. Econ."},{"issue":"5","key":"717_CR12","doi-asserted-by":"crossref","first-page":"5986","DOI":"10.1016\/j.eswa.2010.11.022","volume":"38","author":"TC Chiang","year":"2011","unstructured":"Chiang, T.C., Cheng, H.C., Fu, L.C.: NNMA: an effective memetic algorithm for solving multiobjective permutation flow shop scheduling problems. Expert Syst. Appl. 38(5), 5986\u20135999 (2011)","journal-title":"Expert Syst. Appl."},{"key":"717_CR13","doi-asserted-by":"crossref","first-page":"350","DOI":"10.1016\/j.ijepes.2014.12.011","volume":"67","author":"A Rasoulzadeh-akhijahani","year":"2015","unstructured":"Rasoulzadeh-akhijahani, A., Mohammadi-ivatloo, B.: Short-term hydrothermal generation scheduling by a modified dynamic neighborhood learning based particle swarm optimization. Int. J. Electr. Power Energy Syst. 67, 350\u2013367 (2015)","journal-title":"Int. J. Electr. Power Energy Syst."},{"key":"717_CR14","doi-asserted-by":"crossref","unstructured":"Nouiri, M., Bekrar, A., Jemai, A., Niar, S., Ammari, A.C.: An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem. J. Intell. Manuf. 1\u201313 (2015)","DOI":"10.1007\/s10845-015-1039-3"},{"key":"717_CR15","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1016\/j.ijpe.2014.03.006","volume":"153","author":"A Rossi","year":"2014","unstructured":"Rossi, A.: Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships. Int. J. Prod. Econ. 153, 253\u2013267 (2014)","journal-title":"Int. J. Prod. Econ."},{"issue":"1","key":"717_CR16","doi-asserted-by":"crossref","first-page":"150","DOI":"10.1016\/j.engappai.2012.03.011","volume":"26","author":"RT Neto","year":"2013","unstructured":"Neto, R.T., Godinho Filho, M.: Literature review regarding ant colony optimization applied to scheduling problems: guidelines for implementation and directions for future research. Eng. Appl. Artif. Intell. 26(1), 150\u2013161 (2013)","journal-title":"Eng. Appl. Artif. Intell."},{"key":"717_CR17","doi-asserted-by":"crossref","unstructured":"Huacuja, H.J.F., Santiago, A., Pecero, J.E., Dorronsoro, B., Bouvry, P., Monterrubio, J. C. S., et al.: A comparison between memetic algorithm and seeded genetic algorithm for multi-objective independent task scheduling on heterogeneous machines. In: Design of Intelligent Systems Based on Fuzzy Logic, Neural Networks and Nature-Inspired Optimization, pp. 377\u2013389 (2015)","DOI":"10.1007\/978-3-319-17747-2_29"},{"issue":"8","key":"717_CR18","doi-asserted-by":"crossref","first-page":"1886","DOI":"10.1002\/cpe.3105","volume":"27","author":"IA Moschakis","year":"2015","unstructured":"Moschakis, I.A., Karatza, H.D.: Towards scheduling for Internet-of-Things applications on clouds: a simulated annealing approach. Concurr. Comput.: Pract. Exp. 27(8), 1886\u20131899 (2015)","journal-title":"Concurr. Comput.: Pract. Exp."},{"key":"717_CR19","doi-asserted-by":"crossref","first-page":"154","DOI":"10.1016\/j.cor.2014.08.006","volume":"53","author":"B Peng","year":"2015","unstructured":"Peng, B., L\u00fc, Z., Cheng, T.C.E.: A tabu search\/path relinking algorithm to solve the job shop scheduling problem. Comput. Oper. Res. 53, 154\u2013164 (2015)","journal-title":"Comput. Oper. Res."},{"key":"717_CR20","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1016\/j.cor.2013.06.006","volume":"52","author":"A Mjirda","year":"2014","unstructured":"Mjirda, A., Jarboui, B., Macedo, R., Hanafi, S., Mladenovi\u0107, N.: A two phase variable neighborhood search for the multi-product inventory routing problem. Comput. Oper. Res. 52, 291\u2013299 (2014)","journal-title":"Comput. Oper. Res."},{"issue":"5","key":"717_CR21","doi-asserted-by":"crossref","first-page":"2347","DOI":"10.1109\/TPWRS.2014.2302033","volume":"29","author":"A Glotic","year":"2014","unstructured":"Glotic, A., Kitak, P., Pihler, J., Ticar, I.: Parallel self-adaptive differential evolution algorithm for solving short-term hydro scheduling problem. IEEE Trans. Power Syst. 29(5), 2347\u20132358 (2014)","journal-title":"IEEE Trans. Power Syst."},{"key":"717_CR22","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1016\/j.jocs.2015.03.011","volume":"8","author":"GM Komaki","year":"2015","unstructured":"Komaki, G.M., Kayvanfar, V.: Grey Wolf optimizer algorithm for the two-stage assembly flow shop scheduling problem with release time. J. Comput. Sci. 8, 109\u2013120 (2015)","journal-title":"J. Comput. Sci."},{"key":"717_CR23","doi-asserted-by":"crossref","first-page":"617","DOI":"10.1016\/j.ijepes.2014.05.017","volume":"62","author":"N Fang","year":"2014","unstructured":"Fang, N., Zhou, J., Zhang, R., Liu, Y., Zhang, Y.: A hybrid of real coded genetic algorithm and artificial fish swarm algorithm for short-term optimal hydrothermal scheduling. Int. J. Electr. Power Energy Syst. 62, 617\u2013629 (2014)","journal-title":"Int. J. Electr. Power Energy Syst."},{"issue":"3","key":"717_CR24","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1007\/s10845-012-0701-2","volume":"25","author":"X Qiu","year":"2014","unstructured":"Qiu, X., Lau, H.Y.: An AIS-based hybrid algorithm for static job shop scheduling problem. J. Intell. Manuf. 25(3), 489\u2013503 (2014)","journal-title":"J. Intell. Manuf."},{"key":"717_CR25","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/j.advengsoft.2014.07.006","volume":"77","author":"Z Xie","year":"2014","unstructured":"Xie, Z., Zhang, C., Shao, X., Lin, W., Zhu, H.: An effective hybrid teaching-learning-based optimization algorithm for permutation flow shop scheduling problem. Adv. Eng. Softw. 77, 35\u201347 (2014)","journal-title":"Adv. Eng. Softw."},{"issue":"5\u20138","key":"717_CR26","doi-asserted-by":"crossref","first-page":"1229","DOI":"10.1007\/s00170-013-5375-1","volume":"71","author":"M Rabiee","year":"2014","unstructured":"Rabiee, M., Rad, R.S., Mazinani, M., Shafaei, R.: An intelligent hybrid meta-heuristic for solving a case of no-wait two-stage flexible flow shop scheduling problem with unrelated parallel machines. Int. J. Adv. Manuf. Technol. 71(5\u20138), 1229\u20131245 (2014)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"1\u20134","key":"717_CR27","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1007\/s00170-014-6415-1","volume":"77","author":"M Rohaninejad","year":"2015","unstructured":"Rohaninejad, M., Kheirkhah, A., Fattahi, P., Vahedi-Nouri, B.: A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem. Int. J. Adv. Manuf. Technol. 77(1\u20134), 51\u201366 (2015)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"717_CR28","doi-asserted-by":"crossref","unstructured":"Aghassi, H., Abadi, S.N., Roghanian, E.: A multi-objective genetic algorithm for optimization time-cost trade-off scheduling. In: Knowledge Technology, pp. 356\u2013359. Springer, Berlin (2012)","DOI":"10.1007\/978-3-642-32826-8_38"},{"issue":"6","key":"717_CR29","doi-asserted-by":"crossref","first-page":"979","DOI":"10.1007\/s10845-009-0374-7","volume":"22","author":"M Zandieh","year":"2011","unstructured":"Zandieh, M., Karimi, N.: An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times. J. Intell. Manuf. 22(6), 979\u2013989 (2011)","journal-title":"J. Intell. Manuf."},{"issue":"5\u20138","key":"717_CR30","doi-asserted-by":"crossref","first-page":"915","DOI":"10.1007\/s00170-012-4051-1","volume":"64","author":"SHA Rahmati","year":"2013","unstructured":"Rahmati, S.H.A., Zandieh, M., Yazdani, M.: Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem. Int. J. Adv. Manuf. Technol. 64(5\u20138), 915\u2013932 (2013)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"4","key":"717_CR31","doi-asserted-by":"crossref","first-page":"637","DOI":"10.1007\/s10723-014-9306-7","volume":"12","author":"H Khajemohammadi","year":"2014","unstructured":"Khajemohammadi, H., Fanian, A., Gulliver, T.A.: Efficient workflow scheduling for grid computing using a leveled multi-objective genetic algorithm. J. Grid Comput. 12(4), 637\u2013663 (2014)","journal-title":"J. Grid Comput."},{"key":"717_CR32","doi-asserted-by":"crossref","unstructured":"Sedaghat, N., Tabatabaee-Yazdi, H., Akbarzadeh T.M.R.: Pareto front based realistic soft real-time task scheduling with multi-objective genetic algorithm in unstructured heterogeneous distributed system. In: Advances in Grid and Pervasive Computing, pp. 268\u2013279. Springer, Berlin (2010)","DOI":"10.1007\/978-3-642-13067-0_30"},{"key":"717_CR33","doi-asserted-by":"crossref","unstructured":"Arakawa, M.: Hierarchy genetic algorithm to solve multi-objective scheduling problems involving various types of assignments for parallel processing system. In: Service Robotics and Mechatronics, pp. 251\u2013256. Springer, London (2010)","DOI":"10.1007\/978-1-84882-694-6_44"},{"issue":"9\u201312","key":"717_CR34","doi-asserted-by":"crossref","first-page":"2123","DOI":"10.1007\/s00170-015-7329-2","volume":"81","author":"UA Umar","year":"2015","unstructured":"Umar, U.A., Ariffin, M.K.A., Ismail, N., Tang, S.H.: Hybrid multiobjective genetic algorithms for integrated dynamic scheduling and routing of jobs and automated-guided vehicle (AGV) in flexible manufacturing systems (FMS) environment. Int. J. Adv. Manuf. Technol. 81(9\u201312), 2123\u20132141 (2015)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"717_CR35","doi-asserted-by":"crossref","first-page":"188","DOI":"10.1016\/j.amc.2015.03.059","volume":"260","author":"TF Abdelmaguid","year":"2015","unstructured":"Abdelmaguid, T.F.: A neighborhood search function for flexible job shop scheduling with separable sequence-dependent setup times. Appl. Math. Comput. 260, 188\u2013203 (2015)","journal-title":"Appl. Math. Comput."},{"key":"717_CR36","volume-title":"Genetic Algorithms in Search, Optimization, and Machine Learning","author":"D Goldberg","year":"1989","unstructured":"Goldberg, D.: Genetic Algorithms in Search, Optimization, and Machine Learning. Addison-Wesley, Boston (1989)"},{"key":"717_CR37","doi-asserted-by":"crossref","unstructured":"Jakobovic, D., Budin, L.: Dynamic scheduling with genetic programming. Lecture Notes in Computer Science, vol. 3905, pp. 73\u201384 (2006)","DOI":"10.1007\/11729976_7"}],"container-title":["Cluster Computing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10586-016-0717-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10586-016-0717-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10586-016-0717-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,9,28]],"date-time":"2020-09-28T12:36:44Z","timestamp":1601296604000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10586-016-0717-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,1,3]]},"references-count":37,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2017,3]]}},"alternative-id":["717"],"URL":"https:\/\/doi.org\/10.1007\/s10586-016-0717-z","relation":{},"ISSN":["1386-7857","1573-7543"],"issn-type":[{"type":"print","value":"1386-7857"},{"type":"electronic","value":"1573-7543"}],"subject":[],"published":{"date-parts":[[2017,1,3]]}}}