{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,6]],"date-time":"2026-10-06T04:11:43Z","timestamp":1791259903427,"version":"4.1.0"},"reference-count":30,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2017,1,16]],"date-time":"2017-01-16T00:00:00Z","timestamp":1484524800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["51605267"],"award-info":[{"award-number":["51605267"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100007129","name":"Natural Science Foundation of Shandong Province","doi-asserted-by":"publisher","award":["ZR2016EEQ07"],"award-info":[{"award-number":["ZR2016EEQ07"]}],"id":[{"id":"10.13039\/501100007129","id-type":"DOI","asserted-by":"publisher"}]},{"name":"Colleges and Universities of Shandong Province Science and Technology Plan Projects","award":["J16LB04"],"award-info":[{"award-number":["J16LB04"]}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Cluster Comput"],"published-print":{"date-parts":[[2017,3]]},"DOI":"10.1007\/s10586-017-0734-6","type":"journal-article","created":{"date-parts":[[2017,1,16]],"date-time":"2017-01-16T09:09:11Z","timestamp":1484557751000},"page":"439-453","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":11,"title":["A hybrid heuristic algorithm for flowshop inverse scheduling problem under a dynamic environment"],"prefix":"10.1007","volume":"20","author":[{"given":"Jianhui","family":"Mou","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Liang","family":"Gao","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Qianjian","family":"Guo","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Jiancai","family":"Mu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2017,1,16]]},"reference":[{"issue":"2","key":"734_CR1","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1109\/TASE.2012.2204874","volume":"10","author":"QK Pan","year":"2013","unstructured":"Pan, Q.K., Wang, L., Mao, K., Zhao, J.H., Zhang, M.: An effective artificial bee colony algorithm for a real-world hybrid flowshop problem in steel making proces. IEEE Trans. Autom. Sci. Eng. 10(2), 307\u2013322 (2013)","journal-title":"IEEE Trans. Autom. Sci. Eng."},{"issue":"5","key":"734_CR2","doi-asserted-by":"crossref","first-page":"815","DOI":"10.1007\/s10845-009-0370-y","volume":"22","author":"EL Solano-Charris","year":"2011","unstructured":"Solano-Charris, E.L., Montoya-Torres, J.R., Paternina-Arboleda, C.D.: Ant colony optimization algorithm for a Bi-criteria 2-stage hybrid flowshop scheduling problem. J. Intell. Manuf. 22(5), 815\u2013822 (2011)","journal-title":"J. Intell. Manuf."},{"issue":"C","key":"734_CR3","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1016\/j.cie.2016.03.011","volume":"96","author":"N Kundakc\u0131","year":"2016","unstructured":"Kundakc\u0131, N., Kulak, O.: Hybrid genetic algorithms for minimizing makespan in dynamic job shop scheduling problem. Comput. Ind. Eng. 96(C), 31\u201351 (2016)","journal-title":"Comput. Ind. Eng."},{"key":"734_CR4","doi-asserted-by":"crossref","first-page":"360","DOI":"10.1016\/j.cie.2016.06.018","volume":"98","author":"D Rahmani","year":"2016","unstructured":"Rahmani, D., Ramezanian, R.: A stable reactive approach in dynamic flexible flow shop scheduling with unexpected disruptions: a case study. Comput. Ind. Eng. 98, 360\u2013372 (2016)","journal-title":"Comput. Ind. Eng."},{"key":"734_CR5","doi-asserted-by":"crossref","first-page":"198","DOI":"10.1016\/j.ins.2014.11.036","volume":"298","author":"XN Shen","year":"2015","unstructured":"Shen, X.N., Yao, X.: Mathematical modeling and multi-objective evolutionary algorithms applied to dynamic flexible job shop scheduling problems. Inf. Sci. 298, 198\u2013224 (2015)","journal-title":"Inf. Sci."},{"issue":"4","key":"734_CR6","doi-asserted-by":"crossref","first-page":"982","DOI":"10.1007\/s10878-015-9860-3","volume":"30","author":"S Wang","year":"2015","unstructured":"Wang, S., Su, H., Wan, G.: Resource-constrained machine scheduling with machine eligibility restriction and its applications to surgical operations scheduling. J. Comb. Optim. 30(4), 982\u2013995 (2015)","journal-title":"J. Comb. Optim."},{"key":"734_CR7","doi-asserted-by":"crossref","first-page":"475","DOI":"10.1007\/s10951-009-0117-9","volume":"12","author":"P Brucker","year":"2009","unstructured":"Brucker, P., Shakhlevich, N.V.: Inverse scheduling with maximum lateness objective. J. Sched. 12, 475\u2013488 (2009)","journal-title":"J. Sched."},{"key":"734_CR8","first-page":"35","volume":"1","author":"K Christos","year":"2005","unstructured":"Christos, K.: Inverse scheduling with controllable job parameters. Int. J. Serv. Oper. Manag. 1, 35\u201343 (2005)","journal-title":"Int. J. Serv. Oper. Manag."},{"key":"734_CR9","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1007\/s10951-010-0168-y","volume":"14","author":"P Brucker","year":"2011","unstructured":"Brucker, P., Shakhlevich, N.V.: Inverse scheduling: two-machine flow-shop problem. J. Sched. 14, 239\u2013256 (2011)","journal-title":"J. Sched."},{"issue":"2","key":"734_CR10","first-page":"1","volume":"22","author":"RJ Chen","year":"2005","unstructured":"Chen, R.J., Chen, F., Chun, T.G.: Inverse problems of a single machine scheduling to minimize the total completion time. J. Shanghai Second Polytech. Univ. 22(2), 1\u20137 (2005)","journal-title":"J. Shanghai Second Polytech. Univ."},{"issue":"2","key":"734_CR11","first-page":"80","volume":"18","author":"RJ Chen","year":"2009","unstructured":"Chen, R.J., Tang, G.C.: Inverse problems of supply chain scheduling and flow shop scheduling. Oper. Res. Manag. Sci. 18(2), 80\u201384 (2009)","journal-title":"Oper. Res. Manag. Sci."},{"issue":"6","key":"734_CR12","first-page":"757","volume":"38","author":"H Pham","year":"2012","unstructured":"Pham, H., Lu, X.: Inverse problem of total weighted completion time objective with unit processing time on identical parallel machines. J. East China Univ. Sci. Technol. 38(6), 757\u2013761 (2012)","journal-title":"J. East China Univ. Sci. Technol."},{"key":"734_CR13","doi-asserted-by":"crossref","first-page":"417","DOI":"10.1007\/s10951-013-0314-4","volume":"16","author":"SS Li","year":"2013","unstructured":"Li, S.S., Brucker, P., Ng, C.T., Cheng, T.C.E., Shakhlevich, N.V., Yuan, J.J.: A note on reverse scheduling with maximum lateness objective. J. Sched. 16, 417\u2013422 (2013)","journal-title":"J. Sched."},{"issue":"4","key":"734_CR14","doi-asserted-by":"crossref","first-page":"763","DOI":"10.1007\/s10845-012-0626-9","volume":"24","author":"L Nie","year":"2013","unstructured":"Nie, L., Gao, L., Li, P., Li, X.: A GEP-based reactive scheduling policies constructing approach for dynamic flexible job shop scheduling problem with job release dates. J. Intell. Manuf. 24(4), 763\u2013774 (2013)","journal-title":"J. Intell. Manuf."},{"key":"734_CR15","unstructured":"Heydari, M., Aazami, A., Shekarian, M.: Two-objective job shop scheduling problem with sequence-dependent setup times. Appl. Math. Model. (2017)"},{"key":"734_CR16","doi-asserted-by":"crossref","first-page":"341","DOI":"10.1016\/j.eswa.2016.01.054","volume":"55","author":"A Jamili","year":"2016","unstructured":"Jamili, A.: Robust job shop scheduling problem: mathematical models, exact and heuristic algorithms. Expert Syst. Appl. 55, 341\u2013350 (2016)","journal-title":"Expert Syst. Appl."},{"issue":"C","key":"734_CR17","first-page":"71","volume":"45","author":"K Vahit","year":"2016","unstructured":"Vahit, K.: An object-oriented approach for multi-objective flexible job-shop scheduling problem. Expert Syst. Appl. Int. J. 45(C), 71\u201384 (2016)","journal-title":"Expert Syst. Appl. Int. J."},{"key":"734_CR18","first-page":"1","volume":"229","author":"AAR Hosseinabadi","year":"2014","unstructured":"Hosseinabadi, A.A.R., Siar, H., Shamshirband, S., Shojafar, M., Nizam, M.H.: Using the gravitational emulation local search algorithm to solve the multi-objective flexible dynamic job shop scheduling problem in small and medium enterprises. Ann. Oper. Res. 229, 1\u201324 (2014)","journal-title":"Ann. Oper. Res."},{"key":"734_CR19","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1177\/003754978604700502","volume":"47","author":"RT Barrett","year":"1986","unstructured":"Barrett, R.T., Barman, S.A.: SLAMII simulation study of a simplified flowshop. Simulation 47, 181\u2013189 (1986)","journal-title":"Simulation"},{"issue":"1","key":"734_CR20","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1016\/j.ijpe.2012.10.016","volume":"145","author":"CW Pickardt","year":"2013","unstructured":"Pickardt, C.W., Hildebrandt, T., Branke, J., et al.: Evolutionary generation of dispatching rule sets for complex dynamic scheduling problems. Int. J. Prod. Econ. 145(1), 67\u201377 (2013)","journal-title":"Int. J. Prod. Econ."},{"key":"734_CR21","doi-asserted-by":"crossref","unstructured":"Wang, D.J., Liu, F., Jin, Y.: A multi-objective evolutionary algorithm guided by directed search for dynamic scheduling. Comput. Oper. Res. (2016)","DOI":"10.1016\/j.cor.2016.04.024"},{"key":"734_CR22","doi-asserted-by":"crossref","unstructured":"Riccardo, M., Chee, Y.W., Chandra, S.L.: Mitigating supply and production uncertainties with dynamic scheduling using real-time transport information. Int. J. Prod. Res. 52(17), 5223\u20135235 (2014)","DOI":"10.1080\/00207543.2014.900201"},{"key":"734_CR23","doi-asserted-by":"crossref","first-page":"193","DOI":"10.4028\/www.scientific.net\/AMM.834.193","volume":"834","author":"J Petronijevi\u0107","year":"2016","unstructured":"Petronijevi\u0107, J., Petrovi\u0107, M., Vukovi\u0107, N., Miti\u0107, M., Babi\u0107, B., Miljkovi\u0107, Z.: Integrated process planning and scheduling using multi-agent methodology. Appl. Mech. Mater. 834, 193\u2013198 (2016)","journal-title":"Appl. Mech. Mater."},{"key":"734_CR24","doi-asserted-by":"crossref","first-page":"75","DOI":"10.4995\/ijpme.2016.5780","volume":"4","author":"RM Branco","year":"2016","unstructured":"Branco, R.M., Coelho, A.S., Mayerle, S.F.: Hybrid genetic algorithms: solutions in realistic dynamic and setup dependent job-shop scheduling problems. Int. J. Prod. Manag. Eng. 4, 75\u201385 (2016)","journal-title":"Int. J. Prod. Manag. Eng."},{"issue":"9","key":"734_CR25","doi-asserted-by":"crossref","first-page":"8095","DOI":"10.1016\/j.eswa.2012.01.158","volume":"39","author":"P G\u00f3mez-Gasquet","year":"2012","unstructured":"G\u00f3mez-Gasquet, P., Andr\u00e9s, C., Lario, F.C.: An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespan. Expert Syst. Appl. 39(9), 8095\u20138107 (2012)","journal-title":"Expert Syst. Appl."},{"key":"734_CR26","volume-title":"Metaheuristics and Performance Evaluation Models for the Stochastic Permutation Flow-Shop Scheduling Problem. Flexibility and Robustness in Scheduling","author":"M Gourgand","year":"2010","unstructured":"Gourgand, M., Grangeon, N., Norre, S.: Metaheuristics and Performance Evaluation Models for the Stochastic Permutation Flow-Shop Scheduling Problem. Flexibility and Robustness in Scheduling. ISTE, Hoboken (2010)"},{"issue":"2","key":"734_CR27","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1109\/TCC.2015.2394316","volume":"3","author":"AG Kumbhare","year":"2015","unstructured":"Kumbhare, A.G., Simmhan, Y., Frincu, M., Prasanna, V.K.: Reactive resource provisioning heuristics for dynamic dataflows on cloud infrastructure. IEEE Trans. Cloud Comput. 3(2), 105\u2013118 (2015)","journal-title":"IEEE Trans. Cloud Comput."},{"issue":"1","key":"734_CR28","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1016\/j.ijpe.2010.08.017","volume":"129","author":"V Vinod","year":"2011","unstructured":"Vinod, V., Sridharan, R.: Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system. Int. J. Prod. Econ. 129(1), 127\u2013146 (2011)","journal-title":"Int. J. Prod. Econ."},{"key":"734_CR29","doi-asserted-by":"crossref","first-page":"278","DOI":"10.1016\/0377-2217(93)90182-M","volume":"64","author":"E Taillard","year":"1993","unstructured":"Taillard, E.: Benchmarks for basic scheduling problems. Eur. J. Oper. Res. 64, 278\u2013285 (1993)","journal-title":"Eur. J. Oper. Res."},{"issue":"8","key":"734_CR30","doi-asserted-by":"crossref","first-page":"733","DOI":"10.1080\/0951192X.2013.834465","volume":"27","author":"MET Araghi","year":"2014","unstructured":"Araghi, M.E.T., Jolai, F., Rabiee, M.: Incorporating learning effect and deterioration for solving a SDST flexible job-shop scheduling problem with a hybrid meta-heuristic approach. Int. J. Comput. Integr. Manuf. 27(8), 733\u2013746 (2014)","journal-title":"Int. J. Comput. Integr. Manuf."}],"container-title":["Cluster Computing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10586-017-0734-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10586-017-0734-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10586-017-0734-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,17]],"date-time":"2019-09-17T12:20:06Z","timestamp":1568722806000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10586-017-0734-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,1,16]]},"references-count":30,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2017,3]]}},"alternative-id":["734"],"URL":"https:\/\/doi.org\/10.1007\/s10586-017-0734-6","relation":{},"ISSN":["1386-7857","1573-7543"],"issn-type":[{"value":"1386-7857","type":"print"},{"value":"1573-7543","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,1,16]]}}}