{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,4]],"date-time":"2026-03-04T16:36:12Z","timestamp":1772642172845,"version":"3.50.1"},"reference-count":28,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2024,11,8]],"date-time":"2024-11-08T00:00:00Z","timestamp":1731024000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,11,8]],"date-time":"2024-11-08T00:00:00Z","timestamp":1731024000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"funder":[{"DOI":"10.13039\/501100002858","name":"China Postdoctoral Science Foundation","doi-asserted-by":"publisher","award":["2022T150319"],"award-info":[{"award-number":["2022T150319"]}],"id":[{"id":"10.13039\/501100002858","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100017630","name":"Humanities and Social Sciences Youth Foundation, Ministry of Education","doi-asserted-by":"publisher","award":["22YJC630041"],"award-info":[{"award-number":["22YJC630041"]}],"id":[{"id":"10.13039\/501100017630","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Comput Optim Appl"],"published-print":{"date-parts":[[2025,12]]},"DOI":"10.1007\/s10589-024-00624-1","type":"journal-article","created":{"date-parts":[[2024,11,8]],"date-time":"2024-11-08T06:43:59Z","timestamp":1731048239000},"page":"787-809","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["A two-stage stochastic programming approach for generation and transmission maintenance scheduling with risk management"],"prefix":"10.1007","volume":"92","author":[{"given":"Aoyu","family":"Fan","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3821-0383","authenticated-orcid":false,"given":"Zhouchun","family":"Huang","sequence":"additional","affiliation":[]},{"given":"Qipeng","family":"Zheng","sequence":"additional","affiliation":[]},{"given":"Xiaodong","family":"Luo","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,8]]},"reference":[{"issue":"3","key":"624_CR1","doi-asserted-by":"publisher","first-page":"1302","DOI":"10.1109\/TPWRS.2007.901673","volume":"22","author":"Y Fu","year":"2007","unstructured":"Fu, Y., Shahidehpour, M., Li, Z.: Security-constrained optimal coordination of generation and transmission maintenance outage scheduling. IEEE Trans. Power Syst. 22(3), 1302\u20131313 (2007). https:\/\/doi.org\/10.1109\/TPWRS.2007.901673","journal-title":"IEEE Trans. Power Syst."},{"key":"624_CR2","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1016\/j.epsr.2012.03.016","volume":"92","author":"UE Ekpenyong","year":"2012","unstructured":"Ekpenyong, U.E., Zhang, J., Xia, X.: An improved robust model for generator maintenance scheduling. Electr. Power Syst. Res. 92, 29\u201336 (2012). https:\/\/doi.org\/10.1016\/j.epsr.2012.03.016","journal-title":"Electr. Power Syst. Res."},{"issue":"3","key":"624_CR3","doi-asserted-by":"publisher","first-page":"1045","DOI":"10.1016\/j.ejor.2017.07.008","volume":"264","author":"P Mazidi","year":"2018","unstructured":"Mazidi, P., Tohidi, Y., Ramos, A., Sans-Bobi, M.A.: Profit-maximization generation maintenance scheduling through bi-level programming. Eur. J. Oper. Res. 264(3), 1045\u20131057 (2018). https:\/\/doi.org\/10.1016\/j.ejor.2017.07.008","journal-title":"Eur. J. Oper. Res."},{"key":"624_CR4","doi-asserted-by":"publisher","DOI":"10.1007\/s12667-019-00342-2","author":"MVR Mart\u00ednez","year":"2019","unstructured":"Mart\u00ednez, M.V.R., Zuluaga, A.H.E., Guimar\u00e3es, F.G.A.: A MILP model for generation maintenance scheduling coordinated with hydrothermal dispatch. Energy Syst. (2019). https:\/\/doi.org\/10.1007\/s12667-019-00342-2","journal-title":"Energy Syst."},{"issue":"2","key":"624_CR5","doi-asserted-by":"publisher","first-page":"233","DOI":"10.1016\/j.ress.2005.01.004","volume":"91","author":"CMF Lapa","year":"2006","unstructured":"Lapa, C.M.F., Pereira, C.M.N.A., Barros, M.P.: A model for preventive maintenance planning by genetic algorithms based in cost and reliability. Reliab. Eng. Syst. Saf. 91(2), 233\u2013240 (2006). https:\/\/doi.org\/10.1016\/j.ress.2005.01.004. (Selected Papers Presented at QUALITA 2003)","journal-title":"Reliab. Eng. Syst. Saf."},{"issue":"4","key":"624_CR6","doi-asserted-by":"publisher","first-page":"697","DOI":"10.1002\/etep.1867","volume":"25","author":"C Lv","year":"2015","unstructured":"Lv, C., Wang, J., You, S., Zhang, Z.: Short-term transmission maintenance scheduling based on the Benders decomposition. Int. Trans. Electr. Energy Syst. 25(4), 697\u2013712 (2015). https:\/\/doi.org\/10.1002\/etep.1867","journal-title":"Int. Trans. Electr. Energy Syst."},{"issue":"3","key":"624_CR7","first-page":"1674","volume":"25","author":"L Wu","year":"2010","unstructured":"Wu, L., Shahidehpour, M., Fu, Y.: Security-Constrained Generation and Transmission 25(3), 1674\u20131685 (2010)","journal-title":"Security-Constrained Generation and Transmission"},{"key":"624_CR8","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1016\/j.asoc.2014.03.015","volume":"21","author":"M Abirami","year":"2014","unstructured":"Abirami, M., Ganesan, S., Subramanian, S., Anandhakumar, R.: Source and transmission line maintenance outage scheduling in a power system using teaching learning based optimization algorithm. Appl. Soft Comput. J. 21, 72\u201383 (2014). https:\/\/doi.org\/10.1016\/j.asoc.2014.03.015","journal-title":"Appl. Soft Comput. J."},{"issue":"1","key":"624_CR9","doi-asserted-by":"publisher","first-page":"893","DOI":"10.1109\/JSYST.2020.2986961","volume":"15","author":"B Bagheri","year":"2020","unstructured":"Bagheri, B., Amjady, N., Dehghan, S.: Multiscale multiresolution generation maintenance scheduling: A stochastic affinely adjustable robust approach. IEEE Syst. J. 15(1), 893\u2013904 (2020)","journal-title":"IEEE Syst. J."},{"issue":"3","key":"624_CR10","doi-asserted-by":"publisher","first-page":"1036","DOI":"10.1016\/j.ejor.2020.03.036","volume":"287","author":"Z Huang","year":"2020","unstructured":"Huang, Z., Zheng, Q.P.: A multistage stochastic programming approach for preventive maintenance scheduling of GENCOs with natural gas contract. Eur. J. Oper. Res. 287(3), 1036\u20131051 (2020). https:\/\/doi.org\/10.1016\/j.ejor.2020.03.036","journal-title":"Eur. J. Oper. Res."},{"issue":"6","key":"624_CR11","doi-asserted-by":"publisher","first-page":"6470","DOI":"10.1109\/TSG.2017.2713719","volume":"9","author":"SD Manshadi","year":"2017","unstructured":"Manshadi, S.D., Khodayar, M.E.: Risk-averse generation maintenance scheduling with microgrid aggregators. IEEE Trans. Smart Grid 9(6), 6470\u20136479 (2017)","journal-title":"IEEE Trans. Smart Grid"},{"issue":"2","key":"624_CR12","doi-asserted-by":"publisher","first-page":"1061","DOI":"10.1109\/TPWRS.2019.2938618","volume":"35","author":"Z Zhuo","year":"2019","unstructured":"Zhuo, Z., Du, E., Zhang, N., Kang, C., Xia, Q., Wang, Z.: Incorporating massive scenarios in transmission expansion planning with high renewable energy penetration. IEEE Trans. Power Syst. 35(2), 1061\u20131074 (2019)","journal-title":"IEEE Trans. Power Syst."},{"issue":"2","key":"624_CR13","doi-asserted-by":"publisher","first-page":"479","DOI":"10.1007\/s10589-018-0006-2","volume":"70","author":"J Cheng","year":"2018","unstructured":"Cheng, J., Chen, R.L.-Y., Najm, H.N., Pinar, A., Safta, C., Watson, J.-P.: Chance-constrained economic dispatch with renewable energy and storage. Comput. Optim. Appl. 70(2), 479\u2013502 (2018)","journal-title":"Comput. Optim. Appl."},{"issue":"6","key":"624_CR14","doi-asserted-by":"publisher","first-page":"6755","DOI":"10.1109\/TPWRS.2018.2829175","volume":"33","author":"B Basciftci","year":"2018","unstructured":"Basciftci, B., Ahmed, S., Gebraeel, N.Z., Yildirim, M.: Stochastic optimization of maintenance and operations schedules under unexpected failures. IEEE Trans. Power Syst. 33(6), 6755\u20136765 (2018). https:\/\/doi.org\/10.1109\/TPWRS.2018.2829175","journal-title":"IEEE Trans. Power Syst."},{"key":"624_CR15","doi-asserted-by":"publisher","first-page":"58788","DOI":"10.1109\/ACCESS.2020.2982183","volume":"8","author":"X Lou","year":"2020","unstructured":"Lou, X., Feng, C., Chen, W., Guo, C.: Risk-based coordination of maintenance scheduling and unit commitment in power systems. IEEE Access 8, 58788\u201358799 (2020)","journal-title":"IEEE Access"},{"key":"624_CR16","doi-asserted-by":"publisher","first-page":"379","DOI":"10.1007\/s10589-015-9813-x","volume":"64","author":"Y Cao","year":"2016","unstructured":"Cao, Y., Laird, C.D., Zavala, V.M.: Clustering-based preconditioning for stochastic programs. Comput. Optim. Appl. 64, 379\u2013406 (2016)","journal-title":"Comput. Optim. Appl."},{"key":"624_CR17","doi-asserted-by":"publisher","first-page":"637","DOI":"10.1007\/s10589-016-9851-z","volume":"65","author":"W Ackooij","year":"2016","unstructured":"Ackooij, W., Frangioni, A., Oliveira, W.: Inexact stabilized benders\u2019 decomposition approaches with application to chance-constrained problems with finite support. Comput. Optim. Appl. 65, 637\u2013669 (2016)","journal-title":"Comput. Optim. Appl."},{"issue":"2","key":"624_CR18","doi-asserted-by":"publisher","first-page":"461","DOI":"10.1007\/s10589-020-00179-x","volume":"76","author":"G Lan","year":"2020","unstructured":"Lan, G., Zhou, Z.: Algorithms for stochastic optimization with function or expectation constraints. Comput. Optim. Appl. 76(2), 461\u2013498 (2020)","journal-title":"Comput. Optim. Appl."},{"issue":"2","key":"624_CR19","doi-asserted-by":"publisher","first-page":"759","DOI":"10.1016\/j.ejor.2006.11.018","volume":"184","author":"SP Canto","year":"2008","unstructured":"Canto, S.P.: Application of Benders\u2019 decomposition to power plant preventive maintenance scheduling. Eur. J. Oper. Res. 184(2), 759\u2013777 (2008). https:\/\/doi.org\/10.1016\/j.ejor.2006.11.018","journal-title":"Eur. J. Oper. Res."},{"issue":"6","key":"624_CR20","doi-asserted-by":"publisher","first-page":"6883","DOI":"10.1109\/TPWRS.2018.2833465","volume":"33","author":"B Odetayo","year":"2018","unstructured":"Odetayo, B., Kazemi, M., MacCormack, J., Rosehart, W.D., Zareipour, H., Seifi, A.R.: A chance constrained programming approach to the integrated planning of electric power generation, natural gas network and storage. IEEE Trans. Power Syst. 33(6), 6883\u20136893 (2018). https:\/\/doi.org\/10.1109\/TPWRS.2018.2833465","journal-title":"IEEE Trans. Power Syst."},{"issue":"4","key":"624_CR21","doi-asserted-by":"publisher","first-page":"2528","DOI":"10.1109\/TPWRS.2018.2889237","volume":"34","author":"G Dalal","year":"2019","unstructured":"Dalal, G., Gilboa, E., Mannor, S., Wehenkel, L.: Chance-constrained outage scheduling using a machine learning proxy. IEEE Trans. Power Syst. 34(4), 2528\u20132540 (2019). https:\/\/doi.org\/10.1109\/TPWRS.2018.2889237. arXiv:1801.00500","journal-title":"IEEE Trans. Power Syst."},{"issue":"5","key":"624_CR22","doi-asserted-by":"publisher","first-page":"686","DOI":"10.1049\/iet-gtd.2018.5887","volume":"13","author":"C Wang","year":"2019","unstructured":"Wang, C., Wang, Z., Wang, J., Hou, Y.: Chance-constrained maintenance scheduling for interdependent power and natural gas grids considering wind power uncertainty. IET Gener. Transm. Distrib. 13(5), 686\u2013694 (2019). https:\/\/doi.org\/10.1049\/iet-gtd.2018.5887","journal-title":"IET Gener. Transm. Distrib."},{"key":"624_CR23","doi-asserted-by":"publisher","first-page":"427","DOI":"10.1016\/j.epsr.2014.07.010","volume":"116","author":"Y Huang","year":"2014","unstructured":"Huang, Y., Zheng, Q.P., Wang, J.: Two-stage stochastic unit commitment model including non-generation resources with conditional value-at-risk constraints. Electr. Power Syst. Res. 116, 427\u2013438 (2014). https:\/\/doi.org\/10.1016\/j.epsr.2014.07.010","journal-title":"Electr. Power Syst. Res."},{"issue":"9","key":"624_CR24","doi-asserted-by":"publisher","first-page":"1261","DOI":"10.1287\/mnsc.1040.0201","volume":"50","author":"GJ Alexander","year":"2004","unstructured":"Alexander, G.J., Baptista, A.M.: A comparison of var and cvar constraints on portfolio selection with the mean-variance model. Manage. Sci. 50(9), 1261\u20131273 (2004). https:\/\/doi.org\/10.1287\/mnsc.1040.0201","journal-title":"Manage. Sci."},{"key":"624_CR25","doi-asserted-by":"publisher","DOI":"10.1007\/s10898-018-0708-0","author":"Z Huang","year":"2019","unstructured":"Huang, Z., Zheng, Q.P., Pasiliao, E., Boginski, V., Zhang, T.: A cutting plane method for risk-constrained traveling salesman problem with random arc costs. J. Glob. Optim. (2019). https:\/\/doi.org\/10.1007\/s10898-018-0708-0","journal-title":"J. Glob. Optim."},{"issue":"4","key":"624_CR26","doi-asserted-by":"publisher","first-page":"1919","DOI":"10.1287\/ijoc.2022.1177","volume":"34","author":"Z Huang","year":"2022","unstructured":"Huang, Z., Zheng, Q.P., Liu, A.L.: A nested cross decomposition algorithm for power system capacity expansion with multiscale uncertainties. INFORMS J. Comput. 34(4), 1919\u20131939 (2022). https:\/\/doi.org\/10.1287\/ijoc.2022.1177","journal-title":"INFORMS J. Comput."},{"key":"624_CR27","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1007\/s10107-010-0365-7","volume":"124","author":"M Fischetti","year":"2010","unstructured":"Fischetti, M., Salvagnin, D., Zanette, A.: A note on the selection of benders\u2019 cuts. Math. Program. 124, 175\u2013182 (2010)","journal-title":"Math. Program."},{"key":"624_CR28","unstructured":"IIT: Index of data Illinois Institute of Technology. http:\/\/motor.ece.iit.edu\/data\/ (2003)"}],"container-title":["Computational Optimization and Applications"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10589-024-00624-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10589-024-00624-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10589-024-00624-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,11,28]],"date-time":"2025-11-28T10:28:00Z","timestamp":1764325680000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10589-024-00624-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,11,8]]},"references-count":28,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2025,12]]}},"alternative-id":["624"],"URL":"https:\/\/doi.org\/10.1007\/s10589-024-00624-1","relation":{},"ISSN":["0926-6003","1573-2894"],"issn-type":[{"value":"0926-6003","type":"print"},{"value":"1573-2894","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,11,8]]},"assertion":[{"value":"5 November 2023","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"24 October 2024","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"8 November 2024","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}