{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,6]],"date-time":"2026-10-06T04:51:00Z","timestamp":1791262260026,"version":"4.1.0"},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2015,4,22]],"date-time":"2015-04-22T00:00:00Z","timestamp":1429660800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Constraints"],"published-print":{"date-parts":[[2015,7]]},"DOI":"10.1007\/s10601-015-9192-z","type":"journal-article","created":{"date-parts":[[2015,4,21]],"date-time":"2015-04-21T07:53:11Z","timestamp":1429602791000},"page":"304-324","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":24,"title":["A hybrid exact method for a scheduling problem with a continuous resource and energy constraints"],"prefix":"10.1007","volume":"20","author":[{"given":"Margaux","family":"Nattaf","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Christian","family":"Artigues","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Pierre","family":"Lopez","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2015,4,22]]},"reference":[{"issue":"1","key":"9192_CR1","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/j.ijpe.2010.09.030","volume":"143","author":"C Artigues","year":"2013","unstructured":"Artigues, C., Lopez, P., & Ha\u00eft, A. (2013). The energy scheduling problem: industrial case-study and constraint propagation techniques. International Journal of Production Economics, 143(1), 13\u201323.","journal-title":"International Journal of Production Economics"},{"key":"9192_CR2","doi-asserted-by":"crossref","unstructured":"Artigues, C., & Lopez, P. Energetic reasoning for energy-constrained scheduling with a continuous resource. Journal of Scheduling. doi: 10.1007\/s10951-014-0404-y .","DOI":"10.1007\/s10951-014-0404-y"},{"key":"9192_CR3","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-1479-4","volume-title":"Constraint-based scheduling","author":"P Baptiste","year":"2001","unstructured":"Baptiste, P., Le Pape, C., & Nuijten, W. (2001). Constraint-based scheduling. Boston\/Dordrecht\/London: Kluwer Academic Publishers."},{"key":"9192_CR4","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-04363-9","volume-title":"Scheduling computer and manufacturing processes","author":"J BlaZewicz","year":"2001","unstructured":"BlaZewicz, J., Ecker, K.H., Pesch, E., Schmidt, G., & Weglarz, J. (2001). Scheduling computer and manufacturing processes. Berlin\/Heidelberg: Springer-Verlag."},{"issue":"1-4","key":"9192_CR5","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1023\/B:ANOR.0000030682.25673.c0","volume":"129","author":"J BlaZewicz","year":"2004","unstructured":"BlaZewicz, J., Machowiak, M., Weglarz, J., Kovalyov, M., & Trystram, D. (2004). Scheduling malleable tasks on parallel processors to minimize the makespan. Annals of Operations Research, 129(1-4), 65\u201380.","journal-title":"Annals of Operations Research"},{"issue":"9","key":"9192_CR6","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1109\/TC.1979.1675432","volume":"28","author":"JL Bentley","year":"1979","unstructured":"Bentley, J.L., & Ottmann, T.A. (1979). Algorithms for reporting and counting geometric intersections. IEEE Transactions on Computers, 28(9), 643\u2013647.","journal-title":"IEEE Transactions on Computers"},{"key":"9192_CR7","unstructured":"Bonifas, N. (2014). Fast propagation for the energy reasoning. In Doctoral program of the 20th international conference on principles and practice of constraint programming (CP) (pp. 16\u201322)."},{"issue":"3","key":"9192_CR8","first-page":"311","volume":"25","author":"J Carlier","year":"1991","unstructured":"Carlier, J., & Latapie, B. (1991). Une m\u00e9thode arborescente pour r\u00e9soudre les probl\u00e8mes cumulatifs. RAIRO Recherche op\u00e9rationnelle, 25(3), 311\u2013340.","journal-title":"RAIRO Recherche op\u00e9rationnelle"},{"key":"9192_CR9","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1007\/978-3-319-10428-7_22","volume":"8656","author":"A Derrien","year":"2014","unstructured":"Derrien, A., & Petit, T. (2014). A new characterization of relevant intervals for energetic reasoning. Principles and practice of constraint programming. Lecture Notes in Computer Science, 8656, 289\u2013297.","journal-title":"Lecture Notes in Computer Science"},{"issue":"3","key":"9192_CR10","doi-asserted-by":"crossref","first-page":"568","DOI":"10.1016\/j.ejor.2009.09.019","volume":"203","author":"C-U F\u00fcndeling","year":"2010","unstructured":"F\u00fcndeling, C.-U., & Trautmann, N. (2010). A priority-rule method for project scheduling with work-content constraints. European Journal of Operational Research, 203(3), 568\u2013574.","journal-title":"European Journal of Operational Research"},{"key":"9192_CR11","unstructured":"Erschler, J., & Lopez, P. (1990). Energy-based approach for task scheduling under time and resources constraints. In 2nd international workshop on project management and scheduling (pp. 115\u2013121). Compi\u00e8gne, France."},{"key":"9192_CR12","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1007\/978-1-4615-5533-9_13","volume-title":"Project scheduling: recent models, algorithms, and applications","author":"J J\u00f3zefowska","year":"1999","unstructured":"J\u00f3zefowska, J., Mika, M., R\u00f3Zycki, R., Walig\u00f3ra, G., & Weglarz, J. (1999). Project scheduling under discrete and continuous resources. In Weglarz, J. (Ed.) Project scheduling: recent models, algorithms, and applications (pp. 289\u2013308). Boston: Kluwer Academic Publishers."},{"key":"9192_CR13","doi-asserted-by":"crossref","first-page":"515","DOI":"10.1007\/s10107-004-0551-6","volume":"103","author":"T Kis","year":"2005","unstructured":"Kis, T. (2005). A branch-and-cut algorithm for scheduling of project with variable-intensity activities. Mathematical Programming Series A, 103, 515\u2013539.","journal-title":"Mathematical Programming Series A"},{"issue":"1","key":"9192_CR14","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/j.cor.2009.12.011","volume":"38","author":"O Kon\u00e9","year":"2011","unstructured":"Kon\u00e9, O., Artigues, C., Lopez, P., & Mongeau, M. (2011). Event-based MILP models for resource-constrained project scheduling problems. Computers & Operations Research, 38(1), 3\u201313.","journal-title":"Computers & Operations Research"},{"key":"9192_CR15","doi-asserted-by":"crossref","first-page":"335","DOI":"10.1016\/j.ejor.2014.05.036","volume":"239","author":"A Naber","year":"2014","unstructured":"Naber, A., & Kolisch, R. (2014). MIP models for resource-constrained project scheduling with flexible resource profiles. European Journal of Operational Research, 239, 335\u2013348.","journal-title":"European Journal of Operational Research"},{"key":"9192_CR16","unstructured":"Naber, A., & Kolisch, R. (2014). A continuous time model for the resource-constrained project scheduling with flexible resource profiles. In Proceedings of the 14th international conference on project management and scheduling (pp. 166\u2013168). Munich, Germany."},{"key":"9192_CR17","unstructured":"Nattaf, M., Artigues, C., & Lopez, P. (2014). A polynomial satisfiability test using energetic reasoning for energy constraint scheduling. In 14th international workshop on project management and scheduling (pp. 169\u2013172). Munich, Germany."},{"key":"9192_CR18","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/j.ejor.2010.03.037","volume":"208","author":"J Weglarz","year":"2009","unstructured":"Weglarz, J., J\u00f3zefowska, J., Mika, M., & Walig\u00f3ra, G. (2009). Project scheduling with finite or infinite number of activity processing modes - A survey. European Journal of Operational Research, 208, 177\u2013205.","journal-title":"European Journal of Operational Research"}],"container-title":["Constraints"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10601-015-9192-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10601-015-9192-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10601-015-9192-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T19:14:18Z","timestamp":1559243658000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10601-015-9192-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,4,22]]},"references-count":18,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2015,7]]}},"alternative-id":["9192"],"URL":"https:\/\/doi.org\/10.1007\/s10601-015-9192-z","relation":{},"ISSN":["1383-7133","1572-9354"],"issn-type":[{"value":"1383-7133","type":"print"},{"value":"1572-9354","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,4,22]]}}}