{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,20]],"date-time":"2024-08-20T07:12:12Z","timestamp":1724137932223},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2008,3,15]],"date-time":"2008-03-15T00:00:00Z","timestamp":1205539200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc\/2.0"},{"start":{"date-parts":[[2008,3,15]],"date-time":"2008-03-15T00:00:00Z","timestamp":1205539200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc\/2.0"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Discrete Event Dyn Syst"],"published-print":{"date-parts":[[2008,9]]},"DOI":"10.1007\/s10626-008-0038-3","type":"journal-article","created":{"date-parts":[[2008,3,14]],"date-time":"2008-03-14T13:34:10Z","timestamp":1205501650000},"page":"355-383","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":11,"title":["Throughput-Optimal Sequences for Cyclically Operated Plants"],"prefix":"10.1007","volume":"18","author":[{"given":"Eckart","family":"Mayer","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Utz-Uwe","family":"Haus","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"J\u00f6rg","family":"Raisch","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Robert","family":"Weismantel","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2008,3,15]]},"reference":[{"issue":"1\u20132","key":"38_CR1","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/S0098-1354(03)00171-6","volume":"28","author":"A Alle","year":"2004","unstructured":"Alle A, Papageorgiou L, Pinto J (2004) A mathematical programming approach for cyclic production and cleaning scheduling of multistage continuous plants. Comput Chem Eng 28(1\u20132):3\u201315","journal-title":"Comput Chem Eng"},{"key":"38_CR2","unstructured":"Bertsimas D, Weismantel R (2005) Optimization over integers. Dynamic Ideas, Belmont"},{"key":"38_CR3","doi-asserted-by":"crossref","unstructured":"Brucker P (2004) Scheduling algorithms. Springer","DOI":"10.1007\/978-3-540-24804-0"},{"issue":"1","key":"38_CR4","doi-asserted-by":"publisher","first-page":"144","DOI":"10.1109\/70.660860","volume":"14","author":"H Chen","year":"1998","unstructured":"Chen H, Chu C, Proth J-M (1998) Cyclic scheduling of a hoist with time window constraints. IEEE Trans Robot Autom 14(1):144\u2013152","journal-title":"IEEE Trans Robot Autom"},{"key":"38_CR5","doi-asserted-by":"publisher","first-page":"97","DOI":"10.1023\/A:1018995317468","volume":"96","author":"Y Crama","year":"2000","unstructured":"Crama Y, Kats V, van\u00a0de Klundert J, Levner E (2000) Cyclic scheduling in robotic flowshops. Ann Oper Res 96:97\u2013124","journal-title":"Ann Oper Res"},{"issue":"4","key":"38_CR6","doi-asserted-by":"publisher","first-page":"307","DOI":"10.1002\/jos.100","volume":"5","author":"N Hall","year":"2002","unstructured":"Hall N, Lee T-E, Posner M (2002) The complexity of cyclic shop scheduling problems. J Sched 5(4):307\u2013327","journal-title":"J Sched"},{"key":"38_CR7","unstructured":"ILOG (2006) ILOG CPLEX. http:\/\/www.ilog.com\/products\/cplex\/"},{"issue":"1","key":"38_CR8","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1016\/j.compchemeng.2004.07.007","volume":"29","author":"I Karimi","year":"2004","unstructured":"Karimi I, Tan Z, Bhushan S (2004) An improved formulation for scheduling an automated wet-etch station. Comput Chem Eng 29(1):217\u2013224","journal-title":"Comput Chem Eng"},{"issue":"1","key":"38_CR9","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1023\/A:1008123115577","volume":"12","author":"T-E Lee","year":"2000","unstructured":"Lee T-E (2000) Stable earliest starting schedules for cyclic job shops: a linear system approach. Int J Flex Manuf Syst 12(1):59\u201380","journal-title":"Int J Flex Manuf Syst"},{"issue":"1","key":"38_CR10","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1287\/opre.45.1.72","volume":"45","author":"T-E Lee","year":"1997","unstructured":"Lee T-E, Posner M (1997) Performance measures and schedules in periodic job shops. Oper Res 45(1):72\u201391","journal-title":"Oper Res"},{"issue":"1\u20133","key":"38_CR11","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1016\/S0166-218X(98)00054-7","volume":"87","author":"E Levner","year":"1998","unstructured":"Levner E, Kats V (1998) A parametric critical path problem and an application for cyclic scheduling. Discrete Appl Math 87(1\u20133):149\u2013158","journal-title":"Discrete Appl Math"},{"issue":"3","key":"38_CR12","doi-asserted-by":"publisher","first-page":"500","DOI":"10.1016\/S0377-2217(96)00272-X","volume":"97","author":"E Levner","year":"1997","unstructured":"Levner E, Kats V, Levit V (1997) An improved algorithm for cyclic flowshop scheduling in a robotic cell. Eur J Oper Res 97(3):500\u2013508","journal-title":"Eur J Oper Res"},{"key":"38_CR13","unstructured":"Mayer E (2007) Globally optimal schedules for cyclic systems with non-blocking specification and time window constraints. PhD\u00a0Thesis, Fachgebiet Regelungssysteme, Technische Universit\u00e4t Berlin, Germany."},{"key":"38_CR14","unstructured":"Mayer E, Raisch J (2003) Throughput-optimal scheduling for cyclically repeated processes. MMAR2003\u20149th IEEE international conference on methods and models in automation and robotics. Miedzyzdroje, Poland, pp 871\u2013876"},{"issue":"2\u20133","key":"38_CR15","doi-asserted-by":"publisher","first-page":"181","DOI":"10.1016\/j.matcom.2003.11.004","volume":"66","author":"E Mayer","year":"2004","unstructured":"Mayer E, Raisch J (2004) Time-optimal scheduling for high throughput screening processes using cyclic discrete event models. MATCOM\u2014Math Comput Simul 66(2\u20133):181\u2013191","journal-title":"MATCOM\u2014Math Comput Simul"},{"issue":"2","key":"38_CR16","doi-asserted-by":"publisher","first-page":"135","DOI":"10.1002\/jos.95","volume":"5","author":"M Middendorf","year":"2002","unstructured":"Middendorf M, Timkovsky VG (2002) On scheduling cycle shops: classification, complexity and approximation. J Sched 5(2):135\u2013169","journal-title":"J Sched"},{"issue":"5","key":"38_CR17","doi-asserted-by":"publisher","first-page":"295","DOI":"10.1002\/(SICI)1098-2728(1996)8:5<295::AID-LRA6>3.0.CO;2-W","volume":"8","author":"C Murray","year":"1996","unstructured":"Murray C, Anderson C (1996) Scheduling software for high-throughput screening. Lab Robot Autom 8(5):295\u2013305","journal-title":"Lab Robot Autom"},{"issue":"6","key":"38_CR18","doi-asserted-by":"publisher","first-page":"455","DOI":"10.1016\/0191-2615(96)00005-7","volume":"30B","author":"M Odijk","year":"1996","unstructured":"Odijk M (1996) A constraint generation algorithm for the construction of periodic railway timetables. Transp Res Part B\u2014Methodol 30B(6):455\u2013464","journal-title":"Transp Res Part B\u2014Methodol"},{"key":"38_CR19","unstructured":"Parker R (1995) Deterministic scheduling theory. Chapman & Hall"},{"key":"38_CR20","unstructured":"Pinedo M (1995) Scheduling: theory, algorithms, and systems. Prentice Hall"},{"issue":"9","key":"38_CR21","doi-asserted-by":"publisher","first-page":"797","DOI":"10.1016\/0098-1354(93)E0021-Z","volume":"18","author":"J Pinto","year":"1994","unstructured":"Pinto J, Grossmann I (1994) Optimal cyclic scheduling of multistage continuous multiproduct plants. Comput Chem Eng 18(9):797\u2013816","journal-title":"Comput Chem Eng"},{"key":"38_CR22","doi-asserted-by":"publisher","first-page":"433","DOI":"10.1023\/A:1018929829086","volume":"81","author":"J Pinto","year":"1998","unstructured":"Pinto J, Grossmann I (1998) Assignment and sequencing models for the scheduling of process systems. Ann Oper Res 81:433\u2013466","journal-title":"Ann Oper Res"},{"issue":"4","key":"38_CR23","doi-asserted-by":"crossref","first-page":"842","DOI":"10.1287\/moor.17.4.842","volume":"17","author":"R Roundy","year":"1992","unstructured":"Roundy R (1992) Cyclic schedules for job shops with identical jobs. Math Oper Res 17(4):842\u2013865","journal-title":"Math Oper Res"},{"issue":"4","key":"38_CR24","doi-asserted-by":"publisher","first-page":"291","DOI":"10.1023\/A:1020911406530","volume":"14","author":"J-W Seo","year":"2002","unstructured":"Seo J-W, Lee T-E (2002) Steady-state analysis and scheduling of cyclic job shops with overtaking. Int J Flex Manuf Syst 14(4):291\u2013318","journal-title":"Int J Flex Manuf Syst"},{"issue":"1\u20134","key":"38_CR25","doi-asserted-by":"publisher","first-page":"193","DOI":"10.1007\/BF02023176","volume":"42","author":"N Shah","year":"1993","unstructured":"Shah N, Pantelides C, Sargent R (1993) Optimal periodic scheduling of multipurpose batch plants. Ann Oper Res 42(1\u20134):193\u2013228","journal-title":"Ann Oper Res"}],"container-title":["Discrete Event Dynamic Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10626-008-0038-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10626-008-0038-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10626-008-0038-3.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10626-008-0038-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,8,31]],"date-time":"2021-08-31T19:36:00Z","timestamp":1630438560000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10626-008-0038-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,3,15]]},"references-count":25,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2008,9]]}},"alternative-id":["38"],"URL":"https:\/\/doi.org\/10.1007\/s10626-008-0038-3","relation":{},"ISSN":["0924-6703","1573-7594"],"issn-type":[{"value":"0924-6703","type":"print"},{"value":"1573-7594","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,3,15]]},"assertion":[{"value":"28 November 2005","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"24 January 2008","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 March 2008","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}